Page 4

KINERJA 2013

KEY PERFORMANCE 2013

KINERJA LINGKUNGAN

ENVIRONMENTAL PERFORMANCE 1. Realisasi biaya pengelolaan lingkungan tahun 2013:

1. Cost realization of environmental management in 2013:

- Biaya aktivitas pelestarian alam mencapai Rp455,57 juta, antara lain dimanfaatkan untuk pengadaan 1.000 bibit pohon pucuk merah untuk penghijauan wilayah kota Pontianak, penghijauan sebanyak 8.050 bibit pohon (bibit sengon, bibit buah-buahan, bibit bakau/mangrove, bibit jati babon, bibit gaharu, bibit trembesi, mahoni) di sejumlah lokasi. - Biaya Studi Kelayakan dan Amdal mencapai Rp608,24 juta. - Biaya Pilot project produksi pupuk hayati BioN13 berbasis limbah cair mencapai Rp228.181.200,-

- Cost for natural preservation activities reached Rp455.57 million, among others were used for 1,000 red bud tree seeds for greening the Pontianak City, greening of 8,050 tree seeds (silk tree seeds, fruit seeds. Mangrove seeds, teak seeds, aloes seeds, rain tree seeds, and mahogany seeds) in number of location - Cost for Feasibility Study and Environmental Impact Analysis (EIA) reached Rp608.24 million - Cost for Pilot Project of liquid waste-based bio fertilizer production BioN13 reached Rp228,181,200.

2. Dalam rangka efisiensi dan penghematan energi, PTPN XIII telah memanfaatkan biodiesel produk sendiri untuk operasional pabrik dan kendaraan di unit usaha. Untuk meningkatkan kapasitas UPB dari 6.000 liter/ hari menjadi 20.000 liter/hari, selama tahun 2013 PTPN XIII telah melaksanakan revamping kapasitas oleh PT. Bioenergi Pratama Jaya. Commissioning telah dilakukan pada 2 februari 2014 untuk UPB di PMS Samuntai. (G4EN7)

2. In context of energy efficiency and saving, PTPN XIII has took advantage of own product biodiesel for mill operational and transportation in business unit. To enhance the BPU capacity from 6,000 liter/day into 20,000 liter/day, during 2013 PTPN XIII has carried out the capacity revamping performed by PT Bioenergi Pratama Jaya. Commissioning has been performed on 2 February 2014 for UPB in POM Samuntai. (G4-EN7)

3. PTPN XIII melakukan inisiatif untuk mengurangi efek GRK antara lain melalui (G4-EN18):

3. PTPN XIII performs initiative to reduce GHG effect include by (G4-EN18):

- Pembukaan lahan baru dengan sistem zeroburn. - Peremajaan tanaman dengan sistem under-planting dan tidak membakar tonggak tanaman tua. - Pemakaian biodiesel produk sendiri untuk operasional pabrik dan transportasi. - Memeriksa secara rutin emisi gas buang kendaraan bermotor secara berkala. - Memasang dust collector di cerobong pabrik.

- New land clearance using zeroburn system - Replanting using under-planting system and not burning the old stake plant - The use of own-product biodiesel for the mill operation and transportation - Examine routinely the vehicle exhaust emission gradually - Install the dust collector in mill chimney.

PTPN XIII > Laporan Keberlanjutan 2013

3

Sustaiable report n13 2013  

PTPN 13 Sustaiable TAHUN 2013

Sustaiable report n13 2013  

PTPN 13 Sustaiable TAHUN 2013

Advertisement