Appendix K Needs Plan Project Costs, Purpose and Need

February 7, 2015


This page is intentionally blank.


Path Forward 2040 Long Range Transportation Plan

PURPOSE AND NEED STATEMENTS

The Needs Plan included a six county area consisting of Baker, Clay, Duval, Nassau, Putnam and St. Johns counties. The Needs Plan is not a prioritized list of projects, nor is it constrained by financial resources. The Needs Plan leveraged prior studies development by the Florida Department of Transportation, the North Florida Transportation Planning Organization and local governments. Maintaining the public consensus continuity of these efforts was essential to the credibility of the planning process. Because of the level of visioning and planning that occurred within these studies, the known needs greatly exceeded the resources anticipated to be available. Building on the community consensus that was achieved, the development of the Needs Plan began with a review and confirmation of these studies. The following sources were used to define the needs.               

2035 Envision Long Range Transportation Plan City of Jacksonville Mobility Plan Committed Development Projects Provided by Local Governments Coordination with local governments and stakeholders on additional needs FDOT’s Strategic Intermodal Systems Needs Plan and Cost Feasible Plan (includes 1st Five Year and 2nd Five Year) FDOT’s Adopted Work Program First Coast Regional Greenways and Trails Plan Jacksonville Transportation Authority Blueprint 2020 Local Government Comprehensive Plans North Florida TPO Congestion Management Plan North Florida TPO Freight, Logistics and Intermodal Planning Framework Plan North Florida TPO ITS Master Plan North Florida TPO Regional Bicycle and Pedestrian Plan North Florida TPO Strategic Safety Plan North Florida TPO Transportation Improvement Program

As part of the planning process, these needs were confirmed through an analysis of the safety, congestion, mobility and emergency evacuation needs. The following tables summarize the needs plan costs in present day dollars and provide a summary of the purpose and need for each project of the road and transit capacity projects.

1


Path Forward 2040 Long Range Transportation Plan

Table 1. Summary of the Need Plan Project Cost and Operating and Maintenance Costs (in millions of present day dollars) Facility County Map ID From

To

Improvement Type New 2 Lane Road Widen to 4 Lanes Widen to 5 Lanes New 4 Lane Road Widen to 4 Lanes* Widen to 6 Lanes New 2 Lane Road New 2 Lane Road Widen to 4 Lanes New 2 Lane Bridge New 2 Lane Road New 2 Lane Road New 2 Lane Road New 2 Lane Bridge Reconstruct 2 Lanes New 2 Lane Road New 2 Lane Road New 2 Lane Road Widen to 5 Lanes New 4 Lane Road New 2 Lane Road New 3 Lane Road Widen to 6 Lanes New 4 Lane Road Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes New Interchange New 4 Lane Road, Two Overpass and New Interchange

Abaco Island Drive Extension Alta Drive Alta Drive / Yellow Bluff Road Alta Drive Realignment Amelia Island Parkway Argyle Forest Boulevard Arrigo‐Parliament Reconnection Barnwell‐0' Neil Scott Connector Baxley Road Blount Island Boulevard Extension Braddock Parkway Brady Point‐Clements Connector Brinkhoff Road Buffalo Road Cahoon Road Cardinal Street North Extension Cardinal Street South Extension Cecil Field Connector Chaffee Road Cheswick Oak Avenue Extension Christian Way Extension Clark Road Extension College Drive College Drive Extension Collins Road Collins Road Collins Road Collins Road Collins Road Realignment

Nassau Duval Duval Duval Nassau Duval Nassau Nassau Clay Duval Duval Nassau St. Johns Putnam Duval Nassau Nassau Duval Duval Clay Nassau Duval Clay Clay Duval Duval Duval Duval Duval

988 3 2 1 704 936 980 1001 900 1006 939 1002 801 503 1016 976 975 972 971 13 995 1020 902 14 930 932 15 16 16B

Abaco Island Drive SR 105 Heckscher Drive I‐295 SR 105 Zoo Parkway South 14th Street SR 23 First Coast Expressway Arrigo Boulevard Barnwell Road CR 220 Doctors Inlet Road Spoil Island SR 115 Lem Turner Road Brady Point Road SR 207 Buffalo Road west Lenox Avenue Cardinal Avenue Spring Meadow Avenue Commerce Center SR 228 Normandy Boulevard Oakleaf Plantation Parkway Christian Way Broward Road CR 220 Doctors Inlet Road SR 21 Blanding Boulevard Shindler Drive Old Middleburg Road S SR 21 Blanding Boulevard at US 17 Roosevelt Boulevard Pine Verde

Zion Court I‐295 New Berlin Road (north ) North of New Berlin Road (south) CR 105A Buccaneer Trail Old Middleburg Road Parliament Drive O'Neil Scott Road SR 21 Blanding Boulevard Jacksonville Port Authority Pecan Park Road Clements Road Wildwood Drive Buffalo east US 90 Beaver Street SR 200 SR AIA  Yulee Backage Roads William Burgess Boulevard SR 23 First Coast Expressway Crystal Springs Road Savannah Glen Boulevard Hampton Club Way Clark Road SR 21 Blanding Boulevard Challenger Drive (Branan Field Road) Rampart Road Shindler Drive Pine Verde

Comfort Road Commodore Point Drive Extension Concourse Loop Road Connector Road CR 105A Buccaneer Trail CR 16A CR 16A Extension CR 209 Russell Road CR 209 South CR 210 CR 210 CR 210 W CR 214 CR 218 CR 218 CR 218 CR 218 CR 218 Extension CR 218 Extension CR 220 Doctors Inlet Road CR 220 Doctors Inlet Road CR 2209 CR 2209 CR 2209 CR 2209 CR 2209 CR 2209 CR 2209 CR 2209 CR 305

Putnam Nassau Nassau Putnam Nassau St. Johns St. Johns Clay Clay St. Johns St. Johns St. Johns St. Johns Clay Clay Clay Clay Clay Clay Clay Clay St. Johns St. Johns St. Johns St. Johns St. Johns St. Johns St. Johns St. Johns St. Johns

505 996 501 502 705 803 802 905 906 805 807 849 809 1026 1027 24 909 25 26 33 34 810 811 812 813 814 815 816 843 818

Port Road Commodore Point Drive License Road US 17 South Fletcher Avenue SR 16 Connector CR 16A CR 739 Henley Road Decoy Road I‐95 Greenbriar Road Longleaf Pine Parkway Holmes Boulevard US 301 Cosmos Avenue SR 21 Blanding Boulevard SR 16 CR 739 Henley Road SR 23 First Coast Expressway SR 21 Blanding Boulevard College Drive SR 23 First Coast Expressway SR 16 Connector International Golf Parkway CR 214 SR 207/CR 305 SR 16 CR 208 at CR 210 CR 204

US 17 Blackrock Road Amelia Concourse Distribution Center Canopy Drive SR 13 Leo Maguire Parkway US 17 US 17 near US 1 Cimarrone Road Greenbriar Road US 1 Cosmos Avenue Pine Tree Lane CR 739 Henley Road CR 739 Henley Road SR 23 First Coast Expressway CR 315 Knight Boxx Road US 17 CR 210 SR 23 First Coast Expressway SR 16 Connector CR 208 CR 214 International Golf Parkway SR 16

US 17 Roosevelt Boulevard

SR 206

Page 1 of 13

Widen to 4 Lanes New 2 Lane Road New 2 Lane Road New 2 Lane Road Turn Lane Improvements* Widen to 4 Lanes New 2 Lane Road Widen to 4 Lanes Reconstruct 2 Lanes Widen to 6 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 3 Lanes* Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes New 4 Lane Road New 4 Lane Road Widen to 4 Lanes Widen to 6 Lanes New 6 Lane Road New 6 Lane Road New 6 Lane Road New 4 Lane Road New 4 Lane Road New 4 Lane Road New 4 Lane Road New Interchange New 2 Lane Road

2013 Cost  O&M Cost  (millions) (millions) $0.72 $0.00 $8.85 $0.21 $14.50 $0.15 $15.15 $0.10 $4.17 $0.10 $8.49 $0.48 $0.59 $0.00 $2.89 $0.02 $4.61 $0.05 $80.21 $0.08 $47.68 $0.24 $2.89 $0.02 $4.32 $0.04 $34.71 $0.05 $10.20 $0.07 $1.44 $0.01 $0.48 $0.00 $12.57 $0.07 $30.00 $0.39 $23.08 $0.30 $6.49 $0.04 $0.90 $0.04 $16.29 $0.31 $30.08 $0.23 $11.30 $0.22 $4.10 $0.15 $4.30 $0.15 $36.00 $0.19 $104.84 $0.07 $5.86 $3.61 $3.17 $0.95 $1.41 $24.85 $1.41 $71.88 $68.15 $10.10 $19.90 $10.08 $0.92 $90.98 $7.50 $42.39 $31.33 $33.40 $26.00 $36.86 $40.74 $20.30 $17.75 $11.50 $27.13 $39.51 $11.50 $26.22 $35.23 $10.00

$0.07 $0.02 $0.03 $0.95 $0.05 $0.72 $0.02 $0.77 $0.30 $0.44 $0.22 $0.29 $0.13 $0.96 $0.25 $0.45 $0.33 $0.20 $0.30 $0.30 $0.77 $0.52 $0.45 $0.42 $0.42 $0.61 $0.06 $0.41 $0.19 $0.16


Path Forward 2040 Long Range Transportation Plan

Table 1. Summary of the Need Plan Project Cost and Operating and Maintenance Costs (in millions of present day dollars) Facility County Map ID From

To

Improvement Type

CR 305 CR 315 CR 315 CR 739B Sandridge Road Crosby Avenue Extension Davis / 9B Parcel Decoy Road Dixie Highway / Pellicer Lane

St. Johns Clay Clay Clay Nassau Duval Clay St. Johns

850 31 32 904 993 1036 907 1025

SR 206 SR 16 CR 315B CR 739 Henley Road US 17 SR 5 SR 9B US 17 SR 207

SR 207 CR 315B US 17 CR 209 Russell Road Pinewood Drive SR 152 Baymeadows Road CR 209 South CR 214 West of King Street

Dove Road Extension {west} Durbin Parkway Durbin Parkway Duval Station Road east Dove Road Extension East Nassau Connector East Nassau Connector Eastport Road Flora Parke‐Wal Mart Connector Florida Boulevard Future Corridor Initiative

991 819 844 942 974 36 969 37 986 1021 721

Harper Chapel Road Extension 9B Extension at US 1/SR 5 Dixie Highway US 17/SR 5 Main Street Harper Chapel Road I‐95 at I‐95 SR 105 Heckscher Drive Flora Parke Boulevard Penman Road Tampa Bay

Mentoria Road Nocatee Parkway

Pulaski Road Walmart Supercenter SR 10 Atlantic Boulevard Northeast Florida

Gator Bowl Boulevard

Nassau St. Johns St. Johns Duval Nassau Nassau Nassau Duval Nassau Duval Baker/Clay/Duv al Duval

Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes New 2 Lane Road Widen to 4 Lanes Reconstruct 2 Lanes Reconstruct 2 Lanes and Widen to add Sidewalks and Bike  Lanes New 2 Lane Road New 4 Lane Road Modify Interchange Widen to 4 Lanes New 2 Lane Road New 4 Lane Road New Interchange Widen to 3 Lanes New 2 Lane Road Widen to 3 Lanes Future Corridor

Liberty Street

Hart / Mathews Bridge

Widen to 6 Lanes and Remove Ramps

Gene Lasserre Boulevard Extension Goodbread Road Reconstruction Governors Park Road Hamilton Street Extension Harlow Boulevard Harper Chapel Extension Hart Expressway Ramps Hartley Road Harts Road Holmes Boulevard I‐10 I‐10 I‐10 I‐10 I‐10 I‐10 I‐10 I‐10 I‐10 I‐10/US 90 Parallel Reliever I‐295 I‐295 I‐295

Nassau Nassau Clay Nassau Duval Nassau Duval Duval Duval St. Johns Duval Nassau Duval Baker Baker Duval Duval Baker Duval Baker Duval/Clay Duval Duval

985 977 46 1000 943 989 43B 49 963 821 401 402* 403* 404* 405* 406 432 453 454 720 57 119 407

Gene Lassere Boulevard US 17 SR 5 US 17 Goodbread Circle SR 134 103rd Street Harper Chapel Road Liberty Street SR 13 San Jose Boulevard SR 104 Dunn Avenue CR 214 SR 23 First Coast Expressway Baker/Nassau County Line Nassau/Duval County Line W of CR 125 W of SR 121 US 301 I‐295 Baker/Columbia County Line at I‐295 South Mac Clenny SR 13 San Jose Boulevard SR 9B I‐95 North

SR 200A Pages Dairy Road Hamilton Street SR 16

I‐295 I‐295 I‐295 I‐295 I‐295 I‐295 I‐295 I‐295 I‐295 I‐95 I‐95 I‐95 I‐95

Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval St. Johns St. Johns Duval

408 409 410 411 431 964 1022 1023 121 68 138 400 413

North of Trout River US 1 New Kings Road SR 134 103rd Street I‐10 US 17 Roosevelt Boulevard at US 17 Roosevelt Boulevard I‐95 South SR 202 J. T. Butler Boulevard SR 113 Southside Connector at SR 102 Airport Road at US 1/SR 5 Ponce De Leon Boulevard and at SR  St. Johns/Flagler County Line SR 104 Dunn Avenue

43

Starratt Road William Burgess Boulevard Chester Road

Lane Avenue Dove Road Extension Hart / Mathews Bridge Old St. Augustine Road I‐295 Four Mile Road I‐295 Nassau/Duval County Line US 301 W of SR 121 Baker/Nassau County Line SR 23 First Coast Expressway I‐95 CR 125

Page 2 of 13

East Baldwin W of US 17 Roosevelt Boulevard I‐295 SR 105 Dames Point Bridge/Heckscher  Drive I‐95 North of Trout River I‐10 US 1 South of New Kings Road SR 134 103rd Street SR 13 San Jose Boulevard SR 9B SR 202 J. T. Butler Boulevard

SR 206 SR 102 Airport Road

2013 Cost  O&M Cost  (millions) (millions) $13.39 $0.39 $29.50 $0.30 $7.10 $0.10 $34.10 $0.36 $0.72 $0.00 $3.15 $0.42 $3.37 $0.02 $2.27 $0.03 $2.78 $52.52 $35.23 $14.48 $0.30 $93.40 $35.23 $11.80 $1.44 $5.30 $2,000.00

$0.03 $0.43 $0.19 $0.13 $0.00 $0.82 $0.19 $0.18 $0.01 $0.14 $5.10

$40.50

$0.00

New 2 Lane Road and Roundabout New 2 Lane Road New 4 Lane Road New 2 Lane Road Widen to 3 Lanes New 2 Lane Road Remove Ramps Widen to 3 Lanes Widen to 4 Lanes Widen to 6 Lanes Add 4 Express Lanes Add 4 Express Lanes Add 4 Express Lanes Add 4 Express Lanes Add 4 Express Lanes Add 4 Express Lanes Add 4 Express Lanes Add 4 Express Lanes Modify Interchange Future Corridor Add 4 Express Lanes on Bridge Add 4 Express Lanes Add 4 Express Lanes

$1.44 $1.98 $71.80 $2.37 $1.89 $0.49 $6.30 $8.40 $18.83 $5.08 $219.54 $4.58 $56.25 $50.57 $16.96 $101.87 $372.32 $155.61 $131.63 $144.00 $177.64 $12.30 $123.30

$0.01 $0.04 $0.59 $0.02 $0.02 $0.01 ‐$0.19 $0.09 $0.22 $0.10 $7.00 $0.71 $3.28 $1.17 $3.28 $6.32 $5.58 $18.49 $0.19 $0.37 $5.20 $3.00 $6.08

Add 4 Express Lanes Add 4 Express Lanes Add 4 Express Lanes Add 4 Express Lanes Add 4 Express Lanes Modify Interchange Add 2 Express Lanes Add 2 Express Lanes Add 4 Express Lanes Modify Interchange Modify Interchange Add 4 Express Lanes Add 4 Express Lanes

$87.38 $28.17 $180.57 $66.47 $52.45 $34.10 $0.85 $0.85 $176.80 $9.00 $13.18 $92.49 $456.58

$5.18 $1.16 $6.22 $5.47 $6.31 $0.19 $4.46 $4.86 $8.39 $0.19 $0.19 $8.00 $3.62


Path Forward 2040 Long Range Transportation Plan

Table 1. Summary of the Need Plan Project Cost and Operating and Maintenance Costs (in millions of present day dollars) Facility County Map ID From I‐95 I‐95 I‐95 I‐95 I‐95 I‐95 I‐95 I‐95 I‐95 International Golf Parkway Jones Road Kernan Boulevard Kernan Boulevard Knight Boxx Road Lake Asbury East West 1 Lake Asbury North South Road 3 Lofton Creek Crossing Long Bay Road Extension North Macaw Avenue Extension McDuff Avenue / 5th Street Mentoria‐Wm Burgess Connector Merrill Road Mickler Road Monument Road Monument Road National Cemetery Road New Berlin Road New Berlin Road New World Avenue New World Avenue Norfolk Southern Railroad Overpass Northern Cross Town Corridor Northern Outer Beltway Oakleaf Village Parkway Extension Old Kings Road Old Middleburg Road Old St. Augustine Road Old St. Augustine Road

Duval Duval St. Johns Duval St. Johns Duval Duval St. Johns Duval St. Johns Duval Duval Duval Clay Clay Clay Nassau Clay Nassau Duval Nassau Duval St. Johns Duval Duval Duval Duval Duval Duval Duval Duval Baker Duval/Nassau Clay Duval Duval Duval Duval

414 418A 418B 419 420 433 434 846 962 823 944 73 933 901 915 914 710 911 982 1019 990 945 825 946 947 1033 948 949 1034 1035 85 500 88 913 951 1015 90 1010

North of Fuller Warren Bridge Duval/St. Johns County Line International Golf Parkway at US 1/SR 15 MLK SR 206 SR 202 J. T. Butler Boulevard I‐295 at CR 210 at SR 115 Southside Boulevard I‐95 US 90 Beaver Street SR 202 J. T. Butler Boulevard SR 10 Atlantic Boulevard CR 220 Doctors Inlet Road NS3 CR 739B Sandridge Road Hendricks Road Old Jennings Road Cardinal Street Melson Avenue William Burgess Boulevard Hartsfield Road Palm Valley Road Tredinick Parkway I‐295 Lannie Road Pulaski Road Yellow Bluff Road SR 23 First Coast Expressway SR 23 First Coast Expressway West 12th Street CR 125 I‐10 Oakleaf Plantation Parkway SR 111 Edgewood Avenue Argyle Forest Boulevard Bartram Park Boulevard at Greenland Road

Outer Loop Facility Pages Dairy Road East Extension Pages Dairy Road South Extension Palm Valley Road Pecan Park Road Pecan Park Road Pulaski Road Pulaski Road / Starratt Road Race Track Road Race Track Road Race Track Road Connector Ramona Boulevard Rampart / Firestone Road Ranch Road Ricker Road Salisbury Road Extension San Pablo Road Shindler Drive SR 10 Atlantic Boulevard SR 10 Atlantic Boulevard SR 10 Atlantic Boulevard

Baker/Duval Nassau Nassau St. Johns Duval Duval Duval Duval St. Johns St. Johns St. Johns Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval

91 987 983 826 952 92 953*** 97 827 828 851 935 98 1038 934 99 1009 101 714 715 716

SR 228 Normandy Boulevard Chester Road SR 200 SR A1A Intracoastal Waterway Braddock Boulevard I‐95 Eastport Road I‐295 St. Johns Parkway Bartram Park Boulevard Durbin Parkway / 9B Extension Hammond Boulevard Collins Road Tradeport Road Morse Avenue SR 152 Baymeadows Boulevard US 90 Beach Boulevard Collins Road at Girvin Road at Hodges Boulevard at San Pablo Boulevard

To

Improvement Type

SR 104 Dunn Avenue I‐295 St. Johns/Duval County Line

Add 4 Express Lanes Add 4 Express Lanes Add 4 Express Lanes Modify Interchange Add 4 Express Lanes Add 4 Express Lanes Add 4 Express Lanes Modify Interchange Modify Interchange Widen to 4 Lanes* Intersection Improvements Widen to 6 Lanes Widen to 6 Lanes Widen to 6 Lanes New 2 Lane Road New 2 Lane Road New 2 Lane Bridge New 2 Lane Road New 2 Lane Road Widen to 3 Lanes New 2 Lane Road Widen to 6 Lanes Widen to 4 Lanes Widen to 6 Lanes Widen to 6 Lanes New 2 Lane Road Widen to 4 Lanes Widen to 4 Lanes New 2 Lane Road Widen to 4 Lanes New 3 Lane Road / Bridge New 2 Lane Road Future Corridor New 2 Lane Road Intersection Improvements Widen to 4 Lanes Widen to 6 Lanes and Overpass Intersection Improvements / Add 1 Lane

2013 Cost  O&M Cost  (millions) (millions) $2,167.51 $11.00 $67.16 $5.47 $106.25 $8.64 $59.50 $0.19 $850.86 $18.00 $301.38 $5.16 $361.45 $6.21 $36.00 $0.19 $35.23 $0.19 $0.43 $0.09 $5.40 $0.18 $4.50 $0.29 $7.50 $0.55 $12.22 $0.23 $15.15 $0.08 $18.51 $0.10 $70.03 $0.12 $5.05 $0.03 $4.69 $0.03 $25.09 $0.04 $1.44 $0.01 $5.03 $0.30 $12.10 $0.13 $6.15 $0.05 $6.15 $0.25 $25.00 $0.12 $42.67 $0.28 $42.67 $0.10 $4.30 $0.07 $4.30 $0.17 $24.90 $0.07 $6.65 $6.65 $787.90 $4.08 $10.10 $0.05 $12.96 $0.30 $23.10 $0.39 $458.55 $0.36 $0.60 $0.05

Future Corridor New 2 Lane Road New 2 Lane Road Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes New 2 Lane Road Widen to 5 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 3 Lanes New 3 Lane Road Widen to 3 Lanes Widen to 3 Lanes Intersection Improvements Intersection Improvements Intersection Improvements

$1,600.00 $7.22 $1.70 $11.43 $22.43 $5.40 $3.09 $25.10 $40.80 $30.00 $3.99 $2.70 $26.24 $2.10 $9.40 $16.10 $35.19 $11.40 $7.57 $7.57 $7.57

International Golf Parkway SR 10 Atlantic Boulevard SR 202 J. T. Butler Boulevard

Turn/Bend Pritchard Road Glen Kernan Parkway SR 116 McCormick Road SR 21 Blanding Boulevard CR 209 Russell Road CR 209 Russell Road Avant Road Long Bay Road US 17 SR 5 Huron Street Harper Chapel Road SR 113 Southside Connector SR A1A I‐295 Lee Road Arnold Road Yellow Bluff Road Cedar Point Road Chaffee Road Chaffee Road US 23 New Kings Road SR 121 I‐95 Oakleaf Village Parkway Plummer Road SR 134 103rd Street US 1/SR 5 Phillips Highway

SR 228 Normandy Boulevard Blackrock Road Sowell Road Mickler Road JIA North Access Road US 17 Main Street I‐295 Duval Station Road Bartram Park Boulevard Bartram Springs Race Track Road Cahoon Road South SR 134 103rd Street SR 102 North of Airport Road Old Middleburg Road Belfort Road SR 10 Atlantic Boulevard SR 134 103rd Street

Page 3 of 13

$4.08 $0.04 $0.01 $0.13 $0.09 $0.06 $0.03 $0.28 $0.17 $0.15 $0.03 $0.07 $0.30 $0.03 $0.21 $0.13 $0.18 $0.21 $0.05 $0.05 $0.05


Path Forward 2040 Long Range Transportation Plan

Table 1. Summary of the Need Plan Project Cost and Operating and Maintenance Costs (in millions of present day dollars) Facility County Map ID From SR 100 SR 100 SR 101 Mayport Road SR 101 Mayport Road SR 102 Airport Road SR 104 Dunn Avenue SR 104 Dunn Avenue SR 115 Arlington Expressway SR 115 Arlington Expressway * SR 115 Lem Turner Road SR 115 Southside Boulevard SR 115 Southside Boulevard SR 115 Southside Boulevard SR 115 Southside Boulevard SR 115 Southside Boulevard SR 115 Southside Boulevard SR 115 Southside Boulevard SR 152 Baymeadows Road SR 152 Baymeadows Road SR 16 SR 16 SR 16 SR 16 SR 16 SR 16 Connector SR 19 Connector SR 20 SR 20 SR 200  Overpass SR 200  William Burgess Connector SR 200  Yulee Backage Roads SR 200 SR A1A SR 200 SR A1A SR 200A Pages Dairy Road SR 207 SR 207 SR 21 Blanding Boulevard SR 21 Blanding Boulevard SR 21 Blanding Boulevard SR 21 Blanding Boulevard SR 21 Blanding Boulevard SR 228 Hart Bridge SR 228 Normandy Boulevard SR 228 Normandy Boulevard SR 23 First Coast Expressway SR 23 First Coast Expressway SR 23 First Coast Expressway SR 23 First Coast Expressway SR 23 First Coast Expressway SR 23 First Coast Expressway SR 23 First Coast Expressway SR 23 First Coast Expressway SR 23 First Coast Expressway SR 23 First Coast Expressway SR 243 JIA North Access Road SR 312 SR 313 SR 313 SR 313 SR 9B

