Issuu on Google+

January 30, 2013


Create special contract that contains competitive rates for Cam-Plex  

Protect PRECorp from stranded investment should the City Annex the Cam-Plex 

Utilize meter consolidation to reduce monthly fixed charges Address impacts of MBD and demand ratchet due to varying nature of load

There is a large portion of existing URD cable that is nearing the end of its useful life and may need to be replaced in the near future. Consider working with the City to ultimately provide a redundant power supply to the Cam-Plex that take advantage of system additions.

Bring back a proposal that is mutually beneficial to the parties


2013-01-30-cam-plex-proposal-principles