Page 1

PORTFOLIO TEDESCO


5 PROJECTS

NICHOLAS J TEDESCO


DESIGN PROJECTS

1 2 3

LINCOLN HEIGHTS CHARTER HIGH SCHOOL PASADENA LOW RISE DEVELOPMENT COLLAPSE OF SUBURBIA

BUILT

4

RESIDENTIAL BATHROOM REMODEL

WORK EXPERIENCE

5

DUTTON ARCHITECTS | INGLISH STUDIO


DESIGN PROJECTS


PROJECT

1

LINCOLN HEIGHTS CHARTER HIGH SCHOOL


FIELD ACCESS

CURRENT

PROPOSED

LINCOLN HEIGHTS CHARTER HIGH SCHOOL LOCATION | LINCOLN HEIGHTS, CA EVERY SCHOOL NEEDS A FIELD. FURTHERMORE, EVERY COMMUNITY NEEDS A RECREATIONAL SPACE. LINCOLN HEIGHTS HAS A RECREATIONAL AREA THAT IS NEXT TO THE PROPOSED SITE FOR THE NEW HIGH SCHOOL; HOWEVER, IT IS CURRENTLY DIFFICULT TO ACCESS AND IT IS UNDER-UTILIZED. BY RETRO-FITTING THE FIELD AREA, THE SCHOOL AS WELL AS THE FIELD BENEFIT. THUS, THE AIM OF THE PROJECT IS TO INTEGRATE THE FIELD AND THE HIGH SCHOOL. FURTHERMORE, THIS SAME IDEA OF INTEGRATION INFLUECED THE CLASSROOM DESIGN. CLASSROOMS WERE DESIGNED IN CLUSTERS THAT ATTACH TO A SHARED ATRIUM SPACE. THE INTERIOR OF THE CLUSTERS CAN BE CHANGED TO ALLOW FOR SHARED LEARNING BETWEEN DIFFERENT SUBJECTS.


EXTEND TO COMMUNITY

IF THE HIGH SCHOOL WAS RESTRAINED BY THE SITE BOUNDRIES.

HIGH SCHOOL OPENS UP AND REACHES OUT TO ITS SURROUNDINGS.

RESULT OF BREAKING SITE BOUNDRIES.

DIRT REMOVAL REQUIRED FOR SUBTERANEAN PARKING. IT WOULD BE EXPENSIVE TO REMOVE THIS AMOUNT OF DIRT AND IT IS NOT SUSTAINABLE TO DO SO.

INSTEAD OF REMOVING A LARGE AMOUNT OF DIRT FOR SUBTERANEAN PARKING, A SMALL AMOUNT IS REMOVED FOR A RAMP. PARKING IS MOVED TO THE FIELD AND REMOVED DIRT IS USED TO EXTEND THE SIDEWALK. THE MONEY SAVED FROM NOT HAVING SUBTERANEAN PARKING IS USED TO RETROFIT THE NEIGHBORING FIELD AND REC. CENTER.

INTENDED SITE

LA RIVER REMEDIATION PROJECT

SUSTAINABILITY | DIRT REMOVAL

PROPOSED SITE. THE SITE FOR THE SCHOOL IS 16FT. HIGHER THAN THE RECREATIONAL PARK AND FIELD THAT IS DIRECTLY NEXT TO IT.

