CuMo WORDS OF GREETING

Mongolian – Russian Joint Erdenet Mining Corporation – Mongolian Vanguard Construction of the 20th Century – has been giving enormous contribution continually to the economical progress of Mongolia in its history. Our creative staff has been overfulfilling the production plan regularly and reached the annual ore processing up to 26 million tons. Thanks to the step-by-step realization of technological modernization up to 2020 and timely enhancements on productivity and innovation, we are able to reach the annual ore processing up to 35 million tons pursuant to the strategic planning. Our company has been working to reach our status up to the same level of which the world leading mining companies are standing, doing our best for the “Safety First”. As the social responsible company, Erdenet Mining Corporation is proud of its responsibilities as the firm actual investor to the all of Mongolian sectors, even the pivot and key of the thrive to the Orkhon province and Erdenet city. Finally, I would like to wish high success and all the best personally and on behalf of over 6000 employees of EMC, which has been leading the Mongolian TOP-100 Entrepreneurs over 10 years.

Mr. DAVAATSEREN Tserevsamba Director General of Erdenet Mining Corporation, Honored Industrial Worker of Mongolia

4


5

WORDS OF GREETING Over the years, the Erdenet Mining Corporation has earned a high reputation in the international market and was one of the leading Asian companies. Our company works closely with more than 100 companies around the world including Swiss company Trafigura (TRAFIGURA), British Ocean Partners (OCEAN PARTNERS), the South Korean company Samsung (Samsung Corporation), Austrian Stork international GmbH and others. Over the past 4 years, as a result of permanent introduction of new machinery and technologies the company has produced more than 15,5 thousand tons of copper in concentrate and 1,0 thousand tons of molybdenum in concentrate in excess of plan. Net financial profit for 2012 was 191.3 billion MNT. Due to the modernization and commissioning of the third and fourth sections of flotation, the company updated and automated the 70% of the primary mining equipment. Reconstruction of Autogenic Grinding Section was begun; and the company started to produce own electricity. A new range of vacuum-film forming or molding at the Machinery Repair Plant has been introduced and 40% of the foundry shop was converted to the new method of vacuum - film molding. The company’s all successes and achievements will depend on effort and experience of our staff, and in the future, our company will progress towards the high achievements for further growth and development of the company.

Mr. ALEXANDER PETROVICH FOMENKO The First Deputy Director-General and Chief Engineer of Erdenet Mining Corporation


ERDENET MINING CORPORATION

TM

CuMo MINING

Ore body of the copper-molybdenum deposit in the “Erdenetiin-Ovoo� stretches to the west from the east, 25 km in the length and 1.5-3 km in the width and consists of 4 main parts. The length of pit in the primary mining is approx. 2500 m, the width is approx.1500 m, the lowest level is 1265 m and the depth has been reached up to 120 m. The top of the mount was 1606m from the sea level in the initial period of operation. The pit is planned to have the ledge height of 15 m, the sidewall of 370-420, bench of 30 m and the least stripping area of 50 m. The ore body of copper-molybdenum consists of the minerals including chalcosine (Cu2S), chalcopyrite (CuFeS2), turquoise, bornite (Cu5FeS4), brochantite (Cu4SO4(OH)6), azurite (Cu3(CO3)2(OH)2), molybdenite (MoS2), delafossite (CuFeO2), tenorite (CuO), sericite and other minerals.

6


7

Today LIEBHERR-994B hydraulic excavators from Germany, chain excavators including ЭКГ-10 and ЭКГ-15 from Russia operate for the mining works and drilling machine СБШ-250 MHA-32 are used for drilling. Chain and wheeled bulldozers such as Liebherr PK-764, Komatsu D-275A, WD-500, Caterpillar 824G, wheeled loaders L-581, WA 800, WA 600 and, motograders GD-825, CAT 16G etc., from USA, Japan, and Germany are used for spoil heap, road construction and repair for technological haulage. A powerful maintenance centre is running to perform all kinds of repair of mining equipment. The open pit annually produces 15000 tons of water resistant emulsion explosives. Australian “Orika Exsel” has been used for blasting and since 2009, the blasting has been conducted using the remote control blasting devices and apparatus from “Rothenbuhler engineering”, USA.