Clay Putnam Duval Duval Duval Duval Duval Duval Duval Duval/Nassau Duval Duval Duval Duval Duval Duval Duval Duval Duval Clay St. Johns Clay St. Johns St. Johns St. Johns Putnam Putnam Putnam Nassau Nassau Nassau Nassau Nassau Nassau St. Johns St. Johns Duval Clay Duval Duval Duval Duval Duval Duval Clay Clay Clay Clay Clay Clay/Duval Clay/St. Johns St. Johns St. Johns St. Johns Duval St. Johns St. Johns St. Johns St. Johns Duval

450 451 152B 152 421 940 941 100 153 74 102 103 104 960 966 967 968 937 938 106 110 908 835 836 829 965 422 423 1003 998 992 427 703 979 113 830 9 114 957A 957B 957C 47 86 87 41 8202 1011 1012 1013 8201 8203 840 841 847 701 115 831 832 839 1024

Clay/Bradford County Line Clay/Putnam County Line SR 116 Wonderwood Drive at SR 116 Wonderwood Drive Airport Entrance US 1/SR 15 New Kings Road Old Kings Road SR 109 University Boulevard at SR 109 University Boulevard I‐295 US 1/SR 5 Philips Highway SR 202 J. T. Butler Boulevard US 90 Beach Boulevard Hogan Road at SR 202 J. T. Butler Boulevard at SR 152 Baymeadows Road at SR 10 Atlantic Boulevard I‐95 US 1 /SR 5 Philips Highway CR 218 I‐95 US 17 South Francis Road CR 208 Outlet Mall SR 16/CR 16A SR 19 Putnam/Alachua County Line SW 56th Avenue at US 17 SR 5 and Railroad Tracks William Burgess Boulevard Cardinal Street North Extension at US 17 Amelia Island Parkway at Felmor Road I‐95 Holmes Boulevard I‐295 SR 16 at Collins Road at SR 134 103rd Street at Cedar Hills Boulevard SR 228  Hart Expressway ‐ Downtown US 301 SR 23 First Coast Expressway at CR 218 SR 21 Blanding Boulevard at SR 21 Blanding Boulevard at CR 739 at SR 16 I‐10 US 17 at I‐95 at CR 16 A at CR 2209 SR 102 Airport Road US 1/SR 5 Dixie Highway SR 207 SR 16 at US 1/SR 5 Dixie Highway US 1/SR 5 Philips Highway

Page 4 of 13

To

Improvement Type

Clay/Putnam County Line US 17 SR 5 Mayport Main Gate

Widen to 4 Lanes Widen to 4 Lanes Add 2 Northbound Lanes Intersection Improvements Widen to 6 Lanes Widen to 4 Lanes Intersection Improvements Widen to 6 Lanes* Modify Interchange Widen to 4 Lanes Widen to 6 Lanes* Widen to 6 Lanes* Widen to 6 Lanes* Intersection Improvements Modify Interchange Underpass Intersection Improvements Widen to 6 Lanes Widen to 6 Lanes* Widen to 4 Lanes Widen to 6 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes New 4 Lane Road New 4 lane road / bridge Widen to 4 Lanes Widen to 4 Lanes Overpass New 2 Lane Road New 2 Lane Road Intersection Improvements Widen to 6 Lanes Roundabout Projects Widen to 6 Lanes Widen to 6 Lanes Widen to 6 Lanes Widen to 4 Lanes Intersection Improvements Intersection Improvements Intersection Improvements New 6 Lane Bridge Widen to 4 Lanes Widen to 6 Lanes New Interchange New 4 Lane Road New Interchange New Interchange New Interchange Widen to 6 Lanes New 6 Lane Road New Interchange New Interchange New Interchange Widen to 4 Lanes Widen to 6 Lanes New 6 Lane Road New 4 Lane Road New Interchange Add 2 Auxiliary Lanes

I‐95 I‐295 US 23 New Kings Road SR 10 Atlantic Boulevard US 1 / Callahan S Kings Road I‐95 Ramps US 90 Beach Boulevard SR 10 Atlantic Boulevard Gate Parkway

SR 115 Southside Boulevard I‐95 SR 15A Oakridge Avenue SR 313 Shands Bridge International Golf Parkway South Francis Road CR 2209 Putnam County Boulevard SW 56th Avenue CR 315 Interlachen SR 200 SR A1A Old Yulee Road Sadler Road South Holmes Boulevard SR 312 Wilson Boulevard CR 215 Blanding Boulevard

SR 10 Atlantic Boulevard Bell Road (Equestrian Park ) SR 111 Cassat Avenue US 17

SR 21 Blanding Boulevard I‐95

Pecan Park Road SR A1A SR 16 US 1 Dixie Highway I‐295

2013 Cost  O&M Cost  (millions) (millions) $20.59 $0.49 $96.87 $2.06 $0.49 $0.12 $0.50 $0.05 $8.47 $0.39 $25.71 $0.23 $3.00 $0.05 $31.66 $0.64 $12.50 $0.19 $87.00 $1.56 $0.97 $0.37 $8.50 $0.50 $1.22 $0.47 $25.50 $0.05 $35.23 $0.19 $12.50 $0.19 $10.30 $0.05 $10.52 $0.20 $0.43 $0.16 $54.70 $0.69 $20.25 $0.50 $37.78 $0.40 $5.90 $0.17 $15.59 $0.45 $26.00 $0.16 $198.93 $0.34 $57.95 $0.72 $44.68 $0.34 $83.20 $0.19 $4.14 $0.03 $4.26 $0.02 $3.00 $0.05 $3.79 $0.19 $0.80 $0.02 $26.00 $0.65 $26.00 $0.08 $75.18 $1.01 $34.30 $0.39 $5.80 $0.05 $5.80 $0.05 $5.80 $0.05 $198.00 $0.23 $54.70 $0.66 $69.30 $1.66 $42.19 $42.19 $518.83 $518.83 $35.43 $35.43 $35.43 $35.43 $35.43 $35.43 $123.66 $123.66 $706.26 $706.26 $35.43 $35.43 $35.43 $35.43 $42.19 $42.19 $32.40 $0.34 $22.80 $0.50 $39.26 $0.82 $34.35 $0.58 $35.23 $0.19 $0.85 $3.22


Path Forward 2040 Long Range Transportation Plan

Table 1. Summary of the Need Plan Project Cost and Operating and Maintenance Costs (in millions of present day dollars) Facility County Map ID From

To

Improvement Type

I‐295 Race Track Road

Widen to 6 Lanes Widen to 6 Lanes New Interchange Widen to 6 Lanes* Turn Lane Improvements* Intersection Improvements Widen to 4 Lanes Widen to 4 Lanes* CSS Ferry Slip Replacement Widen to 6 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes New 2 Lane Road Modify Interchange Widen to 6 Lanes Widen to 6 Lanes Intersection Improvements Widen to 6 Lanes Widen to 6 Lanes Widen to 6 Lanes Widen to 6 Lanes Widen to 6 Lanes* Widen to 6 Lanes* Widen to 6 Lanes Widen to 6 Lanes Intersection Improvements Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes New Interchange New 2 Lane Road and Roundabout

2013 Cost  O&M Cost  (millions) (millions) $31.20 $1.06 $23.87 $0.48 $35.23 $0.19 $0.99 $0.38 $3.00 $0.06 $3.00 $0.05 $27.00 $0.27 $3.00 $0.16 $2.10 $0.06 $8.00 $11.12 $0.23 $27.26 $0.25 $7.00 $0.07 $34.10 $0.36 $6.60 $0.06 $11.78 $0.06 $17.53 $0.19 $24.50 $0.61 $40.10 $1.05 $1.08 $0.06 $47.50 $1.27 $22.20 $0.56 $60.90 $1.58 $19.90 $0.50 $6.56 $0.58 $7.00 $0.94 $31.60 $0.70 $18.10 $0.39 $2.97 $0.09 $79.74 $0.91 $7.15 $0.05 $69.80 $0.40 $78.50 $0.39 $21.41 $0.19 $3.55 $0.03

New 2 Lane Road Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes New 2 Lane Road Context Sensitive Solutions (CSS) Context Sensitive Solutions (CSS) Widen to 4 Lanes Widen to 6 Lanes Intersection Improvements Widen to 6 Lanes New 6 Lane Bridge and Transit Widen to 4 Lanes Widen to 4 Lanes Intersection Improvements

$4.26 $50.70 $19.07 $66.47 $6.72 $0.85 $3.15 $7.15 $146.09 $28.05 $7.16 $25.08 $1,175.00 $60.71 $40.82 $8.00

$0.06 $0.20 $0.28 $1.28 $0.46 $0.00 $0.04 $0.07 $0.43 $1.16 $0.05 $1.35 $0.34 $0.58 $0.46 $0.05

$36.37 $0.31 $1.44 $33.06

$0.30 $0.00 $0.01 $0.28

SR 9B SR 9B Extension SR 9B Extension SR A1A SR A1A SR A1A SR A1A SR A1A SR A1A Anastasia Boulevard SR A1A St Johns River Ferry St. Johns Parkway Starratt Road Touchton Road Town Center Boulevard Trout River Boulevard Tynes Road US 1 SR 5 US 1/SR 15 New Kings Road US 1/SR 15 New Kings Road US 1/SR 15 New Kings Road US 1/SR 5 Dixie Highway US 1/SR 5 Dixie Highway US 1/SR 5 Dixie Highway US 1/SR 5 Philips Highway US 1/SR 5 Philips Highway US 1/SR 5 Philips Highway US 1/SR 5 Philips Highway US 17 US 17 US 17 US 17 US 17 Main Street US 17 Main Street US 17 Main Street US 17 Pages Dairy Connector w/roundabout

Duval St. Johns St. Johns St. Johns Nassau St. Johns St. Johns Duval St. Johns Duval St. Johns Duval Duval Clay Duval Clay St. Johns Duval Duval Duval St. Johns St. Johns St. Johns Duval Duval Duval Duval Clay Nassau Nassau Clay Duval/Nassau Duval Duval Nassau

18 833 842 128 706 1008 800 151 1031 2331 848 954 129 903 955 912 845 82 83 950 130 131 132 93 94 95 96 133 707 709 1037 78 1017 959 984

US 1/SR 5 Philips Highway St. Johns Parkway at Durbin Parkway Solana Road South Fletcher Avenue at Red Cox/Coquina Rd Mickler Road SR 116 Wonderwood Drive Casanova Road

US 17 Powerline Corridor US 17 SR 15 US 17 SR 15 US 17 SR 15 US 17 SR 15 US 17 Yulee Backage Roads US 1B King Street US 1B San Marco Avenue US 301 SR 200 US 301 SR 200 US 301 SR 200 US 301 SR 201 US 90 / SR 115 Mathews Bridge US 90 Beaver Street US 90 Beaver Street Various SR 200 Intersections Modifications

Nassau Putnam Putnam Putnam Putnam Nassau St. Johns St. Johns Duval Clay Nassau Duval Duval Duval Duval Nassau

994 428 429 430 452 999 1029 1030 123 424 708 425 79 6 7 981

Vegas Boulevard West of Dunn Creek Bridge CR 309 Satsuma Putnam/Volusia County Line Pomona Park/Feagle Avenue US 17 SR 5 US 1 Ponce de Leon Boulevard Bridge of Lions US 90 Clay/Bradford County Line US 1 at S Kings Road Duval/Clay County Line Alt. US 1 MLK Jr. Parkway SR 23 First Coast Expressway Cahoon Road

Radio Avenue Horse Landing Road West of Dunn Creek Bridge Pomona Park/Feagle Avenue CR 309 Satsuma North of Koen Lane Avenida Menendez SR 16 Duval/Nassau County Line Duval/Clay County Line

Veterans Parkway Wells Road Woodbridge Parkway Extension Yellow Bluff Road * Candidates for context sensitive solutions

St. Johns Clay Nassau Duval

834 910 997 956

Greenbriar Road Aquarius Concourse Woodbrigde Parkway Starratt Road

Longleaf Pine Parkway SR 21 Blanding Boulevard Clements Road New Berlin Road (north)

SR 202 J. T. Butler Boulevard Amelia Island Parkway Palm Valley Road Naval Station Mayport North Gate Bridge of Lions

CR 2209 Duval Station Road Belfort Road US 17 Old Kings Road Pipit Place at CR 210 Soutel Drive I‐295 SR 111 Edgewood Avenue SR 206 SR 313 International Golf Parkway Nocatee Parkway / Race Track Road SR 9B I‐95 at the Avenues SR 202 J. T. Butler Boulevard CR 315 Nassau/Duval County Line SR 200 SR A1A Governor Street Pecan Park Road New Berlin Road at Eastport Road US 17 SR 5

9B Extension Yellow Bluff Road SR 115 Southside Boulevard CR 220 Doctors Inlet Road US 23 New Kings Road Oakleaf Plantation Parkway I‐295 Old Kings Road Soutel Drive Lewis Point Road International Golf Parkway Race Track Road SR 9B I‐295 SR 202 J. T. Butler Boulevard SR 126 Emerson Street Town Center Boulevard Harts Road Georgia State Line Haven Avenue SR 200 / SR A1A Pecan Park Road SR 200A Pages Dairy Road

I‐10 SR 109 University Boulevard Cahoon Road McDuff Avenue

Page 5 of 13

New 4 Lane Road Reconstruct and New 2 Lane Road New 2 Lane Road Widen to 4 Lanes


Path Forward 2040 Long Range Transportation Plan

Table 1. Summary of the Need Plan Project Cost and Operating and Maintenance Costs (in millions of present day dollars) Facility County Map ID From

Anastasia Island (Amphitheatre) Area wide  Area wide  Area wide  Area wide  Area wide  Area wide  Center Street CR 210 CR 220  Doctors Inlet Road  Cumberland Island Ferry Downtown ‐ Sports Complex Downtown Facility Drew Street Duval Road East First Coast Flyer Five Points/Core/Brooklyn Five Points/Core/Brooklyn I‐95 I‐95 La Villa/Core Mayport Road North (CSX) North Extension (CSX) Northwest (CSX) Racetrack Road  Riverside/Avondale South of Glen St. Mary Southbank/San Marco Southbank/San Marco Southeast (FEC) Southeast Extension (FEC) Southwest (CSX) Southwest Extension (CSX) Southwest First Coast Flyer Springfield SR 115   Lem Turner Road  SR 115   Lem Turner Road  SR 115   Lem Turner Road  SR 115  Southside Boulevard  SR 134  103rd Street  SR 134  103rd Street  SR 16*** SR 200  SR A1A   SR 200  SR A1A   SR 207*** SR 21  Blanding Boulevard   SR 21  Blanding Boulevard   SR 21  Blanding Boulevard   SR 21  Blanding Boulevard   SR 21  Blanding Boulevard   SR 21  Blanding Boulevard   SR 21  Blanding Boulevard   SR 21  Blanding Boulevard   SR 21  Blanding Boulevard   SR 21  Blanding Boulevard   SR 21  Blanding Boulevard   SR 21  Blanding Boulevard   SR 228  Normandy Boulevard  

St. Johns  Baker Clay Duval Nassau Putnam St. Johns  Duval St. Johns  Clay Nassau Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval  Nassau Duval  St. Johns  Duval Baker Duval Duval Duval St. Johns  Duval  Clay  Duval Duval Duval Duval  Duval  Duval Duval Duval St. Johns  Nassau Nassau St. Johns  Clay Clay Clay Clay Clay Clay Clay Duval Duval Duval Duval  Duval  Duval

2380 2303 2310 2332 2370 2374 2378 2304 2381 2316 2369 2349 2355 2305 2336 2385 2347 2350 2326 2330 2351 2338 2356 2366 2357 2382 2352 2306 2348 2353 2327 2377 2358 2319 2386 2354 2337 2361 2362 2325 2321 2334 2385 2371 2372 2386 2308 2311 2312 2313 2314 2315 2318 2335 2340 2341 2360 2364 2322

To

Improvement Type

Transit Capacity Projects     Park and Ride Lots     Local Bus Service      Local Bus Service      Local Bus Service      Local Bus Service      Local Bus Service     Local Bus Service  North of Drew Street (Baldwin)   Park and Ride Lots east of US 1   Park and Ride Lots at Hollow Road   Park and Ride Lots Fernandina Cumberland Island Ferry Service Downtown Jacksonville (Bay Street & Main Street) Jacksonville Municipal Stadium Streetcar      Transportation Center at Center Street (Baldwin)   Park and Ride Lots at I‐95   Park and Ride Lots Downtown Jacksonville (Duval County) 3rd Street (Jacksonville Beach) BRT Central Station Brooklyn  Station  Skyway Extension  Five Points Downtown Jacksonville (Bay Street & Ma Streetcar  Gateway Mall Jacksonville International Airport BRT   Downtown Jacksonville (Duval County) Yulee (Nassau County) Express Bus Service Transportation Center Duval Street & Monroe Street to Ocean Streetcar  at SR A1A   Park and Ride Lots Downtown Jacksonville (Duval County) Yulee (Nassau County) Commuter Rail Yulee Fernandina Beach Commuter Rail Downtown Jacksonville (Duval County) Callahan (Nassau County) Commuter Rail at US 1   Park and Ride Lots Riverside (King Street) Five Points Streetcar      Park and Ride Lots Kings Avenue Station Southwest  of Railroad Tracks (SouthbankSkyway Extension  Kings Avenue Station Baptist Hospital / MOSH & Atlantic Boule Streetcar  St. Augustine (St. Johns County) Downtown Jacksonville (Duval County) Commuter Rail Palm Coast (Flagler County) City of St. Augustine Commuter Rail Green Cove Springs (Clay County) Downtown Jacksonville (Duval County) Commuter Rail Palatka (Putnam County) Green Cove Springs (Clay County) Commuter Rail Wells Road Downtown Jacksonville (Duval County) BRT FSCJ Station 8th Street/ Medical Complex Streetcar  at SR 104 Dunn Avenue   Park and Ride Lots at Soutel    Park and Ride Lots at I‐295   Park and Ride Lots Avenues Mall Regency Square Mall BRT  SR 228  Normandy Boulevard   SR 21  Blanding Boulevard   BRT at SR 228  Normandy Boulevard     Park and Ride Lots     Park and Ride Lots at I‐95   Park and Ride Lots east of Yulee   Park and Ride Lots     Park and Ride Lots CR 218 Wells Road BRT at Tanglewood   Park and Ride Lots at Old Jennings Road   Park and Ride Lots at Edson Drive   Park and Ride Lots at Wells Road   Park and Ride Lots at SR 224 Kingsley Avenue   Park and Ride Lots North and South of Bolton Road   Park and Ride Lots at Weconnett Boulevard   Park and Ride Lots North and South of Wilson Boulevard   Park and Ride Lots North and South of SR 134 103rd Street   Park and Ride Lots at 105th Street   Park and Ride Lots North of I‐295   Park and Ride Lots SR 134 103rd Street Downtown Jacksonville (Duval County) BRT

Page 6 of 13

2013 Cost  O&M Cost  (millions) (millions) $0.25

$0.25 $0.25 $0.25 $5.00 $38.50 $60.00 $0.25 $0.25 $28.00 $26.60 $85.00 $12.20 $31.50 $0.25 $271.69 $122.90 $179.60 $0.25 $26.25 $0.25 $52.50 $52.50 $0.00 $255.20 $294.01 $236.30 $19.00 $46.17 $0.25 $0.25 $0.25 $18.00 $38.35 $0.25 $0.25 $0.25 $0.25 $0.25 $37.50 $0.25 $0.25 $0.25 $0.25 $0.25 $0.25 $0.25 $0.09 $0.25 $0.25 $0.25 $97.45

$0.00 $1.00 $1.00 $69.00 $1.00 $1.00 $1.10 $0.00 $0.00 $0.00 $1.00 $0.41 $2.55 $0.00 $0.00 $7.08 $6.37 $0.41 $3.89 $1.71 $0.41 $0.00 $0.00 $4.49 $15.96 $0.00 $0.41 $0.00 $4.24 $0.41 $0.00 $14.97 $0.00 $14.97 $4.96 $0.41 $0.00 $0.00 $0.00 $2.83 $2.16 $0.00 $0.00 $0.00 $0.00 $0.00 $3.01 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $5.49


Path Forward 2040 Long Range Transportation Plan

Table 1. Summary of the Need Plan Project Cost and Operating and Maintenance Costs (in millions of present day dollars) Facility County Map ID From

To

Improvement Type

SR A1A SR A1A SR A1A  St Johns River Ferry  SR A1A  St Johns River Ferry  SR A1A  St Johns River Ferry  SR A1A  St Johns River Ferry  SR A1A  St Johns River Ferry  SR A1A  St Johns River Ferry  St. Augustine Airport US 1 US 1  US 1  US 1/SR 15  New Kings Road   US 1/SR 15  New Kings Road   US 17  Roosevelt Boulevard  US 17  Roosevelt Boulevard  US 90 US 90  Beach Boulevard  US 90  Beach Boulevard  West (CSX) West Extension (CSX) Yellow Water Road Youngerman Circle

Duval St. Johns  Duval Duval Duval Duval Duval Duval St. Johns  St. Johns  Duval St. Johns  Duval Duval  Clay  Duval Baker Duval Duval  Duval Baker Duval Clay

2343 2379 2329 2331 2333 2344 2345 2346 2383 2384 2324 2375 2323 2363 2320 2342 2302 2339 2359 2328 2301 2307 2317

North and South of SR 202 J. T. Butler Boulevard at Palm Valley Road     Ft. George/Mayport JPA Property Mayport Ft. George/Mayport   at Lewis Speedway Road Lewis Speedway (St. Johns County) Lewis Speedway (St. Johns County) Downtown Jacksonville (Duval County) Timucuan DRI at Wells Road at SR 128 San Juan Avenue MacClenny (Baker County) West and East of Kernan Boulevard at San Pablo Road Baldwin (Duval County) MacClenny (Baker County) North of I‐10 at Argyle Forest Boulevard

        Mayport Terminal Ft. George Island       Avenues Mall (Duval County) Avenues Mall (Duval County) Edgewood Avenue       Downtown Jacksonville (Duval County)     Downtown Jacksonville (Duval County) Baldwin (Duval County)    

Park and Ride Lots Park and Ride Lots Drydock /  Ferry Repairs Ferry Slip Replacement Long Term Site Improvements Relocation of Ferry offices Service & Capital Improvements Site Improvements Park and Ride Lots Park and Ride Lots BRT BRT BRT Park and Ride Lots Park and Ride Lots Park and Ride Lots Local Bus Service Park and Ride Lots Park and Ride Lots Commuter Rail Commuter Rail Park and Ride Lots Park and Ride Lots

SR 121 Rail Trail Corridor Cecil Field Conservation Corridor CR 218 CR 220   Doctors Inlet Road  CR 220   Doctors Inlet Road  Long Bay Road Old Jennings Road US 17 US 17   Roosevelt Boulevard / Park Avenue  US 17  Park Avenue  SR 16  5th Street Arlington Road Arlington Road West Bay Street Baymeadows Road Beauclerc Road Boulevard Street Bowden Road Bowden Road Broad Street Cecil Field Conservation Corridor Clark Road Commonwealth Avenue CSX Corridor North Deerwood Area Downtown Jacksonville Downtown Neptune/Atlantic Beach Duval Road Duval Street East Coast Greenway ‐ Duval County Corridor Edgewood Avenue Forest Street Forsyth Street Gate Parkway East

Baker Clay Clay Clay Clay Clay Clay Clay Clay Clay Clay / St. Johns Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval

2000 2001 2002 2004 2003 2005 2006 2007 2009 2008 2010 2012 2013 2014 2019 2020 2023 2026 2028 2027 2029 2031 2032 2033 2034 2035 2036 2037 2039 2040 2041 2043 2045 2046 2047

