Issuu on Google+


PEGAH SHABEHPOUR Selected Professional Works

01


RIDGE POLICE DEPARTMENT EVIDENCE STORAGE 05 | PARK Maemar PC Architects Park Ridge, Illinois, USA

RESIDENCE 13 | LIGGETT Maemar PC Architects Lake Forest, Illinois, USA

TOBACCO FACTORY 17 | PACE Maemar PC Architects Mongla, Bangladesh

CONTENTS

02


PEGAH SHABEHPOUR Chicago, IL | pshabehp@hawk.iit.edu | linkedin.com/in/pshabehpour

Objective To obtain an architectural position within a progressive multidisciplinary firm or organization, utilizing my diverse skill set in digital design, energy consciousness, and landscape architecture.

Experience

Technical Skills

Architectural Intern | Maemar P.C. Architects | Long Grove, IL | 2012-Current

Software

 Assist in the streamlining of the architectural design process from conceptual design through overall completion of projects

Autodesk Revit Architecture Autodesk AutoCAD Architecture Autodesk 3ds Max Design Autodesk Revit MEP Autodesk Ecotect Analysis Autodesk Vitari Autodesk AutoCAD Map 3D IES Gaia Adobe Photoshop Adobe Illustrator Adobe InDesign Adobe Dreamweaver Adobe Premiere Elements Rhinoceros Grasshopper Trimble SketchUp

 Utilize three-dimensional building information modeling using Revit to communicate concepts to the client for approval  Produce construction and permit drawings for various scaled commercial, religious, and public projects using AutoCAD  Prepare measured drawings based on site visits of existing spaces for design development  Create three-dimensional renderings for client presentations using Revit and 3DsMax

Architectural Intern | ICL Interior Architecture, Inc. | Chicago, IL | 2008  Collaborated with both architects and engineers in a ten-person firm to develop solutions for architectural projects  Designed potential iterations of floor plans for the initial stages of projects  Produced drawings for renovations and new construction using AutoCAD  Performed redline changes and revisions of drawings  Projects included office buildings, commercial facilities, and multi-story residential buildings

Education Illinois Institute of Technology | College of Architecture | Chicago, IL Bachelor of Architecture | May 2013 Grade Point Average | 3.52/4.0 Cum Laude

3D Printer Bridgeport Laser Cutter CMC Machine

Specializations

Recognition

Digital Design + Landscape Architecture

 Nominated for the Schiff Foundation Fellowship | 2013

Projects  College of International Relations | Studio | 2013  The Plant: Innovating the Farm of the 21st Century| Interprofessional Project | 2013  95th/Dan Ryan CTA Station | Studio | 2012  Building-Integrated Wind Energy Modules | Interprofessional Project | 2012  Two Apartment Towers on Spire Site | Studio | 2012  Catalytic Waterway: City Transformation in Landscape | Graduate Landscape Studio | 2011  Big Sky Ski Lodge | Studio | 2011  Near North Farmer’s Market | Studio | 2010

03

Digital Fabrication

 Track 1 Winner at IPRO Day for Wind Power and Energy Storage | 2012  Work Published on COA Arch+Fab Portal | 2011-Current  National Society of Leadership and Success | 2011-Current  Work Exhibited at COA Open House | 2010 + 2012

 Bridgeport Library | Studio | 2010

 Dean’s List | 2009 + 2011 + 2012 + 2013

 Graphic Designer’s Studio and House | Studio | 2009

 Heald Scholarship | 2008-2013


Creativity is the ultimate form of expression and to architect is the ultimate form of creativity.

