GROUP PROJECT A BIKE SHELTER FOR SHEFFIELD

C R O S S OV E R


WE ENTERED A COMPETITION AS A GROUP OF FOUR FROM TRADA, ENCOURAGING THE USE OF TIMBER TO CREATE A LARGE BICYCLE STORAGE FACILITY WITHIN A MOUNTAIN BIKE TRAIL PARK IN SHEFFIELD. THIS WAS TO INCLUDE A CAFE, COMMUNITY SPACE, BIKE WORKSHOPS AND STORAGE FOR A THOUSAND BIKES. SMALLER BIKE HUBS THAT ARE SCATTERED AROUND SHEFFIELD WERE ALSO PART OF THE DESIGN. THE BRIEF WAS VERY OPEN ENDED WITH NO MEASUREMENT RESTRICTIONS OF VOLUMES GIVEN.

SITE ANALYSIS IT WAS DIFFICULY TO ANALYSE THE SITE IN THE FIRST WEEK AS IT WAS TOO FAR AWAY FOR US TO VISIT. WE RESEARCHED EXISTING BICYCLE ROUTES WITHIN PARKWOOD SPRINGS AND ON A WIDER SCALE THROUGH SHEFFIELD, ACCESS POINTS, CURRENT SPORTS FACILITIES AND OUTDOOR AREAS SURROUNDING THE SITE. WE PRODUCED A LARGE A0 MAPS SHOWING THIS ALONG WITH VISTAS AND VIEWS OF AND FROM THE SITE. THIS REALLY HELPED WITH UNDERSTANDING THE TOPOGRAPHY AND CONTEXT OF THE SITE.

50


DESIGN ANALYSIS

GROUND FLOOR PLAN

VIEWING PLATFORM PLAN

51


52


53


3. C O M M U N I T Y S P A C E On the South East of the Building sits the community space; a multifunctional area used for indoor sports and functions. Placed next to the cafe/kitchen it allows for easy access to catering facilities and includes shower/changing facilities. The reception also connects to this, monitoring who enters and leaves.

4. B I K E W O R K S H O P Both ends of the bike storage include a bike workshop, oering spare parts and repairs. The windows frame the equipment and look in to the bike storage for security,

section elevation accross path 54

5. V I E W I N G P L A T F O R M Resting above the whole building, the platform frames views of SheďŹƒeld as well as down in to the activity of the building.

ELEVATION OF BIKE STORAGE AND SECTION THROUGH VIEW PLATFORM


section of activity

SHORT SECTION SHWOING ACTIVITY WITHIN EACH OF THE SPACES.