{' '} {' '}
Limited time offer
SAVE % on your upgrade.

Page 1

Experience Where It Counts

OWEN GROUP - PM/CM/PQM

Owen

Project Management | Construction Management | Project Quality Management Services

The Owen Group provides a comprehensive range of Project Management, Construction Management, and Project Quality Management services for government projects on the municipal, state and federal levels, as well as private sector clients.

OWEN GROUP PROJECT MANAGEMENT, CONSTRUCTION MANAGEMENT, AND PROJECT QUALITY MANAGEMENT SERVICES:

• Program Management

For every project, we partner with the owner to function as the owner’s representative dedicated to their best interests. We then assist in creating a partnership environment with the total project team including the Designers and Contractors to achieve a successful project.

• Project Management

We provide objective management principles to meet the challenges of controlling costs, adhering to timelines, adapting to regulatory constraints and insuring project quality, As the primary contact for the owner, we facilitate effective communication and the smooth flow of work.

–– Code Review

• Project Control

(continued on last page)

• Claims Mitigation

• Construction Management • Value Engineering • Project Quality Management –– Peer Review –– Design Review –– Constructability Review –– Construction Inspection


Experience Where It Counts TRANSPORTATION Riverside County Transportation Commission (RCTC) Perris Multi-Modal Rail and Bus Facility

Perris Multi-Modal Rail and Bus Facility

Owen provided construction management services for the new parking lot and layover facility at Perris Metrolink. The Perris Multi-Modal Facility includes a new Metrolink commuter train platform and eight-bay RTA bus station. The platform is a 900-foot long concrete structure with inlaid concrete pavers and landscaping. It has five welded steel shelters, which were erected on site. There is a 200-car asphalt parking lot with six ADA parking stalls. The facility also consists of a surface parking lot with landscaping improvements, shelter structures, a state-of-the-art security system, and a railway platform for the future Perris Valley Line (PVL), which Metrolink service is anticipated to commence in 2012.

MTA Union Station Gateway (USG) Building

MTA Union Station Gateway Building

Owen, as part of Vanir Construction Management, is providing construction and engineering management services to MTA’s Union Station Gateway (USG) building, a 628,000 square foot, 27-story high rise office tower and four-level subterranean parking structure and the entire Union Station site in Los Angeles, CA. Scope of services include energy lighting study, cooling tower replacement and retrofit, design build project, site study for drainage, paver and pavement repair, Emergency Operations Center (EOC) study, facility condition audit and facility repair, modernization, etc.


Who we have worked for TRANSPORTATION World Trade Center Transportation Hub

Riverside County Transportation Commission Corona Metrolink Parking Structure

World Trade Center

Owen is teamed with David Evans & Associates to provide peer review and other construction management support services for the World Trade Center (WTC) Transportation Hub in New York City. This project is located on the 16 acre lower Manhattan “Ground Zero.” The Port Authority of New York and New Jersey (PANYNJ), in association with the Federal Transit Administration (FTA), developed the plans for the new WTC Transportation Hub that will serve as a central transit hub with trains running under the Hudson River from New Jersey, North-South Manhattan subways, bus stations, and many other transportation and retail services. The site development happens at a subterranean level as well as above ground. The underground development will go for a total of 8 stories, while the above-ground development will include the 9/11 Memorial, the One World Trade Center (Freedom Tower), and many other new skyscrapers. The overall development of the WTC will comprise the re-built World Trade Center Complex. Another landmark representing our national pride and freedom!

RCTC Corona Metrolink Parking Structure

Owen’s structural and MEP engineering team performed worked on the six-level, 375,000-square foot, 1,100 car parking structure and pedestrian bridge for the Riverside County Transportation Commission (RCTC) in Corona, CA. A digital, CCTV system comprised of a 40 camera surveillance system provides views from within the structure and on the adjacent Metrolink platform. Other systems in place include a floor by floor car counting system, air conditioning systems for the data room, future security room, and the electric and elevator machinery room. An existing surface parking lot was demolished on the western portion of the site to accommodate the new structure made of reinforced concrete and post-tension concrete slabs with moment frame to house the 1,100 parking spaces.

