Prospekt+SIL+CREST+ENG1

Page 1

“Sil Crest” Residential Development Via Alpsu, Sedrun


Restaurants 33 35 36 37 38 39 40 44

Las Palas Restaurant Café Dulazi Alpsu/ Passhöhe Restaurant Bahnhofbuffet Restaurant Valtgeve Restaurant Milaz Restaurant Sudada Restaurant Golf Clubhouse

Discos/ Bars 4 5 8 41 42 43

La Siala Bar, Hotel La Val Mac Lounge & Music Bar, Hotel Mira Disco Pub, Hotel Oberalp Disco Mad Peanuts Music Cafe Fravia Bar

Tourist infrastructure ÜBERBAUUNG SIL CREST

1 2 3 4 5 6 8 9 10 11 13 15 16 17 18 19 20 21 22 23 25

SDT Information Center Train stations/ train stops Public parking Medical doctor Passenger transport to scenic outlooks (Tgorn, Milaz) Bogn Sedrun/ Aqua Wellness Oasis Sedrun cable cars, Dieni base station Trash pick-up site Skating/ curling rink Campfire spot Selva Golf Course Children’s playground Kiosk Tgorn aerial cable car La Truaisch Museum Ski- and snowboarding schools Oberalp ski lift Valtgeva ski lift/ Valtgeva Snow Park Gas stations Public telephones Tennis courts Fitness trail Soccer field Badminton court Changing cabin for cross-country skiers

Public buildings/ services 1 2 3 4 6 7 8 9 10 12 13 14 15 16 17 18 19

Senior living facility Assembly hall Bakeries Banks/ATMs (no ATMs in Rueras) Village church Electronics stores Municipal government/ Police station Alp Transit Gotthard Information Center Cheese dairies Grocery stores Butcher shops Post offices School house Sporting goods stores Sports hall Public restrooms Casa Soldanella holiday resortv


