Page 1

C o mpl e t i o n

2008 S i z e /Sc o p e

21,500 sq.ft. addition P r o j e c t c o st

$6.2 million

Pool Addition Mas o n P u b l i c S c h o o l s n 8-lane

competition pool

n Shallow n Deep

end for full water polo competition

end and diving well separated by moveable bulk head

n Elevated n Kalwall

spectator seating for 450 people

windows for natural light

n Technology—Colorado

timing system, projection scoreboard, cameras for diving and starting blocks

n Six

locker rooms—one family, two community pool, two PE, and one varsity

n Offices

and storage

n Energy-efficient n Economic n Highly n Pool

lighting and mechanical systems

and durable finish materials

durable and low maintenance flooring in locker room and corridor

entry and parking lot improvements

n Epoxy

floors in locker rooms and tile in the showers

n New

family locker room with areas for changing, showering, and personal item storage

n Physical

Education locker rooms with access to both the pool deck and the gymnasium

Separate entry to the pool for community use

Mason Pool  
Read more
Read more
Similar to
Popular now
Just for you