LARGER PROJECT

PROPOSED SITE


SITE PLAN


COMMUNITY | SCHOOL SPACE

ATRIUM FUNCTIONS

SHARED SPACE

CLUSTER ARRANGEMENTS

LIGHT

VENTILATION


ROOF PLAN

LONGITUDINAL SECTION

SITE PLAN


4 1 5

5

4 1 1 2

4 6

6 4

1

1

7

1 4

3 1

SECOND FLOOR PLAN

1-CLASSROOM 2-LIBRARY 3-DINING 4-ATRIUM OPEN TO BELOW 5-ADMINISTRATION 6-COURTYARD 7-GREEN ROOF


DETAIL SECTION

ROOF DETAIL FLASHING

ROOF DETAIL

4” RIGID INSULATION METAL DECK WPM STAINLESS STL. GUTTER METAL CLIP SYSTEM DETAIL 3

FLASHING

FIXING BATTENS METAL PANELS

DROP CEILING

STAINLESS STL. GUTTER MAIN STRUCTURAL COLUMN

FIXING BATTENS

5/8” GYPSUM BOARD

WPM

PRIMARY STL. 20 GA. GALV. METAL SHEETING

RIGID INSULATION WPM

6” STL. STUDS

RIGID INSULATION DETAIL 2 6” STL. STUDS

4” STL. STUDS

WPM

4” RIGID INSULATION

METAL DECK PRIMARY STL. METAL CLIP SYSTEM AUTOMATED DOOR PISTON

METAL PANELS

DETAIL 2 T. STL. FRAME SUPPORT

RIGID INSULATION DOOR TRUSS FRAME AT BOTH SIDES POLYCARBONATE CLIP

METAL PANEL

EXTRUDED POLYCARBONATE

WPM

FIXING BATTENS METAL CLIP SYSTEM

6” STL. STUDS

EDGE CLIP GUTTER PAINTED TUBE STL. FRAME

METAL CLIP SYSTEM 5” CONCRETE SLOPE 1/4” PER FT.

METAL PANEL


DETAIL CHUNK

GRASS EARTH DRAINAGE MAT GLASS RAILING WPM FLASHING METAL DECK CONCRETE DROP CEILING METAL PANELS DUCT PRIMARY STL. WPM INSULATION FIXING BATTENS METAL CLIP SYSTEM 5/8” GYPSUM BOARD 4” STL. STUDS PRIMARY STL. 6” STL. STUDS PAINTED TUBE STL. FRAME

DOOR TRUSS FRAME AT BOTH SIDES

HANGAR DOOR

AUTOMATED DOOR PISTON T. STL. FRAME SUPPORT POLYCARBONATE CLIP EXTRUDED POLYCARBONATE

GUTTER EDGE CLIP 5” CONCRETE SLOPE 1/4” PER FT. EARTH


CONCEPT DIAGRAM

OPEN

MOVING

CLOSED


UNIT MODEL

2

PROJECT

PASADENA LOW RISE DEVELOPMENT


N

SITE PLAN

4 UNIT LOW RISE DEVELOPMENT LOCATION | PASADENA, CA

CONCEPT | DESIGN UNITS THAT CAN TRANSFORM AND ADAPT TO PEOPLE’S CHANGING LIVES. MANY OF THE WALLS IN THE UNITS CAN MOVE TO ENLARGE SPACES OR CREATE NEW SPACES. THE UNITS ARE MADE FROM PREFABRICATED MODULES. THERE IS A SLEEPING, EATING, LIVING, AND PARKING MODULE. EACH OF THESE MODULES IS CREATED FROM A KIT OF PARTS. CLIENTS CAN CHOOSE THE PARTS THEY MOST DESIRE BEFORE CONSTRUCTION.


MODULE

CATALOGUE OF PARTS

PARKING

VENTILATION DAYLING PANEL

SOLAR ROOF

LIVING

SLIDING WALL

VENTILATION DAYLING PANEL

SOLAR ROOF

EATING

SLIDING WALL

SOLAR ROOF

SLEEPING

SLIDING WALL

VENTILATION DAYLING PANEL

ASSEMBLY


NORTH ELEVATION

FLOOR 2

UNIT C

2

5 5

1

5

4

7

3

4

2

1

4

5

4

5

3

UNIT D

6


LONGITUDINAL SECTION

FLOOR 1 6

6

5

UNIT A

4

4

3

2

5

UNIT C

1

5

4

4 5

4

5

1

3

7

5

4

2 UNIT D

UNIT B

UNIT A AND B ARE IDENTICAL. UNIT C AND D ARE IDENTICAL. THEY ARE REPRESENTED IN TWO DIFFERENT FORMS. 1-LIVING 2-KITCHEN 3-DINING 4-BATHROOM 5-BEDROOM 6-EXTENDED BALCONY 7-OFFICE