Bicycle and Pedestrian Projects Baker/Union County Line Baker/Nassau County Line CR 218 Duval/Clay County Line SR 16 SR 21 College Drive  US 17 SR 21 College Drive  SR 21  Blanding Boulevard Old Jennings Road Long Bay Road SR 23  First Coast Expressway  at CR 220  (Fleming Island Area)   Palatka Clay/Duval County Line at Kingsley Avenue (Orange Park)   Kingsley Lake Drive SR 13  San Jose Boulevard  Lane Avenue  Melson Avenue Lone Star Road King Arthur Road Cesery Road King Arthur Road Myrtle Avenue Lee Street SR 115  at Southside Boulevard    I‐295 SR 13  San Jose Boulevard  5th Street 12th Street Spring Park Road Southpoint Parkway US 1  Philips Highway  Spring Park Road Water Street 5th Street Duval/Clay County Line US 90  Beaver Street  Broward Road US 17  Main Street  Imeson Road Lane Avenue US 17 Main Street  / S Rail Line US 17 Main Street / Trout River Drive Deerwood Park Boulevard Gate Parkway     at Sherry Drive, 2nd Street, Ocean Street, Cherry Stre  Airport Road Airport Center Drive Lee Street Georgia Street St. Johns/ Duval County Line Nassau/Duval County Line St. Johns Avenue Post Street Acosta Street Lime Street Myrtle Avenue Lee Street Gate Parkway St. Johns Town Center Boulevard

Page 7 of 13

Florida Greenway Land Trail Opportunities Florida Greenway Multi‐Use Trail Florida Greenway Multi‐Use Trail Multi‐Use Trail Accommodate Pedestrians and Bicyclist Florida Greenway Accommodate Pedestrians and Bicyclist Florida Greenway ‐ Multi‐Use Trail Bike Lane Bike Lane Bike Lane Bike Lane Accommodate Pedestrians and Bicyclist Bi‐directional 12 ft. Shared Use Path Bike Lane Bike Lane Bike Lane Bike Lane Florida Greenway Bike Lane Bike Lane Multi‐Use Path Multi‐Use Path Accommodate Pedestrians and Bicyclist Accommodate Pedestrians and Bicyclist Bike Lane Bike Lane Florida Greenway Bike Lane Bike Lane Bike Lane Multi‐Use Path

2013 Cost  O&M Cost  (millions) (millions) $0.25 $0.00 $0.25 $0.00 $13.00 $13.00 $8.00 $8.00 $0.29 $7.00 $0.80 $0.89 $0.25 $0.00 $0.25 $0.00 $132.03 $7.43 $29.55 $0.25 $0.25 $0.25 $1.08 $0.25 $170.10 $85.10 $0.25 $0.25

$1.66 $0.00 $0.00 $0.00 $2.14 $0.00 $0.00 $9.48 $5.49 $0.00 $0.00

$3.08 $2.54 $1.73 $0.93 $1.62 $1.28 $0.46 $0.34 $18.14 $0.04 $6.48 $0.40 $0.01 $0.11 $0.09 $0.03 $0.64 $0.15 $0.06 $0.14 $0.27 $2.78 $0.19 $0.30 $0.71 $0.17 $1.45 $0.07 $0.15 $0.41 $11.30 $0.32 $0.13 $0.09 $0.05

$0.12 $0.10 $0.07 $0.04 $0.06 $0.03 $0.02 $0.00 $0.72 $0.00 $0.26 $0.02 $0.00 $0.00 $0.00 $0.00 $0.03 $0.01 $0.00 $0.01 $0.01 $0.11 $0.01 $0.01 $0.03 $0.01 $0.02 $0.00 $0.01 $0.02 $0.21 $0.01 $0.01 $0.00 $0.00


Path Forward 2040 Long Range Transportation Plan

Table 1. Summary of the Need Plan Project Cost and Operating and Maintenance Costs (in millions of present day dollars) Facility County Map ID From Gate Parkway South East Hogan's Creek Greenway Hubbard Street Imeson Road Jacksonville Baldwin / East Coast Corridor Jacksonville Beach Area Jefferson Street Kernan Boulevard  Laura Street Laura Street Lee Street Lone Star Road Mandarin Road Mary Street McCoys Creek Boulevard / Fitzgerald Street McCoys Creek Boulevard / Fitzgerald Street Moncrief Road Monument Road and  SR 10 Atlantic Boulevard  Myrtle Avenue Newnan Street Old Kings Road Old Middleburg Road Old St Augustine Road Riverplace Boulevard Riverside/Five Point Area Southpoint Parkway SR 10  Atlantic Boulevard  SR 10  Atlantic Boulevard  SR 10  Atlantic Boulevard  SR 10  Atlantic Boulevard  SR 104  Dunn Avenue  SR 105  Zoo Parkway  SR 105  Zoo Parkway  SR 109  University Boulevard North  SR 109  University Boulevard North  SR 111  Cassat Avenue  SR 111  Edgewood Avenue  SR 111  Tallulah Avenue  SR 115  Southside Boulevard  SR 115  Southside Boulevard  SR 115  Southside Boulevard  SR 115  Southside Boulevard  SR 115  Southside Boulevard  SR 126  Emerson Street  SR 128  San Juan Avenue  SR 13  Hendricks Avenue  SR 13  San Jose Boulevard  SR 13  San Jose Boulevard  SR 13  San Jose Boulevard  SR 13  San Jose Boulevard  SR 13  San Jose Boulevard  SR 134  103rd Street  SR 21  Blanding Boulevard   SR 21  Blanding Boulevard   SR 211  Riverside Avenue  SR 211  St. Johns Avenue  SR 228  Normandy Boulevard  SR A1A SR A1A  UNF East

Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval

2048 2052 2053 2054 2055 2056 2057 2058 2059 2060 2061 2062 2065 2089 2067 2066 2068 2069 2070 2071 2073 2074 2075 2078 2080 2090 2017 2016 2018 2015 2038 2049 2050 2102 2103 2030 2042 2099 2094 2095 2093 2092 2091 2044 2088 2051 2086 2085 2084 2087 2083 2011 2024 2025 2079 2098 2072 2096 2097 2100

To

Improvement Type

Deerwood Parkway St. Johns Town Center Boulevard Bike Lane Market Street North Riverbank Multi‐Use Path Orange Street  14th Street Bike Lane Commonwealth Avenue Baldwin Rail Trail Bike Lane Bulls Bay Highway (Jacksonville Baldwin Corridor) St Johns River Ferry (East Coast GreenwayFlorida Greenway at 3rd Avenue, Ocean Street, 2nd Avenue, South 10t   Accommodate Pedestrians and Bicyclist Water Street 1st Street Bike Lane Baymeadows Road (SR 152) SR 116  Fort Caroline Road  Florida Greenway 8th Street S‐Line Pavement Markings and Signage Bay Street 8th Street Pavement Markings and Signage Water Street Duval Street Bike Lane Mill Creek Road SR 113  Southside Connector  Bike Lane San Jose Boulevard (SR 13) I‐295 Bi‐directional 12 ft. Shared Use Path San Marco Boulevard  US 17  Main Street Bridge  Bike Lane Nixon Street Forest Street Multi‐Use Path McDuff Avenue Leland Street Bike Lane 13th Street Golfair Boulevard Bike Lane SR 113  Southside Boulevard  N Regency Square Boulevard  Bike Lane Forest Street Kings Road Bike Lane Bay Street Orange Street  Pavement Markings and Signage S‐line Martha Street Bike Lane Herlong Road Lenox Avenue Bike Lane Losco Road SR 13  San Jose Boulevard  Bike Lane Prudential Drive US 1  Main Street  Bike Lane at Stockton Street, Rossell Street, I‐95, St. Johns Rive   Accommodate Pedestrians and Bicyclist Belfort Road Bowden Road Bike Lane Kings Road US 90  Beach Boulevard  Bike Lane US 90  Beach Boulevard  SR 228 Alt. US 1  Hart Expressway  Bike Lane SR 228  Hart Expressway  SR 109  University Boulevard  Bike Lane Hart Expressway (SR 228 Alt. US 1) SR A1A Bi‐directional 12 ft. Shared Use Path Biscayne Avenue US 17  Main Street  Bike Lane Busch Drive I‐295 Bike Lane US 17  Main Street  SR A1A Multi‐Use Path SR 10  Atlantic Boulevard  Cesery Boulevard Bike Lane University Boulevard / Cesery Boulevard Gable Lane Bike Lane SR 21  Blanding Boulevard   SR 111  Edgewood Avenue  Bike Lane SR 111  Cassat Avenue  US 1/SR 15  New Kings Road   Bike Lane US 17  Main Street  68th Street Bike Lane Gate Parkway Touchton Road Sidewalk Improvements US 1  Philips Highway  Belle Rive Boulevard Sidewalk Improvements Deerwood Park Boulevard US 90  Beach Boulevard  Sidewalk Improvements US 1  Philips Highway  Belle Rive Boulevard Multi‐Use Path Avenues Mall (US 1) SR 10 Atlantic Boulevard / Regency SquarBi‐directional 12 ft. Shared Use Path Hendricks Avenue US 1  Philips Highway  Bike Lane SR 21  Blanding Boulevard   SR 211  Herschel Street  Bike Lane SR 13  San Jose Boulevard  San Marco Boulevard Bike Lane Julington Creek Road Plummers Cove Road Bike Lane Old St. Augustine Road SR 152  Baymeadows Road  Bike Lane SR 152  Baymeadows Road  Hendricks Avenue Bike Lane Loretto Road SR 152  Baymeadows Road  Accommodate Pedestrians and Bicyclist Racetrack Road Downtown (Southbank) Bi‐directional 12 ft. Shared Use Path Old Middleburg Road Old Middleburg Road North Bike Lane Blackburn Road Appleton Avenue Bike Lane Harlow Boulevard Wilson Boulevard  Bike Lane St. Johns Avenue Forest Street Bike Lane Woodmere Street Talbot Avenue Bike Lane SR 103  Lane Avenue  SR 111  Cassat Avenue  Bike Lane SR 202  J. T. Butler Boulevard  SR 10  Atlantic Boulevard  Bi‐directional 12 ft. Shared Use Path St. Johns River Ferry Duval/Nassau County Line Bi‐directional 12 ft. Shared Use Path Kernan Boulevard UNF West Bike Lane

Page 8 of 13

2013 Cost  O&M Cost  (millions) (millions) $0.11 $0.00 $0.23 $0.01 $0.11 $0.01 $0.08 $0.00 $17.47 $0.26 $0.23 $0.00 $0.21 $0.01 $3.05 $0.12 $0.06 $0.00 $0.06 $0.00 $0.07 $0.00 $0.11 $0.00 $1.50 $0.06 $0.03 $0.00 $0.03 $0.00 $0.10 $0.00 $0.30 $0.01 $0.33 $0.01 $0.29 $0.01 $0.07 $0.00 $0.05 $0.00 $0.28 $0.01 $0.05 $0.00 $0.08 $0.00 $0.67 $0.01 $0.38 $0.02 $0.18 $0.01 $0.23 $0.01 $0.29 $0.01 $3.16 $0.12 $0.37 $0.02 $0.12 $0.01 $0.14 $0.01 $0.11 $0.00 $0.36 $0.01 $0.77 $0.03 $0.77 $0.03 $0.22 $0.01 $0.14 $0.00 $0.48 $0.00 $0.72 $0.00 $0.43 $0.02 $2.30 $0.09 $0.25 $0.01 $0.20 $0.01 $0.50 $0.02 $0.07 $0.00 $0.22 $0.01 $1.07 $0.04 $3.18 $0.04 $3.10 $0.12 $0.19 $0.01 $0.09 $0.00 $0.15 $0.01 $0.36 $0.01 $0.22 $0.01 $0.30 $0.01 $1.09 $0.04 $2.27 $0.09 $0.20 $0.01


Path Forward 2040 Long Range Transportation Plan

Table 1. Summary of the Need Plan Project Cost and Operating and Maintenance Costs (in millions of present day dollars) Facility County Map ID From UNF West Duval 2101 US 1  Philips Highway  Duval 2077 US 1  Philips Highway  Duval 2076 US 17  Main Street  Duval 2064 US 17  Main Street  Duval 2063 US 17  Roosevelt Boulevard  Duval 2082 US 17  Roosevelt Boulevard  Duval 2081 US 17  Roosevelt Boulevard  Duval 2104 US 90  Beach Boulevard  Duval 2022 US 90  Beach Boulevard  Duval 2021 Water Street Duval 2105 Jacksonville Baldwin Corridor Duval / Nassau 2106 8th Street Nassau 2107 Amelia Island Parkway  Nassau 2108 Amelia Island Parkway Path Segment 1 Nassau 2109 Amelia Island Parkway Path Segment 2 Nassau 2110 Amelia Island Parkway Path Segment 3 Nassau 2111 Amelia Island Parkway Path Segment 4 Nassau 2112 Amelia Island Trial ‐ Central (1st Ave) Nassau 2113.1 Amelia Island Trial ‐ South (Buccaneer Trail) Nassau 2113 Amelia Island Trial‐ North ( Friendly/Clinch) Nassau 2113.2 American Beach Loop  Nassau 2114 American Beach Loop  Nassau 2116 American Beach Loop  Nassau 2115 Crandall Parkway Corridor Nassau 2117 East Coast Greenway ‐ Nassau County Corridor Nassau 2118 ENCPA DSAP 1‐ Central (Old Yulee Vicinity) Nassau 2120.1 ENCPA DSAP 1‐ North (Owens Rd Vicinity) Nassau 2120.2 ENCPA DSAP 1‐ South (Harper Chapel Vicinity) Nassau 2120 Highland Broom Street  Nassau 2121 Maxine Street  Nassau 2123 Ocklawaha Trail Nassau 2124 Orange Avenue Nassau 2125 Simmons Connector Nassau 2126 SR 200  SR A1A  Nassau 2127 US 17 Nassau 2129 US 17 / SR A1A  East Coast Greenway  Nassau 2119 Nassau 2128 US 301/ SR 200  Trans Nassau Trail Corridor  William Burgess Boulevard  Nassau 2130 CR 121/CR 119  Jacksonville Baldwin Rail Trail Northern Extension CorridNassau / Duval 2122 CR 216 Putnam 2131 Cross Florida Greenway Corridor Putnam 2132 SR 100 Putnam 2133 SR 20 Putnam 2134 US 17 Putnam 2135 US 17 Crescent City (parallel facilities) Putnam 2136 SR 207 Putnam / St. Joh 2137 County Road 214 Corridor St. Johns 2138 CR 13  Spuds Palmo Trail Corridor  St. Johns 2149 CR210 St. Johns 2139 Deep Creek to ECG Corridor St. Johns 2140 Downtown and Uptown St. Augustine St. Johns 2141 East Coast Greenway ‐ St. Johns County Corridor St. Johns 2142 Nocatee Corridor St. Johns 2143 Race Track Road St. Johns 2147 Racetrack Corridor St. Johns 2148 SR 13  San Jose Boulevard  St. Johns 2150 SR 13  William Bartram Trail Corridor  St. Johns 2155 SR 16 St. Johns 2151 SR A1A  St. Johns 2152

To

Improvement Type

I‐295 UNF East Bike Lane Southside Boulevard (SR 115) Southbank Riverwalk Rails‐W‐Trails Racetrack Road Downtown (Southbank) Bi‐directional 12 ft. Shared Use Path Trout River Bridge New Berlin Road Rails‐W‐Trails Eastport Road Pecan Park Road Bi‐directional 12 ft. Shared Use Path Duval/Clay County Line Forest Street Rails‐W‐Trails I‐295 Edison Avenue  Bi‐directional 12 ft. Shared Use Path Duval/Clay County Line Forest Street Florida Greenway at Hodges Boulevard   Accommodate Pedestrians and Bicyclist San Pablo Boulevard Downtown (Southbank) Bi‐directional 12 ft. Shared Use Path Lee Street Pearl Street Bike Lane West of Baldwin Bulls Bay Highway Florida Greenway at Sadler Road   Accommodate Pedestrians and Bicyclist at Amelia Road   Accommodate Pedestrians and Bicyclist Bailey Road 8th Street/ SR A1A Multi‐Use Trail 14th Street Bailey Road Multi‐Use Trail Via Del Rey 14th Steet Multi‐Use Trail SR A1A Fletcher Avenue / Amelia Island Trail Via Del Rey Multi‐Use Trail Bill Melton Matanzas Way Trail Fletcher Avenue Amelia Island Pkwy Trail Bailey Road Atlantic Avenue Trail American Beach Loop Julia Street Segment American Beach Bike Lane American Beach Loop Ocean Avenue Segment American Beach Multi‐Use Path American Beach Loop Burney Road Segment American Beach Multi‐Use Path East Coast Greenway (US 17) SR A1A  East Coast Greenway Corridor  Florida Greenway Nassau/Duval County Line Fernandina Beach Florida Greenway East Nassau Community Planning Area East Nassau Community Planning Area Multi‐Use Path East Nassau Community Planning Area East Nassau Community Planning Area Multi‐Use Path East Nassau Community Planning Area East Nassau Community Planning Area Multi‐Use Path Proposed Highland Broom Street Multi‐use Trail Proposed Highland Broom Street  Multi‐Use Path Maxine Street Path Maxine Street Path Multi‐Use Path Via Del Rey / Bill Melton Road Sadler Road Multi‐Use Trail Orange Avenue Path Orange Avenue Path Multi‐Use Path Simmons/AIP Connector Simmons/AIP Connector Multi‐Use Trail at SR 200 Bridge   Accommodate Pedestrians and Bicyclist Nassau/Duval County Line SR 200  SR A1A  Bi‐directional 12 ft. Shared Use Path Fernandina Beach Georgia State Line Florida Greenway CR 119 US 17 Main Street /  Yulee  Florida Greenway SR 200  SR A1A  US 17 Multi‐Use Trail Beaver Street (US 90) US 301/SR 200  Trans Nassau Trail Corrid Florida Greenway SR 100 US 17 Multi‐Use Path Existing Cross Florida Greenway Trail Palatka Florida Greenway Clay/Putnam County  Line Palatka Florida Greenway Hawthorne Palatka Florida Greenway Putnam/Volusia County Line Palatka Florida Greenway Prospect Street CR 308 Multi‐Use Path Palatka St. Augustine Florida Greenway SR 13  San Jose Boulevard  SR 207  Florida Greenway Spuds (SR 207) SR 13  San Jose Boulevard  Florida Greenway at SR A1A    Accommodate Pedestrians and Bicyclist SR 207  SR A1A Florida Greenway at US 1, Park Avenue, River, South Street, Riberia Str   Accommodate Pedestrians and Bicyclist St. Johns/Flagler County Line St. Johns/Duval County Line Florida Greenway San Jose Boulevard (SR 13) SR A1A Florida Greenway San Jose Boulevard (SR 13) US 1  Philips Highway  Bi‐directional 12 ft. Shared Use Path San Jose Boulevard (SR 13) Nocatee Corridor Florida Greenway Roberts Road Julington Creek  Bi‐directional 12 ft. Shared Use Path CR 13 St. Johns/Duval County Line Florida Greenway I‐95 Collins Avenue Bi‐directional 12 ft. Shared Use Path at SR 312    Accommodate Pedestrians and Bicyclist

Page 9 of 13

2013 Cost  O&M Cost  (millions) (millions) $0.43 $0.02 $2.46 $0.11 $4.39 $0.17 $0.98 $0.04 $2.30 $0.09 $2.28 $0.10 $2.28 $0.09 $4.13 $0.16 $0.00 $0.00 $1.97 $0.08 $0.10 $0.00 $1.40 $0.15 $0.00 $0.00 $0.01 $0.00 $0.63 $0.01 $0.63 $0.01 $0.63 $0.01 $0.63 $0.01 $0.16 $0.01 $0.29 $0.01 $0.96 $0.04 $0.11 $0.00 $0.36 $0.00 $0.60 $0.01 $1.75 $0.07 $2.02 $0.11 $4.03 $0.16 $0.78 $0.03 $0.66 $0.03 $0.36 $0.01 $0.13 $0.01 $0.94 $0.03 $0.25 $0.01 $1.72 $0.02 $0.71 $0.01 $3.13 $0.12 $30.08 $0.19 $6.58 $0.26 $0.79 $0.03 $3.09 $0.12 $0.58 $0.02 $6.05 $0.08 $9.43 $0.23 $15.23 $0.24 $38.54 $0.25 $0.58 $0.02 $10.48 $0.23 $2.74 $0.11 $5.10 $0.20 $0.02 $0.00 $3.21 $0.13 $1.13 $0.01 $27.88 $0.41 $5.10 $0.20 $2.14 $0.08 $2.14 $0.09 $0.65 $0.03 $3.76 $0.15 $0.77 $0.03 $0.03 $0.00


Path Forward 2040 Long Range Transportation Plan

Table 1. Summary of the Need Plan Project Cost and Operating and Maintenance Costs (in millions of present day dollars) Facility County Map ID From

To

Improvement Type

St. Augustine Bike Plan US 1  Dixie Highway  US 1  Dixie Highway  US 1  Dixie Highway / Ponce De Leon Boulevard  US 1  St. Augustine to Nocatee Corridor 

St. Johns St. Johns St. Johns St. Johns St. Johns

2153 2146 2145 2144 2154

Areawide at SR 312  Putnam/Flagler County Line San Marco Avenue (US 1 B) (St. Augustine) St. Augustine

Areawide SR 207 Racetrack Road Nocatee Corridor

Bicycle accommodations Accommodate Pedestrians and Bicyclist Bi‐directional 12 ft. Shared Use Path Bi‐directional 12 ft. Shared Use Path Florida Greenway

CSX Transportation CSX Transportation CSX Transportation CSX Transportation CSX Transportation CSX Transportation CSX Transportation Florida East Coast Railway Florida East Coast Railway Jacksonville International Airport Jacksonville International Airport Jacksonville International Airport Jacksonville International Airport Jacksonville International Airport Norfolk Southern Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority Jacksonville Port Authority CSX Transportation CSX Transportation CSX Transportation Florida East Coast Railway CSX Transportation CSX Transportation Port of Fernandina Port of Fernandina Port of Fernandina Port of Fernandina City of Palatka County CSX Transportation City of Saint Augustine Florida East Coast Railway

Clay Clay Duval Nassau Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval/Baker Duval/Clay Duval/Nassau Duval/St. Johns Duval Nassau Nassau Nassau Nassau Nassau Putnam Putnam Putnam St. Johns Statewide

2200 2201 2202 2203 2204 2205 2206 2207 2208 2209 2210 2211 2212 2213 2214 2215 2216 2217 2218 2219 2220 2221 2222 2223 2224 2225 2226 2227 2228 2229 2230 2231 2232 2233 2234 2235 2236 2237 2238 2239 2240 2241 2242 2243 2244 2245 2246 2247 2248 2249 2250 2251 2252

Multimodal Freight Projects at Wells Road at SR 224 Kingsley Avenue at SR 104  Busch Drive at SR A1A (SR 200) / Yulee Beaver Street Interlocking North Rail Corridors Phase 1 Westlake Cecil Commerce Connector at Bowden Intermodal at Jacksonville Bridge Construction of Runway 7R/25L Air Cargo Ramp Improvements Air Cargo Surface Storage Design & Construct By‐Pass Taxiways Intermodal Terminal Facility Development at Norfolk Southern Railway (Near Simpson Yard) Blount Island / Dames Point Marine Terminals Rail Blount Island Marine Terminal Berth Upgrades Blount Island Marine Terminal Facility Upgrades Dames Point Marine Terminal Berth Upgrades Dames Point Marine Terminal Facility Upgrades New Cranes for Talleyrand and Blount Island Marine Terminals Talleyrand Marine Terminal Berth Upgrades Talleyrand Marine Terminal Facility Upgrades Talleyrand Marine Terminal Rail Blount Island Marine Terminal Facility Upgrades Dames Point Marine Terminal Facility Upgrades New Cranes for Talleyrand and Blount Island Marine Terminals Talleyrand Marine Terminal Facility Upgrades Blount Island / Dames Point Terminals ‐ Rail and Bridge Blount Island Marine Terminal Berth Upgrades Blount Island Marine Terminal Facility Upgrades Dames Point Marine Terminal Berth Upgrades Dames Point Marine Terminal Facility Upgrades Harbor Deepening New Cranes for Talleyrand and Blount Island Marine Terminals Talleyrand Marine Terminal Berth Upgrades Talleyrand Marine Terminal Facility Upgrades Talleyrand Marine Terminal Rail MacClenny  to Jacksonville Green Cove Springs to Jacksonville Jacksonville to Yulee St. Augustine to Jacksonville at US 301 (SR 200) / Baldwin at US 301  / Crawford Diamond Berth Improvements Cruise / Cargo Berth Rail Track Improvements at Fernandina Port SR 100 CR 309D Barge Port at  SR 15 Reid Street Historic Commercial Areas Amtrak Service Miami to Jacksonville

Page 10 of 13

Grade Separation Grade Separation Grade Separation Grade Separation Capacity Upgrade Multi Modal Corridor Multi Modal Corridor Capacity Upgrade Bridge Construct Runway Expand Apron Expand Apron Construct Taxiway Terminal Development Grade Separation Internal Rail Docks Intermodal Transfer Improvement Docks Intermodal Transfer Improvement Intermodal Transfer Improvement Docks Intermodal Transfer Improvement Internal Rail Intermodal Transfer Improvement Intermodal Transfer Improvement Intermodal Transfer Improvement Intermodal Transfer Improvement Internal Rail Docks Intermodal Transfer Improvement Docks Intermodal Transfer Improvement Dredging Harbor Intermodal Transfer Improvement Docks Intermodal Transfer Improvement Internal Rail Upgrade to Accommodate Freight and Passenger Service* Upgrade to Accommodate Freight and Passenger Service Upgrade to Accommodate Freight and Passenger Service Upgrade to Accommodate Freight and Passenger Service Grade Separation Grade Separation Docks Docks Internal Rail Access Improvements Runway expansion Operational and Capital Improvements Grade Separation Mobility & Distribution Improvements New Passenger Service

2013 Cost  O&M Cost  (millions) (millions) $1.17 $0.00 $0.00 $0.00 $3.77 $0.15 $3.88 $0.15 $3.79 $0.15

$56.74 $56.74 $90.78 $68.08 $6.00 $40.00 $30.00 $14.36 $8.84 $53.50 $2.82 $0.54 $8.65 $99.42 $14.75 $32.42 $32.42 $97.26 $54.04 $97.26 $86.45 $43.23 $32.42 $21.62 $81.05 $37.82 $43.23 $21.62 $270.18 $43.23 $81.50 $32.42 $32.42 $648.42 $32.42 $27.02 $21.61 $10.81 $294.00 $271.69 $0.00 $53.33 $32.42 $0.86 $10.81 $0.65 $5.00 $15.00 $15.00 $49.75 $10.00 $162.16

$0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $85.10

$0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10


Path Forward 2040 Long Range Transportation Plan

Table 1. Summary of the Need Plan Project Cost and Operating and Maintenance Costs (in millions of present day dollars) Facility County Map ID From

To

Florida East Coast Railway Intercity Passenger Rail Intercity Passenger Rail Intercity Passenger Rail Norfolk Southern CSX Transportation Florida East Coast Railway Downtown Transportation Center* Jacksonville Port Authority Florida East Coast Railway * Project costs are identified in the Transit Capacity Needs table.

