Page 1

The Sliver

MINI CABIN + LARGE CABIN


Mini Cabin Looking North West

Mini Cabin Looking North East

02

POWDER MOUNTAIN MINI CABIN


Mini Cabin Looking South East

Mini Cabin Looking North West

03


KITCHEN

HOOD ABOVE GAS COOK TOP

DINING

LIVING BE D

TV GAS F.P.

CL.

3' GUARD RAILING

3'-4"x8'

UP DOWN

4'

BATH

EN

UP

SINK

AREA CALCULATION

W/D

388 sqft

UPPER LEVEL FLOOR PLAN

360 sqft

LOWER LEVEL FLOOR PLAN

84 sqft

MECH. ROOM

40 sqft

TOTAL HEATED LIVING AREA TOTAL AREA GROSS SQUARE FOOTAGE UNHEATED GARAGE

748 sqft 872 sqft 1166sqft sqft 294

D/W R.F. HOOD ABOVE GAS COOK TOP

KITCHEN

CL.

DINING

LIVING BE D

TV GAS F.P.

MAIN LEVEL FLOOR PLAN

3' GUARD RAILING

Mini Cabin Main Level Floor Plan

AREA CALCULATION

04

POWDER MOUNTAIN MINI CABIN

COVERED ENTRY

DOWN

3'x8'

OP

RAILING

3'

SHOWER

MAIN LEVEL FLOOR PLAN

388 sqft

UPPER LEVEL FLOOR PLAN

360 sqft

LOWER LEVEL FLOOR PLAN

84 sqft

MECH. ROOM

40 sqft

TOTAL HEATED AREA

872 sqft

UNHEATED GARAGE

294 sqft


LIVING BE D

BE D

4'-9"

BATH 3'

OP E

N

CL.

3'

3'x7'

4'-9"

N

SHOWER

BATH

OP RAILING E

CL.

TV GAS F.P.

LIVING

TV GAS F.P.

DINING

3'x7'

3'x7'

D/W D/W W/D R.F. R.F. HOOD ABOVE HOOD ABOVE KITCHEN GAS KITCHEN COOK TOP GAS COOK TOP

CL.

DINING

RAILING

3'x7'

DOWN

DOWN

SINK

3'x7'

UP

SHOWER

3'-4"x8'

3'

DOWN 3'-4"x8'

RAILING

DOWN

RAILING

N

COVERED ENTRY

N

SINK W/D

UP

PE

W

3'x8'

EN

COVERED ENTRY O

O

BATH

3'x8'

UP

OP

D

UP

N

4'

W

BATH

SHOWER

O

4'

D

3'

SHOWER

CL. 3'x7'

JR. MASTER JR. MASTER BEDROOM BEDROOM

3' GUARD RAILING 3' GUARD RAILING

Mini Cabin Lower Level Floor Plan

Mini Cabin Upper Level Floor Plan

AREA CALCULATION AREA CALCULATION 388 sqft MAIN LEVEL MAIN FLOOR LEVEL PLANFLOOR PLAN

388 sqft

UPPER LEVEL UPPER FLOOR LEVEL PLANFLOOR360 PLAN sqft

360 sqft

LOWER LEVEL LOWER FLOOR LEVEL PLANFLOOR84 PLAN sqft

84 sqft

MECH. ROOMMECH. ROOM

40 sqft

40 sqft

TOTAL HEATED TOTAL AREA HEATED AREA872 sqft

872 sqft

UNHEATED GARAGE UNHEATED GARAGE 294 sqft

294 sqft

05


1X4 VERTICAL SHIPLAP WOOD CLADDING

+20'-5 5/8"

10'-9"

10'-9" 10'-2 7/8" 10'-2 7/8" 10'-2 7/8" 10'-2 7/8"

1X4 VERTICAL SHIPLAP WOOD CLADDING

+20'-5 5/8" UPPER LEVEL TOP OF PLYWOOD

+10'-2 7/8"

UPPER LEVEL TOP OF PLYWOOD

+10'-2 7/8"

MAIN LEVEL TOP OF PLYWOOD

[±0'-0"] +XXXX'-X"

MAIN LEVEL TOP OF PLYWOOD

[±0'-0"] +XXXX'-X"

GARAGE / LOWER LEVEL TOP OF SLAB

-10'-9"

GARAGE / LOWER LEVEL TOP OF SLAB

VERTICAL 6" BOARD-FORMED CONCRETE

-10'-9"

VERTICAL 6" BOARD-FORMED CONCRETE

Mini Cabin South Building Elevation

10'-9"

