Page 1

_portfolio _pascal wagner


_content _vision2018

studies

04

_eternitown

studies

10

_timeout

studies

20

_transborder

studies

32

_264m3.house

studies

44

_roughlandscape

studies

50

_single.family.house

studies

54

_barclay-vesey.building

studies

56

_shelter

studies

60

_brick.tower

studies

64

_comics.and.cartoons

studies

68

_single-family house

work

70

_exhibition.building

work

74

_housing.complex

work

76

_entrance.roofing

work

78

private

82

_exposure-pedestal


studies

university of liechtenstein 6semester_bachelor dieter j端ngling_docent build in a park_studio vision2018_project task

advancement of an existing center of further education within a mansion district in liechtenstein. there have been no structural changes since 30 years on the 1940s villa - therefore it was necessary to think about appropriate modifications to satisfy the 21st centuries needs.

evolution

analysis of the existing building structure and the surrounding landscape. evaluation of the existing rooms and assessment of their future qualities.

result

entering the newly designed area of the stein.egerta further education association through a spacious portal finding the way into a closed patio, in which events can take place. several course rooms, bonus rooms and a kitchen studio are located in the two annexes. the new villa accommodates a seminar center in which office premises, a modern kitchen and two spacious seminar rooms are located.

04

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

location

site plan

overview map

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

05


studies

floor plans

first floor 06

second floor

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

sections.elevations villa

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

07


studies

facade section

08

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

visualization

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

09


studies

university of liechtenstein 5semester_bachelor hatz.volpato_docents eternit.schweiz.ag_studio eternitown_project task

development of a masterplan for two villages in switzerland. creating of a social connection between these two communities. elaborate a chosen area of the overall project on the abandoned factory site.

evolution

reduce the footprint of the old factory. show covered canals. create free space. bring in new life into old warehouses.

result

eternitown offers a big range of uses. to range from apartments, lofts, townhouses to offices, ateliers through to a multipurpose hall and a market hall connected by a big public square. canals, meadows, parks with a lot of trees and walk paths surround the various buildings. in the southern part of the area are lofts built in the old warehouses.light and air gets into these areas through courtyards and skylights. there are apartments offered for singles, couples or even large families - where all rooms have access to the inner garden which is beside the living area one of the social gathering places.

10

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

progress

solution

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

11


studies

floor plans

12

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

elevations

sections

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

13


studies

roof plan

14

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

15


studies

visualization.inside

16

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

visualization.outside

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

17


studies

facade section

18

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

19


studies

university of liechtenstein 4semester_bachelor erich strolz_docent sacred space_studio timeout_project task

design of a sacred space with the inclusion of lighting design, construction, statics, urban planning, materialization and detailed planning. it is seeked for the architectural epiphany.

evolution

the people are always in rush these days. to give them a place of retreat in daily routine the sacred space has to be compact an mobile - where it is needed, it is going to be used.

result

the timeout gives the poeple the opportunity to cut themselves off from the stress of the daily routine. it is composed of a basic-module, which has a recognition value, because of its uniform appearance from the outside. according to requirements this module can be adapted respectively used in various types. it can be used as an individual but also in combination with other modules - special spaces inbetween are getting created. to maintain the timeouts mobility and versatility, it consists of a bivalve “carbon fiber reinforced plastic� (cfrp) outer casing, which is very light and stable at the same time.

20

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

progress

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

21


studies

combination

22

worldwide

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

sample.urban university

sample.rural park

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

23


studies

24

ground plan

ground plan

section

section

section

section

ground plan ground plan vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

elevations

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

25


studies

details

ground plan

section 26

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

detail.01

detail.03

detail.02

detail.04

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

27


studies

visualization.frontside

28

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

29


studies

visualization.backside

30

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

31


studies

university of liechtenstein 3semester_bachelor hatz.volpato_docents community hall_studio transborder_project task

design of a community hall for the two villages of widnau in switzerland and lustenau in austria.

evolution

the villages of widnau and lustenau are geographical grown together. but there is a non-physical barrier: the border. this bar generates, not only because of the obvious characteristic, a social gap between the people of switzerland and austria. therefor it is very important to have a place where the community meets - because they do not have such a location by now. a new multipurpose building for both villages will reanimate the social life and the relations between widnau and lustenau.

result

the building spans the river and connects two important points in widnau and lustenau. you enter the community center over a bridge, which also functions as a public park. through a spacious entrance you get into the inside of the bulding, where a multipurpose hall, a library, a restaurant, a sportshall and much more is located.