04


PROFESSIONAL

PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE FIRM | MAEMAR PC ARCHITECTS PRINCIPAL | MEHRAN FARAHMANDPOUR TYPOLOGY | GOVERNMENT LOCATION | PARK RIDGE, ILLINOIS YEAR | 2013

05


CITY HALL PARKING LOT

EXISTING BUILDING

PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | Existing Site Plan 1’-0”

10’-0”

20’-0”

1’-0”

10’-0”

20’-0”

CITY HALL PARKING LOT

NEW 1 STORY POLICE EVIDENCE BUILDING

PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | Proposed Site Plan

06


PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | Proposed Floor Plan

07

1 | Typ. Non-Load Bearing Stud Wall

2 | Typ. Non-Load Bearing CMU Wall

1’-0”

5’-0”

10’-0”

3 | Typ. Ext. Load Bearing Wall 1’-0”

5’-0”

10’-0”


PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | West Elevation

PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | North Elevation

PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | East Elevation

PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | South Elevation

1’-0”

5’-0”

10’-0”

1’-0”

5’-0”

10’-0”

1’-0”

5’-0”

10’-0”

1’-0”

5’-0”

10’-0”

08


PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | Foundation Plan

1 | Footing @ Perimeter Wall

4 | Footing @ Interior Wall 09

2 | Footing @ Entrance

1’-0”

5’-0”

10’-0”

3 | Footing @ Perimeter Wall

5 | Footing @ Perimeter Wall

1’-0”

5’-0”

10’-0”


PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | Mechanical Plan

1’-0”

5’-0”

10’-0”

10


PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | RCP/Electrical Plan

DIAGRAM | Electric Riser

11

1’-0”

5’-0”

10’-0”


PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | Plumbing Plan

DIAGRAM | Water Supply

1’-0”

5’-0”

10’-0”

DIAGRAM | Waste/Vent 12


PROFESSIONAL

LIGGETT RESIDENCE FIRM | MAEMAR PC ARCHITECTS PRINCIPAL | MEHRAN FARAHMANDPOUR TYPOLOGY | RESIDENTIAL LOCATION | LAKE FOREST, ILLINOIS YEAR | 2013

15


LIGGETT RESIDENCE | Demolition Plan

LIGGETT RESIDENCE | Second Floor Plan

1’-0”

5’-0”

1’-0”

10’-0”

10’-0”

20’-0”

14


LIGGETT RESIDENCE | Proposed Floor Plan

1’-0”

5’-0”

10’-0”

LIGGETT RESIDENCE | RCP/Electrical Plan

A | Wall Section 1’-0”

15

5’-0”

10’-0”

B| Wall Section

1’-0”

5’-0”

10’-0”


LIGGETT RESIDENCE | West Elevation 1’-0”

5’-0”

10’-0”

1’-0”

5’-0”

10’-0”

LIGGETT RESIDENCE | South Elevation 1’-0”

5’-0”

10’-0”

LIGGETT RESIDENCE | East Elevation

A | Master Bath

D | Master Closet

B| Master Bath

E| Master Closet

C| Master Bath

F| Master Closet

16


PROFESSIONAL

PACE TOBACCO FACTORY FIRM | MAEMAR PC ARCHITECTS PRINCIPAL | MEHRAN FARAHMANDPOUR TYPOLOGY | INDUSTRIAL LOCATION | MONGLA, BANGLADESH YEAR | 2012

17


PACE TOBACCO FACTORY | First Floor Plan

1’-0”

10’-0”

20’-0”

18


PACE TOBACCO FACTORY | Second Floor Plan

19

1’-0”

10’-0”

20’-0”


PACE TOBACCO FACTORY | Roof Plan

1’-0”

10’-0”

20’-0”

20


PACE TOBACCO FACTORY | First Floor RCP

21

1’-0”

10’-0”

20’-0”


PACE TOBACCO FACTORY | Second Floor RCP

1’-0”

10’-0”

20’-0”

22


PACE TOBACCO FACTORY | First Floor Mechanical Plan

23

1’-0”

10’-0”

20’-0”


PACE TOBACCO FACTORY | Second Floor Mechanical Plan

1’-0”

10’-0”

20’-0”

24


PACE TOBACCO FACTORY | North Elevation 1’-0”

10’-0”

20’-0”

PACE TOBACCO FACTORY | West Elevation 1’-0”

10’-0”

20’-0”

1’-0”

10’-0”

20’-0”

PACE TOBACCO FACTORY | South Elevation 1’-0”

10’-0”

20’-0”

PACE TOBACCO FACTORY | East Elevation

25


26



Pegah Shabehpour | Professional Portfolio