OPEN PIT MINE


ERDENET MINING CORPORATION

TM

CuMo TRANSPORTATION

Auto Transportation Department comprises 3 main sections including technological haulage, all variety vehicles and special purpose vehicles or machineries as well as 3 auto repair services for vehicles. The department employs over 830 workers. It operates with over 290 vehicles of different models, including heavy load trucks BeLAZ-75131with capacity of 130 tons and all kinds of cars for performing transportation services including haulage of ore mass, transporting the employees to the industrial sites, repair or maintenance or cleaning of roads and areas, piling spoil banks or heaps as well as transporting freight and materials required for production operation. The technological haulage section transports 17.9 million m3 of mining mass and has a freight turnover of 150 million tons/km per annum. The all variety vehicle section and special purpose vehicles and machinery section perform works of 474.9 thousand machine/hours annually.

8


9

For service and maintenance purposes, a German technology “Tip-Top” for over-size tire-repairs and restoration was adopted and the Technical Diagnostics Centre for BELAZ dump trucks, Lubricants Spectral Analytical Laboratory, high compressors Mark-Cummins for engine fuel, and stand to inspect or adjust air-jet or engine fuel are operated. For the last years, the auto transportation facility has introduced the following into the operation: • Stand used for checking and calibrating fuel high pressure pump and spray jet of Cummins type motors; • Equipment used for testing, calibrating or repairing of feeding systems; • Auto Service equipped with equipments or devices from Italy and Belgium; • Fully automatic car wash; • VIST system used for monitoring and controlling remotely using satellite system; and • Auto tracker system used for controlling using mobile network.

THE TRANSPORTATION FACILITY UNIT


ERDENET MINING CORPORATION

TM

CuMo PROCESSING

The Mineral Processing Plant is the main production unit with technological circuits including ore crushing, grinding, flotation, filtration drying, and shipping of the copper and molybdenum concentrates. Two technological lines for ore preparation are operated in this plant. The first line is capable to process 20.5 million tons of ore per year and it crushes ore in three stages using cone crushers and conveys the crushed ore for 2-stage grinding processes using mills МШЦ 5.5 х 6.5, МШЦ 5.8 х 6.9 and МШЦ 3.2 х 4.5. The second line is autogenic grinding section with the annual capacity to receive 5 million tons of ore for grinding. The future commissioning of the Section 6 enables us to process 35 million tons of ore per annum.

10


11

Ore is crushed using jaw crushers and grinded by the autogenic grinder MMC-90x30 having the volume 160 cubic meters in the first stage and by the ball mill МШЦ 5.5 х 6.5 with the volume 140 cubic meters in the second stage and the grinded ore goes to the grinding enrichment section autogenously in the form of pulp. Ore processing technology is operated in collective flotation methods and the copper and molybdenum concentrate is extracted using separation process. Waste pulp from the concentration process is compressed to the disposal pond. The precipitated water in the pond is recycled for technological processes. Mineral Processing Plant produces copper and molybdenum concentrates which meet international standards.

THE MINERAL PROCESSING PLANT


ERDENET MINING CORPORATION

TM

EQUIPMENT MAINTENANCE AND MANUFACTURING

CuMo

12

Machinery Repair Plant performs the basic functions such as capital, periodic and current maintenances to the technological equipment; repair of the worn parts; armoring the equipment with the rubber or corundum; manufacturing or fabricating metal structure or nonstandard equipment or spare parts; repair to the electrical equipment or devices; diagnosis or repair to the lifting machineries; and smelting of steel, cast iron and non-ferrous metals for casting parts.