Statewide Statewide Statewide Statewide Duval Duval Duval Duval Duval Duval

2253 2254 2255 2256 2257 2258 2259 2355 1006 2260

Miami to Jacksonville Upgrade Bolt and Clip System New Orleans to Jacksonville Jacksonville to Savannah Orlando to Jacksonville Soutel Drive to Norfolk Southern Intermodal Yard North Rail Corridors Phase 2 at Sunbeam Road  Downtown Facility Spoil Island Connector Bridge at Shad Road

SR 21  Blanding Boulevard   SR 21  Blanding Boulevard   SR 21  Blanding Boulevard   SR 21  Blanding Boulevard   SR 21  Blanding Boulevard   SR 21  Blanding Boulevard   SR 21  Blanding Boulevard   SR 21  Blanding Boulevard   SR 21  Blanding Boulevard  CR 215 CR 218 CR 220   Doctors Inlet Road  CR 220A  Long Bay Road   CR 209   Russell Road   US 17 SR 15   SR 134  103rd Street  SR 134  103rd Street  SR 134  103rd Street  SR 134  103rd Street  SR 134  103rd Street  SR 134  103rd Street  SR 134  103rd Street  SR 13  Acosta Bridge  SR 115  Arlington Expressway   SR 10  Atlantic Boulevard   SR 10  Atlantic Boulevard   US 90  Beach Boulevard   US 90  Beach Boulevard   SR 21  Blanding Boulevard   SR 21  Blanding Boulevard   SR 21  Blanding Boulevard  SR 21  Blanding Boulevard  SR 109  Cesery Boulevard  Collins Road  SR 126  Emerson Street  Firestone Road  SR 23  First Coast Expressway  SR 116  Fort Caroline Road  Harlow Boulevard  Alt US 1  Hart Bridge Expressway   I‐295

Clay Clay Clay Clay Clay Clay Clay Clay Clay Clay Clay Clay Clay Clay Clay Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval

209 212 215 219 221 231 605 606 241 202 203 608 204 201 327 207 218 222 225 226 311 603 310 301 650 651 223 652 230 232 242 317 653 200 304 205 213 654 206 300 607

at Arora Boulevard  at SR 16 at Youngerman Circle at Argyle Forest Boulevard  at Wells Road  at CR 215 Everett Avenue  Old Jennings Road  SR 16 SR 16 N Mimosa Avenue  SR 21  Blanding Boulevard   CR 220  Doctors Inlet Road  Old Ferry Road  CR 315 at New World Avenue  at Firestone Road , I‐295 Interchanges at Harlow Boulevard  at SR 21  Blanding Boulevard   at Shindler Drive , Old Middleburg Road  SR 228  Normandy Boulevard   SR 228  Normandy Boulevard   I‐95  US 17 / US 17 SR 228  State Street  Monument Road  Hart Bridge Expressway  at Forest Boulevard  Parental Home Road  at Collins Road  at I‐295 NB Off Ramp Argyle Forest Boulevard  Collins Road  SR 109  University Boulevard  Shindler Drive  I‐95 Morse Avenue  at US 90 , I‐10 Beaver Street  Merrill Road  SR 134  103rd Street  Monroe Street Old St Augustine Road 

Improvement Type Track Upgrade New Passenger Service New Passenger Service New Passenger Service New Connector Multi Modal Corridor Grade Separation Transportation Center New 2 Lane Bridge Grade Separation

2013 Cost  O&M Cost  (millions) (millions) $21.67 $0.10 TBD $0.10 TBD $0.10 TBD $0.10 $14.65 $0.10 $5.00 $0.10 $52.82 $60.00 $80.21 $40.00

Safety and Operations Improvements

Page 11 of 13

          Old Jennings Road  Argyle Forest Boulevard  CR 218 SR 21  Blanding Boulevard   CR 739  Henley Road   CR 224  College Drive   Old Jennings Road  CR 220  Doctors Inlet Road   Kingsley Avenue            I‐295 Wesconnett Boulevard  Broad Street SR 10  Atlantic Boulevard   Intracoastal Waterway SR 109  University Boulevard    San Pablo Road      US 17  Roosevelt Boulevard  US 17  Roosevelt Boulevard  SR 115  Arlington Expressway   Rampart Road  Bedford Road  SR 208  Wilson Boulevard     McCormick Road  SR 21  Blanding Boulevard   US 90  Beach Boulevard   SR 228  Normandy Boulevard  

Safety Projects ‐ Intersections Safety Projects ‐ Intersections Safety Projects ‐ Intersections Safety Projects ‐ Intersections Safety Projects ‐ Intersections Safety Projects ‐ Intersections Safety Projects ‐ Corridors Safety Projects ‐ Corridors Safety Projects ‐ Corridors Safety Projects ‐ Corridors Safety Projects ‐ Corridors Safety Projects ‐ Corridors Safety Projects ‐ Corridors Safety Projects ‐ Corridors Arterial Management System Safety Projects ‐ Intersections Safety Projects ‐ Intersections Safety Projects ‐ Intersections Safety Projects ‐ Intersections Safety Projects ‐ Intersections Arterial Management System Safety Projects ‐ Corridors Freeway Management System Freeway Management System Arterial Management System Arterial Management System Safety Projects ‐ Intersections Arterial Management System Safety Projects ‐ Intersections Safety Projects ‐ Intersections Safety Projects ‐ Corridors Arterial Management System Arterial Management System Safety Projects ‐ Corridors Traffic Operations Improvements Safety Projects ‐ Corridors Safety Projects ‐ Intersections Arterial Management System Safety Projects ‐ Corridors Freeway Management System Safety Projects ‐ Corridors

$1.50

$0.05

$1.50

$0.05

$1.50

$0.05

$1.50

$0.05

$1.50

$0.05

$1.50

$0.05

$7.05

$0.46

$11.10

$0.73

$11.85

$0.78

$9.30

$0.61

$9.90

$0.65

$8.25

$0.54

$2.85

$0.19

$2.85

$0.19

$1.37

$0.08

$1.50

$0.05

$1.50

$0.05

$1.50

$0.05

$1.50

$0.05

$1.50

$0.05

$0.77

$0.04

$13.20

$0.87

$0.28

$0.01

$1.77

$0.06

$1.04

$0.06

$0.23

$0.01

$1.50

$0.05

$1.16

$0.07

$1.50

$0.05

$1.50

$0.05

$9.00

$0.59

$1.07

$0.06

$0.27

$0.02

$3.00

$0.20

$2.42

$0.08

$4.65

$0.31

$1.50

$0.05

$0.15

$0.01

$2.70

$0.18

$0.91

$0.03

$33.00

$2.16


Path Forward 2040 Long Range Transportation Plan

Table 1. Summary of the Need Plan Project Cost and Operating and Maintenance Costs (in millions of present day dollars) Facility County Map ID From

To

Improvement Type

I‐295 SR 202  J. T. Butler Boulevard  SR 202  J. T. Butler Boulevard  Jammes Road  SR 115   Lem Turner Road  US 17  Main Street  US 1  Main Street Bridge  SR 106  Merrill Road  US 1  MLK Parkway   Monument Road  Morse Avenue  Mt. Pleasant Road  US 1/SR 15  New Kings Road   US 1/SR 15  New Kings Road   SR 228  Normandy Boulevard   SR 228  Normandy Boulevard   SR 228  Normandy Boulevard   SR 228  Normandy Boulevard   SR 228  Normandy Boulevard   Old Middleburg Road  Old Middleburg Road  Old St. Augustine Road  US 1/SR 5  Philips Highway   Rampart Road  Ricker Road  Ricker Road  Shindler Drive  US 17 / US 17 SR 228  State Street  SR 134  Timuquana Road  US 17 / US 17 SR 228  Union Street   SR 109  University Boulevard  SR 109  University Boulevard  SR 109  University Boulevard  US 301  SR 200   Wesconnett Boulevard  SR 208  Wilson Boulevard   SR 116  Wonderwood Connector  SR 116  Wonderwood Connector  SR 116  Wonderwood Connector  US 301  SR 200   SR 9B SR 200  SR A1A   SR 200  SR A1A   US 1/SR 5  Dixie Highway   US 1/SR 5  Dixie Highway   US 1/SR 5  Dixie Highway/Ponce De Leon Boulevard   International Golf Parkway  International Golf Parkway  CR 214  King Street/Anastasia Boulevard  CR 210  Palm Valley Road  US 1/SR 5  Ponce De Leon Boulevard  Race Track Road 

SR 115  Lem Turner Road   SR A1A Hodges Boulevard  San Juan Avenue   I‐295 I‐295 Bay Street SR 113  Southside Connector  I‐95 Fort Caroline Road  Jammes Road  Girvin Road    I‐295     I‐295 SR 111  Cassat Avenue   I‐295 SR 134  103rd Street  Lenox Avenue US 1/ SR 5  Philips Highway     Park City Drive  SR 134  103rd Street  Old Middleburg Road  SR 134  103rd Street  Liberty Street US 17  Roosevelt Boulevard   Liberty Street US 90  Beach Boulevard   Merrill Road  SR 109  Cesery Boulevard  US 90  Beaver Street  SR 21  Blanding Boulevard   SR 103  Lane Avenue   Mt. Pleasant Road  Fort Caroline Road East SR 101  Mayport Road  Mickler Street (Callahan) I‐295 Fernandina Beach Chester Road      SR 16     SR A1A SR A1A SR 16 US 1

Safety Projects ‐ Corridors Freeway Management System Safety Projects ‐ Corridors Safety Projects ‐ Corridors Arterial Management System Arterial Management System Arterial Management System Arterial Management System Freeway Management System Arterial Management System Safety Projects ‐ Corridors Arterial Management System Safety Projects ‐ Intersections Arterial Management System Safety Projects ‐ Intersections Safety Projects ‐ Intersections Arterial Management System Safety Projects ‐ Corridors Safety Projects ‐ Corridors Safety Projects ‐ Corridors Safety Projects ‐ Corridors Arterial Management System Safety Projects ‐ Intersections Safety Projects ‐ Corridors Safety Projects ‐ Corridors Safety Projects ‐ Corridors Safety Projects ‐ Corridors Arterial Management System Safety Projects ‐ Corridors Arterial Management System Arterial Management System Arterial Management System Arterial Management System Rural ITS Safety Projects ‐ Corridors Safety Projects ‐ Corridors Arterial Management System Arterial Management System Arterial Management System Rural ITS Freeway Management System Arterial Management System Safety Projects ‐ Corridors Safety Projects ‐ Intersections Safety Projects ‐ Intersections Arterial Management System Safety Projects ‐ Intersections Safety Projects ‐ Intersections Arterial Management System Rural ITS Access Management Plan Arterial Management System

Duval 610 Duval 315 Duval 712 Duval 233 Duval 305 Duval 326 Duval 324 Duval 663 Duval 325 Duval 306 Duval 234 Duval 657 Duval 224 Duval 307 Duval 208 Duval 220 Duval 318 Duval 609 Duval 611 Duval 235 Duval 236 Duval 658 Duval 229 Duval 237 Duval 238 Duval 239 Duval 240 Duval 322 Duval 602 Duval 323 Duval 659 Duval 660 Duval 661 Duval 313 Duval 600 Duval 601 Duval 655 Duval 656 Duval 662 Duval / Nassau314 Duval / St. Joh319 Nassau 320 Nassau 604 St. John's 210 St. John's 214 St. John's 328 St. John's 216 St. John's 217 St. John's 303 St. John's 302 St. John's 329 St. John's 308

SR 228  Normandy Boulevard   US 1/SR 5  Philips Highway  SR 115  Southside Boulevard  Morse Avenue  I‐95  Bay Street I‐95 SR 109  University Boulevard  SR 115  Arlington Expressway   SR 10  Atlantic Boulevard   Ricker Road  McCormick Road  at Moncrief Road  I‐95  at Fouraker Road  at Blair Road  South SR 134  103rd Street  I‐295 SR 23  First Coast Expressway  Argyle Forest Boulevard  SR 134  103rd Street  I‐95 at Bowden Road  Argyle Forest Boulevard  Morse Avenue  SR 134  103rd Street  Collins Road  I‐95  Wesconnett Boulevard  I‐95 St. Augustine Road  Arlington Road  SR 10  Atlantic Boulevard   SR 228  Normandy Boulevard   SR 21  Blanding Boulevard   Fouraker Road  Fort Caroline Road East SR 113  Southside Connector  Mt. Pleasant Road  US 90  Beaver Street  CR 2209 I‐95 I‐95 at SR 312 at SR 206 SR 312 at SR 16 at US 1/SR 5  Dixie Highway  I‐95  SR 13 SR 5A King Street  SR 13   San Jose Boulevard 

Page 12 of 13

2013 Cost  O&M Cost  (millions) (millions) $18.30 $1.20 $65.06

$2.16

$7.65

$0.50

$5.85

$0.38

$1.20

$0.07

$1.29

$0.07

$0.28

$0.01

$0.37

$0.02

$18.69

$0.62

$0.82

$0.05

$2.25

$0.15

$0.14

$0.01

$1.50

$0.05

$2.07

$0.12

$1.50

$0.05

$1.50

$0.05

$0.79

$0.04

$3.90

$0.26

$12.90

$0.85

$7.20

$0.47

$6.15

$0.40

$0.03

$0.00

$1.50

$0.05

$1.50

$0.10

$1.50

$0.10

$2.10

$0.14

$4.50

$0.30

$0.16

$0.01

$3.90

$0.26

$0.16

$0.01

$0.28

$0.01

$0.17

$0.01

$0.04

$0.00

$0.36

$0.01

$2.85

$0.19

$2.25

$0.15

$0.32

$0.02

$0.07

$0.00

$0.40

$0.02

$0.97

$0.04

$1.13

$0.03

$0.82

$0.04

$19.80

$1.30

$1.50

$0.05

$1.50

$0.05

$0.34

$0.02

$1.50

$0.05

$1.50

$0.05

$0.69

$0.04

$1.65

$0.08

$0.19

$0.01

$0.83

$0.04


Path Forward 2040 Long Range Transportation Plan

Table 1. Summary of the Need Plan Project Cost and Operating and Maintenance Costs (in millions of present day dollars) Facility County Map ID From

To

Improvement Type

SR 13 SR 16 SR 16/SR 13 SR 207/SR 312 SR A1A US 1, A1A & SR 5A 

Julington Creek Road US 1   SR A1A CR 214  

Arterial Management System Arterial Management System Safety Projects ‐ Intersections Rural ITS Rural ITS Transportation Management Plan

St. John's St. John's St. John's St. John's St. John's St. John's

309 312 211 316 321 330

Shands Bridge CR 13  at CR 13 I‐95  SR 206  

Page 13 of 13

2013 Cost  O&M Cost  (millions) (millions) $0.87 $0.04 $1.26

$0.07

$1.50

$0.05

$0.92

$0.05

$1.20

$0.06

$37.50

$1.23


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

County

Map ID 

From

To

Improvement Type 

Source

Purpose

Need

Road Capacity Projects 

Abaco Island Drive Extension 

Alta Drive 

Alta Drive / Yellow Bluff Road 

Alta Drive Realignment 

Amelia Island Parkway 

Nassau

Duval

Duval

Duval

Nassau

988

3

2

1

704

Abaco Island Drive 

SR 105 Heckscher Drive 

I‐295

SR 105 Zoo Parkway 

South 14th Street 

Zion Court 

I‐295

New Berlin Road (north ) 

North of New Berlin Road (south) 

CR 105A Buccaneer Trail 

New 2 Lane Road 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

2035 Needs Plan 

The project's purpose is to widen Alta  The project need was established in  Drive to four lanes from SR 105  the 2035 Needs Plan and confirmed  Heckscher Drive to I‐295 to address  as part of the planning process.  congestion needs and improve mobility. 

2035 Needs Plan 

The project's purpose is to widen to  Alta Drive / Yellow Bluff Road to five  lanes from I‐295 to New Berlin Road  (north) to address congestion needs  and improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

New 4 Lane Road 

2035 Needs Plan 

The project's purpose is to construct a  new four‐lane road and realign Alta  Drive from SR 105 Zoo Parkway to  North of New Berlin Road (south) to  address congestion needs and improve  mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

Widen to 4 Lanes* 

The project's purpose is to widen  Amelia Island Parkway to four lanes  from South 14th Street to CR 105A  Local government  Buccaneer Trail to address congestion  coordination  needs and improve mobility. This  project was also identified as candidate  for context sensitive solutions. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

Widen to 4 Lanes 

Widen to 5 Lanes 

1  

The project's purpose is to construct a  new two‐lane road called Abaco Island  Local government  Drive Extension from Abaco Island Drive  coordination  to Zion Court to address congestion  needs and improve mobility. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Argyle Forest Boulevard 

Arrigo‐Parliament Reconnection 

Barnwell‐0' Neil Scott  Connector 

Baxley Road 

Blount Island Boulevard  Extension 

County

Duval

Nassau

Nassau

Clay

Duval

Map ID 

936

980

1001

900

1006

From

SR 23 First Coast  Expressway 

Arrigo Boulevard 

Barnwell Road 

To

Old Middleburg Road 

Parliament Drive 

O'Neil Scott Road 

CR 220 Doctors Inlet Road  SR 21 Blanding Boulevard 

Spoil Island 

Jacksonville Port Authority 

Improvement Type 

Source

Purpose

Need

Widen to 6 Lanes 

Argyle Traffic  Circulation Study 

The project's purpose is to widen Argyle  Forest Boulevard to six lanes from SR 23  First Coast Expressway to Old  Middleburg Road to address congestion  needs and improve mobility. 

The project need was established  during a corridor planning study  performed by the North Florida  TPO to address congestion, mobility  and safety needs. 

New 2 Lane Road 

The project's purpose is to construct a  new two lane road called Arrigo‐ Local government  Parliament Reconnection from Arrigo  coordination  Boulevard to Parliament Drive to  address congestion needs and improve  mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called Barnwell‐0'  Local government  Neil Scott Connector from Barnwell  coordination  Road to O'Neil Scott Road to address  congestion needs and improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

Widen to 4 Lanes 

Other Local  Government  Priority 

The project's purpose is to widen Baxley  Road to four lanes CR 220 Doctors Inlet  Road to SR 21 Blanding Boulevard to  address congestion needs and improve  mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

Other Local  Government  Priority 

The project's purpose is to New two  Lane Bridge along Blount Island  Boulevard Extension from Spoil Island  to Jacksonville Port Authority to  address congestion needs and improve  mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

New 2 Lane Bridge 

2  


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Braddock Parkway 

Brady Point‐Clements  Connector 

Brinkhoff Road 

Buffalo Road 

Cahoon Road 

County

Duval

Nassau

St Johns 

Putnam

Duval

Map ID 

939

1002

801

503

1016

From

SR 115 Lem Turner Road 

Brady Point Road 

SR 207 

Buffalo Road west 

Lenox Avenue 

To

Pecan Park Road 

Clements Road 

Wildwood Drive 

Buffalo east 

US 90 Beaver Street 

Improvement Type 

Purpose

Need

New 2 Lane Road 

The project's purpose is to construct a  new tow lane road called Braddock  Local government  Parkway from SR 115 Lem Turner Road  coordination  to Pecan Park Road to address  congestion needs and improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called Brady Point‐ Local government  Clements Connector from Brady Point  coordination  Road to Clements Road to address  congestion needs and improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

New 2 Lane Road 

Other Local  Government  Priority 

The project's purpose is to construct a  new two‐lane road called Brinkhoff  Road from SR 207 to Wildwood Drive to  address congestion needs and improve  mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

New 2 Lane Bridge 

Other Local  Government  Priority 

The project's purpose is to construct    new two‐lane bridge along Buffalo Road  from Buffalo Road West to Buffalo East  to address congestion needs and  improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

Local Government CIP 

The project's purpose is to reconstruct  two lanes of Cahoon Road from Lenox  Avenue to US 90 Beaver Street to  address congestion needs and improve  mobility and provide bicycle and  pedestrian accommodations. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

Reconstruct 2 Lanes 

3  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Cardinal Street North  Extension 

Cardinal Street South  Extension 

Cecil Field Connector 

Chaffee Road 

Cheswick Oak Avenue  Extension 

County

Nassau

Nassau

Duval

Duval

Clay

Map ID 

976

975

972

971

13

From

Cardinal Avenue 

Spring Meadow Avenue 

Commerce Center 

SR 228 Normandy   Boulevard 

Oakleaf Plantation  Parkway 

To

SR 200 SR AIA  Yulee Backage  Roads 

William Burgess Boulevard 

SR 23 First Coast Expressway 

Crystal Springs Road 

Savannah Glen Boulevard 

Improvement Type 

Purpose

Need

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called Cardinal  Local government  Street North Extension from Cardinal  coordination  Avenue to SR 200 SR AIA Yulee Backage  Roads to address congestion needs and  improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called Cardinal  Local government  Street South Extension from Spring  coordination  Meadow Avenue to William Burgess  Boulevard to address congestion needs  and improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

New 2 Lane Road 

Widen to 5 Lanes 

New 4 Lane Road 

4  

Source

Local Government CIP 

The project's purpose is to construct a  new two‐lane road called Cecil Field  Connector from Commerce Center to  SR 23 First Coast Expressway to address  congestion needs and improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

Local Government CIP 

The project's purpose is to widen  Chaffee Road to five lanes from SR 228  Normandy Boulevard to Crystal Springs  Road to address congestion needs and  improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

2035 Cost  Feasible Plan 

The project's purpose is to construct a  new four‐lane road called Cheswick Oak  Avenue Extension from Oakleaf  Plantation Parkway to Savannah Glen  Boulevard to address congestion needs  and improve mobility. 

The project need was established in  the 2035 Cost Feasible Plan and  confirmed as part of the planning  process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Christian Way Extension 

Clark Road Extension 

College Drive 

College Drive Extension 

Collins Road 

County

Nassau

Duval

Clay

Clay

Duval

Map ID 

995

1020

902

14

930

From

Christian Way 

Broward Road 

To

Hampton Club Way 

Clark Road 

CR 220 Doctors Inlet Road  SR 21 Blanding Boulevard 

SR 21 Blanding Boulevard 

Shindler Drive 

Challenger Drive (Branan Field  Road ) 

Rampart Road 

Improvement Type 

New 2 Lane Road 

New 3 Lane Road 

Widen to 6 Lanes 

New 4 Lane Road 

Widen to 4 Lanes 

5  

Source

Purpose

The project's purpose is to construct a  new two‐lane road called Christian Way  Local government  Extension from Christian Way to  coordination  Hampton Club Way to address  congestion needs and improve mobility. 

Need

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

Local Government CIP 

The project's purposes to construct a  new three‐lane road called Clark Road  Extension from Broward Road to Clark  Road to address congestion needs and  improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

2035 Needs Plan 

The project's purpose is to widen  College Drive to six lanes from CR 220  Doctors Inlet Road to SR 21 Blanding  Boulevard to address congestion needs  and improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

2035 Cost  Feasible Plan 

The project's purpose is to construct a  new four‐lane road called College Drive  Extension from SR 21 Blanding  Boulevard to Challenger Drive (Branan  Field Road) to address congestion  needs and improve mobility. 