10'-9" 10'-2 7/8" 10'-2 7/8" 10'-2 7/8" 10'-2 7/8"

+20'-5 5/8"

+20'-5 5/8" UPPER LEVEL TOP OF PLYWOOD

+10'-2 7/8"

UPPER LEVEL TOP OF PLYWOOD

+10'-2 7/8"

MAIN LEVEL TOP OF PLYWOOD

[±0'-0"] +XXXX'-X"

MAIN LEVEL TOP OF PLYWOOD

[±0'-0"] +XXXX'-X"

GARAGE / LOWER LEVEL TOP OF SLAB

-10'-9"

GARAGE / LOWER LEVEL TOP OF SLAB

-10'-9"

Mini Cabin West Building Elevation

06

POWDER MOUNTAIN MINI CABIN


LADDING

+20'-5 5/8"

1X4 VERTICAL SHIPLAP WOOD CLADDING

+20'-5 5/8"

LADDING

GARAGE / LOWER LEVEL TOP OF SLAB

10'-9" 10'-2 7/8" 10'-2 7/8" 10'-2 7/8" 10'-2 7/8"

GARAGE / LOWER LEVEL TOP OF SLAB

10'-9"

+20'-5 5/8" UPPER LEVEL TOP OF PLYWOOD

+10'-2 7/8"

UPPER LEVEL TOP OF PLYWOOD

+10'-2 7/8"

MAIN LEVEL TOP OF PLYWOOD

[±0'-0"] +XXXX'-X"

MAIN LEVEL TOP OF PLYWOOD

[±0'-0"] +XXXX'-X"

1X4 VERTICAL SHIPLAP WOOD CLADDING

-10'-9"

RMED CONCRETE

-10'-9"

+20'-5 5/8"

UPPER LEVEL TOP OF PLYWOOD

+10'-2 7/8"

UPPER LEVEL TOP OF PLYWOOD

+10'-2 7/8"

MAIN LEVEL TOP OF PLYWOOD

[±0'-0"] +XXXX'-X"

MAIN LEVEL TOP OF PLYWOOD

[±0'-0"] +XXXX'-X"

GARAGE / LOWER LEVEL TOP OF SLAB

-10'-9"

GARAGE / LOWER LEVEL TOP OF SLAB

-10'-9"

RMED CONCRETE

Mini Cabin North Building Elevation

UPPER LEVEL TOP OF PLYWOOD

+10'-2 7/8"

UPPER LEVEL TOP OF PLYWOOD

+10'-2 7/8"

MAIN LEVEL TOP OF PLYWOOD

[±0'-0"] +XXXX'-X"

MAIN LEVEL TOP OF PLYWOOD

[±0'-0"] +XXXX'-X"

GARAGE / LOWER LEVEL TOP OF SLAB

-10'-9"

GARAGE / LOWER LEVEL TOP OF SLAB

10'-2 7/8" 10'-2 7/8" 10'-9" 10'-2 7/8" 10'-2 7/8"

+20'-5 5/8"

1X4 VERTICAL SHIPLAP WOOD CLADDING

1X4 VERTICAL SHIPLAP WOOD CLADDING

10'-9"

+20'-5 5/8"

+20'-5 5/8"

+20'-5 5/8"

UPPER LEVEL TOP OF PLYWOOD

+10'-2 7/8"

UPPER LEVEL TOP OF PLYWOOD

+10'-2 7/8"

MAIN LEVEL TOP OF PLYWOOD

[±0'-0"] +XXXX'-X"

MAIN LEVEL TOP OF PLYWOOD

[±0'-0"] +XXXX'-X"

GARAGE / LOWER LEVEL TOP OF SLAB

-10'-9"

GARAGE / LOWER LEVEL TOP OF SLAB

VERTICAL 6" BOARD-FORMED CONCRETE

-10'-9"

-10'-9"

VERTICAL 6" BOARD-FORMED CONCRETE

Mini Cabin East Building Elevation

C

C

07


Large Cabin Looking North West

Large Cabin Looking North East

08

POWDER MOUNTAIN LARGE CABIN


Large Cabin Looking South East

Large Cabin Looking North West

09


WI

LIVING D BE

OP E

N

BALCONY

UP

BATH

SHOWER

3' GUARD RAILING

3'x8'

UPPER LEVEL FLOOR PLAN

490 sqft

LOWER LEVEL FLOOR PLAN MECH. ROOM

99 sqft 70 sqft

LIVING D BE

OP E

N

TOTALHEATED LIVING AREA TOTAL AREA GROSS SQUARE FOOTAGE UNHEATED GARAGE

DOWN GARAGE FOYER UP

644 sqft

GAS F.P.