10.655

7.58

13.65

4.10

4.645

15.30

3.86

13.15

House B

13.715

13.65 12.23

15.30

House A

4.02

SIL CREST DEVELOPMENT, SEDRUN

8.08

4.355 10.65

13.15

3.735

4.09

SCALE = 1: 500


Basement 10 7.23 m2

Basement 9 7.20 m2

Basement 8 7.40 m2

Basement 2 9.98 m2

P3

Basement 11 7.74 m2

Basement 1 10.83 m2

P2

Basement 7 7.43 m2

P1

HEATING SYSTEM LAUNDRY ROOM 9.91 m2

VA 75

Garage

P4

Basement 3 8.87 m2

P6

P7

P8

Basement 5 8.83 m2

Garage Entryway

Basement 4 8.65 m2

P5

Basement 6 8.89 m2

P9

P10

11

BASEMENT / GARAGE SIL CREST DEVELOPMENT, SEDRUN

SCALE = 1: 200


3.945

Bedroom 1 12.00 m2

Bath/ toilet 4.50 m2

Bath/ toilet 4.50 m2

Kitchen 5.20 m2

Kitchen 5.20 m2

Bedroom 2 13.25 m2

2

Bedroom 2 13.25 m2 13.655

Hallway 2.40 m2

Living/Dining Room 29.65 m2

Shower/ toilet 3.65 m2

Bedroom 1 12.00 m2

15.30

15.30

Closet 4.50 m2 Hallway 2.40 m2

Closet 4.50 m2

1

Seating area

Shower/ toilet 3.65 m2

Seating area

Bedroom 1 12.00 m2 Closet 4.50 m2

Closet 4.50 m2

Hallway 2.40 m2 Bath/ 6 toilet 2 4.55 m

Bath/ toilet 4.55 m2

Kitchen 5.20 m2

Seating area

Kitchen 5.20 m2

13.65 13.65

10.645

12.285

7.58

4.355

10.65

13.65

10.655

Seating area

Balcony 14.10 m2

Balcony 14.10 m2

SILCREST DEVELOPMENT, SEDRUN

Living/Dining Room 29.65 m2

Balcony 11.90 m2

Balcony 11.90 m2

FIRST FLOOR HOUSE A

7

Living/Dining Room 29.65 m2

Living/Dining Room 29.65 m2

4.02

Bedroom 2 13.25 m2

15.30

3.735

Bedroom 1 12.00 m2

4.645

13.15

Shower/ toilet 3.65 m2

Shower/ toilet 3.65 m2

Bedroom 2 13.25 m2

25

7.58

4.10

25

13.15

3.86

4.09

FIRST FLOOR HOUSE B SCALE = 1: 200


Shower/ toilet 3.65 m2

Shower/ toilet 3.65 m2 Bedroom 1 12.00 m2 Bedroom 2 13.25 m2

Shower/ toilet 3.65 m2 Bedroom 1 12.00 m2

Closet 4.50 m2 Hallway 2.40 m2

3

Bath/ toilet 4.50 m2

Kitchen 5.20 m2 Living/Dining Room 28.95 m2

Closet 4.50 m2 Hallway 2.40 m2 Bath/ toilet 4.50 m2

Bedroom 2 13.25 m2

Shower/ toilet 3.65 m2

Bedroom 1 12.00 m2 Bedroom 2 13.25 m2

Bedroom 1 12.00 m2 Closet 4.50 m2 Hallway 2.40 m2

8

4

Bath/ toilet 4.55 m2

Kitchen 5.60 m2

Kitchen 5.20 m2 Living/Dining Room 29.00 m2 Living/Dining Room 29.65 m2

Closet 4.50 m2 Hallway 2.40 m2 Bath/ toilet 4.55 m2

Bedroom 2 13.25 m2

9

Kitchen 5.20 m2

Living/Dining Room 29.35 m2 Balcony 11.90 m2

Balcony 14.10 m2

SECOND FLOOR HOUSE A SIL CREST DEVELOPMENT, SEDRUN

Balcony 11.90 m2

Balcony 14.10 m2

SECOND FLOOR HOUSE B SCALE = 1: 200


SILCREST DEVELOPMENT, SEDRUN

FLOOR PLANS


Bedroom 1 11.72 m2 Bedroom 2 11.32 m2

Bedroom 2 11.32 m2 Hallway 5.78 m2

5

Hallway 5.78 m2 Bath/Toilet 5.85 m2

Kitchen 4.95 m2 Living/ Dining Room 32.80 m2

Balcony 8.75 m2

THIRD FLOOR HOUSE A SIL CREST DEVELOPMENT, SEDRUN

Bedroom 1 11.72 m2

10

Bath/Toilet 5.85 m2

Kitchen 4.95 m2 Living/ Dining Room 32.80 m2

Balcony 8.75 m2

THIRD FLOOR HOUSE B SCALE = 1: 200


2.069

2.85

2.07

30

30 2.85

DG

OG

EG

EG

Grenze

OG

2.26

44

2.35

32

Grenze

2.35

20

DG

UG

HOUSE A Section A-A SILCREST DEVELOPMENT, SEDRUN

Garage

UG

HOUSE B Section A-A SCALE = 1 : 200


Property line SIL CREST DEVELOPMENT, SEDRUN

Property line

OG

2.35

32

2.49

2.26

44

HOUSE A Section B-B

4

20

2.26

30

20

2.35

32

DG

EG

Garage

Exist

ing t errai

n

SCALE = 1: 200


HOUSE A South Elevation SILCREST DEVELOPMENT, SEDRUN

HOUSE B South Elevation SCALE = 1 : 200


HOUSE A North Elevation SIL CREST DEVELOPMENT, SEDRUN

HOUSE B North Elevation SCALE = 1: 200


HOUSE A West Elevation

HOUSE A East Elevation

SILCREST DEVELOPMENT, SEDRUN

SCALE = 1 : 200


HOUSE B West Elevation

HOUSE B East Elevation

SIL CREST DEVELOPMENT, SEDRUN

SCALE = 1: 200


SILCREST DEVELOPMENT, SEDRUN

PANORAMIC VIEWS OF PARCEL


SIL CREST DEVELOPMENT, SEDRUN

PERSPECTIVE SKETCH


Construction Information “Sil Crest” Development Via Alpsu, 7188 Sedrun, Graubuenden, Switzerland Parcel No.’s 999 and 1000

Introduction This construction information is intended to give a general overview of the planned development and its construction. The materials and their intended use sites will be itemized in the execution plan specifications. The drawings of furniture and cabinets are renderings of possible furnishing configurations and are not to be considered a component of the construction information.