RCTC Corona Metrolink Parking Structure

World Trade Center

RCTC Corona Metrolink Parking Structure


Experience Where It Counts AVIATION

EDUCATION

San Diego Int’l Airport Constructability Review Capital Improvements Program Various Projects

Los Angeles Community College District Support and Staff Augmentation

LACCD - Pierce College San Diego International Airport

Owen has been contracted by San Diego International Airport to provide constructability review services for the Airport Authority’s $300 million Capital Improvements Project Program. The Authority’s Capital Improvement Program (CIP) is a rolling 3-5 year program concerned with critical improvements and preservation efforts. Included in the program’s scope are projects addressing federal security requirements, airfield safety and capacity, terminal building improvements, electrical upgrades, and initial planning for the Airport Master Plan Program.

John Wayne Airport - Construction Management Support Services for Terminal C and Parking Structure Demo

Owen is providing LACCD with preconstruction and construction services for a variety of projects on several campuses. The services include: • constructability review • close-outs • change order review • staff augmentation (bench contract) • plan review • code review and compliance • value engineering

Los Angeles Unified School District Construction Management and Review Service

East Valley High School John Wayne Airport - Parking Structure

Owen provided Construction Management support services for John Wayne Airport’s terminal expansion and new parking structure in Orange County. Scope of work included constructability review of a new 250,000 SF Terminal C, and the demolition of a parking structure. The terminal includes six new passenger gates, additional concessions, hold rooms, passenger/ baggage processing capabilities, and facilities with space for commuter/regional jets at the south end.

Owen is providing LAUSD with preconstruction and construction services for a variety of projects on several campuses. The services include: • constructability review • close-outs • change order review • staff augmentation (bench contract) • plan review • code review and compliance • value engineering • Owner’s Authorized Representative (OAR)


Who we have worked for HEALTHCARE Kaiser Permanente Construction Management Alliance

Healthcare Plan Check and Peer Review Services, Various Location in California, OSHPD and DGS

Kaiser Permanente

Owen recently became a part of the Kaiser Construction Management Alliance and will be providing complete programming, construction management and engineering services for their new mega center medical centers. Full preconstruction services will be provided for the new facilities, including constructability, plan review, construction and staff augmentation. The projects are located throughout the western United States.

Cedars Sinai Medical Center, Main Hospital Project Coordination Pre-Construction

Cedars - Sinai Medical Center

Cedars Sinai Medical Center (CSMC) has a number of concurrent projects located on the 3rd, 5th, 6th, 7th, and 8th floors of the main hospital’s Professional Tower. These projects are in different stages of design, OSHPD review, and construction. Owen is providing architectural review of each ongoing project to determine if there are any clashes or problems between projects and is suggesting solutions with each project’s architect and OSHPD for the resolution of any problems. The services require detailed and on-going comparative plan review,

Surgical Specialty Hospital

Review and Plan Check is a specialty at Owen, not a sideline. We have developed a web based review database system to streamline the review and back check process. This was successfully utilized on our last review for OSHPD and DGS and is available as a part of our standard services. We understand how to be effective parts of state services teams and highly value our long-term plan check service relationships with numerous state agencies. As demonstrated by our extensive DGS, OSHPD and Public project experience, our team of reviewers have expertise in all areas of code compliance. Plan Check / Peer Review Projects include: • Palo Alto Medical Foundation San Carlos Center • Santa Barbara Cottage Hospital • Surgical Specialty Hospital of N. California • Glendale Adventist Medical Center, Phases 1 & 2 • Kaiser Roseville Cenral Utility Plant and Hospital • Surgical Specialty Hospital • Loma Linda University Medical Center • Jewish Home For The Aging, New Acute Psychiatric Hospital • Eisenhower Hospital • Veterans Homes of California, Various Locations • Patton State Hospital, Ed Bernath Building Renovations • California Department of Corrections, Institute for Women Housing and Health Care Facility • Atascadero State Hospital


Experience Where It Counts COMMERCIAL

INSTITUTION

The Crescent

Administrative Office of the Courts (AOC) San Bernardino and San Diego Superior Courts

The Crescent San Bernardino and San Diego Superior Courts

Owen provided value engineering and peer review services for The Crescent, Beverly Hills. The Crescent is an upscale mixed-use residential and office development in the famed “golden triangle” of Beverly Hills. The $50 million project is the first rental apartment complex to be developed in the City in the past 25 years. The Crescent encompasses 40,000 square feet of world-class office space, 12 two-story brownstones and 76 luxury townhouse apartments.