The project need was established in  the 2035 Cost Feasible Plan and  confirmed as part of the planning  process. 

Local Government CIP 

The project's purpose is to widen  Collins Road to four lanes from Shindler  Drive to Rampart Road to address  congestion needs and improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Collins Road 

Collins Road 

Collins Road 

Collins Road Realignment 

Comfort Road 

County

Duval

Duval

Duval

Duval

Putnam

Map ID 

932

From

Old Middleburg Road S 

15

SR 21 Blanding Boulevard 

16

at US 17 Roosevelt  Boulevard 

16B

505

Pine Verde 

Port Road 

To

Shindler Drive 

Pine Verde 

Improvement Type 

Widen to 4 Lanes 

Widen to 4 Lanes 

Purpose

Need

Local Government CIP 

The project's purpose is to widen  Collins Road to four lanes from Old  Middleburg Road S to Shindler Drive to  address congestion needs and improve  mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

2035 Needs Plan 

The project's purpose is to widen  Collins Road to four lanes from SR 21  Blanding Boulevard to Pine Verde to  address congestion needs and improve  mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

2035 Needs Plan 

The project's purpose is to construct a  The project need was established in  new interchange along Collins Road at  the 2035 Needs Plan and confirmed  US 17 Roosevelt Boulevard to address  as part of the planning process.  congestion needs and improve mobility. 

 

New Interchange 

US 17 Roosevelt Boulevard 

Local government  coordination and  New 4 Lane Road, Two  the project was  Overpass and New Interchange  part of the Better  Jacksonville Plan 

US 17 

Widen to 4 Lanes 

6  

Source

Other Local  Government  Priority 

The project's purpose is to construct a  new four‐lane road, two overpasses and  a new interchange along the Collins  Road Realignment from Pine Verde to  US 17 Roosevelt Boulevard to address  congestion needs and improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

The project's purpose is to widen  Comfort Road to four lanes from Port  Road to US 17 to address congestion  needs and improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Commodore Point Drive  Extension 

Concourse Loop Road 

Connector Road 

CR 105A Buccaneer Trail 

CR 16A 

County

Nassau

Nassau

Putnam

Nassau

St Johns 

Map ID 

996

501

502

705

803

From

Commodore Point Drive 

License Road 

US 17 

South Fletcher Avenue 

SR 16 Connector 

To

Blackrock Road 

Amelia Concourse 

Distribution Center 

Canopy Drive 

SR 13 

Improvement Type 

Purpose

Need

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called Commodore  Local government  Point Drive Extension from Commodore  coordination  Point Drive to Blackrock Road to  address congestion needs and improve  mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

New 2 Lane Road 

Other Local  Government  Priority 

The project's purpose is to construct a  new two‐lane road called Concourse  Loop Road from License Road to Amelia  Concourse to address congestion needs  and improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

New 2 Lane Road 

SIS CFP 

The project's purpose is to construct a  new two‐lane road called Connector  Road from US 17 to Distribution Center  to address congestion needs and  improve mobility. 

The project need was established in  the SIS CFP and confirmed as part  of the planning process. 

Turn Lane Improvements* 

The project's purpose is to construct  turn lane improvements along CR 105A  Buccaneer Trail from South Fletcher  Local government  Avenue to Canopy Drive to address  coordination  congestion needs and improve mobility.   This project was also identified as a  candidate for context sensitive  solutions. 

Widen to 4 Lanes 

Other Local  Government  Priority 

7  

Source

The project's purpose is to widen CR  16A to four lanes from SR 16 Connector  to SR 13 to address congestion needs  and improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

CR 16A Extension 

CR 209 Russell Road 

CR 209 South 

CR 210 

CR 210 

County

St Johns 

Clay

Clay

St Johns 

St Johns 

Map ID 

802

905

906

805

807

From

CR 16A 

CR 739 Henley Road 

Decoy Road 

I‐95

Greenbriar Road 

To

Leo Maguire Parkway 

US 17 

US 17 

near US 1 

Cimarrone Road 

Improvement Type 

New 2 Lane Road 

Purpose

The project's purpose is to construct a  new two‐lane road called CR 16A  Local government  Extension from CR 16A to Leo Maguire  coordination  Parkway to address congestion needs  and improve mobility. 

Need

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

2035 Needs Plan 

The project's purpose is to CR 209  The project need was established in  Russell Road to four lanes from CR 739  the 2035 Needs Plan and confirmed  Henley Road to US 17 to address  as part of the planning process.  congestion needs and improve mobility. 

Reconstruct 2 Lanes 

Other Local  Government  Priority 

The project's purpose is to reconstruct  two lanes along CR 209 South from  Decoy Road to US 17 to address  congestion needs and improve mobility  and provide bicycle and pedestrian  accommodations. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

Widen to 6 Lanes 

Other Local  Government  Priority 

The project's purpose is to widen CR  210 to six lanes from I‐95 to near US 1  to address congestion needs and  improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

2035 Needs Plan 

The project's purpose is to widen CR  The project need was established in  210 to four lanes from Greenbriar Road  the 2035 Needs Plan and confirmed  to Cimarrone Road to address  as part of the planning process.  congestion needs and improve mobility. 

Widen to 4 Lanes 

Widen to 4 Lanes 

8  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

CR 210 West 

CR 214 

CR 218 

CR 218 

CR 218 

County

St Johns 

St Johns 

Clay

Clay

Clay

Map ID 

849

809

1026

1027

24

From

Longleaf Pine Parkway 

Holmes Boulevard 

US 301 

Cosmos Avenue 

SR 21 Blanding Boulevard 

To

Greenbriar Road 

US 1 

Cosmos Avenue 

Pine Tree Lane 

CR 739 Henley Road 

Improvement Type 

Purpose

Need

Other Local  Government  Priority 

The project's purpose is to widen CR  210 West to four lanes from Longleaf  Pine Parkway to Greenbriar Road to  address congestion needs and improve  mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

Widen to 3 Lanes* 

Other Local  Government  Priority 

The project's purpose is to widen CR  214 to three lanes from Holmes  Boulevard to US 1 to address  congestion needs and improve mobility.   This project was also identified as a  candidate for context sensitive  solutions in lieu of widening. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

Widen to 4 Lanes 

Local Government CIP 

The project's purpose is to widen CR  218 to four lanes from US 301 to  Cosmos Avenue to address congestion  needs and improve mobility. 

The project need was established in  the Local Government CIP and  confirmed as part of the planning  process. 

2035 Needs Plan 

The project's purpose is to widen to CR  The project need was established in  218 to four lanes from Cosmos Avenue  the 2035 Needs Plan and confirmed  to Pine Tree Lane to address congestion  as part of the planning process.  needs and improve mobility. 

Local Government CIP 

The project's purpose is to widen CR  218 to dour lanes from SR 21 Blanding  Boulevard to CR 739 Henley Road to  address congestion needs and improve  mobility. 

Widen to 4 Lanes 

Widen to 4 Lanes 

Widen to 4 Lanes 

9  

Source

The project need was established in  the Local Government CIP and  confirmed as part of the planning  process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

CR 218 

CR 218 Extension 

CR 218 Extension 

CR 220 Doctors Inlet Road 

CR 220 Doctors Inlet Road 

County

Clay

Clay

Clay

Clay

Clay

Map ID 

909

25

26

33

34

From

SR 16 

CR 739 Henley Road 

SR 23 First Coast  Expressway 

SR 21 Blanding Boulevard 

College Drive 

To

CR 739 Henley Road 

SR 23 First Coast Expressway 

CR 315 

Knight Boxx Road 

US 17 

Improvement Type 

Widen to 4 Lanes 

New 4 Lane Road 

New 4 Lane Road 

Widen to 4 Lanes 

Widen to 6 Lanes 

10  

Source

Purpose

Need

2035 Needs Plan 

The project's purpose is to widen CR  218 to four lanes from SR 16 to CR 739  Henley Road to address congestion  needs and improve mobility. 

2035 Needs Plan 

The project's purpose is to construct a  The project need was established in  new four‐lane road called CR 218  the 2035 Needs Plan and confirmed  Extension from CR 739 Henley Road to  SR 23 First Coast Expressway to address  as part of the planning process.  congestion needs and improve mobility. 

2035 Needs Plan 

The project's purpose is to construct a  new four‐lane road called CR 218  The project need was established in  the 2035 Needs Plan and confirmed  Extension from SR 23 First Coast  as part of the planning process.  Expressway to CR 315 to address  congestion needs and improve mobility. 

2035 Needs Plan 

The project's purpose is to widen CR  The project need was established in  220 Doctors Inlet Road to four lanes  the 2035 Needs Plan and confirmed  from SR 21 Blanding Boulevard to  Knight Boxx Road to address congestion  as part of the planning process.  needs and improve mobility. 

2035 Needs Plan 

The project's purpose is CR 220 Doctors  Inlet Road from College Drive to US 17  to address congestion needs and  improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

CR 2209 

CR 2209 

CR 2209 

CR 2209 

CR 2209 

County

St Johns 

St Johns 

St Johns 

St Johns 

St Johns 

Map ID 

810

811

812

813

814

From

SR 23 First Coast  Expressway 

SR 16 Connector 

International Golf  Parkway 

CR 214 

SR 207/CR 305 

To

CR 210 

SR 23 First Coast Expressway 

SR 16 Connector 

CR 208 

CR 214 

Improvement Type 

New 6 Lane Road 

New 6 Lane Road 

New 6 Lane Road 

New 4 Lane Road 

New 4 Lane Road 

11  

Source

Purpose

Need

2035 Cost  Feasible Plan 

The project's purpose is to construct a  new six‐lane road called CR 2209 from  SR 23 First Coast Expressway to CR 210  to address congestion needs and  improve mobility. 

The project need was established in  the 2035 Cost Feasible Plan and  confirmed as part of the planning  process. 

2035 Cost  Feasible Plan 

The project's purpose is to construct a  new six‐lane road called CR 2209 from  SR 16 Connector to SR 23 First Coast  Expressway to address congestion  needs and improve mobility. 

The project need was established in  the 2035 Cost Feasible Plan and  confirmed as part of the planning  process. 

2035 Cost  Feasible Plan 

The project's purpose is to construct a  new six‐lane road called CR 2209 from  International Golf Parkway to SR 16  Connector to address congestion needs  and improve mobility. 

The project need was established in  the 2035 Cost Feasible Plan and  confirmed as part of the planning  process. 

2035 Needs Plan 

The project's purpose is to construct a  new four‐lane road called CR 2209 from  CR 214 to CR 208 to address congestion  needs and improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

2035 Needs Plan 

The project's purpose is to construct a  The project need was established in  new four‐lane road called CR 2209 from  the 2035 Needs Plan and confirmed  SR 207/CR 305 to CR 214 to address  as part of the planning process.  congestion needs and improve mobility. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

CR 2209 

CR 2209 

CR 2209 

CR 305 

CR 305 

County

St Johns 

St Johns 

St Johns 

St Johns 

St Johns 

Map ID 

815

816

843

818

850

From

SR 16 

CR 208 

at CR 210 

CR 204 

SR 206 

To

International Golf Parkway 

SR 16 

 

SR 206 

SR 207 

Improvement Type 

Source

Purpose

Need

2035 Needs Plan 

The project's purpose is to construct a  new four‐lane road called CR 2209 from  SR 16 to International Golf Parkway to  address congestion needs and improve  mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

2035 Needs Plan 

The project's purpose is to construct a  new four‐lane road called CR 2209 from  CR 208 to SR 16 to address congestion  needs and improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

2035 Needs Plan 

The project's purpose is to construct a  new interchange along CR 2209 at CR  210 to address congestion needs and  improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

New 2 Lane Road 

2035 Needs Plan 

The project's purpose is to construct a  The project need was established in  new two‐lane road called CR 305 from  the 2035 Needs Plan and confirmed  CR 20four to SR 206 to address  as part of the planning process.  congestion needs and improve mobility. 

Widen to 4 Lanes 

Other Local  Government  Priority 

The project's purpose is to widen CR  305 to four lanes from SR 206 to SR 207  to address congestion needs and  improve mobility. 

New 4 Lane Road 

New 4 Lane Road 

New Interchange 

12  

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

CR 315 

CR 315 

CR 739B Sandridge Road 

Crosby Avenue Extension 

Davis / 9B Parcel 

County

Clay

Clay

Clay

Nassau

Duval

Map ID 

31

32

904

993

1036

From

SR 16 

CR 315B 

CR 739 Henley Road 

US 17 SR 5 

SR 9B 

To

CR 315B 

US 17 

CR 209 Russell Road 

Pinewood Drive 

SR 152 Baymeadows Road 

Improvement Type 

Purpose

Need

2035 Needs Plan 

The project's purpose is to widen CR  The project need was established in  315 to four lanes from SR 16 to CR 315B  the 2035 Needs Plan and confirmed  to address congestion needs and  as part of the planning process.  improve mobility. 

Widen to 4 Lanes 

2035 Needs Plan 

The project's purpose is to widen CR  The project need was established in  315 to four lanes from CR 315B to US 17  the 2035 Needs Plan and confirmed  to address congestion needs and  as part of the planning process.  improve mobility. 

Widen to 4 Lanes 

Other Local  Government  Priority 

The project's purpose is to widen CR  739B Sandridge Road to four lanes from  CR 739 Henley Road to CR 209 Russell  Road to address congestion needs and  improve mobility. 

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called Crosby  Local government  Avenue Extension from US 17 SR 5 to  coordination  Pinewood Drive to address congestion  needs and improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

Widen to 4 Lanes 

The project's purpose is to widen Davis  / 9B Parcel Road to four lanes from SR  Local government  9B to SR 152 Baymeadows Road to  coordination  address congestion needs and improve  mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

Widen to 4 Lanes 

13  

Source

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Decoy Road 

Dixie Highway / Pellicer Lane 

Dove Road Extension {west} 

Durbin Parkway 

Durbin Parkway 

County

Clay

St Johns 

Nassau

St Johns 

St Johns 

Map ID 

907

1025

991

From

US 17 

SR 207 

Harper Chapel Road  Extension 

819

SR 9B Extension 

844

at US 1 SR 5 Dixie  Highway 

To

CR 209 South 

CR 214 West of King Street 

Mentoria Road 

Nocatee Parkway 

 

Improvement Type 

Purpose

Need

Other Local  Government  Priority 

The project's purpose is to reconstruct  two lanes of Decoy Road from US 17 to  CR 209 South to address congestion  needs and improve mobility and  provide bicycle and pedestrian  accommodations. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

Reconstruct 2 Lanes and  Widen to add Sidewalks and  Bike Lanes 

2035 Needs Plan 

The project's purpose is to reconstruct  two lanes and widen Dixie Highway /  The project need was established in  Pellicer Lane to add sidewalks and bike  the 2035 Needs Plan and confirmed  lanes from SR 207 to CR 214 West of  as part of the planning process.  King Street to address congestion needs  and improve mobility. 

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called Dove Road  Local government  Extension {west} from Harper Chapel  coordination  Road Extension to Mentoria Road to  address congestion needs and improve  mobility. 

New 4 Lane Road 

Other Local  Government  Priority 

The project's purpose is to construct a  new four‐lane road called Durbin  Parkway from the SR 9B Extension to  Nocatee Parkway to address congestion  needs and improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

Modify Interchange 

Other Local  Government  Priority 

The project's purpose is to modify the  interchange of Durbin Parkway at US 1  SR 5 Dixie Highway to address  congestion needs and improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

Reconstruct 2 Lanes 

14  

Source

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Duval Station Road 

East Dove Road Extension 

East Nassau Connector 

East Nassau Connector 

Eastport Road 

County

Duval

Nassau

Nassau

Nassau

Duval

Map ID 

942

974

36

969

37

From

US 17 SR 5 Main Street 

Harper Chapel Road 

I‐95

at I‐95 

SR 105 Heckscher Drive 

To

Starratt Road 

William Burgess Boulevard 

Chester Road 

 

Pulaski Road 

Improvement Type 

Purpose

Need

Widen to 4 Lanes 

The project's purpose is to widen Duval  Station Road to four lanes from US 17  Local government  SR 5 Main Street to Starratt Road to  coordination  address congestion needs and improve  mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called east Dove  Local government  Road Extension from Harper Chapel  coordination  Road to William Burgess Boulevard to  address congestion needs and improve  mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

New 4 Lane Road 

Local Government CIP 

The project's purpose is to construct a  new four‐lane road called East Nassau  Connector from I‐95 to Chester Road to  address congestion needs and improve  mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

New Interchange 

The project need was established in  The project's purpose is to construct a  through requests by local  Local government  new interchange along East Nassau  governments for consideration in  coordination  Connector at I‐95 to address congestion  the plan and confirmed as part of  needs and improve mobility.  the planning process. 

Widen to 3 Lanes 

15  

Source

Local Government CIP 

The project's purpose is to widen  Eastport Road to three lanes from SR  105 Heckscher Drive to Pulaski Road to  address congestion needs and improve  mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Flora Parke‐Wal‐Mart  Connector 

Florida Boulevard 

Future Corridor Initiative 

Gator Bowl Boulevard 

Gene Lassere Boulevard  Extension 

County

Nassau

Duval

Baker/Clay/Duval

Duval

Nassau

Map ID 

986

1021

721

43

985

From

Flora Parke Boulevard 

Penman Road 

Tampa Bay 

Liberty Street 

Gene Lassere Boulevard 

To

Walmart Supercenter 

SR 10 Atlantic Boulevard 

Northeast Florida 

SR 228 Hart Bridge Expressway  and SR 115 Mathews Bridge 

SR 200A Pages Dairy Road 

Improvement Type 

Purpose

Need

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called Flora Parke‐ Local government  Wal‐Mart Connector from Flora Parke  coordination  Boulevard to Walmart Supercenter to  address congestion needs and improve  mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

Widen to 3 Lanes 

Local Government CIP 

The project's purpose is to widen  Florida Boulevard to three lanes from  Penman Road to SR 10 Atlantic  Boulevard to address congestion needs  and improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

SIS Unfunded  Needs 

The project's purpose is to construct a  new limited‐access roadway from  Tampa Bay to Northeast Florida to  address congestion needs and improve  mobility. 

The project need was established in  the SIS Unfunded Needs and  confirmed as part of the planning  process. 

Widen to 6 Lanes and Remove  Ramps 

2035 Needs Plan 

The project's purpose is to widen Gator  Bowl Boulevard to six lanes and remove  The project need was established in  the 2035 Needs Plan and confirmed  ramps from Liberty Street to Hart SR  as part of the planning process.  115 Mathews Bridge to address  congestion needs and improve mobility. 

New 2 Lane Road and  Roundabout 

The project's purpose is to construct a  new two lane road and roundabout  Local government  called Gene Lassere Boulevard  coordination  Extension from Gene Lassere Boulevard  to SR 200A Pages Dairy Road to address  congestion needs and improve mobility. 

Future Corridor 

16  

Source

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Goodbread Road  Reconstruction 

Governors Park Road 

Hamilton Street Extension 

Harlow Boulevard 

Harper Chapel Extension 

County

Nassau

Clay

Nassau

Duval

Nassau

Map ID 

977

46

1000

943

989

From

US 17 SR 5 

US 17 

Goodbread Circle 

SR 134 103rd Street 

Harper Chapel Road 

To

Hamilton Street 

SR 16 

 

Lane Avenue 

Dove Road Extension 

Improvement Type 

New 2 Lane Road 

Purpose

The project's purpose is to construct a  new two‐lane road called Goodbread  Local government  Road Reconstruction from US 17 SR 5 to  coordination  Hamilton Street to address congestion  needs and improve mobility. 

Need

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

New 4 Lane Road 

2035 Needs Plan 

The project's purpose is to construct a  new four‐lane road called Governors  Park Road from US 17 to SR 16 to  address congestion needs and improve  mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called Hamilton  Local government  Street Extension from Goodbread Circle  coordination  to address congestion needs and  improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

Widen to 3 Lanes 

The project's purpose is to widen  Harlow Boulevard to three lanes from  Local government  SR 134 103rd Street to Lane Avenue to  coordination  address congestion needs and improve  mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called Harper  Local government  Chapel Extension from Harper Chapel  coordination  Road to Dove Road Extension to  address congestion needs and improve  mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

17  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Hart Expressway Ramps 

Hartley Road 

Harts Road 

Holmes Boulevard 

I‐10

County

Duval

Duval

Duval

St Johns 

Duval

Map ID 

43B

49

963

821

401

From

Liberty Street 

SR 13 San Jose Boulevard 

SR 104 Dunn Avenue 

CR 214 

SR 23 First Coast  Expressway 

To

SR 228 Hart Expressway and SR  115 Mathews Bridge 

Old St. Augustine Road 

I‐295

Four Mile Road 

I‐295

Improvement Type 

Purpose

Need

Phases in TIP or  Work Program 

The project's purpose is to remove  Ramps along SR 228 Hart Expressway  ramps from Liberty Street to the SR 228  Hart Bridge and SR 115 Mathews Bridge  to address congestion needs and  improve mobility. 

The project need was established in  the Phases in TIP or Work Program  and confirmed as part of the  planning process. 

Widen to 3 Lanes 

Local Government CIP 

The project's purpose is to widen  Hartley Road to three lanes from SR 13  San Jose Boulevard to Old St. Augustine  Road to address congestion needs and  improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

Widen to 4 Lanes 

Other Local  Government  Priority 

The project's purpose is to widen Harts  Road to four lanes from SR 104 Dunn  Avenue to I‐295 to address congestion  needs and improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

Widen to 6 Lanes 

Other Local  Government  Priority 

The project's purpose is to widen  Holmes Boulevard to six lanes from CR  214 to Four Mile Road to address  congestion needs and improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

SIS CFP 

The project's purpose is to add four  express lanes along I‐10 from SR 23  First Coast Expressway to I‐295 to  address congestion needs and improve  mobility. 

The project need was established in  the SIS CFP and confirmed as part  of the planning process. 

Remove Ramps 

Add 4 Express Lanes 

18  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

I‐10

I‐10

I‐10

I‐10

I‐10

County

Nassau

Duval

Baker

Baker

Duval

Map ID 

402*

403*

404*

405*

406

From

To

Baker/Nassau County Line  Nassau/Duval County Line 

Nassau/Duval County Line  US 301 

W of CR 125 

W of SR 121 

US 301 

W of SR 121 

Baker/Nassau County Line 

SR 23 First Coast Expressway 

Improvement Type 

Purpose

Need

SIS CFP 

The project's purpose is to add four  express lanes along I‐10 from  The project need was established in  Baker/Nassau County Line to  the SIS CFP and confirmed as part  of the planning process.  Nassau/Duval County Line to address  congestion needs and improve mobility. 

SIS CFP 

The project's purpose is to add four  express lanes along I‐10 from  Nassau/Duval County Line to US 301 to  address congestion needs and improve  mobility. 

SIS CFP 

The project's purpose is to add four  The project need was established in  express lanes along I‐10 from west of  the SIS CFP and confirmed as part  CR 125 to west of SR 121 to address  of the planning process.  congestion needs and improve mobility. 

Add 4 Express Lanes 

SIS CFP 

The project's purpose is to add four  express lanes along I‐10 from west of SR  The project need was established in  the SIS CFP and confirmed as part  121 to Baker/Nassau County Line to  address congestion needs and improve  of the planning process.  mobility. 

Add 4 Express Lanes 

Phases in TIP or  Work Program 

The project's purpose is to add four  express lanes along I‐10 from US 301 to  SR 23 First Coast Expressway to address  congestion needs and improve mobility. 

Add 4 Express Lanes 

Add 4 Express Lanes 

Add 4 Express Lanes 

19  

Source

The project need was established in  the SIS CFP and confirmed as part  of the planning process. 

The project need was established in  the Phases in TIP or Work Program  and confirmed as part of the  planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

I‐10

I‐10

I‐10

I‐10/US 90 Parallel Reliever 

I‐295

County

Duval

Baker

Duval

Baker

Duval/Clay

Map ID 

432

453

454

720

57

From

I‐295

Baker/Columbia County  Line 

at I‐295 

South MacClenny 

SR 13 San Jose Boulevard 

To

I‐95

CR 125 

 

East Baldwin 

W of US 17 Roosevelt Boulevard 

Improvement Type 

Purpose

Need

SIS CFP 

The project's purpose is to add four  express lanes along I‐10 from I‐295 to I‐ 95 to address congestion needs and  improve mobility. 

The project need was established in  the SIS CFP and confirmed as part  of the planning process. 

Add 4 Express Lanes 

SIS Unfunded  Needs 

The project's purpose is to add four  express lanes along I‐10 from  Baker/Columbia County Line to CR 125  to address congestion needs and  improve mobility. 

The project need was established in  the SIS Unfunded Needs and  confirmed as part of the planning  process. 

