Issuu on Google+

Deadend Assembly per Staking Sheet

4&5

8

7 1 2

3

Ungrounded Wye - Center Tap Delta A B C H1 1

H2 H1

X3 X2

X1

X3

H2 H1

X2

X1

X3

H2

5&6 Strap for every 5' of conduit in meter loop

Stand-offs not required on 200A service

4

X1 X2

a b c N

200A

15' MIN to Customer Disconnect

66" Min 72" Max To Center of Meter

Ground per RUS standard H1.1

Finished Grade 1. All clearances and protective devices to be in conformance to the most stringent requirements of either the NESC, NEC or other codes of governmental or regulating authorities as applicable. 2. If length of conduit exceeds 10 feet, coupling is permited on end adjacent to meter. 3. Guy pole as required. 4. For every additional 5' length on meter loop add 20' of wire to the installation.

MATERIALS LISTING ITEM DESCRIPTION QTY 10' DL QTY 15' DL UNIT 1 2/0 Copper THHN (195A Rating) Phase and Neutral 100 120 Ft. 2 2/0 Terminal Adapter (Pigtail) 5 5 Ea. 3 2" Weatherhead 1 1 Ea. 4 2" Conduit 10 15 Ea. 5 2" Straps 2 3 Ea. 6 1/4" x 2 1/2" Lag Bolt 6 8 Ea. 7 7T 200A 3 Phase Meter Box w/Disconnect 1 1 Ea. 8 Form 16S/15S Class 200 120-480V 4-Wire 3Ă˜ Meter 1 1 Ea. 120/240V 200A Closed Delta Self Contained Service Design Parameters: 4-Wire Down Loop Mounted on Transformer Pole > See design notes above. > *Loop length per staking sheet.

5/12/2008

Rev .0

PREC # 3130 9011 8220-2 8030 9160-2 9109 9186

Q3.1-02PSC*