MAIN LEVEL FLOOR PLAN

R.F.

KITCHEN/ DINING

WINE

AREA CALCULATION

W/D laundry

SINK

D/W

BUILD-IN CLOSET

HOOD ABOVE GAS COOK TOP

1134 1303 sqft sqft

BALCONY

UP

1783 sqft 480 sqft 3' GUARD RAILING

Large Cabin Main Level Floor Plan AREA CALCULATION

010

POWDER MOUNTAIN LARGE CABIN

MAIN LEVEL FLOOR PLAN

644 sqft

UPPER LEVEL FLOOR PLAN

490 sqft

LOWER LEVEL FLOOR PLAN MECH. ROOM

99 sqft 70 sqft

TOTAL HEATED AREA

1303 sqft

UNHEATED GARAGE

480 sqft


3' GUARD RAILING

5'

COVERED ENTRY

3' GUARD RAILING

3' GUARD RAILING

BOARDWALK ENTRY

DOWN

3'x7'

RAILING

RAILING DOWN DOWN

BATH 3'x7'

3'x7'

3'x7'

RAILING

JR. MASTER BEDROOM

UP

RAILING

GLASS WALL OP E

OP E

N

RAILING

3 4 1 2

3'x7'

SHELVES SHOWER

SHOWER

3'x7'

GLASS WALL

FOYER

OP E

N

RAILING

3'x8'

N

FOYER 3'-4"x8'

OP E

N

3'x8'

ALCONY 16'x9'

LOFT / BACK SIDE FOYER

3'x7'

BATH

JR. MASTER BEDROOM UP

3 4 1 2

480,4 sq ft

UP

DOWN GARAGE FOYER

(2,5) CAR GARAGE

LOFT / BACK3'-4"x8' SIDE FOYER

BUNK 3'x7' IN D- ED IL B BEDROOM BU UNK B

' 2'-4"x7

480,4 sq ft

HEATING 90% + BOILER

3'x8'

BUNK IN D- ED IL B BEDROOM BU UNK B

' 2'-4"x7

(2,5) CAR GARAGE

UP

MECH.

HEATING 90% + BOILER

3'x8'

5 6 7 8 9 10 11 12 13 14 15 16 17 18

2'-6" x 6'-6"

70,0 sq ft

drain

drain

MECH.

UP

STORAGE

5 6 7 8 9 10 11 12 13 14 15 PANEL 16 17 18 ELECTRICAL

STORAGE

ELECTRICAL PANEL 2'-6" x 6'-6"

SHELVES

3'-4"x8'

ENTRY 16'x9'

UP 3'-4"x8'

ENTRY

LOWER LEVEL FLOOR PLAN

Large Cabin Lower Level Floor Plan

UPPER LEVEL FLOOR PLAN

Large Cabin Upper Level Floor Plan

011


1X4 VERTICAL SHIPLAP WOOD CLADDING

+21'-3 7/8"

1X4 VERTICAL SHIPLAP WOOD CLADDING

10'-8 1/2"

10'-8 1/2"

+21'-3 7/8"

UPPER LEVEL TOP OF PLYWOOD +10'-7 3/8" LEVEL UPPER TOP OF PLYWOOD

10'-7 3/8"

10'-7 3/8"

+10'-7 3/8"

MAIN LEVEL TOP OF PLYWOOD MAIN+XXXX'-X" LEVEL [±0'-0"] TOP OF PLYWOOD

GARAGE / LOWER LEVEL GARAGE / TOP OF SLAB LOWER LEVEL -10'-9" TOP OF SLAB

10'-9"

10'-9"

[±0'-0"] +XXXX'-X"

VERTICAL 6" BOARD-FORMED CONCRETE -10'-9"

1 3.1

SOUTH BUILDING ELEVATION VERTICAL 6" BOARD-FORMED CONCRETE SCALE 1 SOUTH BUILDING ELEVATION Large Cabin South Building Elevation

3.1

0 2 4

SCALE 8

0 2 4

8

+21'-3 7/8"

10'-8 1/2"

10'-8 1/2"

+21'-3 7/8"

UPPER LEVEL TOP OF PLYWOOD +10'-7 3/8" LEVEL UPPER TOP OF PLYWOOD

10'-7 3/8"

10'-7 3/8"

+10'-7 3/8"