Modify Interchange 

SIS Unfunded  Needs 

The project need was established in  The project's purpose is to modify the  the SIS Unfunded Needs and  interchange of I‐10 at I‐295 to address  confirmed as part of the planning  congestion needs and improve mobility.  process. 

2035 Needs Plan 

The project's purpose is to construct a  new roadway called the I‐10 US 90  Parallel Reliever from South MacClenny  to East Baldwin to address congestion  needs and improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

SIS CFP 

The project's purpose is to add four  express lanes on the Buckman Bridge  along I‐295 from SR 13 San Jose  Boulevard to west of US 17 Roosevelt  Boulevard to address congestion needs  and improve mobility. 

The project need was established in  the SIS CFP and confirmed as part  of the planning process. 

Add 4 Express Lanes 

Future Corridor 

Add 4 Express Lanes on Bridge 

20  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

I‐295

I‐295

I‐295

I‐295

I‐295

County

Duval

Duval

Duval

Duval

Duval

Map ID 

119

407

408

409

410

From

SR 9B 

I‐95 North 

North of Trout River 

US 1 New Kings Road 

SR 134 103rd Street 

To

I‐295

SR 105 Dames Point  Bridge/Heckscher Drive 

I‐95

North of Trout River 

I‐10

Improvement Type 

Add 4 Express Lanes 

Add 4 Express Lanes 

Add 4 Express Lanes 

Add 4 Express Lanes 

Add 4 Express Lanes 

21  

Source

Purpose

Need

SIS Unfunded  Needs 

The project's purpose is to add four  express lanes along I‐295 from SR 9B to    I‐295 to address congestion needs and  improve mobility. 

The project need was established in  the SIS Unfunded Needs and  confirmed as part of the planning  process. 

Phases in TIP or  Work Program 

The project's purpose is to add four  express lanes along I‐295 from I‐95  North to SR 105 Dames Point  Bridge/Heckscher Drive to address  congestion needs and improve mobility. 

The project need was established in  the Phases in TIP or Work Program  and confirmed as part of the  planning process. 

SIS CFP 

The project's purpose is to add four  The project need was established in  express lanes along I‐295 from north of  the SIS CFP and confirmed as part  the Trout River to I‐95 to address  of the planning process.  congestion needs and improve mobility. 

SIS CFP 

The project's purpose is to add four  express lanes along I‐295 from US 1  New Kings Road to north of Trout River  to address congestion needs and  improve mobility. 

SIS CFP 

The project's purpose is to add four  The project need was established in  express lanes along I‐295 from SR 134  the SIS CFP and confirmed as part  103rd Street to I‐10 to address  of the planning process.  congestion needs and improve mobility. 

The project need was established in  the SIS CFP and confirmed as part  of the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

I‐295

I‐295

I‐295

I‐295

I‐295

County

Duval

Duval

Duval

Duval

Duval

Map ID 

411

From

I‐10

431

US 17 Roosevelt  Boulevard 

964

at US 17 Roosevelt  Boulevard 

1022

I‐95 South 

1023

SR 202 J. T. Butler  Boulevard 

To

US 1 South of New Kings Road 

SR 134 103rd Street 

 

SR 13 San Jose Boulevard 

SR 9B 

Improvement Type 

Purpose

Need

SIS CFP 

The project's purpose is to add four  express lanes along I‐295 from I‐10 to  US 1 South of New Kings Road to  address congestion needs and improve  mobility. 

The project need was established in  the SIS CFP and confirmed as part  of the planning process. 

Add 4 Express Lanes 

SIS CFP 

The project's purpose is to add four  express lanes along I‐295 from US 17  Roosevelt Boulevard to SR 134 103rd  Street to address congestion needs and  improve mobility. 

The project need was established in  the SIS CFP and confirmed as part  of the planning process. 

Modify Interchange 

Phases in TIP or  Work Program 

The project's purpose is to modify the  interchange of I‐295 at US 17 Roosevelt  Boulevard to address congestion needs  and improve mobility. 

The project need was established in  the Phases in TIP or Work Program  and confirmed as part of the  planning process. 

SIS CFP 

The project's purpose is to add two  express lanes along I‐295 from I‐95  South to SR 13 San Jose Boulevard to  address congestion needs and improve  mobility. 

The project need was established in  the SIS CFP and confirmed as part  of the planning process. 

SIS CFP 

The project's purpose is to add two  The project need was established in  express lanes along I‐295 from SR 202 J.  the SIS CFP and confirmed as part  T. Butler Boulevard to SR 9B to address  of the planning process.  congestion needs and improve mobility. 

Add 4 Express Lanes 

Add 2 Express Lanes 

Add 2 Express Lanes 

22  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

I‐295

I‐95

I‐95

I‐95

I‐95

County

Duval

Duval

St Johns 

St Johns 

Duval

Map ID 

121

From

SR 113 Southside  Connector 

68

at SR 102 Airport Road 

138

at US 1/SR 5 Ponce De  Leon Boulevard and at SR  206 

400

413

St. Johns/Flagler County  Line 

SR 104 Dunn Avenue 

To

SR 202 J. T. Butler Boulevard 

 

 

SR 206 

SR 102 Airport Road 

Improvement Type 

Purpose

Need

The project need was established in  the SIS CFP and confirmed as part  of the planning process. 

Add 4 Express Lanes 

SIS CFP 

The project's purpose is to add four  express lanes along I‐295 from SR 113  Southside Connector to SR 202 J. T.  Butler Boulevard to address congestion  needs and improve mobility. 

Modify Interchange 

2035 Cost  Feasible Plan 

The project's purpose is to modify the  interchange of I‐95 at SR 102 Airport  Road to address congestion needs and  improve mobility. 

The project need was established in  the 2035 Cost Feasible Plan and  confirmed as part of the planning  process. 

SIS Unfunded  Needs 

The project's purpose is to modify the  interchange of I‐95 from US 1 SR 5  Ponce De Leon Boulevard to SR 206 to  address congestion needs and improve  mobility. 

The project need was established in  the SIS Unfunded Needs and  confirmed as part of the planning  process. 

SIS Unfunded  Needs 

The project's purpose is to add four  express lanes along I‐95 from St.  Johns/Flagler County Line to SR 206 to  address congestion needs and improve  mobility. 

The project need was established in  the SIS Unfunded Needs and  confirmed as part of the planning  process. 

SIS Unfunded  Needs 

The project's purpose is to add four  express lanes along I‐95 from SR 104  Dunn Avenue to SR 102 Airport Road to  address congestion needs and improve  mobility. 

The project need was established in  the SIS Unfunded Needs and  confirmed as part of the planning  process. 

Modify Interchange 

Add 4 Express Lanes 

Add 4 Express Lanes 

23  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

I‐95

I‐95

I‐95

I‐95

I‐95

County

Duval

Duval

St Johns 

Duval

St Johns 

Map ID 

From

414

North of Fuller Warren  Bridge 

418A

Duval/St. Johns County  Line 

418B

419

420

International Golf  Parkway 

at US 1/SR 15 MLK 

SR 206 

To

SR 104 Dunn Avenue 

I‐295

St. Johns/Duval County Line 

 

International Golf Parkway 

Improvement Type 

Purpose

Need

SIS Unfunded  Needs 

The project's purpose is to add four  express lanes along I‐95 from North of  Fuller Warren Bridge to SR 104 Dunn  Avenue to address congestion needs  and improve mobility. 

SIS CFP 

The project's purpose is to add four  The project need was established in  express lanes along I‐95 from Duval/St.  the SIS CFP and confirmed as part  Johns County Line to I‐295 to address  of the planning process.  congestion needs and improve mobility. 

SIS CFP 

The project's purpose is to add four  express lanes along I‐95 from  The project need was established in  the SIS CFP and confirmed as part  International Golf Parkway to St.  of the planning process.  Johns/Duval County Line to address  congestion needs and improve mobility. 

Modify Interchange 

SIS CFP 

The project's purpose is to modify the  interchange of I‐95 at US 1/SR 15 MLK  to address congestion needs and  improve mobility. 

The project need was established in  the SIS CFP and confirmed as part  of the planning process. 

Add 4 Express Lanes 

SIS Unfunded  Needs 

The project's purpose is to add four  express lanes along I‐95 from SR 206 to  International Golf Parkway to address  congestion needs and improve mobility. 

The project need was established in  the SIS Unfunded Needs and  confirmed as part of the planning  process. 

Add 4 Express Lanes 

Add 4 Express Lanes 

Add 4 Express Lanes 

24  

Source

The project need was established in  the SIS Unfunded Needs and  confirmed as part of the planning  process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

I‐95

County

Duval

Map ID 

433

From

SR 202 J. T. Butler  Boulevard 

To

SR 10 Atlantic Boulevard 

Improvement Type 

Purpose

Need

The project need was established in  the SIS CFP and confirmed as part  of the planning process. 

The project need was established in  the SIS Unfunded Needs and  confirmed as part of the planning  process. 

Add 4 Express Lanes 

SIS CFP 

The project's purpose is to add four  express lanes along I‐95 from SR 202 J.  T. Butler Boulevard to SR 10 Atlantic  Boulevard to address congestion needs  and improve mobility. 

The project's purpose is to add four  express lanes along I‐95 from I‐295 to  SR 202 J. T. Butler Boulevard to address  congestion needs and improve mobility. 

I‐95

Duval

434

I‐295

SR 202 J. T. Butler Boulevard 

Add 4 Express Lanes 

SIS Unfunded  Needs 

I‐95

St Johns 

846

at CR 210 

 

Modify Interchange 

2035 Needs Plan 

The project's purpose is to modify the  The project need was established in  interchange of I‐95 at CR 210 to address  the 2035 Needs Plan and confirmed  congestion needs and improve mobility.  as part of the planning process. 

962

at SR 115 Southside  Boulevard 

Modify Interchange 

SR 115 Southside  Boulevard  Corridor Study 

The project's purpose is to modify the  interchange of I‐95 at SR 115 Southside  Boulevard to address congestion needs  and improve mobility. 

2035 Needs Plan 

The project's purpose is to widen  International Golf Parkway to four from  The project need was established in  I‐95 to Turn/Bend to address  congestion needs and improve mobility.   the 2035 Needs Plan and confirmed  as part of the planning process.  This corridor was also identified as a  candidate for context sensitive  solutions in lieu of widening. 

I‐95

International Golf Parkway 

Duval

St Johns 

823

I‐95

 

Turn/Bend

Widen to 4 Lanes* 

25  

Source

The project need was established in  the SR 115 Southside Boulevard  Corridor Study and confirmed as  part of the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Jones Road 

Kernan Boulevard 

Kernan Boulevard 

Knight Boxx Road 

Lake Asbury East West 1 

County

Duval

Duval

Duval

Clay

Clay

Map ID 

944

73

933

901

915

From

US 90 Beaver Street 

SR 202 J. T. Butler  Boulevard 

SR 10 Atlantic Boulevard 

To

Pritchard Road 

Glen Kernan Parkway 

SR 116 McCormick Road 

CR 220 Doctors Inlet Road  SR 21 Blanding Boulevard 

NS3

CR 209 Russell Road 

Improvement Type 

Purpose

Need

The project's purpose is to construct  intersection improvements along Jones  Local government  Road from US 90 Beaver Street to  coordination  Pritchard Road to address congestion  needs and improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

Local Government CIP 

The project's purpose is wide Kernan  Boulevard to six lanes from SR 202 J. T.  Butler Boulevard to Glen Kernan  Parkway to address congestion needs  and improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

Widen to 6 Lanes 

Local Government CIP 

The project's purpose is to widen  Kernan Boulevard to six lanes from SR  10 Atlantic Boulevard to SR 116  McCormick Road to address congestion  needs and improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

Widen to 6 Lanes 

Other Local  Government  Priority 

The project's purpose is to widen Knight  Boxx Road to six lanes from CR 220  Doctors Inlet Road to SR 21 Blanding  Boulevard to address congestion needs  and improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called Lake Asbury  Local government  East West 1 from NS3 to CR 209 Russell  coordination  Road to address congestion needs and  improve mobility. 

Intersection Improvements 

Widen to 6 Lanes 

26  

Source

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Lake Asbury North South  Road 3 

Lofton Creek Crossing 

Long Bay Road Extension  North 

Macaw Avenue Extension 

McDuff Avenue / 5th Street 

County

Clay

Nassau

Clay

Nassau

Duval

Map ID 

914

710

911

982

1019

From

CR 739B Sandridge Road 

Hendricks Road 

Old Jennings Road 

Cardinal Street 

Melson Avenue 

To

CR 209 Russell Road 

Avant Road 

Long Bay Road 

US 17 SR 5 

Huron Street 

Improvement Type 

Purpose

Need

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called Lake Asbury  Local government  North South Road 3 from CR 739B  coordination  Sandridge Road to CR 209 Russell Road  to address congestion needs and  improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

New 2 Lane Bridge 

Other Local  Government  Priority 

The project's purpose is to construct a  new two‐lane bridge called the Lofton  Creek Crossing from Hendricks Road to  Avant Road to address congestion  needs and improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

New 2 Lane Road 

Other Local  Government  Priority 

The project's purpose is to construct a  new two‐lane road called Long Bay  Road Extension North from Old  Jennings Road to Long Bay Road to  address congestion needs and improve  mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called Macaw  Local government  Avenue Extension from Cardinal Street  coordination  to US 17 SR 5 to address congestion  needs and improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

Widen to 3 Lanes 

27  

Source

Local Government CIP 

The project's purpose is to widen 5th  Street to three lanes from Melson  Avenue to Huron Street to address  congestion needs and improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Mentoria‐William Burgess  Connector 

Merrill Road 

Mickler Road 

Monument Road 

Monument Road 

County

Nassau

Duval

St Johns 

Duval

Duval

Map ID 

990

945

825

946

947

From

William Burgess  Boulevard 

Hartsfield Road 

Palm Valley Road 

Tredinick Parkway 

I‐295

To

Harper Chapel Road 

SR 113 Southside Connector 

SR A1A 

I‐295

Lee Road 

Improvement Type 

Purpose

Need

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called Mentoria‐ Local government  William Burgess Connector from  coordination  William Burgess Boulevard to Harper  Chapel Road to address congestion  needs and improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

Widen to 6 Lanes 

The project's purpose is to widen  Merrill Road to six lanes from Hartsfield  Local government  Road to SR 113 Southside Connector to  coordination  address congestion needs and improve  mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

The project's purpose is to widen  The project need was established in  Mickler Road to four lanes from Palm  the 2035 Needs Plan and confirmed  Valley Road to SR A1A to address  as part of the planning process.  congestion needs and improve mobility. 

Widen to 4 Lanes 

2035 Needs Plan 

Widen to 6 Lanes 

The project need was established in  The project's purpose is to widen  through requests by local  Local government  Monument Road to six lanes from  governments for consideration in  coordination  Tredinick Parkway to I‐295 to address  the plan and confirmed as part of  congestion needs and improve mobility.  the planning process. 

Widen to 6 Lanes 

The project's purpose is to widen  Local government  Monument Road to six lanes from I‐295  coordination  to Lee Road to address congestion  needs and improve mobility. 

28  

Source

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

National Cemetery Road 

New Berlin Road 

New Berlin Road 

New World Avenue 

New World Avenue 

County

Duval

Duval

Duval

Duval

Duval

Map ID 

1033

948

949

1034

1035

From

Lannie Road 

Pulaski Road 

Yellow Bluff Road 

SR 23 First Coast  Expressway 

SR 23 First Coast  Expressway 

To

Arnold Road 

Yellow Bluff Road 

Cedar Point Road 

Chaffee Road 

Chaffee Road 

Improvement Type 

Purpose

The project's purpose is to construct a  new two‐lane road called National  Cemetery Road from Lannie Road to  Arnold Road to address congestion  needs and improve mobility. 

Need

The project need was established in  the 2035 Cost Feasible Plan and  confirmed as part of the planning  process. 

New 2 Lane Road 

2035 Cost  Feasible Plan 

Widen to 4 Lanes 

The project need was established in  The project's purpose is to widen New  through requests by local  Local government  Berlin Road to four lanes from Pulaski  governments for consideration in  coordination  Road to Yellow Bluff Road to address  the plan and confirmed as part of  congestion needs and improve mobility.  the planning process. 

Widen to 4 Lanes 

The project's purpose is to widen New  Berlin Road to four lanes from Yellow  Local government  Bluff Road to Cedar Point Road to  coordination  address congestion needs and improve  mobility. 

The project's purpose is to construct a  new two‐lane road called New World  Avenue from SR 23 First Coast  Expressway to Chaffee Road to address  congestion needs and improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

New 2 Lane Road 

Local Government CIP 

Widen to 4 Lanes 

The project need was established in  The project's purpose is to widen New  through requests by local  Local government  World Avenue from SR 23 First Coast  governments for consideration in  coordination  Expressway to Chaffee Road to address  the plan and confirmed as part of  congestion needs and improve mobility.  the planning process. 

29  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Norfolk Southern Railroad  Overpass 

County

Duval

Northern Cross Town Corridor  Baker 

Northern Outer Beltway 

Oakleaf Village Parkway  Extension 

Old Kings Road 

Duval/Nassau

Clay

Duval

Map ID 

85

500

88

913

951

From

West 12th Street 

CR 125 

I‐10

Oakleaf Plantation  Parkway 

SR 111 Edgewood Avenue 

To

US 23 New Kings Road 

SR 121 

I‐95

Oakleaf Village Parkway 

Plummer Road 

Improvement Type 

Purpose

Need

New 3 Lane Road / Bridge 

2035 Needs Plan 

The project's purpose is to construct a  new three lane road and bridge called  The project need was established in  the Norfolk Southern Railroad Overpass  the 2035 Needs Plan and confirmed  from West 12th Street to US 23 New  as part of the planning process.  Kings Road to address congestion needs  and improve mobility. 

New 2 Lane Road 

Other Local  Government  Priority 

The project's purpose is to construct a  new two‐lane road called Northern  Cross Town Corridor from CR 125 to SR  121 to address congestion needs and  improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

2035 Needs Plan 

The project's purpose is to construct a  new limited‐access facility called the  Northern Outer Beltway from I‐10 to I‐ 95 to address congestion needs and  improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

New 2 Lane Road 

Other Local  Government  Priority 

The project's purpose is to construct a  new two‐lane road called Oakleaf  Village Parkway Extension from Oakleaf  Plantation Parkway to Oakleaf Village  Parkway to address congestion needs  and improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

Intersection Improvements 

The project's purpose is to construct  intersection improvements along Old  Local government  Kings Road from SR 111 Edgewood  coordination  Avenue to Plummer Road to address  congestion needs and improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

Future Corridor 

30  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Old Middleburg Road 

Old St. Augustine Road 

Old St. Augustine Road 

Outer Loop Facility 

Pages Dairy Road East  Extension 

County

Duval

Duval

Duval

Baker/Duval

Nassau

Map ID 

1015

90

1010

91

987

From

Argyle Forest Boulevard 

Bartram Park Boulevard 

at Greenland Road 

SR 228 Normandy   Boulevard 

Chester Road 

To

SR 134 103rd Street 

US 1/SR 5 Phillips Highway 

 

SR 228 Normandy  Boulevard 

Blackrock Road 

Improvement Type 

Purpose

Need

Local Government CIP 

The project's purpose is to widen Old  Middleburg Road from Argyle Forest  Boulevard to SR 134 103rd Street to  address congestion needs and improve  mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

2035 Needs Plan 

The project's purpose is to widen Old  St. Augustine Road to six lanes and  construct an overpass of US 1 SR 5  Philips Highway from Bartram Park  Boulevard to US 1 SR 5 Phillips Highway  to address congestion needs and  improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

Local Government CIP 

The project's purpose is to construct  intersection improvements and add one  lane along Old St. Augustine Road at  Greenland Road to address congestion  needs and improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

Future Corridor 

2035 Needs Plan 

The project's purpose is to construct a  new roadway called the Outer Loop  Facility from SR 228 Normandy  Boulevard to SR 228 Normandy  Boulevard to address congestion needs  and improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called Pages Dairy  Local government  Road East Extension from Chester Road  coordination  to Blackrock Road to address  congestion needs and improve mobility. 

Widen to 4 Lanes 

Widen to 6 Lanes and  Overpass 

Intersection Improvements /  Add 1 Lane 

31  

Source

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Pages Dairy Road South  Extension 

Palm Valley Road 

Pecan Park Road 

Pecan Park Road 

Pulaski Road 

County

Nassau

St Johns 

Duval

Duval

Duval

Map ID 

983

826

952

92

From

SR 200 SR A1A 

Intracoastal Waterway 

Braddock Boulevard 

I‐95

953*** Eastport Road 

To

Sowell Road 

Mickler Road 

JIA North Access Road 

US 17 Main Street 

I‐295

Improvement Type 

Purpose

Need

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called Pages Dairy  Local government  Road South Extension from SR 200 SR  coordination  A1A to Sowell Road to address  congestion needs and improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

Widen to 4 Lanes 

Other Local  Government  Priority 

The project's purpose is to widen Palm  Valley Road from Intracoastal  Waterway to Mickler Road to address  congestion needs and improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

Widen to 4 Lanes 

The project need was established in  The project's purpose is to widen Pecan  through requests by local  Local government  Park Road from Braddock Boulevard to  governments for consideration in  coordination  JIA North Access Road to address  the plan and confirmed as part of  congestion needs and improve mobility.  the planning process. 

The project's purpose is to widen Pecan  Park Road from I‐95 to US 17 Main  Street to address congestion needs and  improve mobility. 

Widen to 4 Lanes 

2035 Needs Plan 

Widen to 4 Lanes 

The project's purpose is to widen  Local government  Pulaski Road from Eastport Road to I‐ coordination  295 to address congestion needs and  improve mobility. 

32  

Source

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Pulaski Road / Starratt Road 

Race Track Road 

Race Track Road 

Race Track Road Connector 

Ramona Boulevard 

County

Duval

St Johns 

St Johns 

St Johns 

Duval

Map ID 

97

827

828

851

935

From

I‐295

St. Johns Parkway 

Bartram Park Boulevard 

Durbin Parkway / 9B  Extension 

Hammond Boulevard 

To

Duval Station Road 

Bartram Park Boulevard 

Bartram Springs 

Race Track Road 

Cahoon Road South 

Improvement Type 

Purpose

Need

2035 Needs Plan 

The project's purpose is to widen  The project need was established in  Pulaski Road / Starratt Road from I‐295  the 2035 Needs Plan and confirmed  to Duval Station Road to address  as part of the planning process.  congestion needs and improve mobility. 

Widen to 4 Lanes 

2035 Needs Plan 

The project's purpose is to widen Race  The project need was established in  Track Road from St. Johns Parkway to  the 2035 Needs Plan and confirmed  Bartram Park Boulevard to address  as part of the planning process.  congestion needs and improve mobility. 

Widen to 4 Lanes 

Other Local  Government  Priority 

The project's purpose is to widen Race  Track Road from Bartram Park  Boulevard to Bartram Springs to  address congestion needs and improve  mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

Other Local  Government  Priority 

The project's purpose is to construct a  new two‐lane road called Race Track  Road Connector from Durbin Parkway  and 9B Extension to Race Track Road to  address congestion needs and improve  mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

Local Government CIP 

The project's purpose is to widen  Ramona Boulevard to five lanes from  Hammond Boulevard to Cahoon Road  South to address congestion needs and  improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

Widen to 4 Lanes 

New 2 Lane Road 

Widen to 5 Lanes 

33  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Rampart / Firestone Road 

Ranch Road 

Ricker Road 

Salisbury Road Extension 

San Pablo Road 

County

Duval

Duval

Duval

Duval

Duval

Map ID 

98

1038

934

99

1009

From

Collins Road 

Tradeport Road 

Morse Avenue 

SR 152 Baymeadows  Boulevard 

US 90 Beach Boulevard 

To

SR 134 103rd Street 

SR 102 North of Airport Road 

Old Middleburg Road 

Belfort Road 

SR 10 Atlantic Boulevard 

Improvement Type 

Widen to 4 Lanes 

Widen to 4 Lanes 

Widen to 3 Lanes 

New 3 Lane Road 

Widen to 3 Lanes 

34  

Source

Purpose

Need

2035 Needs Plan 

The project's purpose is to widen  Rampart / Firestone Road to four lanes  from Collins Road to SR 134 103rd  Street to address congestion needs and  improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

SIS Unfunded  Needs 

The project's purpose is to widen Ranch  Road to four lanes from Tradeport Road  to SR 102 North of Airport Road to  address congestion needs and improve  mobility. 

The project need was established in  the SIS Unfunded Needs and  confirmed as part of the planning  process. 