5

6


GROUND FLOOR UNIT INTERIOR RENDER


EXTERIOR RENDER


3

PROJECT

COLLAPSE OF SUBURBIA


N

SITE PLAN 48 UNIT MID RISE BUILDING LOCATION | CULVER CITY, CA

CONCEPT | ALLOW USERS THE SAME AMENITIES THAT SUBURBIA OFFERS IN THE CITY. THE PROJECT CHALLENGED THE STANDARD MID RISE LIVING MODEL AND WAS INFLUENCED BY THE RELATIONSHIP BETWEEN THE CAR AND THE UNIT. SUBURBIA WAS NOT LITERALLY PUT INTO THE CITY, BUT IT WAS ADAPTED TO THE CITY AND THE CHANGING LOS ANGELES CULTURE. SOME OF THE AMENITIES IN THE UNITS INCLUDE PARKING IN YOUR DWELLING SPACE, PRIVATE GREEN SPACE, AND OPEN AIR SPACE. AFTER DRIVING INTO A CAR ELEVATOR, CARS CAN PULL INTO THE UNITS. ELECTRIC CARS CAN PLUG IN TO THE DWELLING SPACE. AS PEOPLE IN LOS ANGELES OFTEN USE THEIR CARS AS A SECOND OFFICE, THE CAR WAS BROUGHT INTO THE DWELLING SPACE TO ADAPT TO THIS PHENOMENON AND TO USE AS ADDITIONAL PROGRAM.


CONCEPT DIAGRAMS

OLD MODEL

SUBURBIA

URBAN SUBURBIA UNIT

STACKED


AGGREGATION DIAGRAM

2 BED UNIT

1 BED UNIT


TRANSVERSE SECTION


1 BED UNIT

6

5 3 4

2

10

9

8

7

1- LIVING 2- KITCHEN 3- DINING 4- BATHROOM 5 - BEDROOM 6- PRIVATE YARD 7- PARKING IN UNIT 8- CAR ELEVATOR 9- ELEVATOR 10 - STAIR

1


2 BED UNIT

5

5 4

4

FLOOR 2

9

8

7

6 10

FLOOR 1

4

2

1

3


FLOOR PLAN


GROUND FLOOR


WEST ELEVATION


BUILT


4

PROJECT

RESIDENTIAL BATHROOM REMODEL


RESIDENTIAL BATHROOM REMODEL LOCATION | VENTURA, CA A NEWER AND MORE OPEN BATHROOM WAS DESIRED BY THE CLIENT. THE ENTIRE BATHROOM WAS DEMOLISHED. DEMO INCLUDED THE SHOWER AREA, ALL OF THE TILE, DRY WALL, COUNTERS, AND DIVIDER WALL. A NEW TUB WAS INSTALLED AND HALF WALLS WERE INSTALLED AROUND THE TUB. THE TILING AROUND THE TUB AS WELL AS THE FLOORS WAS ALL RE-DONE. NEW FIXTURES WERE INSTALLED AS WELL AS NEW BASEBOARD AND CHAIR RAIL.


WORK EXPERIENCE


5

PROJECT

DUTTON ARCHITECTS | INGLISH STUDIO


639 S. Spring St #4A Los Angeles, CA. 90014 TEL: 323.668.2600 FAX: 323.668.2800

•••• ••••

PLANS, EXISTING & PROPOSED

A2.1

PHOTOGRAPHY STUDIO REMODEL LOCATION | WEST HOLLYWOOD, CA A PHOTOGRAPHER FOR VOGUE ACQUIRED A BUILDING IN WEST HOLLYWOOD, PREVIOUSLY USED FOR FURNITURE MANUFACTURING, AND DESIRED TO TURN IT INTO A PHOTOGRAPHY STUDIO. ALL INTERIOR WALLS AND ELEMENTS WERE DEMOLISHED. THE EXTERIOR WALLS WERE KEPT INTACT. THE CEILING AND BRICK WALLS WERE PAINTED WHITE AND BLEACHED PLYWOOD ELEMENTS WERE ADDED TO THE SPACE THAT HOUSED NEW PROGRAMS.


Nicholas Tedesco Portfolio  

Architecture Portfolio

Read more
Read more
Similar to
Popular now
Just for you