Page 1

C o mpl e t i o n

2008 S i z e /Sc o p e

21,500 sq.ft. addition P r o j e c t c o st

$6.2 million

Pool Addition Mas o n P u b l i c S c h o o l s n 8-lane

competition pool

n Shallow n Deep

end for full water polo competition

end and diving well separated by moveable bulk head

n Elevated n Kalwall

spectator seating for 450 people

windows for natural light

n Technology—Colorado

timing system, projection scoreboard, cameras for diving and starting blocks

n Six

locker rooms—one family, two community pool, two PE, and one varsity

n Offices

and storage

n Energy-efficient n Economic n Highly n Pool

lighting and mechanical systems

and durable finish materials

durable and low maintenance flooring in locker room and corridor

entry and parking lot improvements

n Epoxy

floors in locker rooms and tile in the showers

n New

family locker room with areas for changing, showering, and personal item storage

n Physical

Education locker rooms with access to both the pool deck and the gymnasium

Separate entry to the pool for community use

Mason Pool  
Mason Pool  
Advertisement