Local Government CIP 

The project's purpose is to widen Ricker  Road to three lanes from Morse Avenue  to Old Middleburg Road to address  congestion needs and improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

2035 Needs Plan 

The project's purpose is to construct a  new three‐lane road called Salisbury  Road Extension from SR 152  Baymeadows Boulevard to Belfort Road  to address congestion needs and  improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

Local Government CIP 

The project's purpose is to widen San  Pablo Road to three lanes from US 90  Beach Boulevard to SR 10 Atlantic  Boulevard to address congestion needs  and improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Shindler Drive 

SR 10 Atlantic Boulevard 

SR 10 Atlantic Boulevard 

SR 10 Atlantic Boulevard 

SR 100 

County

Duval

Duval

Duval

Duval

Clay

Map ID 

101

714

715

716

450

From

Collins Road 

at Girvin Road 

at Hodges Boulevard 

at San Pablo Boulevard 

To

SR 134 103rd Street 

 

 

 

Clay/Bradford County Line  Clay/Putnam County Line 

Improvement Type 

Purpose

Need The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

Widen to 3 Lanes 

Local Government CIP 

The project's purpose is to widen  Shindler Drive to three lanes from  Collins Road to SR 134 103rd Street to  address congestion needs and improve  mobility. 

Intersection Improvements 

Phases are  currently  included in a local  government  capital  improvement  program. 

The project's purpose is to construct  intersection improvements along SR 10  Atlantic Boulevard at Girvin Road to  address congestion needs and improve  mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

Intersection Improvements 

Local Government CIP 

The project's purpose is to construct  intersection improvements along SR 10  Atlantic Boulevard at Hodges Boulevard  to address congestion needs and  improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

Intersection Improvements 

Phases are  currently  included in a local  government  capital  improvement  program. 

The project's purpose is to construct  intersection improvements along SR 10  Atlantic Boulevard at San Pablo  Boulevard to address congestion needs  and improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

SIS Unfunded  Needs 

The project's purpose is to widen SR  100 to four lanes from Clay/Bradford  County Line to Clay/Putnam County  Line to address congestion needs and  improve mobility. 

The project need was established in  the SIS Unfunded Needs and  confirmed as part of the planning  process. 

Widen to 4 Lanes 

35  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

SR 100 

SR 101 Mayport Road 

SR 101 Mayport Road 

SR 102 Airport Road 

SR 104 Dunn Avenue 

County

Putnam

Duval

Duval

Duval

Duval

Map ID 

451

152B

152

421

940

From

Clay/Putnam County Line 

SR 116 Wonderwood  Drive 

at SR 116 Wonderwood  Drive 

Airport Entrance 

US 1/SR 15 New Kings  Road 

To

US 17 SR 5 

Mayport Main Gate 

 

I‐95

I‐295

Improvement Type 

Purpose

Need

Widen to 4 Lanes 

SIS Unfunded  Needs 

The project's purpose is to widen SR  100 to four lanes from Clay/Putnam  County Line to US 17 SR 5 to address  congestion needs and improve mobility. 

The project need was established in  the SIS Unfunded Needs and  confirmed as part of the planning  process. 

Add 2 Northbound Lanes 

Through coordination with  Mayport Naval  Station  

The project's purpose is to add two  northbound lanes along SR 101  Mayport Road from SR 116  Wonderwood Drive to Mayport Main  Gate to address congestion needs and  improve mobility. 

The project need was established in  the through coordination with  Mayport Naval Station and local  government coordination.   

Intersection Improvements 

The project's purpose is to construct  Through  intersection improvements along SR  coordination with  101 Mayport Road at SR 116  Mayport Naval  Wonderwood Drive to address  Station  congestion needs and improve mobility. 

The project need was established in  the through coordination with  Mayport Naval Station and local  government coordination.   

Widen to 6 Lanes 

SIS Unfunded  Needs 

The project's purpose is to widen SR102  Airport Road to 6 lanes from the Airport  Entrance to I‐95 to address congestion  needs and improve mobility. 

The project need was established in  the SIS Unfunded Needs and  confirmed as part of the planning  process. 

2035 Needs Plan 

The project's purpose is to widen SR  104 Dunn Avenue to four lanes from US  1/SR 15 New Kings Road to I‐295 to  address congestion needs and improve  mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

Widen to 4 Lanes 

36  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

SR 104 Dunn Avenue 

SR 115 Arlington Expressway 

SR 115 Arlington Expressway  

SR 115 Lem Turner Road 

SR 115 Southside Boulevard 

County

Duval

Duval

Duval

Duval/Nassau

Duval

Map ID 

941

100

153

74

102

From

Old Kings Road 

SR 109 University  Boulevard 

at SR 109 University  Boulevard 

I‐295

US 1/SR 5 Philips Highway 

To

US 23 New Kings Road 

SR 10 Atlantic Boulevard 

 

US 1 / Callahan S Kings Road 

I‐95 Ramps 

Improvement Type 

Purpose

Need

2035 Needs Plan 

The project's purpose is to construct  intersection improvements along SR  The project need was established in  104 Dunn Avenue from Old Kings Road  the 2035 Needs Plan and confirmed  as part of the planning process.  to US 23 New Kings Road to address  congestion needs and improve mobility. 

Widen to 6 Lanes* 

New need  identified in the  2040 LRTP. 

The project's purpose is to widen SR  115 Arlington Expressway to six lanes  from SR 109 University Boulevard to SR  10 Atlantic Boulevard to address  congestion needs and improve mobility.   This project was also identified as a  candidate for context sensitive  solutions in lieu of widening. 

The project was identified as a  candidate for context sensitive  solutions through the planning  process based on the lack of  accessibility and mobility within the  corridor.   

Modify Interchange 

Established as  part of the SR 115  Mathews Bridge  Replacement  PD&E Study and  included in the  Duval County  LOGT program for  PE. 

The project's purpose is to modify the  interchange of SR 115 Arlington  Expressway at SR 109 University  Boulevard to address congestion needs  and improve mobility. 

The project need was established as  part of the SR 115 Mathews Bridge  Replacement PD&E Study and  included in the Duval County LOGT  program for PE.  The need for this  project was confirmed as part of  the planning process. 

2035 Cost  Feasible Plan 

The project's purpose is to widen SR  115 Lem Turner Road to four lanes from  I‐295 to US 1 / Callahan S Kings Road to  address congestion needs and improve  mobility. 

The project need was established in  the 2035 Cost Feasible Plan and  confirmed as part of the planning  process. 

SR 115 Southside Boulevard Corridor Study

The project's purpose is to widen SR  115 Southside Boulevard to six lanes  from US 1/SR 5 Philips Highway to the I‐ 95 Ramps to address congestion needs  and improve mobility.  This project was  also identified as a candidate for  context sensitive solutions in lieu of  widening. 

The project need was established in  the 0 and confirmed as part of the  planning process. 

Intersection Improvements 

Widen to 4 Lanes 

Widen to 6 Lanes* 

37  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

SR 115 Southside Boulevard 

SR 115 Southside Boulevard 

SR 115 Southside Boulevard 

SR 115 Southside Boulevard 

SR 115 Southside Boulevard 

County

Duval

Duval

Duval

Duval

Duval

Map ID 

103

104

960

966

967

From

SR 202 J. T. Butler  Boulevard 

US 90 Beach Boulevard 

Hogan Road 

at SR 202 J. T. Butler  Boulevard 

at SR 152 Baymeadows  Road 

To

US 90 Beach Boulevard 

SR 10 Atlantic Boulevard 

Gate Parkway 

 

 

Improvement Type 

Purpose

Need

SR 115 Southside Boulevard Corridor Study

The project's purpose is to widen SR  115 Southside Boulevard to six lanes  from SR 202 J. T. Butler Boulevard to US  The project need was established in  90 Beach Boulevard to address  the 0 and confirmed as part of the  congestion needs and improve mobility.   planning process.  This project was also identified as a  candidate for context sensitive  solutions in lieu of widening. 

2035 Needs Plan 

The project's purpose is to widen SR  The project need was established in  115 Southside Boulevard to six lanes  the 2035 Needs Plan and confirmed  from US 90 Beach Boulevard to SR 10  as part of the planning process.  Atlantic Boulevard to address  congestion needs and improve mobility. 

Intersection Improvements 

Local Government CIP 

The project's purpose is to construct  intersection improvements along SR  115 Southside Boulevard from Hogan  Road to Gate Parkway to address  congestion needs and improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

Modify Interchange 

SR 115 Southside Boulevard Corridor Study

The project's purpose is to modify the  interchange of SR 115 Southside  Boulevard at SR 202 J. T. Butler  Boulevard to address congestion needs  and improve mobility. 

The project need was established in  the 0 and confirmed as part of the  planning process. 

Underpass

SR 115 Southside Boulevard Corridor Study

The project's purpose is to construct an  underpass where SR 152 Baymeadows  Road would go under SR 115 Southside  Boulevard to address congestion needs  and improve mobility.   

The project need was established in  the 0 and confirmed as part of the  planning process. 

Widen to 6 Lanes* 

Widen to 6 Lanes* 

38  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

SR 115 Southside Boulevard 

SR 152 Baymeadows Road 

SR 152 Baymeadows Road 

SR 16 

SR 16 

County

Duval

Duval

Duval

Clay

St Johns 

Map ID 

968

937

938

106

110

From

at SR 10 Atlantic  Boulevard 

I‐95

US 1 /SR 5 Philips  Highway 

CR 218 

I‐95

To

 

SR 115 Southside Boulevard 

I‐95

SR 15A Oakridge Avenue 

SR 313 

Improvement Type 

Intersection Improvements 

Widen to 6 Lanes 

Widen to 6 Lanes* 

Widen to 4 Lanes 

Widen to 6 Lanes 

39  

Source

Purpose

Need

Local Government CIP 

The project's purpose is to construct  intersection improvements along SR  115 Southside Boulevard at SR 10  Atlantic Boulevard to address  congestion needs and improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

2035 Needs Plan 

The project's purpose is to widen SR  152 Baymeadows Road to 6 lanes from  I‐95 to SR 115 Southside Boulevard to  address congestion needs and improve  mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

2035 Needs Plan 

The project's purpose is to widen SR  152 Baymeadows Road to six lanes  from US 1 SR 5 Philips Highway to I‐95  to address congestion needs and  improve mobility. This project was also  identified as a candidate for context  sensitive solutions in lieu of widening. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

2035 Needs Plan 

The project's purpose is to widen SR 16  to four lanes from CR two18 to SR 15A  Oakridge Avenue to address congestion  needs and improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

2035 Needs Plan 

The project's purpose is to widen SR 16  to six lanes from I‐95 to SR 313 to  address congestion needs and improve  mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

SR 16 

SR 16 

SR 16 

SR 16 Connector 

SR 19 Connector 

County

Clay

St Johns 

St Johns 

St Johns 

Putnam

Map ID 

908

835

836

829

965

From

US 17 

South Francis Road 

CR 208 Outlet Mall 

SR 16/CR 16A 

SR 19 

To

Shands Bridge 

International Golf Parkway 

South Francis Road 

CR 2209 

Putnam County Boulevard 

Improvement Type 

Purpose

Need

Widen to 4 Lanes 

Other Local  Government  Priority 

The project's purpose is to widen SR 16  to four lanes from US 17 to Shands  Bridge to address congestion needs and  improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

Widen to 4 Lanes 

Other Local  Government  Priority 

The project's purpose is to widen SR 16  to four lanes from South Francis Road  to International Golf Parkway to  address congestion needs and improve  mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

Widen to 4 Lanes 

Other Local  Government  Priority 

The project's purpose is to widen SR 16  to four lanes from CR 208 Outlet Mall to  South Francis Road to address  congestion needs and improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

New 4 Lane Road 

2035 Needs Plan 

The project's purpose is to construct a  new four‐lane road called SR 16  Connector from SR 16/CR 16A to CR  2209 to address congestion needs and  improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

New 4 lane road / bridge 

Other Local  Government  Priority 

The project's purpose is to construct a  new four‐lane road / bridge called SR 19  Connector from SR 19 to Putnam  County Boulevard to address  congestion needs and improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

40  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

SR 20 

SR 20 

SR 200  Overpass 

SR 200  William Burgess  Connector 

SR 200  Yulee Backage Roads 

County

Putnam

Putnam

Nassau

Nassau

Nassau

Map ID 

422

From

Putnam/Alachua County  Line 

To

SW 56th Avenue 

423

SW 56th Avenue 

1003

at US 17 SR 5 and Railroad     Tracks 

998

992

William Burgess  Boulevard 

Cardinal Street North  Extension 

CR 315 Interlachen 

SR 200 SR A1A 

Old Yulee Road 

Improvement Type 

Purpose

Need

Widen to 4 Lanes 

Phases in TIP or  Work Program 

The project's purpose is to widen SR 20  to four lanes from Putnam/Alachua  County Line to SW 56th Avenue to  address congestion needs and improve  mobility. 

The project need was established in  the Phases in TIP or Work Program  and confirmed as part of the  planning process. 

Widen to 4 Lanes 

Phases in TIP or  Work Program 

The project's purpose is to widen SR20  to four lanes from SW 56th Avenue to  CR 315 in Interlachen to address  congestion needs and improve mobility. 

The project need was established in  the Phases in TIP or Work Program  and confirmed as part of the  planning process. 

Overpass

2035 Needs Plan 

The project's purpose is to construct an  The project need was established in  overpass along SR 200 at US 17 SR 5  the 2035 Needs Plan and confirmed  and the railroad tracks to address  as part of the planning process.  congestion needs and improve mobility. 

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane Road called SR 200  Local government  William Burgess Connector from  coordination  William Burgess Boulevard to SR 200 SR  A1A to address congestion needs and  improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called SR 200 Yulee  Local government  Backage Roads from the Cardinal Street  coordination  North Extension to Old Yulee Road to  address congestion needs and improve  mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

41  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

SR 200 SR A1A 

SR 200 SR A1A 

SR 200A Pages Dairy Road 

SR 207 

SR 207 

County

Nassau

Nassau

Nassau

St Johns 

St Johns 

Map ID 

427

703

979

113

830

From

at US 17 

Amelia Island Parkway 

at Felmor Road 

I‐95

Holmes Boulevard 

To

 

Sadler Road 

 

South Holmes Boulevard 

SR 312 

Improvement Type 

Purpose

Need

The project's purpose is to construct  The project need was established in  intersection improvements along SR  the SIS CFP and confirmed as part  200 SR A1A at US 17 to address  of the planning process.  congestion needs and improve mobility. 

Intersection Improvements 

SIS CFP 

Widen to 6 Lanes 

The project's purpose is to widen SR  200 SR A1A to six lanes from Amelia  Local government  Island Parkway to Sadler Road to  coordination  address congestion needs and improve  mobility. 

Roundabout Projects 

The project need was established in  The project's purpose is to construction  through requests by local  Local government  a roundabout along SR 200A Pages  governments for consideration in  coordination  Dairy Road at Felmor Road to address  the plan and confirmed as part of  congestion needs and improve mobility.  the planning process. 

Widen to 6 Lanes 

Widen to 6 Lanes 

42  

Source

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

2035 Needs Plan 

The project's purpose is to SR 207  The project need was established in  widen to six lanes from I‐95 to South  the 2035 Needs Plan and confirmed  Holmes Boulevard to address  as part of the planning process.  congestion needs and improve mobility. 

2035 Needs Plan 

The project's purpose is to widen SR  207 to 6 lanes from Holmes Boulevard  to SR 312 to address congestion needs  and improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

SR 21 Blanding Boulevard 

SR 21 Blanding Boulevard 

SR 21 Blanding Boulevard 

SR 21 Blanding Boulevard 

SR 21 Blanding Boulevard 

County

Duval

Clay

Duval

Duval

Duval

Map ID 

9

114

957A

957B

957C

From

I‐295

SR 16 

at Collins Road 

at SR 134 103rd Street 

at Cedar Hills Boulevard 

To

Wilson Boulevard 

CR 215 Blanding Boulevard 

 

 

 

Improvement Type 

Widen to 6 Lanes 

Widen to 4 Lanes 

Intersection Improvements 

Intersection Improvements 

Intersection Improvements 

43  

Source

Purpose

Need

2035 Needs Plan 

The project's purpose is to widen SR 21  The project need was established in  Blanding Boulevard to six lanes from I‐ the 2035 Needs Plan and confirmed  295 to Wilson Boulevard to address  as part of the planning process.  congestion needs and improve mobility. 

2035 Needs Plan 

The project's purpose is to widen SR 21  Blanding Boulevard to four lanes from  SR 16 to CR two15 Blanding Boulevard  to address congestion needs and  improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

Local Government CIP 

The project's purpose is to construct  intersection improvements along SR 21  Blanding Boulevard at Collins Road to  address congestion needs and improve  mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

Local Government CIP 

The project's purpose is to construct  intersection improvements along SR 21  Blanding Boulevard at SR 134 103rd  Street to address congestion needs and  improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

Local Government CIP 

The project's purpose is to construct  intersection improvements along SR 21  Blanding Boulevard at Cedar Hills  Boulevard to address congestion needs  and improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

SR 228 Hart Bridge 

SR 228 Normandy  Boulevard 

SR 228 Normandy  Boulevard 

SR 23 First Coast Expressway 

SR 23 First Coast Expressway 

County

Duval

Duval

Duval

Clay

Clay

Map ID 

47

86

87

41

8202

From

SR 228  Hart Expressway ‐  Downtown 

US 301 

SR 23 First Coast  Expressway 

at CR 218 

SR 21 Blanding Boulevard 

To

SR 10 Atlantic Boulevard 

Bell Road (Equestrian Park ) 

SR 111 Cassatt Avenue 

 

US 17 

Improvement Type 

New 6 Lane Bridge 

Widen to 4 Lanes 

Widen to 6 Lanes 

New Interchange 

New 4 Lane Road 

44  

Source

Purpose

Need

2035 Needs Plan 

The project's purpose is to construct a  replace the SR 228 Hart Bridge from SR  The project need was established in  228 Hart Expressway ‐ Downtown to SR  the 2035 Needs Plan and confirmed  as part of the planning process.  10 Atlantic Boulevard to address  congestion needs and improve mobility. 

2035 Needs Plan 

The project's purpose is to widen SR  228 Normandy Boulevard to four lanes  from US 301 to Bell Road (Equestrian  Park) to address congestion needs and  improve mobility. 

2035 Needs Plan 

The project's purpose is to widen SR  The project need was established in  228 Normandy Boulevard to six lanes  from SR 23 First Coast Expressway to SR  the 2035 Needs Plan and confirmed  as part of the planning process.  111 Cassatt Avenue to address  congestion needs and improve mobility. 

SIS CFP 

The project's purpose is to construct a  The project need was established in  new interchange along SR 23 First Coast  the SIS CFP and confirmed as part  Expressway at CR two18 to address  of the planning process.  congestion needs and improve mobility. 

SIS CFP 

The project's purpose is to construct a  The project need was established in  new four‐lane road called SR 23 First  the SIS CFP and confirmed as part  Coast Expressway from SR 21 Blanding  of the planning process.  Boulevard to US 17 to address  congestion needs and improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

SR 23 First Coast Expressway 

SR 23 First Coast Expressway 

SR 23 First Coast Expressway 

SR 23 First Coast Expressway 

SR 23 First Coast Expressway 

County

Clay

Clay

Clay

Clay/Duval

Clay/St. Johns 

Map ID 

1011

1012

1013

8201

8203

From

at SR 21 Blanding  Boulevard 

at CR 739 

at SR 16 

I‐10

US 17 

To

 

 

 

SR 21 Blanding Boulevard 

I‐95

Improvement Type 

New Interchange 

New Interchange 

New Interchange 

Widen to 6 Lanes 

New 6 Lane Road 

45  

Source

Purpose

Need

SIS CFP 

The project's purpose is to construct a  new interchange along SR 23 First Coast  The project need was established in  Expressway at SR 21 Blanding Boulevard  the SIS CFP and confirmed as part  of the planning process.  to address congestion needs and  improve mobility. 

SIS CFP 

The project's purpose is to construct a  The project need was established in  new interchange along SR 23 First Coast  the SIS CFP and confirmed as part  Expressway at CR 739 to address  of the planning process.  congestion needs and improve mobility. 

SIS CFP 

The project's purpose is to construct a  The project need was established in  new interchange along SR 23 First Coast  the SIS CFP and confirmed as part  Expressway at SR 16 to address  of the planning process.  congestion needs and improve mobility. 

SIS CFP 

The project's purpose is to widen SR 23  The project need was established in  First Coast Expressway from I‐10 to SR  the SIS CFP and confirmed as part  21 Blanding Boulevard to address  of the planning process.  congestion needs and improve mobility. 

SIS CFP 

The project's purpose is to construct a  new six‐lane road called SR 23 First  Coast Expressway from US 17 to I‐95 to  address congestion needs and improve  mobility. 

The project need was established in  the SIS CFP and confirmed as part  of the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

SR 23 First Coast Expressway 

SR 23 First Coast Expressway 

SR 23 First Coast Expressway 

SR 243 JIA North Access Road 

SR 312 

County

St Johns 

St Johns 

St Johns 

Duval

St Johns 

Map ID 

840

841

847

701

115

From

at I‐95 

at CR 16 A 

at CR 2209 

SR 102 Airport Road 

US 1/SR 5 Dixie Highway 

To

 

 

 

Pecan Park Road 

SR A1A 

Improvement Type 

New Interchange 

New Interchange 

New Interchange 

Widen to 4 Lanes 

Widen to 6 Lanes 

46  

Source

Purpose

Need

SIS CFP 

The project's purpose is to construct a  The project need was established in  new interchange along SR 23 First Coast  the SIS CFP and confirmed as part  Expressway at I‐95 to address  of the planning process.  congestion needs and improve mobility. 

SIS CFP 

The project's purpose is to construct a  The project need was established in  new interchange along SR 23 First Coast  the SIS CFP and confirmed as part  Expressway at CR 16 A to address  of the planning process.  congestion needs and improve mobility. 

SIS CFP 

The project's purpose is to construct a  The project need was established in  new interchange along SR 23 First Coast  the SIS CFP and confirmed as part  Expressway at CR 2209 to address  of the planning process.  congestion needs and improve mobility. 

2035 Needs Plan 

The project's purpose is to widen SR  243 JIA North Access Road to four lanes  from SR 102 Airport Road to Pecan Park  Road to address congestion needs and  improve mobility. 

2035 Needs Plan 

The project's purpose is to widen SR  The project need was established in  312 to six lanes from US 1/SR 5 Dixie  the 2035 Needs Plan and confirmed  Highway to SR A1A to address  as part of the planning process.  congestion needs and improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

SR 313 

SR 313 

SR 313 

SR 9B 

SR 9B 

County

St Johns 

St Johns 

St Johns 

Duval

Duval

Map ID 

831

832

839

1024

18

From

SR 207 

SR 16 

at US 1/SR 5 Dixie  Highway 

US 1/SR 5 Philips Highway 

US 1/SR 5 Philips Highway 

To

SR 16 

US 1 Dixie Highway 

 

I‐295

I‐295

Improvement Type 

New 6 Lane Road 

New 4 Lane Road 

New Interchange 

Add 2 Auxiliary Lanes 

Widen to 6 Lanes 

47  

Source

Purpose

Need

2035 Needs Plan 

The project's purpose is to construct a  new six lane road called SR 313 from SR  207 to SR 16 to address congestion  needs and improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

2035 Needs Plan 

The project's purpose is to construct a  The project need was established in  new four‐lane road called SR 313 from  the 2035 Needs Plan and confirmed  SR 16 to US 1 Dixie Highway to address  as part of the planning process.  congestion needs and improve mobility. 

Other Local  Government  Priority 

The project's purpose is to construct a  new interchange along SR 313 at US 1  SR 5 Dixie Highway to address  congestion needs and improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

SIS CFP 

The project's purpose is to add two  auxiliary lanes along SR 9B from US  1/SR 5 Philips Highway to I‐295 to  address congestion needs and improve  mobility. 

The project need was established in  the SIS CFP and confirmed as part  of the planning process. 

SIS CFP 

The project's purpose is to widen SR 9B  to six lanes from US 1 SR 5 Philips  Highway to I‐295 to address congestion  needs and improve mobility. 

The project need was established in  the SIS CFP and confirmed as part  of the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

SR 9B Extension 

SR 9B Extension 

SR A1A 

SR A1A 

SR A1A 

County

St Johns 

St Johns 

St Johns 

Nassau

St Johns 

Map ID 

833

842

128

706

1008

From

St. Johns Parkway 

at Durbin Parkway 

Solana Road 

South Fletcher Avenue 

at Red Cox/Coquina Road 

To

Race Track Road 

 

SR 202 J. T. Butler Boulevard 

Amelia Island Parkway 

 

Improvement Type 

Purpose

Need

Other Local  Government  Priority 

The project's purpose is to widen the SR  9B Extension to six lanes from St. Johns  Parkway to Race Track Road to address  congestion needs and improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

2035 Needs Plan 

The project's purpose is to construct a  The project need was established in  new interchange along the SR 9B  the 2035 Needs Plan and confirmed  Extension at Durbin Parkway to address  as part of the planning process.  congestion needs and improve mobility. 