32

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

location

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

33


studies

ground plan

section

34

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

multipurpose hall

hall 846m2 - 390p at tables 5x meeting room รก51m2 - 24p

multipurpose hall

hall 846m2 - 390p at tables gala 258m2 - 400p standing

multipurpose hall

hall 1106m2 - 800p seated

from lustenau from widnau

connections brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

35


studies

elevations

36

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

37


studies

visualization.access.day

38

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

visualization.access.night

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

39


studies

visualization.rhine-dam.day

40

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

visualization.rhine-dam.night

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

41


studies

model.gesso

42

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

model.gesso

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

43


studies

university of liechtenstein 2semester_bachelor helmut dietrich_docent 264m3 haus_studio summer house_project task

design of a house in an allot settlement. it should not exceed a footprint of 48m2 respectively a volume of 264m3. the building should be constructed in wood.

evolution

in due consideration of the site location without direct lake view the building gets shaped by the surrounding paths and borders, so that spaces for retreat are getting created.

result

due to the placement of the house at the edge of the site, there is a quiet garden in the back area.the second floor is twisted against the ground floor so that a terrace and a roofed garden area are getting created. in the bottom part of the building there are the living area and the kitchen, upstairs are the bedroom, the bathroom and a walk-in closet placed.

44

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

design

ground floor

second floor

section a-a

east

north

section B-B

west

south

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

45


46

ground floor

construction drawing

second floor

studies

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


section b-b

section a-a

studies

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

47


studies

detail drawing

detail.1

48

detail.6

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

detail.7

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

detail.9

49


studies

university of liechtenstein 2semester_bachelor kathrin aste_docent cover version_studio roughlandscape_project task

design of an architecture, which merges with the landscape. the choice of the right environment and its analysis are the basics of the project.

evolution

as the location a mountain ridge in the liechtenstein malbun is optimal - there are rocks, meadows and forstes, so it is a manifold landscape. on the one side you can have foresight over the austrian alps, on the other side you can enjoy the view on malbun. to open a visual axis is the right thing to do.

result

the architecture is placed 20m under the mountain ridge. it breaches the mountain and opens the view on the alps and on the village of malbun. you access the space through a stairs which ushers in the rock. on the one side the architecture opes and sets the view free - in the back part it focuses the vista and frames the landscape.

50

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

analysis

location

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

51


52

section

ground plan

studies

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

model.cardboard

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

53


studies

university of liechtenstein 1semester_bachelor cornelius tafel_docent building construction_studio single.family.house_project task

design of a single-family house for further work in construction- and detailed planning.

evolution

open ground plan layout. a lot of light. simple construction.

result

this house offers enough space to live for a big family. on the ground floor there are a large living area with a kitchen and also a spacious entrance hall. on the second floor there are a bedroom and two child rooms, each with its own bathroom. additionally the house offers an office and a multimedia room.

54

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

design

north

ground floor

east

south

second floor

basement

west

section

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

55


studies

university of liechtenstein 1semester_bachelor urs meister_docent cook.brick.work_studio barclay-vesey building_project task

replica of one of six available new york high-rise buildings out of concrete.

evolution

study of plans and photos. analysis of the building in 3d. drawing of a form work plan. producing of the openings - 2000 windows. building of the form work in two parts. stripping and cleaning.

result

two-part model out of fiberglass reinforced concrete.

56

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

form work

stripping

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

57


studies

model.concrete

58

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

model.concrete

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

59


studies

university of liechtenstein 1semester_bachelor denise ospelt_docent shelter_studio pit.stop_project task

design of a shelter at a fictitious place. the maximum number of romms should be three. reflections about construction and materialization.

evolution

for the annual race days at the bonneville speedway in utah, arizona, usa a paddock is required. the temporary building should protect against heat and sun, and therefore has a reflecting facade.

result

the structure has only few narrow light slots, which allow just filtered light to break into the inside, where three larger and two smaller lounges are.