Owen has been selected to provide Plan Review services for Court Construction projects throughout California on an as-needed basis by the Administrative Office of the Courts (AOC). As part of the on-call contract, Owen provided plan review services for the $300 million San Bernardino Courts Building and the new $400 million San Diego Courthouse.

West Hollywood Gateway

Department of General Services VA Home Facilities - Full A&E Plan Review Various Sites

West Hollywood Gateway

Owen provided value engineering and peer review services on the structural portion of this project. Recognized as one of the finest urban infill retail developments. West Hollywood Gateway is a $75 million, two-level, 250,000 sf shopping center that makes a dramatic architectural statement at one of the busiest intersections in the Los Angeles area. A large outdoor plaza functions as a civic square, inviting pedestrians to enjoy outdoor eating areas, fountains, public art, retail kiosks and abundant landscaping. Visually distinctive sidewalks, street-level display windows and sidewalk cafes further enliven this new urban village.

VA Hospital Facilities, Various Locations in California

Owen provided pre-construction and construction services for the Department of General Services (DSA) to provide fire and life safety plan checking services for the multiple new VA Hospital facilities in Southern California. Facilities Serviced Include: • Los Angeles, CA • Lancaster, CA • Ventura,CA


Experience Where It Counts Owen’s team utilizes e-PlanReview® a web-based collaboration software available to municipalities and organizations interested in simplifying and streamlining the process of plan check/review, and eliminating the cost associated with the process. Accessed through the internet from any standard browser, through a secure log on, it is available to all project team members and internal and external clients alike.

e-PlanReview® is environmentally friendly, with a goal to not only to save the cost and to speed up the plan check process, but also to dramatically cut back, if not eliminate paper prints and the transportation and car emissions associated with the old system. Program Highlights: • Online mark-ups of drawings linked to comments • Standard Comment(s) Database • Streamlined / concurrent team collaboration • View / reports sorted by multiple parameters • Reduces storage space needs • Eliminates paper, printing, inks, and delivery costs Please visit e-PlanReview® http://www.eplanreview.com

(continued from page 1) We begin with a project management plan to organize the administration of each project phase which may include pre-design, bidding, construction as well as turn over. This management includes master schedules and subschedules that chart the course for the entire project and offer viewpoints for measuring progress. It incorporates systems that track actual costs against established budgets and provides for stringent controls on expenditures. Owen utilizes a number of construction management system software including Primavera, Expedition, Viewpoint, Sharepoint, Skire, e-Builder, e-PlanSoft, etc. Each management plan establishes procedures for communication and correspondence to insure the timely accurate exchange of information and the avoidance of disputes. Once a project has started we oversee every aspect of construction. With established goals, we create and sustain the momentum of the project. Each construction element will be supervised for on-schedules compliance as well as adherence to quality and cost specifications. We spot problems before they occur and resolve them. Should the unforeseen happen, we will evaluate the problem and recommend viable solutions. At Owen, we feel the conclusion of a project is as important as the start. We conscientiously direct the entire closeout process and, when needed, oversee start-up testing or staff training for a seamless move-in.

Contacts

Office Michael Chegini, PE, PMI, DBIA Program Director 213.873.4700 mchegini@owengroup.com Steve Hooper, AIA, PE Project Director 213.873.4720 shooper@owengroup.com

Los Angeles Office 811 Wilshire Blvd., Ste. 1050 Los Angeles, CA 90017

Profile for Owen Admin

Construction Management - General  

Examples of Construction Management Projects and Services

Construction Management - General  

Examples of Construction Management Projects and Services

Advertisement