Issuu on Google+

QATestLab 21, Garmatna str., Kiev, Ukraine ph.: +38(044)277-66-61 http://qatestlab.com/ contact@qa-testlab.com

To manage the quality assurance activities and to provide practical chances of quantifiable quality  betterment, it is necessary to conduct:

Quality Planning Quality planning before quality assurance activities is conducted in the pre­QA activities in software  quality engineering. We need to set the general quality purpose by managing client’s quality anticipations under the project  cost and budget. It is necessary to choose specific quality assurance alternatives and methods to perform as well as  measurement and models to provide project monitoring and qualitative feedback.

Quality Quantification and Improvement Such activities as measurement, analysis, feedback need to be performed after the beginning of  specific quality assurance activities, in the so­called post­QA activities in software quality engineering. With the help of analyses we can make quantitative estimation of product quality, and identification of  betterment occasions. The follow­up actions would carry out quality and process betterment initiatives and help us to reach  quantifiable quality betterment.

(c) QATestLab, 2011  

http://qatestlab.com/                     


How Can We Reach Quantifiable Quality Improvement?