13

MACHINERY REPAIR PLANT

The plant manufactures the parts of mining equipment including buckets, upper and lower walls of buckets, teeth, blades, armors, chains driving and driven wheels, support rollers for excavators, drilling machines, bulldozers, auto loaders, auto graders, hammers and armors for cone and other jaw and hammer crushers, lining armors for mills, all variety of working parts for pumps. In addition, the plant has been running its business considering largely on effective adoption of up-to-date technologies, operation or utilization of the full capacity of installed machineries and to increase the number of customer satisfied products which meet the appropriate standards.

www.rmz.mn


ERDENET MINING CORPORATION

TM

QUALITY AND STANDARDIZATION

CuMo

14

Quality Control Department implements company’s quality and standards by strengthening of the quality control, improvement of personnel qualifications, by adoption of the international standards or references, analytic methods (ISO:17025) and high precision equipment. In order to satisfy these requirements, the department introduced a completely documented management system that meets MNS ISO/IEC 17020:2002 standards to keep normal operations and continually enhance it.


15

QUALITY CONTROL DEPARTMENT

Thanks to the international accreditation of chemical tests on copper and molybdenum concentrates, conducted at the Chemical Central Laboratory, Quality Control Department by DIN EN ISO/IEC 17025 standards, we could bring our testing quality and precision of methodology to the global standards, the actual results directly to the customers, be a leader in mining sector in more variety of analyses expansion and create legal environment for execution of independent controlling analyses on products or minerals processing in the mining sector.


ERDENET MINING CORPORATION

TM

POWER ENERGY

ENERGY SHOP

The Power Energy Unit has been functioning and serving plants in Erdenet city, entities and population with running water supply, sewerage services, supply of recycling water to Erdenet Mining Corporation, as well as supply of oxygen and acetylene required for production.

CuMo

16

Every year, the unit extracts and distributes 20-21 million cubic meters of water for the consumption of population of Erdenet city, entities or technological needs of Erdenet Mining Corporation. Also it treats and purifies 8-9 million cubic meters of sewage water purifying percentage of 96-98% per annum. Moreover, the unit supplies technological water amount of 70-74 million m3 to Erdenet Mining Corporation from the artificial pond, as well as it produces and has been supplying with 34-36 thousand tons of acetylene and 116-118 m3 thousand oxygen and nitrogen for the consumption of Erdenet Mining Corporation and the entities in Erdenet city.


ЗУУНЫ МАНЛАЙ БYТЭЭН БАЙГУУЛАЛТ

ELECTRIC SHOP

Erdenet Mining Corporation consumes an average of approx. 760 kW million of electrical energy annually via a major distribution network equipped with 94.4 km of cable lines, 37.4 km of overhead lines, over 480 circuit breakers, approx. 2000 other unit riggings, as well as sub-stations installed with the capacity of 374.6 mW of 6-110 kW, belonging to Electrical Unit.

THERMAL ELECTRIC PLANT Thermal power station was commissioned in 1976. The plant has 6 boilers БКЗ-75-39 ФБ capable to produce 75 tons of steam per hour with the atmospheric pressure 39 ata each and heat of 435OC. It has the projected hourly capacity to produce 450 tons of steam with the foresaid parameters. The projected capacity of heat is 310 Gcal/h. During the early years, it supplied the whole Erdenet city with heat. Since 1988, it supplied the steam heat and hot water to Erdenet Mining Corporation, as well as the technological demand of the entities and building structures in the industrial area. Annual 370 thousand gcal. of power heating has been distributed by the plant. It comprises heat lines over 82.8 km for providing consumers with heat. In 2012, the plant is expanded as a thermoelectric plant by installing and launching 2 pieces of turbine generators having capacity of 2.5 MWt from Dresser Rand, USA.

17


ERDENET MINING CORPORATION

TM

FROM THE HISTORY OF REFORMATION AND PROSPERITY

CuMo

18

Year of 1978 The first concentrate was produced. The initial stage of operation of the Mineral processing plant having an annual capacity of 4 million tons of ore was commissioned. Year of 1980 The second stage of operation of the Mineral processing plant was commissioned and ore processing capacity made up to 8 million tons. Year of 1981 Launched the fourth stage of the Mineral processing plant with the development of its annual ore processing capacity up to 16 million tons. Year of 1989 Launched the fifth stage of operations of the Mineral processing plant with the development of its annual ore processing capacity up to 20 million tons. The overall production reached 1 million tons of copper in concentrate. Year of 1994 Approved the Strategic Development Concept for 1994-2004 of EMC. The Explosives Plant of EMC was commissioned into operation and suspended the foreign import of high cost explosives. Year of 1995 Upgraded the technical advancement completely to the flotation equipments of the Mineral processing plant. Year of 1996 In connection with the Strategic Development Concept for 1994-2004, the resolution No. 05 by the Government of Mongolia was passed to carry out complete technical modernizations over the EMC. Caterpillar dump trucks with load of 136 tons and BELAZ-7512 dump trucks with load of 120 tons were commissioned. EMC started to directly receive electricity from Russia. Year of 1997 Upgraded Excavators EKG-10 was launched to the transportation at Open Pit mine. EMC produced overall 2 million of copper in concentrate.