Residences House A:

Plot area: Parcels 999 and 1000

1291 m2

Residences House B:

No. 1 + 2

First floor

3 ½ rooms 2 bedrooms, 2 baths, kitchen, living/dining room, balcony, outdoor sitting area

No. 3 + 4

Second floor

3 ½ rooms 2 bedrooms, 2 baths, kitchen, living/dining room, balcony

No. 5

Third floor

2 ½ rooms (can later be refitted to 3 ½ rooms) 1 bedroom, 1 bath, kitchen, living/dining room, balcony

Lower level

Basement, heating system, communal laundry room, parking spaces and single-car garages

No. 6 + 7

First floor

3 ½ rooms 2 bedrooms, 2 baths, kitchen, living/dining room, balcony, outdoor sitting area

No. 3 + 4

Second floor

3 ½ rooms 2 bedrooms, 2 baths, kitchen, living/dining room, balcony

No. 5

Third floor

2 ½ rooms (can be expanded to 3 ½ rooms) 1 bedroom, 1 bath, kitchen, living/dining room, balcony

Lower level

Basement, heating system, communal laundry room, parking spaces and single-car garages

Garden: walkways and sitting areas in interlocking pavers/ greenery and regionally appropriate landscaping according to architect’s recommendations


0

Overview Comments on construction information The following building plan encompasses all scheduled activities of the construction project as foreseen by and deemed necessary to the project’s structural engineering and construction. Any items not mentioned in this information are not component parts of the construction plan or within the scope of this description. Additionally, this construction information shall also serve as a valid supplement to the architectural project plans. The construction execution plan is in keeping with the following standards: -

- -

all applicable mandatory provisions of public law, particularly with regards to local-, health-, construction- and fire-related ordinances, which are known and applicable up to this point of construction permitting and licensing, are accommodated for. possible regulatory requirements pertaining to building and construction permits the construction permit building plans are the definitive plans for its construction.

1

Site preparation

10

Surveys, physiographic studies

101

Existing land-use studies Land use surveys of buildable land/building sites, infrastructure (thoroughfare studies, underground cables, utility connections and neighboring construction and facilities) are available through the builder.

11

Site preparation

111

Clearing the site Removal of existing plants, including root removal

13

Overall construction site configuration

Only sound, proven and tested materials will be used. The buyer has a say in the selection of interior fittings to the extent that the status of the project allows (countertops, plasterwork, choice of colors, appliances, etc.)

131/211 Construction site configuration Overall construction site configuration, including designated areas for materials storage and parking.

The right to make changes in building plans, construction description and execution which do not compromise the quality of build is reserved until construction has been completed. The architect’s and specialists’ definitive execution plans shall be the deciding factors for its execution.

135/211 Provisional installations Provisions for drainage, electric and water during the construction process.

The interior finishes and color themes will be established by the architect in conjunction with the buyer’s personal preferences. The exterior appearance and color themes will be determined by the architect.

136

Energy, water etc. costs Estimated costs for water, electric etc. during the construction process.

15/16 Modifications to existing utility infrastructures Upon completion of Houses A + B: clean-up, repair of any damages to and restoration of any local public infrastructure which may have been damaged or adversely affected as a result of the construction activity, or its related equipment.