MAIN LEVEL TOP OF PLYWOOD MAIN+XXXX'-X" LEVEL [±0'-0"] TOP OF PLYWOOD

3 3.1

NORTH BUILDING ELEVATION 3 NORTH BUILDING ELEVATION

SCALE 3.1

SCALE 0 2 4 8

0 2 North 4 8 Building Elevation Large Cabin

012

POWDER MOUNTAIN LARGE CABIN

GARAGE / LOWER LEVEL GARAGE / TOP OF SLAB LOWER LEVEL -10'-9" TOP OF SLAB

10'-9"

10'-9"

[±0'-0"] +XXXX'-X"

-10'-9"

4 3.1


10'-8 1/2"

+21'-3 7/8"

OOD OOD

8"

UPPER LEVEL LEVEL UPPER TOP OF OF PLYWOOD PLYWOOD TOP

10'-7 3/8"

+10'-7 3/8"

OOD OOD

+XXXX'-X"

LLC

S CANDINAVIA N

ING ING

/8"

MAIN MAIN LEVEL LEVEL TOP OF OF PLYWOOD PLYWOOD TOP

[±0'-0"] +XXXX'-X"

ARCHITECTURAL ARCHITECTURAL OFFICE OFFICE Company Company Name Name

Scandinavian Scandinavian LLC LLC

10'-9"

Address Address

6410 6410 N. N. Business Business Park Park Loop Loop Rd. Rd. Unit Unit EE

GARAGE // GARAGE LOWER LEVEL LEVEL LOWER TOP OF OF SLAB SLAB TOP

-10'-9"

435-513-0355 435-513-0355

Phone Phone Fax Fax Project Project No. No. Cad Cad File File Drawn Drawn

RETE RETE

Checked Checked

WEST BUILDING ELEVATION

SCALE Large Cabin West Building Elevation 8

1X4 1X4 VERTICAL VERTICAL SHIPLAP SHIPLAP WOOD WOOD CLADDING CLADDING

+21'-3 7/8"

10'-8 1/2"

21'-3 7/8"

LEVEL LEVEL PLYWOOD PLYWOOD

Summit Powder Mountain Summit Pass, Utah

0 2 4

A New Residence: LARGE CABIN

2 3.1

UPPER LEVEL LEVEL UPPER TOP TOP OF OF PLYWOOD PLYWOOD

+10'-7 3/8"

10'-7 3/8"

10'-7 3/8"

EVEL EVEL PLYWOOD PLYWOOD

MAIN MAIN LEVEL LEVEL TOP TOP OF OF PLYWOOD PLYWOOD

[±0'-0"] +XXXX'-X"

[±0'-0"] +XXXX'-X"

10'-9"

BUILDER BUILDER

E E // LEVEL LEVEL SLAB SLAB

Company Company Name Name

GARAGE // GARAGE LOWER LEVEL LEVEL LOWER TOP TOP OF OF SLAB SLAB

-10'-9"

-10'-9"

Address Address

Park Park City, City, Utah Utah 84098 84098 Phone Phone Fax Fax

VERTICAL VERTICAL 6" 6" BOARD-FORMED BOARD-FORMED CONCRETE CONCRETE

4 3.1

EAST BUILDING ELEVATION SCALE 0 2 4

Large Cabin East Building Elevation 8

Drawing Drawing Date Date

06-26-2018 06-26-2018 3/16" 3/16" == 1' 1' -0" -0"

Scale Scale Title/No. Title/No.

BUILDING ELEVATIONS BUILDER/ BUILDER/ DEALER'S DEALER'SAPPROVAL APPROVAL ::

Signature Signature and and Date Date

C C

COPYRIGHT COPYRIGHT 2018 2018

THIS THIS DRAWING DRAWING AND AND ALL ALL INFORMATION INFORMATION CONTAINED CONTAINED HEREIN HEREIN IS IS THE THE EXCLUSIVE EXCLUSIVE PROPERTY PROPERTY OF OF SCANDINAVIAN SCANDINAVIAN LLC. LLC. IS IS NOT NOT TO TO BE BE COPIED COPIED OR OR USED USED IN IN ANY ANY WAY WAY WITHOUT WITHOUT THE THE EXPRESS EXPRESS WRITTEN WRITTEN CONSENT CONSENT OF OF SCANDINAVIAN SCANDINAVIAN LLC LLC AND AND MUST MUST BE BE RETURNED RETURNED UPON UPON REQUEST. REQUEST.

3.1

013


The Sliver - Mini Cabin + Large Cabin  
The Sliver - Mini Cabin + Large Cabin