
3 minute read
CONSTRUCTION MANAGEMENT SERVICES
As part of our standard construction management deliverables, &build offers the following list of services that may be employed to serve our clients and our projects:
Menu of Services
Advertisement
Pre-Construction or Design Phase Services
Program Validation
Cost Consulting
Conceptual Estimating
Architectural / Civil / Structural Estimating
Mechanical / Electrical / Plumbing Estimating
Value engineering / life-cycle costing
Scheduling
Stakeholders meeting
Constructability review
Permit coordination
Bid packaging strategy
Bidder evaluations/recommendations
Construction Phase Services
Full-time management
Detailed scheduling
On-site supervision
Contractor coordination
Implementing Partnering Process
Monthly status reports
Change order negotiation
Accounting reporting
Management of payment applications
Submittal management
RFI administration
Safety
Risk Management and Dispute Resolution
Correspondence and communication management
Coordinate Owner-furnished items
Post-Construction Phase and Closeout Services
Closeout coordination
Final inspections
Occupancy permits
Owner Move-in coordination
Staff training coordination
Punchlist completion
Contract closeout
Idea!
• Capital Improvements Project
• Concept meeting with your team Architect and &build
ARCHITECTURE &build CONSTRUCTION MANAGEMENT
Architectural services during preconstruction provided in 2 phases
Programming
We define the type, size, location and end-user requirements for the project. We conceive the Owner’s mission with multiple options.
Based on Owner approval of the preferred conceptual design, we parepare the schematic drawings. The schematic design will include alternate options to help establish project scope.
Your building components are coming together, we know what all your pieces and parts are, your drawing is refined. We get you to 75-85% complete.
PRE-CONSTRUCTION
Conceptual Design
We provide input on benefits and limitations of the conceptual design
We estimate the multiple options that The Architect suggests. The team collaboratively decides the viable solution for the project.
Schematic Design
Design Development
You now have a 75%-100% complete, “permitable” set of drawings.
At this point we have a 10,000’ view of the project - we know what the build is, we know the site, the size and intended use. We apply costs to the Architect’s vision.
We estimate again and provide value engineering ideas to keep the project on track.
Construction Documents
We use the 75%-100% complete set of drawings to determine your Guaranteed Maximum Price (GMP).
GMP
Our 75%-100% drawings will be used to competitively bid the construction. We also provide addenda and clarifications during the
Construction
Scope Review
We provide the GMP. GMP = Cost of the Work + Our Fee
We review shop drawings and material submittals.
We review shop drawings and material submittals.
Contract Day
We review the subcontractors bids for conformance to our project control estimate, identify variances and reassess scope
Locking up the subs numbers and finalizing the GMP with the Owner
Issue Subcontracts
BUILD
Attend weekly construction meetings.
Construction Compelte
Conduct a punch list inspection upon substantial completion.
Issue a certificate of substantial completion.
CLOSE OUT
We all start thinking about your next project!
We build your building.
We take care of punch list items, make sure everything is squared away and you’re happy.
We hand you the keys!
Moundsville Municipal Public Safety Building, Moundsville, West Virginia
The Moundsville Municipal Building is a combination of reinforced concrete, steel columns and beams framing with exterior masonry walls on spread footings. The Municipal Building is a three-story structure with a one-story fire station with mezzanine attached. A portion of the existing Municipal building will be demolished to make room for the building with the remaining portion of the building demolished after construction of the new building is finished. The building will be occupied by the Fire & Police Departments as well as the Mayor & Council.
Construction Cost: $10.3 Million
City of Cleveland New Police Headquarters, Cleveland, Ohio
&estimate is assisting the City with project management and cost estimating throughout the design phase for the new police headquarters complex, which is the first project in the development of the new “Opportunity Corridor”. This program provides for a new headquarters complex, including approximately 400,000 square feet of programmed office, training, lab & public spaces, storage and a firing range. Included within the program is fleet parking for 800 vehicles and a full training center for the Officer/Cadet Academy. Additionally, we are providing Owner’s Representative Services providing project management, schedule and budget development and oversight, through all phases.
Construction Cost: $120 Million
City of Wheeling Fire Department Headquarters, Wheeling, West Virginia
The new 25,000 square foot City of Wheeling Fire Department Headuqarters building will house seven (7) apparatus bays with support spaces, a mezzanine for storage and training, a hose drying/training tower, living quarters, administrative space for the HQ staff and a training room. It will be built out of custom precast panels, steel bar joists, an EPDM roof and all interior trades will be involved. Our team estimated and competitively bid the project against several other contractors. Our scope includes scheduling and supervising the construction from start to finish as well as subcontracting all trades including concrete foundations and floor slabs, wood framing, roofing and siding, MEP trades and all interior finish trades. Originally overbudget, our team worked with the Architect to value engineer $1 Million out of the project in five (5) days, which allowed the City to move forward with the project.

Construction Cost: $9 Million
West Virginia State Fire Training Academy, Morgantown, West Virginia

&estimate provided conceptual cost estimating services for this new 25,752 square foot facility, which contains two wings - an office and classroom wing for faculty and staff and a bay area for indoor training and exercises. Pre-construction services included, cost estimating services for Concept, SD, DD and CD Phases, scheduling, value engineering and constructability reviews.
Construction Cost: $5.4 Million