20

Excavation

201

Excavated material

201.1 Earthworks Top soil removal. Sequence of the excavation activities; including access roads, ramps and sites, foundation pits, grading, removal of excavation material, foundation excavations, trench excavating and backfilling for underground plumbing, etc., drainage, possible foundation and trench groundwater drainage, pumps, sedimentation tanks, disposal of excess soil and excavation materials, backfill with appropriate materials and compacting and tamping of soil and backfill between excavation embankments and structures. 21

Structural Works 1

211

Building site management

211.0 Configuration of construction sites Configuration of construction site; including machinery and equipment, accommodations and storerooms, power and other necessary utility connections. Establishment of delivery, setup, reconfiguration and removal of temporary safety fences and enclosures. 211.1 Scaffolding All necessary scaffolding and safety scaffolding. 211.2 External sealing and waterproofing Combiflex strips used as needed to seal sill plate or wall plate joints. Bitumen sealant and sheet membrane applied to the external walls. Garage roof sealed with bitumen rolls. 211.3 Contractor excavations (see also sec. 201.1) Excavation and backfilling for underground plumbing, water and electrical connections to houses. Final grading/ expansion of foundation pits as needed, etc.

211.4 Interior water and sewage lines Sewage and drainage PVC piping as per local regulations. Subsoil drainage piping and drainage mats in basement and subterranean garage areas. Cement sewer shafts as per architectural plans Areaway drainage for hard surface coverings. 211.5 Concrete and reinforced concrete works Concrete foundation slab 20 cm strength, BH PC kg/m3 300, reinforced, with sealant Substratum concrete BN PC kg/m2 150, 5-10 cm strength Concrete walls, 20 cm strength, B 35/25, PB 300 kg/m3 reinforced with sealant Concrete exterior stairs Concrete B 35/25, PC 300 kg/m3, 20 to 30 cm strength, reinforced, dimensions of concrete works available through the contracted construction/ masonry engineer 211.6 Masonry Exterior walls: Brick walls (MBN) of standard bricks, 15 or 17.5 cm strength, thermally insulating Interior load-bearing walls: Brick walls (MBN) of standard bricks, 12.5 15 or 17.5 cm strength. Dwelling separation walls between houses: Double- partition noise insulating wall, with mineral fiber insulation board between the partitions Partition MBN 15 cm Insulation 4 cm Partition MBN 15 cm Chimney: Incoming- and outgoing air ducts as per fire regulations Up to above the rooftop: Schiedel chimney products to be used Chimney enclosures in conformance with local guidelines Interior basement walls: Walls made of sand-lime brick KS 12 or 15 cm strength Brick walls 12.5 or 15 cm strength


214

Carpentry and millwork

214.1 Carpentry work Construction of roof: Gable roof; roof beams and rafters made of planed solid wood or glue-laminated timber. Visible roof ceiling wood paneling mm20, with or without bevels. Planed spruce/ pine. 22

Structural Works 2

221.0 Windows, exterior doors and gates 221.0 Wood-framed windows Windows in the living areas: Noise-insulating windows framed in pinewood, painted or varnished, with rubber seals IV-glass, glass U-value 1.1 V/m2K 221.6 Metal exterior doors and gates House entry doors: Exterior doors made of insulated wood, triple locks including cylinder lock and fittings. Rubber seals. Garage gate: Fully automatic, remote-controlled steel entry gate with derived timber product planking. As per architect’s design. 222

224

Sheet metal work Guttering, chimney enclosures, roof runoff pipes, ventilation made of copper sheet metal .6 mm Roofing works Baffle Mineral fiber insulation wool 12 to 14 cm, as per architectural plans Sub-roof Ventilation, battens Clay brick or Eternit roof tiles

225

Special weatherstripping and insulation

225.1 Joint seals Seals between different construction components and closures, as well as between different construction materials 225.2 Special insulation materials 12 cm thermal insulation adhered to all subterranean surfaces with cold bitumen adhesive, filter mats (Sickermatte). Floor-to-wall joints protected with sealing strips. Subsurface garage roof is protected and sealed against incoming moisture with bitumen rolls. Bitumen sealant and sheet membrane applied to the external walls. 226

Lathing and plastering

226.2 Stucco insulation: Stucco insulated with polystyrol EPS 12 to 14 cm. First coat with reinforcing mesh. Colored silicate finishing coat to 2 mm coarseness, second reinforcing mesh coat in basement area. 227

Exterior surface finishes

227.1 Exterior finishes Color schemes are to be established by the architect during the course of construction. Woodwork will be either painted or clear-coated with veneer in accordance with architect’s color scheme. Wooden construction in the projecting roof will retain its natural color. Metal constructions: primer and resin coating House entry doors and gates will be painted. 228

Window treatments

228.2 Blinds: Motor-operated aluminum vertical blinds, blind width approx. 90 mm, for living area windows. Basement area windows will not be outfitted with window treatments.