19

Year of 2000 The decision to privatize the currently owned apartments passed by the 29th Board Session of EMC to those employees whose years-of-service were above 15 years for the first time. The second step decision was passed by the 31st Board Session of EMC to privatize the currently owned apartments by the employees in spite of their years-of-service. Rougher concentrate section was launched into operations and the annual capacity to process ore had reached 24 million tons. Year of 2001 Thanks to a complete technical modernization of coupled section I, the ore processing capacity of the same section reached up to 10 million tons. Year of 2002 Launched the BELAZ-75145 heavy Dump trucks, with capacity load of 130 thousand tons, for transportations at Vehicle Transport Unit. Year of 2005 Launched the “LIEBHERR” excavators, with a bucket volume capacity of 18 m3, for transportations at Open Pit mine. “EMC produced 3 million tons of copper in concentrate since its commencement of operation. Year of 2006 Thanks to a complete capacity achievements of the 5th stage of operations of Mineral processing plant, the designed capacity had been increased by 50 percent, allows processing 6 million tons of ore annually. Year of 2008 Chained excavator ЭКГ-15, the first in Mongolia , with capacity for loading 15 m3 of ore was launched. Meeting for 30th Anniversary of Erdenet Mining Corporation was held on December 13, 2010. Year of 2010 Launched the fully replaced Section#3 of which the capacity to process 6 million tons of ore per annum. Year of 2011 Replaced and commissioned the flotation Section #4 at the Mineral Processing Plant. Year of 2012 Reached the ore processing capacity up to 26.0 million tons. Year of 2013 Replaced and launched the flotation Section #6 at the Mineral Processing Plant.


ERDENET MINING CORPORATION

TM

TRANSPORTING TRANSMITTING

DRILLING BLASTING MINING

CRUSHING

PROCESSING

EXPORT

CONCENTRATES

SHIPPING

PROSPECTING

PRODUCTION

CuMo

Production index Indicators

20

Measuring unit

2001

2002

2003

2004

2005

2006

Ore mass

thousand m

15889

15865

16730

18410

18650

18550

Ore mining

thousand ton

25346

25787

27010

27920

27550

27090

Ore processing

thousand ton

23807

24447

25327

25280

25300

25550

Indicators

Measuring unit

3

2007

2008

2009

2010

2011

2012

Ore mass

thousand m3

18780

18430

15400

16370

17150

17600

Ore mining

thousand ton

27780

27570

28200

27575

27550

27780

Ore processing

thousand ton

25600

25640

25920

26060

26100

26030


21

COMPETITIVENESS Global leading countries in exporting copper concentrates Category

Name of the country

Amount of export, tons

1

Chile

2.410.360

2

Indonesia

1.862.790

3

Australia

756.137

4

Argentina

467.367

5

Peru

421.976

6

Canada

369.570

7

MONGOLIA

163.707

8

Botswana

103.272

9

Portugal

91.430

10

USA

87.332

11

Kazakhstan

71.922

Erdenet Mining Corporation is included in the list of world 10 leading countries in the export of copper and molybdenum concentrates. Our company cooperates in the sale of concentrates with major and globally recognized trade companies with stable financial status.

