Main industrial facilities, construction and maintenance (Italy)

L.t.d. Air conditioning system at the service of the new electricity production facilities through the burning of AE BIO-8 CDR at the plant Appia Energy Massafra (TA) - Marcegaglia Group. Client: Eurocostruzioni Srl. Annual maintenance since 2004 of air conditioning units installed at the plant Appia Energy Massafra (TA) - Marcegaglia Group. Client: Appia Energy Srl. Central direct expansion VRF type air conditioning at the Management Palace MARICOMMI of Taranto and destined to the new offices of A.P.M. Client: Commissioner Direction Italian Navy. Direct expansion cadres ventilation/cooling to substations in Kv. 66 TNA, TNB, LAF, OSS, service AFO to the primary and secondary systems. Client: Spa Ilva plant in Taranto. Local air conditioning system developer Cabins RX-L and RX-N at TUL2 Ilva of Taranto Spa. Client: Costruzioni Srl Square. Realisation of new air conditioning systems and direct expansion for the operators cabins relating to cabin chargers from n. 1 to n. 7 at the port area. Client: Spa Ilva plant in Taranto. Construction of a new cooling/heating air/water system, with 1 chiller cooling capacity 370 kW, for technical office, store, real estate and SIL at the building TES / UTP. Client: Spa Ilva plant in Taranto. Construction of a new air / water control desk conditioning system “OS / 4” electrical room and filing department offices rolls “DER / 2”. Client: Spa Ilva plant in Taranto. Construction of a new air/water cooling system with n. 1 refrigerator of 400 kW cooling potentials, for sale and service Inverter PLC baked in spars and FAL4 TNA2. Client: Spa Ilva plant in Taranto. Construction of a new plant with direct expansion cooling ventilation to 1 electrical substation and electrical room service chamfering the pipe mill “TUL / 2”. Client: Spa Ilva plant in Taranto. Realisation of new air conditioning systems and direct expansion for the operators relating to the cabins of quay chargers from n. 7 to n. 9 and n. 10-17 at the port area. Client: Spa Ilva plant in Taranto. Construction of a new plant cooling ventilation electric control cabins and heating / cooling air / water, with 2 chillers with cooling capacity 568 kW each. and n. 4 chillers with cooling capacity 411 kW each., For staff booths to the various users of the new galvanizing line hot ZNC / 2. Client: Spa Ilva plant in Taranto.

Construction of a new cooling ventilation system for new premises for the air compressor and the new service turbines at the new facility “XII of industrial technical gas production units (Oxygen, Nitrogen, Argon). Client: Spa Ilva plant in Taranto. New construction Air conditioning and pressurization of service to new cabins and cabin PLC Analysis Unit XII Oxygen Factory. Client: Spa Ilva plant in Taranto. Construction of a new ventilation / cooling system service to cabins Electrical control and PLC control of rolls packaging line systems pickled-LID 1 LID-2. Client: Spa Ilva plant in Taranto. Construction of a new ventilation / cooling Room Paintings of hydraulic controls Electric of ERW pipe mill. Client: Spa Ilva plant in Taranto. Management, maintenance and operation of the air conditioning system at the Bari Operations Center, SIMI Palace of the Superintendence for Archaeological Heritage of Puglia. Client: Superintendence for archaeological heritage of Puglia. Air conditioning Cabin Gas Electric Candle Coke Battery 10 ^ c / o plant Ilva of Taranto. Client: G.F. Ltd. - Torricella (TA). Check, check, launch and maintenance of the systems of conditioning of offices Region Apulia headquarters of Taranto. Client: Regione Puglia. Realization sprinklers “White House” of the Swimming Yachting Club of Taranto. Client: Yachting Club of Taranto Realization central chilled water production process iron area control service laboratory spectrometers and laboratory quality control raw materials. Client: Spa Ilva plant in Taranto. Modernization of ventilation / cooling system Cab Electric roughing TNA / 2. Client: Spa Ilva plant in Taranto. new plant construction for cooling refrigerator taphole “AFO / 5”. Client: Spa Ilva plant in Taranto. sanitation activities and installations of the Coke Oven Blast furnaces area. Client: Spa Ilva plant in Taranto. Realization of control-conditioning system at the NES-CET / 1 of the Ilva plant in Taranto. Client: Semat Spa Artogne (BS). Realization of Coke Oven area pressurization systems. Client: Spa Ilva plant in Taranto. Network construction aerolics Offices and Refectories CCO / 5. Client: Spa Ilva plant in Taranto.

Replacing the vertical pipes (column shafts uprights) of the heating and cooling air / water management building. Client: Spa Ilva plant in Taranto.

Realization of air conditioning and ventilation Call Center in Lama (Taranto). Client: Human Power Srl

New construction of air/water cooling system, with 1 chiller cooling capacity 400 kW, for electric cabin, computer room and new markers room oven spars FAL5 furniture TNA2. Client: Spa Ilva plant in Taranto.

Realization of air conditioning c / o CONI headquarters Provincial of Taranto. Client: CONI Servizi Spa

Construction of a new expansion plant offices, synoptic, dining hall and control room RH-OB “ACC / 1”. Client: Spa Ilva plant in Taranto. Air conditioning Bunker RX cabin at TUL2 Ilva Spa. Client: Square Costruzioni Srl

Construction of a new treatment plant to service air hangar located on board the ship of the fleet Cavour of the Italian Navy. Commissioned by the Italian Navy Realization of VRF air conditioning system at the service of local offices and the operating rooms in the call center service Linkem headquarters of Taranto. Client: Linkem SpA.