60

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

model.cardboard

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

61


studies

section b-b

construction drawing

ground plan

section a-a 62

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

detail drawing

ground plan

section

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

63


studies

university of liechtenstein 1semester_bachelor urs meister_docent cook.brick.work_studio brick tower_project task

design of a tower in brick construcion. consideration of brick measures and masonry bonds.

evolution

experiment in ground plan, section and elevation. develop paths and stairways.

result

12-story brick tower with jutting and setbacking rooms. brick measures projected in the facade. exploring every single room while walking through the stairways.

64

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

65


studies

design

section

66

elevation

ground plan vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

model.concrete

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

67


studies

university of liechtenstein 3semester_bachelor andreas gefe_docent comics and cartoons_studio booty and the brain_project task

development of a comic.

evolution

experiment with lines, colors, shapes, figures. copy some famous comic-figures. developing a story and characters.

result

the story is about the life of the two main characters - booty and brain. the two toughest guys of new york are hanging out at their hood, clubs and the metro stations and do some nonsense.

68

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


studies

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

69


work

heim+m端ller architecture michael heim.herbert m端ller_ceo dornbirn_location single-family house_project design.approval design.construction drawing.detail drawing_work task

add a new garage and a living room to an existing traditional farm house in the austrian alps. additionally the garden has to be redesigned.

evolution

experiment with various volumes, rooms and facades.

result

the new garage has space for two cars and is connected to the entrance area. the stairway has been completely redesigned and offers a lot of free space. behind the main house there is a spacious terrace, a new pool and a bathhouse.

70

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


work

ground plan

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

71


work

section

72

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


work

north

east

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

73


work

heim+m端ller architecture michael heim.herbert m端ller_ceo dornbirn_location exhibition building_project design.approval design.construction drawing_work task

design of an exhibition building for a window manufacturer.

evolution

volumes and light-studies.

result

this exhibition hall offers enough space for exhibits and creates a spacious atmosphere.

74

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


work

ground plan

section brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

75


work

heim+m端ller architecture michael heim.herbert m端ller_ceo dornbirn_location housing complex_project design.approval design.construction drawing_work

task

design of an economical housing complex at the slope in the austrian alps.

evolution

experiment with building volumes.

result

in this housing complex even the belowground apartments get enough true light. on the topmost floor there is a spacious penthouse with a big terrace.

76

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


work

ground plan brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

77


work

dietrich I untertrifaller architects helmut dietrich.much untertrifaller_ceo bregenz.vienna.st gall_locations entrance roofing_project design_work

task

design of a roofing for the entrance area of a kindergarten.

evolution

the roofing should protect against weather and offer a seating accommodation. the construction should be cheap and light.a uniform, closed frame should be created.

result

the roofing, the bounding walls and the seat are shaping a closed frame which is revetted by wooden laths.

78

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


work

existing building

ground plan

elevation brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

79


work

design

ground plan

elevation 80

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


perspective.var2

perspective.var1

work

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

81


private

law office vienna_location exposure-pedestal_project design.detail design.workmanship_work task

design of a pedestal to exhibit the barclay-vesey building model.

evolution

the construction of the pedestal shoud be simple and the shape should make a feature of the exhibit.

result

the pedestal is made of hot-rolled black steel. the single sheets are welded together and therefore support the 80kg heavy concrete-model optimal. due to the height adjustability the pedestal can be placed on every pavement. a illuminated rack offers space for a „work progress photo album“. the exhibit is described on a magnetic sign.

82

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


private

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

83


private

84

vision2018 eternitown timeout transborder 264m3.house roughlandscape one.house barclay-vesey.building shelter


private

brick.tower comics single-family.house exhibition.building housing.complex entrance.roofing exposure-pedestal

85


_pascal wagner _kaufmaennen 27 _a6850 dornbirn _0043 664 3524791 _pascal.wagner@aon.at

portfolio_english  

works of pascal wagner_2008-2014

Read more
Read more
Similar to
Popular now
Just for you