Global leading countries in exporting molybdenum concentrate Category

Name of the country

Amount of export, tons

1

China

94.000

2

USA

56.000

3

Chile

39.000

4

Peru

12.000

5

Canada

9.100

6

Mexico

8.000

7

Armenia

4.200

8

Russia

3.800

9

Iran

3.700

10

MONGOLIA

2.000

11

Uzbekistan

550

12

Kazakhstan

400

13

Kirgizstan

250

Our company concluded long-term Agreements with the world leading companies including Trafigura, Ocean Partners, Gerald Metals, Samsung, Milliford Global Corporation and through the above-mentioned companies we have been supplying our concentrates to the Chinese leading smelting companies such as Jinchuan copper, Yunnan Copper, Daye Nonferrous Metals, Yanggu Xiangguang Copper, Bayan Nonferrous, etc.


ERDENET MINING CORPORATION

TM

FORWARD THE DEVELOPMENT

Strategy

CuMo

According to the strategic plan of development of Erdenet Mining Corporation for the years 2010-2015 /until 2020/, approved by the 43rd Board Session, Erdenet Mining Corporation has set the tasks: to improve the equipment of the plant, to extend the ore processing capacity up to 35 million tons per a year, to reduce cost of unit product, to produce a final product with added value by introducing new techniques and technologies, which are environmentally-friendly and energy saving. Increase of the reserves of raw materials is essential in order to ensure possibility of the long-term operation with high capacity. We planned to do much more for the purpose to increase raw materials and as a result, the lifetime of the operation will be extended. We see that the reserve should be increased thanks to the geological survey and prospection.

Innovations In 2005, a productivity movement titled Productivity Improvement “Erdenet Program” has been commenced at the Mineral Processing Plant, Erdenet Mining Corporation. In this framework, numbers of creative innovations and initiatives have been realized thanks to the improvements on employees’ innovative attitudes. In order to adopt this practice, a program “Khun Erdene” has been conducted successfully since 2011. Based on the requisites to make the new ideas and initiatives suggested by the employees as innovations, the regulation “Adoption of innovation system to Erdenet Mining Corporation” has been implemented since 2003. Adoption of the innovation system ensures each of the employees to propose their intellectual creations or works or to give their real contributions to the productivity oriented works including production efficiency, enhancement of productivity, environmental protection, labor safety, hygienic improvement, etc.

22


23


ERDENET MINING CORPORATION

TM

SAFETY CuMo DEPARTMENT OF LABOR SAFETY AND SANITARY

24


25

FIRST SAFETY AND HEALTH The company considers the labor safety as priority, the integral part and the key criterion for social responsibility of the company. The company regulates the labor safety according to the Constitution of Mongolia, Mongolian Law of Labor, Mongolian Law of Safety and Health, MNS OHSAS 18001:2012 and the policy “Safety First�.


ERDENET MINING CORPORATION

TM

ENVIRONMENTAL MANAGEMENT

CuMo

26

Erdenet Mining Corporation was issued the certificate of ISO 14001:2004 for Environmental Management System for the first time in Mongolia. For the purpose to reduce white dust at Disposal, a program “White Dust” was developed and approved by the Minister of Environment upon discussion. Some certain measures and activities, included in the local or company’s plans, have been conducted, according to the approved program, such as approaches grabbing the dust with dark earth soil and wetting the dust over with waste water. Erdenet Mining Corporation has been conducting rehabilitation at the site of bare rock heap No. 3, Open-pit mine, since 2007; planting up and turf over 18 hectare area and over 15000 trees and bushes; and conducting and controlling company’s and local regional environment using mobile laboratory installed at Gazel vehicle, equipped with up-to-date and high precision machine-tools and instruments for chemical, chemical-physical measurement and analyses.


DEPARTMENT OF ENVIRONMENT PROTECTION

ISO 14001:2004


ERDENET MINING CORPORATION

TM

SOCIAL RESPONSIBILITIES

EDUCATION

CuMo

The School of Technology is operated as a Complex “Education+Research+Production” for the purpose to educate, train, qualify or reserve higher educated personnel, professional workers and retraining or improvisation. The school has been providing the students with Bachelor degree programs in majors of Mineral Processing Technology, Metallurgy, Mining Technology of Utilization, etc., as well as conducting Master degree program majoring in Production management jointly with School of Computer Science and Management. Moreover, vocational training courses to train and reserve professional workers in mining sector have been conducted on orders of “Oyu Tolgoi” Co., Ltd., “MAK” Co., Ltd., “Energy Resource” Co., Ltd., and so on.

