Nu Flow’s innovative solution prevented the busy downtown sidewalk and neighboring trolley station’s tracks from being excavated, while also greatly extending the useful life of the hotel’s drain main. There was absolutely no destruction or disruption to the hotel sewer service, trolley station or nearby areas for a fraction of the cost of a traditional excavation.
Visit our website https://www.nuflowtech.com for more details.