23

Electrical

230

Electrical installation Electrical main service switch with separate conduits and meters for each house Light fixture wiring, 3-pronged outlets, switches and hookups. Telephone, cable or satellite TV hookup in living room and master bedroom. Individual installation of customized security systems available on special request.

233

Shower/toilet: wall basin hot/cold combination faucet mirror cabinet wall toilet specific fixtures and fittings to be determined by builder in agreement with the buyer 258

Lighting and lamps Exterior lighting as per the architect’s recommendations Electrical installations exterior to the building as per the architectural plan

Kitchen: Cabinet panels outfitted in Multiplex real wood. Stainless steel door and drawer handles. Rubbish concealer with trash sorter. Fitted shelving for pans and bottles. Work surfaces: Backsplash: Appliances: (ChromLine)

granite, Africano nero or similar granite, Africano nero or similar installed self-cleaning oven glass ceramic cooking surface stove installable refrigerator with freezer drawers dishwasher range hood kitchen materials to be determined by builder in agreement with buyer.

24

Radiant heating, ventilation, air conditioning systems

240

Heating, ventilation systems Heating Geothermal (ground-source) heat pump, dimensions obtainable from the contracted professional. Specific type, brand and style have not yet been determined. Heat distribution Floor heating with adjustable zone controls

27

Finishing Construction 1

25

Sanitary facilities

271

Plaster work

250

Installation of sanitary facilities Laundry room: Communal laundry room Washing trough with cold and hot water hookups Washer and dryer Bathroom: Bathtub 175 X 135/70, white Bathroom furniture combination Bathroom sink vanity Wall mirror

271.0 Finish coats All interior walls in the living areas and bedrooms to be treated with plaster coat and mineralized, pre-tinted 1 mm finish coat. Edge trim, structure of finish coat and color to be determined by buyer’s specifications. Basement walls finished in paint-ready white Q2 coat.


272

Metal work

272.2 Overall metal work (metalworker construction) Stairway handrails and balustrades: powder-coated galvanized steel finish. Balustrades to be fitted according to respective requirements of corresponding structures. 273

Carpenter and joiner work

273.0 Interior wooden doors Basement doors Smooth medium-strength double wing doors with paintable surfaces. Handles and protective plates made of aluminum alloy. Fire-retardant doors (El 30) as per building permit specifications. Room doors Smooth, medium-strength double wing veneer doors with profile packing. Surfaces are not meant to be painted. Real wood, varnished door leaves. Without Planetdichtung (profile packing?).

281.6 Tile floor coverings Bulk order, incl. MWST, incl. tile work CHF/m2 90.00 Living areas: Kitchen, hallways: natural or ceramic tiles Bath and shower: natural or ceramic tiles Bedroom: natural or ceramic tiles Adjacent areas: Laminate flooring, CHF/m2 58.00 Outdoor sitting areas, walkways partially made of granite tiles 282

Wall coverings

282.3 Tile wall coverings Bulk order, incl. MWST, incl. tile work CHF/m2 90.00 Bath and shower: natural or ceramic tile, up to height of door frame 284

Fireplace-fitting Fittings for fireplace and fresh air intake for chimney or oven are available Interior surfaces

28

Finishing Construction 2

285

281

Floor coverings

285.1 Interior painting The architect will establish a color theme during the course of construction. White primed ceilings will be painted white. Basement will be partially painted with cement floor paint. Basement doors will be painted. Interior doors will have be treated with clear veneer or painted. Wood construction will be left in its natural state.

