Peregian Springs News July 2021

Page 1

JULY 2021 | VOLUME 6 | ISSUE 10

PEREGIAN SPRINGS

NEWS

INFORM • KNOW • GROW

WALL SIZED ART School wall takes an Emu walking

P3

The old residential sales centre for Peregian Springs has been sold with the new owner keen to clear the block and build a childcare centre for 93 children.

PLANS FOR CHILDCARE PLANS LODGED WITH COUNCIL TO BUILD A CHILDCARE CENTRE IN THE PLACE OF THE OLD SALES CENTRE NEXT TO THE GOLF CLUB CAR PARK AT 2 LONGWOOD DRIVE HAVE BEEN MET WITH A MIXED RESPONSE FROM LOCAL RESIDENTS.

A Material Change of Use application was lodged with Council on May 5 by NorthGroup Consulting which outlines plans for the 2553sqm corner block adjacent to the roundabout. It proposes to remove all existing buildings on the site and replace them with a two-storey Peregian Springs News - July 2021

childcare centre to be operated by Habitat Early Learning from 6.30am to 6.30pm. It will have 27 car parking spaces and a maximum occupancy of 93 children each day aged from six weeks to school age. As the property is in a Local Centre Zone, Council will decide whether or not it goes ahead, without the need for public consultation. A Sunshine Coast Council spokesman said: “the application is code assessable and a childcare centre is a consistent use on the site”.

Continued, page 6

YOUTH FOCUS Project celebrates young people

P14

PRO GOLF Katelyn shares top tips for chipping

P25


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.