HEALTH The Medical sanatorium provides the services including diagnosis, treatment, and rehabilitative treatment to all the workers, pioneers, veterans, percentage losers of disability of Erdenet Mining Corporation due to occupational diseases of Erdenet Mining Corporation. Over 6000 employees have been involved with preventive check-ups and examinations by highly specialized doctors and physicians of the medical sanatorium according to the schedule in regular basis. It is completely equipped with up-do-date medical gauges, devices and equipments. In 2013, the medical sanatorium was reissued the Accreditation Certificate.

RELAXING The Resort “Selenge” has been serving the employees of the company all year round. Besides the rendering resort services, it has been paying much of its consideration to the ecology. The resort has been feeding more than 10 deer, reindeers and over 50 birds in nearly 10 species. In summer, the resort receives children for summer camp having the capacity of 400 to 450 children per a shift (8 shifts). In addition, the resort strengthens its material bases by building and constructing ski resort, sports hall, ground tennis, and basketball or volleyball courts.

28


29

SCHOOL OF TECHNOLOGY

MEDICAL SANATORIUM

RESORT “SELENGE”


ERDENET MINING CORPORATION

CuMo

TM

SPORTS Sports Club “Khangarid” has been operating for providing the conditions and environments dedicated for health protection and tone up, and indulge in sports events in order to train and reserve competent athletes in the national, continental or world levels. It is not an accidentally said, “Great Sports – Erdenet Mining Corporation are twins”. Sports Club “Khangarid” has been producing outstanding athletes who raise their state flag in the Olympic Games and global arenas.

SPORT COMPLEX

30


31

Various forms of activities to provide the company’s employees and their family members with opportunity to enjoy their leisure time and relaxation, to discover or develop their abilities or talents, and to satisfy their cultural necessities have been organized at the Cultural Palace “Uurkhaichin”, Erdenet Mining Corporation. As a result, the work efficiency executed by the employees will in-

CULTURE

crease up thanks to those of cultural activities. In particular, the concert “Somnambulant” and the classical theatrical play “Will of heaven”, which have been performed by the artists and performers of Song and Dance Ensemble “Erdenet”, took the Grand Prix and the Cup in the National Competition “Classical Arts 2012”.

CULTURAL PALACE “UURKHAICHIN”


ERDENET MINING CORPORATION

TM

CONSTRUCTION

CuMo

The Live Figure of Burkhan Bagsha

Monument to Miners

32

The rock waterfall


33

Friendship Hill

The park with musical fountain

The stadium


GENERAL ADMINISTRATION BUILDING: Amar square 1, Bayan-Undur soum (Erdenet city) Orkhon province, Mongolia. Tel: +976 (0) 1352 73501 Fax: +976 7035 3002 ADMINISTRATIVE AND SERVICE BUILDING: Bayan-Undur soum(Erdenet city), Orkhon province, Mongolia Tel: +976 (0) 1352 71501; Fax:+976 (0)1352 73002

REPRESENTATIVE OFFICE IN ULAANBAATAR: Building 14, Peace avenue, Ulaanbaatar city , Mongolia. Tel: +976 (0) 11 320561, Fax:+976 (0)11 312039 REPRESENTATIVE OFFICE IN MOSCOW: 117279, Miklukho-Maklaya street 34, office 71, Moscow city, Russian Federation Tel: +7 499 724 3852; +7 926 331 3716; Fax: +7 499 724 3775 REPRESENTATIVE OFFICE IN BEIJING, CHINA: Suit 1512, Beijing Silver Tower 2# North’Rd, Don San Huan Street, Chao Yang District, Beijing, China, Postal Code: 100027 Tel: 0086-10-64106217, 0086-10-64106218 Fax: 0086-10-64106219 REPRESENTATIVE OFFICE IN LONDON, UK: 10, 11 Sheldon Square, London, W2 6DQ, United Kingdom Tel/Fax: (44) 0207 266 7857


ERDENET MINING CORPORATION www.erdenetmc.mn

Emc eng  
Read more
Read more
Similar to
Popular now
Just for you