281.0 Subflooring Floating subfloors made of 7 cm cement mortar. First floor: Polystyrol EPS insulation, 6 cm and 2 cm Impact noise absorption, Polystyrol with aluminum coating (eg: Metalplast T/SE) Third floor: Polystyrol EPS insulation, 2 cm and impact noise absorption 2 cm, Polystyrol with aluminum coating (eg: Metalplast T/SE) 281

Jointless floor coverings

281.5 Artificial stone flooring Concrete or composite stone flooring in the garage


286

Construction drying Drying of construction as a provisional measure for the adherence to established deadlines and regulations.

287

Construction clean-up Provisional primary cleaning during construction phase. One-time final cleaning of all rooms, floors, glass surfaces prior to turnover, upon completion of construction.

29

Certificates of payment

291

Architecture Certificate of payment for architectural works and project management

292

Construction engineer Certificate of payment for construction engineering works and site management

293

Electrical engineer Certificate of payment for electrical engineering works

294

Heating and sanitation engineer Certificate of payment for heating, sanitation engineering works

296

Specialists Certificates of payment for all necessary specialists whose services were utilized preparatory to and during the course of construction.

4

Environment

41

Structural and finishing works

411.4 Draining and sewage systems outside the buildings Drainage and sewage pipes led by PVC pipe into the existing public works, wastewater seepage conduits in PVC . 411.5 Exterior retaining walls Retaining walls in reinforced concrete or partially made of quarry stone with or without mortar grouting. 416 Exterior pavements Driveway and forecourt to the garages in asphalt or connecting pavers 42

Gardens

421

Landscaping As per architectural renderings Generalized and detailed landscaping areas to be seeded with grass seeds for lawns Dirt from the excavations to be used for backfills: 1 frost-resistant exterior water outlet and 1 exterior wall socket connected to house Retaining walls in garden area made of concrete

422

Enclosures/fences and balustrades Granite posts with chestnut wood beams or metal balustrades with chrome cables in accordance with building permit specifications.


5

Additional construction-related expenses

General:

51

Licensing, fees

External cladding/features The colors and external finishes of the exterior walls, balconies and outdoor areas will be determined by the architect and/or builders.

511

Licensing, permits (fees) Fees for licensing permits, drainage/sewer system permits, fire permits. Construction permits, fees for inspections, controls and final acceptance of construction work.

512

Utility hookup fees Utility hookup fees (contribution toward network costs) for water and electricity.

52

Samples, models, copies, documentation

521

Samples, trial materials Floor- and wall-covering samples, as well as surface treatments.

524

Photocopies, plan copies Costs of reproductions, plans and blueprints for construction project, project management, construction phases and revisions. Photocopies and copies of plans and blueprints resulting from changes requested by the buyer will be billed to the buyer.

531

Construction period insurance Mandatory insurance premiums for the insurance coverage of the construction site for the duration of the construction period.

532

Special insurances Insurance premiums for civil engineering and construction insurance for completion during the engineering construction period. Premiums for builder’s liability insurance.

9

Furnishings Furnishings will be provided and purchased by the buyers.

Buyer’s requests The customized requests of pre-construction buyers can be accommodated for within the framework of this construction description. Changes and modifications Modifications resulting from a buyer’s wishes are billed separately and are not a condition of this construction description. They can only be accommodated for and agreed to in writing by both parties. Resultant increases in installation/hook-up fees, overall additional expenses as well as increases in professional fees will be the burden of the buyer. Price reductions cannot be given as a result of requested reductions of standard features or subtracted against the addition of other features or modifications. Special requests made by the buyer, including changes in floor plan, are only possible to the degree that these can be implemented within the existing construction and architectural design framework and without damage to the existing construction sequence. The feasibility of such requests will be determined by the project’s draftsman, planners and statisticians. Royalties An additional royalty of 10% of all modifications and additional costs shall be awarded to the architect. Building permits Building permits for the completion of the “Sil Crest” development shall be issued by the Tujetsch municipality.

Sedrun, 6 Jan. 2009


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.