Page 57

IMPROVE ACCESS

e St

1

Can yon

SW Park Pl

3. New trailhead parking on Fischer Lane for Footbridge Over Burnside. 4. Shuttle, school bus, ride share and passenger drop-off moved to Lot C. Requires a new entrance just north of the TriMet MAX Station and new layout for the existing parking lot.

SW Jeff er so n St

5. Short-term accessible parking and drop-off in the Gardens to replace the existing tennis courts.

od

SW Sh e

Kin gs to

2

o rw

To Goose Hollow / SW Jefferson St MAX

6. Surface parking lot at soccer field to replace on-street parking on lower SW Sherwood and SW Kingston Ave. Approx 170 spaces. 7. South Entry Garden Plaza and auto and ride share drop-off zone in Lot B. 8. When Portland Children’s Museum relocates, a new parking lot adjacent to Lot A will allow the number of existing spaces in the South Entry Zone to be maintained, and will provide access to the Museum’s nature play area, Outdoor Adventure, which will become a public amenity.

6

n Dr

lvd wB e i v SW Fair SW

2. Paid parking and improvements to existing trailhead parking areas on SW Kingston; close informal parking areas not associated with trails or connected to sidewalks.

To Kings Hill / SW Salmon St MAX

Int’l Rose Test Garden

2 SW

1. Parking and shuttle turnaround at Stevens Pavilion for Hoyt Arboretum.

ar

SW Rose

Portland Japanese Garden

Hoyt Arboretum

Projects

ay en W d r St e Ga

Blvd

Ln SW Fis c her

5

3

PARKING

ns

SW Kingston Ave

SW

W Burnsid er Dr Tichn

K t gh ni

s

Blv

2

d

World Forestry Center

Lot C

7

4

Lot B

Oregon Zoo

Lot A Expanded Lot A

PARKING

8

Phase 1 Parking Phase 2 Parking

N

wy 26

U.S. H

Phase 3 Parking

2800’ 1400’ 700’ WASHINGTON PARK MASTER PLAN UPDATE - DRAFT, NOVEMBER 2017

350’

0’ 57

Washington Park Master Plan Update - November 2017 Draft  
Washington Park Master Plan Update - November 2017 Draft