Widen to 6 Lanes* 

2035 Needs Plan 

The project's purpose is to widen SR  A1A to six lanes from Solana Road to SR  The project need was established in  202 J. T. Butler Boulevard to address  congestion needs and improve mobility.   the 2035 Needs Plan and confirmed  as part of the planning process.  This project was also identified as a  candidate for context sensitive  solutions in lieu of widening. 

Turn Lane Improvements* 

The project's purpose is to construct  turn lane improvements along SR A1A  from South Fletcher Avenue to Amelia  Local government  Island Parkway to address congestion  coordination  needs and improve mobility.  This  project was also identified as a  candidate for context solutions. 

Intersection Improvements 

Other Local  Government  Priority 

Widen to 6 Lanes 

New Interchange 

48  

Source

The project's purpose is to construct  intersection improvements along SR  A1A at Red Cox/Coquina Road to  address congestion needs and improve  mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

SR A1A 

SR A1A 

SR A1A Anastasia Boulevard 

SR A1A St Johns River Ferry 

St. Johns Parkway 

County

St Johns 

Duval

St Johns 

Duval

St Johns 

Map ID 

800

151

1031

2331

848

From

Mickler Road 

SR 116 Wonderwood  Drive 

Casanova Road 

 

CR 2209 

To

Palm Valley Road 

Naval Station Mayport North Gate 

Bridge of Lions 

 

9B Extension 

Improvement Type 

Source

Purpose

Need

2035 Needs Plan 

The project's purpose is to widen SR  A1A to four lanes from Mickler Road to  Palm Valley Road to address congestion  needs and improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

2035 Needs Plan 

The project's purpose is to widen SR  A1A to four lanes from SR 116  Wonderwood Drive to Naval Station  The project need was established in  Mayport North Gate to address  the 2035 Needs Plan and confirmed  congestion needs and improve mobility.   as part of the planning process.  This project was also identified as a  candidate for context sensitive  solutions in lieu of widening. 

CSS

St. Augustine  Mobility Institute 

The project's purpose is to construct  context sensitive solutions along SR A1A  Anastasia Boulevard from Casanova  Road to Bridge of Lions to address  congestion needs and improve mobility. 

The project need was established in  the St. Augustine Mobility Institute  and confirmed as part of the  planning process. 

Ferry Slip Replacement 

2035 Cost  Feasible Plan 

The project's purpose is to replace the  St. Johns River ferry slip to maintain  service, address congestion needs and  improve mobility. 

The project need was established in  the 2035 Cost Feasible Plan and  confirmed as part of the planning  process. 

Widen to 6 Lanes 

Other Local  Government  Priority 

The project's purpose is to widen the St.  Johns Parkway to six lanes from CR  2209 to 9B Extension to address  congestion needs and improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

Widen to 4 Lanes 

Widen to 4 Lanes* 

49  


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Starratt Road 

Touchton Road 

Town Center Boulevard 

Trout River Boulevard 

Tynes Road 

County

Duval

Duval

Clay

Duval

Clay

Map ID 

954

129

903

955

912

From

Duval Station Road 

Belfort Road 

US 17 

Old Kings Road 

Pipit Place 

To

Yellow Bluff Road 

SR 115 Southside Boulevard 

CR 220 Doctors Inlet Road 

US 23 New Kings Road 

Oakleaf Plantation Parkway 

Improvement Type 

Purpose

Need

Widen to 4 Lanes 

The project's purpose is to widen  Starratt Road to four lanes from Duval  Local government  Station Road to Yellow Bluff Road to  coordination  address congestion needs and improve  mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

Widen to 4 Lanes 

2035 Needs Plan 

The project's purpose is to widen  Touchton Road to four lanes from  Belfort Road to SR 115 Southside  Boulevard to address congestion needs  and improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

Widen to 4 Lanes 

Other Local  Government  Priority 

The project's purpose is to widen Town  Center Boulevard to four lanes from US  17 to CR 220 Doctors Inlet Road to  address congestion needs and improve  mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

Widen to 4 Lanes 

The project's purpose is to widen Trout  River Boulevard to four lanes from Old  Local government  Kings Road to US two3 New Kings Road  coordination  to address congestion needs and  improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

New 2 Lane Road 

Other Local  Government  Priority 

50  

Source

The project's purpose is to construct a  new two‐lane road called Tynes Road  from Pipit Place to Oakleaf Plantation  Parkway to address congestion needs  and improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

US 1 SR 15 New Kings Road 

US 1 SR 15 New Kings Road 

US 1 SR 15 New Kings Road 

US 1 SR 5 

US 1 SR 5 Dixie Highway 

County

Duval

Duval

Duval

St Johns 

St Johns 

Map ID 

82

83

950

845

130

From

Soutel Drive 

I‐295

SR 111 Edgewood Avenue 

at CR 210 

SR 206 

To

I‐295

Old Kings Road 

Soutel Drive 

 

Lewis Point Road 

Improvement Type 

Purpose

Need

2035 Needs Plan 

The project's purpose is to widen US 1  The project need was established in  SR 15 New Kings Road to six lanes from  the 2035 Needs Plan and confirmed  Soutel Drive to I‐295 to address  as part of the planning process.  congestion needs and improve mobility. 

Widen to 6 Lanes 

2035 Needs Plan 

The project's purpose is to widen US 1  The project need was established in  SR 15 New Kings Road to six lanes from  the 2035 Needs Plan and confirmed  I‐295 to Old Kings Road to address  as part of the planning process.  congestion needs and improve mobility. 

Intersection Improvements 

The project's purpose is to construct  intersection improvements along US 1  Local government  SR 15 New Kings Road at SR 111  coordination  Edgewood Avenue to Soutel Drive to  address congestion needs and improve  mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

Modify Interchange 

Phases in TIP or  Work Program 

The project's purpose is to modify the  interchange of US 1 SR 5 at CR 210 to  address congestion needs and improve  mobility. 

The project need was established in  the Phases in TIP or Work Program  and confirmed as part of the  planning process. 

2035 Needs Plan 

The project's purpose is to widen US 1  The project need was established in  SR 5 Dixie Highway to six lanes from SR  the 2035 Needs Plan and confirmed  206 to Lewis Point Road to address  as part of the planning process.  congestion needs and improve mobility. 

Widen to 6 Lanes 

Widen to 6 Lanes 

51  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

US 1 SR 5 Dixie Highway 

US 1 SR 5 Dixie Highway 

US 1 SR 5 Philips Highway 

US 1/SR 5 Philips Highway 

US 1/SR 5 Philips Highway 

County

St Johns 

St Johns 

Duval

Duval

Duval

Map ID 

131

132

93

94

95

From

SR 313 

International Golf  Parkway 

Nocatee Parkway / Race  Track Road 

SR 9B 

I‐95 at the Avenues 

To

International Golf Parkway 

Race Track Road 

SR 9B 

I‐295

SR 202 J. T. Butler Boulevard 

Improvement Type 

Widen to 6 Lanes 

Widen to 6 Lanes 

Widen to 6 Lanes 

Widen to 6 Lanes* 

Widen to 6 Lanes* 

52  

Source

Purpose

Need

2035 Needs Plan 

The project's purpose is to widen US 1  SR 5 Dixie Highway to six lanes from SR  313 to International Golf Parkway to  address congestion needs and improve  mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

2035 Needs Plan 

The project's purpose is to widen US 1  The project need was established in  SR 5 Dixie Highway to six lanes from  the 2035 Needs Plan and confirmed  International Golf Parkway to Race  Track Road to address congestion needs  as part of the planning process.  and improve mobility. 

2035 Needs Plan 

The project's purpose is to widen US 1  SR 5 Philips Highway to six lanes from  Nocatee Parkway / Race Track Road to  SR 9B to address congestion needs and  improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

2035 Needs Plan 

The project's purpose is to widen US 1  SR 5 Philips Highway to six lanes from  SR 9B to I‐295 to address congestion  needs and improve mobility.  This  project was also identified as a  candidate for context sensitive  solutions in lieu of widening. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

2035 Needs Plan 

The project's purpose is to widen to US  1 SR 5 Philips Highway to six lanes from  I‐95 at the Avenues to SR 202 J. T.  Butler Boulevard to address congestion  needs and improve mobility.  This  project was also identified as a  candidate for context sensitive  solutions in lieu of widening. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

US 1/SR 5 Philips Highway 

US 17 

US 17 

US 17 

US 17 

County

Duval

Clay

Nassau

Nassau

Clay

Map ID 

96

133

707

709

1037

From

SR 202 J. T. Butler  Boulevard 

CR 315 

To

SR 126 Emerson Street 

Town Center Boulevard 

Nassau/Duval County Line  Harts Road 

SR 200 SR A1A 

Governor Street 

Georgia State Line 

Haven Avenue 

Improvement Type 

Purpose

Need

2035 Needs Plan 

The project's purpose is to widen to US  1 SR 5 Philips Highway to six lanes from  The project need was established in  the 2035 Needs Plan and confirmed  SR 202 J. T. Butler Boulevard to SR  as part of the planning process.  1two6 Emerson Street to address  congestion needs and improve mobility. 

Widen to 6 Lanes 

2035 Needs Plan 

The project's purpose is to widen US 17  The project need was established in  to six lanes from CR 315 to Town Center  the 2035 Needs Plan and confirmed  Boulevard to address congestion needs  as part of the planning process.  and improve mobility. 

Intersection Improvements 

The project's purpose is to construct  intersection improvements along US 17  Local government  from Nassau/Duval County Line to Harts  coordination  Road to address congestion needs and  improve mobility. 

Widen to 6 Lanes 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

Widen to 4 Lanes 

I‐95 Parallel  Corridor Study 

The project need was established in  The project's purpose is to widen US 17  through requests by local  to four lanes from SR 200 SR A1A to  governments for consideration in  Georgia State Line to address  the plan and confirmed as part of  congestion needs and improve mobility.  the planning process. 

Widen to 4 Lanes 

2035 Cost  Feasible Plan 

The project's purpose is to widen US 17  to four lanes from Governor Street to  Haven Avenue to address congestion  needs and improve mobility. 

53  

Source

The project need was established in  the 2035 Cost Feasible Plan and  confirmed as part of the planning  process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

US 17 Main Street 

US 17 Main Street 

US 17 Main Street 

US 17 Pages Dairy Connector  w/roundabout 

US 17 Powerline Corridor 

County

Duval/Nassau

Duval

Duval

Nassau

Nassau

Map ID 

78

1017

959

984

994

From

Pecan Park Road 

New Berlin Road 

at Eastport Road 

US 17 SR 5 

Vegas Boulevard 

To

SR 200 / SR A1A 

Pecan Park Road 

 

SR 200A Pages Dairy Road 

Radio Avenue 

Improvement Type 

Source

Purpose

Need

Widen to 4 Lanes 

2035 Needs Plan 

The project's purpose is to widen US 17  Main Street to four lanes from Pecan  Park Road to SR 200 / SR A1A to  address congestion needs and improve  mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

Widen to 4 Lanes 

2035 Cost  Feasible Plan 

The project's purpose is to widen US 17  to four lanes from New Berlin Road to  Pecan Park Road to address congestion  needs and improve mobility. 

The project need was established in  the 2035 Cost Feasible Plan and  confirmed as part of the planning  process. 

New Interchange 

Local Government CIP 

The project's purpose is to construct a  new interchange along US 17 Main  Street at Eastport Road to address  congestion needs and improve mobility. 

The project need was established  based on project phases being  programmed in a local government  capital improvement program.  The  project needs were confirmed as  part of the planning process. 

New 2 Lane Road and  Roundabout 

The project's purpose is to construct a  new road called US 17 Pages Dairy  Local government  Connector from US 17 SR 5 to SR 200A  coordination  Pages Dairy Road and roundabout at SR  200A Paiges Dairy Road to address  congestion needs and improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called US 17  Local government  Powerline Corridor from Vegas  coordination  Boulevard to Radio Avenue to address  congestion needs and improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

54  


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

US 17 SR 15 

US 17 SR 15 

US 17 SR 15 

US 17 SR 15 

US 17 Yulee Backage Roads 

County

Putnam

Putnam

Putnam

Putnam

Nassau

Map ID 

428

429

430

452

999

From

West of Dunn Creek  Bridge 

CR 309 Satsuma 

Putnam/Volusia County  Line 

Pomona Park/Feagle  Avenue 

US 17 SR 5 

To

Horse Landing Road 

West of Dunn Creek Bridge 

Pomona Park/Feagle Avenue 

CR 309 Satsuma 

North of Koen Lane 

Improvement Type 

Purpose

Need

Widen to 4 Lanes 

SIS Unfunded  Needs 

The project's purpose is to widen US 17  SR 15 to four lanes from West of Dunn  Creek Bridge to Horse Landing Road to  address congestion needs and improve  mobility. 

The project need was established in  the SIS Unfunded Needs and  confirmed as part of the planning  process. 

Widen to 4 Lanes 

SIS Unfunded  Needs 

The project's purpose is to widen US 17  SR 15 from CR 309 Satsuma to West of  Dunn Creek Bridge to address  congestion needs and improve mobility. 

The project need was established in  the SIS Unfunded Needs and  confirmed as part of the planning  process. 

SIS Unfunded  Needs 

The project's purpose is to widen to US  17 SR 15 to four lanes from the  Putnam/Volusia County Line to Pomona  Park/Feagle Avenue to address  congestion needs and improve mobility. 

The project need was established in  the SIS Unfunded Needs and  confirmed as part of the planning  process. 

Widen to 4 Lanes 

SIS CFP 

The project's purpose is to widen US 17  SR 15 to four lanes from Pomona  Park/Feagle Avenue to CR 309 Satsuma  to address congestion needs and  improve mobility. 

The project need was established in  the SIS CFP and confirmed as part  of the planning process. 

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called the US 17  Local government  Yulee Backage Roads from US 17 SR 5 to  coordination  North of Koen Lane to address  congestion needs and improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

Widen to 4 Lanes 

55  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

US 1B King Street 

US 1B San Marco Avenue 

US 301 SR 200 

US 301 SR 200 

US 301 SR 200 

County

St Johns 

St Johns 

Duval

Clay

Nassau

Map ID 

1029

1030

123

424

708

From

US 1 Ponce de Leon  Boulevard 

Bridge of Lions 

US 90 

To

Avenida Menendez 

SR 16 

Duval/Nassau County Line 

Clay/Bradford County Line  Duval/Clay County Line 

US 1 at S Kings Road 

 

Improvement Type 

Source

Purpose

Need

St. Augustine  Mobility Institute 

The project's purpose is to construct  context sensitive solutions along US 1B  King Street from US 1 Ponce de Leon  Boulevard to Avenida Menendez to  address congestion needs and improve  mobility. 

The project need was established in  the St. Augustine Mobility Institute  and confirmed as part of the  planning process. 

St. Augustine  Mobility Institute 

The project's purpose is to construct  context sensitive solutions along US 1B  San Marco Avenue from Bridge of Lions  to SR 16 to address congestion needs  and improve mobility. 

The project need was established in  the St. Augustine Mobility Institute  and confirmed as part of the  planning process. 

2035 Needs Plan 

The project's purpose is to widen US  The project need was established in  301 SR 200 to four lanes from US 90 to  the 2035 Needs Plan and confirmed  Duval/Nassau County Line to address  as part of the planning process.  congestion needs and improve mobility. 

Widen to 6 Lanes 

SIS Unfunded  Needs 

The project's purpose is to widen US  301 SR 200 to six lanes from the  Clay/Bradford County Line to  Duval/Clay County Line to address  congestion needs and improve mobility. 

Intersection Improvements 

The project's purpose is to construct  intersection improvements along US  Local government  301 SR 200 from US 1 at South Kings  coordination  Road to address congestion needs and  improve mobility. 

Context Sensitive Solutions 

Context Sensitive Solutions  

Widen to 4 Lanes 

56  

The project need was established in  the SIS Unfunded Needs and  confirmed as part of the planning  process. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

US 301 SR 200 

US 90 / SR 115 Mathews  Bridge 

US 90 Beaver Street 

US 90 Beaver Street 

Various SR 200 Intersections  Modifications 

County

Duval

Duval

Duval

Duval

Nassau

Map ID 

425

79

6

7

981

From

Duval/Clay County Line 

Alt. US 1 MLK Jr. Parkway 

SR 23 First Coast  Expressway 

Cahoon Road 

 

To

I‐10

SR 109 University Boulevard 

Cahoon Road 

McDuff Avenue 

 

Improvement Type 

Purpose

Need

SIS Unfunded  Needs 

The project's purpose is to widen US  301 SR 200 to six lanes from Duval/Clay  County Line to I‐10 to address  congestion needs and improve mobility. 

The project need was established in  the SIS Unfunded Needs and  confirmed as part of the planning  process. 

2035 Needs Plan 

The project's purpose is to reconstruct  the US 90 / SR 115 Mathews Bridge as a  six lane bridge and provide transit  accommodations from Alt. US 1 MLK Jr.  Parkway to SR 109 University Boulevard  to address congestion needs and  improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

2035 Needs Plan 

The project's purpose is to widen US 90  Beaver Street to four lanes from SR 23  First Coast Expressway to Cahoon Road  to address congestion needs and  improve mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

Widen to 4 Lanes 

2035 Needs Plan 

The project's purpose is to widen US 90  Beaver Street to four lanes from  Cahoon Road to McDuff Avenue to  address congestion needs and improve  mobility. 

The project need was established in  the 2035 Needs Plan and confirmed  as part of the planning process. 

Intersection Improvements 

The project need was established in  The project's purpose is to construct  through requests by local  Local government  intersection improvements along SR  governments for consideration in  coordination  200 at various locations to address  the plan and confirmed as part of  congestion needs and improve mobility.  the planning process. 

Widen to 6 Lanes 

New 6 Lane Bridge and Transit 

Widen to 4 Lanes 

57  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Veterans Parkway 

Wells Road 

Woodbridge Parkway  Extension 

Yellow Bluff Road 

County

St Johns 

Clay

Nassau

Duval

Map ID 

834

910

997

956

From

Greenbriar Road 

Aquarius Concourse 

Woodbrigde Parkway 

Starratt Road 

To

Improvement Type 

Longleaf Pine Parkway 

Purpose

Need

Other Local  Government  Priority 

The project's purpose is to construct a  new four‐lane road called Veterans  Parkway from Greenbriar Road to  Longleaf Pine Parkway to address  congestion needs and improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

Reconstruct and New 2 Lane  Road 

Other Local  Government  Priority 

The project's purpose is to reconstruct  Wells Road and construct new two‐lane  road extension of Wells Road from  Aquarius Concourse to SR 21 Blanding  Boulevard to address congestion needs  and improve mobility. 

The project need was established in  the Other Local Government  Priority and confirmed as part of  the planning process. 

New 2 Lane Road 

The project's purpose is to construct a  new two‐lane road called Woodbridge  Local government  Parkway Extension from Woodbrigde  coordination  Parkway to Clements Road to address  congestion needs and improve mobility. 

The project need was established in  through requests by local  governments for consideration in  the plan and confirmed as part of  the planning process. 

Widen to 4 Lanes 

The project need was established in  The project's purpose is to widen  through requests by local  Local government  Yellow Bluff Road from Starratt Road to  governments for consideration in  coordination  New Berlin Road (north) to address  the plan and confirmed as part of  congestion needs and improve mobility.  the planning process. 

New 4 Lane Road 

SR 21 Blanding Boulevard 

Clements Road 

New Berlin Road (north) 

Source

Transit Capacity Projects 

East First Coast Flyer 

Duval

2385

Downtown Jacksonville  (Duval County) 

3rd Street (Jacksonville Beach) 

BRT

58  

Blueprint 2020  and 2035 LRTP 

This project's purpose is to provide  higher quality bus services throughout  the region. 

The need for this project was  identified through the JTA's  Blueprint 2020 study and confirmed  as part of the planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Southwest First Coast Flyer 

SR 134  103rd Street  

SR 21  Blanding Boulevard   

County

Duval

Duval

Clay

SR 228  Normandy Boulevard    Duval 

US 1  

Duval

Map ID 

From

2386

Wells Road 

2321

SR 228  Normandy  Boulevard   

2308

To

Downtown Jacksonville (Duval  County) 

SR 21  Blanding Boulevard   

CR 218 

Wells Road 

2322

SR 134 103rd Street 

Downtown Jacksonville (Duval  County) 

2324

Lewis Speedway (St.  John's County) 

Avenues Mall (Duval County) 

Improvement Type 

Purpose

Need

BRT

Blueprint 2020  and 2035 LRTP 

This project's purpose is to provide  higher quality bus services throughout  the region. 

The need for this project was  identified through the JTA's  Blueprint 2020 study and confirmed  as part of the planning process. 

BRT

Blueprint 2020  and 2035 LRTP 

This project's purpose is to provide  higher quality bus services throughout  the region. 

The need for this project was  identified through the JTA's  Blueprint 2020 study and confirmed  as part of the planning process. 

BRT

Blueprint 2020  and 2035 LRTP 

This project's purpose is to provide  higher quality bus services throughout  the region. 

The need for this project was  identified through the JTA's  Blueprint 2020 study and confirmed  as part of the planning process. 

BRT

Blueprint 2020  and 2035 LRTP 

This project's purpose is to provide  higher quality bus services throughout  the region. 

The need for this project was  identified through the JTA's  Blueprint 2020 study and confirmed  as part of the planning process. 

BRT

Blueprint 2020  and 2035 LRTP 

This project's purpose is to provide  higher quality bus services throughout  the region. 

The need for this project was  identified through the JTA's  Blueprint 2020 study and confirmed  as part of the planning process. 

59  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

US 1  

US 1/SR 15  New Kings Road   

SR 115  Southside Boulevard  

I‐95

North (CSX) 

County

St. John's  

Duval

Duval

Duval

Duval  

Map ID 

From

2375

Lewis Speedway (St.  John's County) 

2323

Downtown Jacksonville  (Duval County) 

2325

Avenues Mall 

2326

Gateway Mall 

2356

Downtown Jacksonville  (Duval County) 

To

Avenues Mall (Duval County) 

Edgewood Avenue 

Regency Square Mall 

Jacksonville International Airport 

Yulee (Nassau County) 

Improvement Type 

Purpose

Need

BRT

Blueprint 2020  and 2035 LRTP 

This project's purpose is to provide  higher quality bus services throughout  the region. 

The need for this project was  identified through the JTA's  Blueprint 2020 study and confirmed  as part of the planning process. 

BRT

Blueprint 2020  and 2035 LRTP 

This project's purpose is to provide  higher quality bus services throughout  the region. 

The need for this project was  identified through the JTA's  Blueprint 2020 study and confirmed  as part of the planning process. 

BRT  

Blueprint 2020  and 2035 LRTP 

This project's purpose is to provide  higher quality bus services throughout  the region. 

The need for this project was  identified through the JTA's  Blueprint 2020 study and confirmed  as part of the planning process. 

BRT   

Blueprint 2020  and 2035 LRTP 

This project's purpose is to provide  higher quality bus services throughout  the region. 

The need for this project was  identified through the JTA's  Blueprint 2020 study and confirmed  as part of the planning process. 

Commuter Rail 

Blueprint 2020  and 2035 LRTP 

The project's purpose is the provide  accessibility to additional mobility  options for longer commuter trips  throughout the region. 

The need for this project was  identified through the JTA's  Blueprint 2020 study and confirmed  as part of the planning process. 

60  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

North Extension (CSX) 

Northwest (CSX) 

Southeast (FEC) 

Southeast Extension (FEC) 

Southwest (CSX) 

County

Nassau

Duval  

Duval

St. John's  

Duval  

Map ID 

From

To

2366

Yulee

Fernandina Beach 

2357

Downtown Jacksonville  (Duval County) 

Callahan (Nassau County) 

2327

St. Augustine (St. John's  County) 

Downtown Jacksonville (Duval  County) 

2377

Palm Coast (Flagler  County) 

City of St. Augustine 

2358

Green Cove Springs (Clay  County) 

Downtown Jacksonville (Duval  County) 

Improvement Type 

Purpose

Need

Commuter Rail 

Blueprint 2020  and 2035 LRTP 

The project's purpose is the provide  accessibility to additional mobility  options for longer commuter trips  throughout the region. 

The need for this project was  identified through the JTA's  Blueprint 2020 study and confirmed  as part of the planning process. 

Commuter Rail 

Blueprint 2020  and 2035 LRTP 

The project's purpose is the provide  accessibility to additional mobility  options for longer commuter trips  throughout the region. 

The need for this project was  identified through the JTA's  Blueprint 2020 study and confirmed  as part of the planning process. 

Commuter Rail 

Blueprint 2020  and 2035 LRTP 

The project's purpose is the provide  accessibility to additional mobility  options for longer commuter trips  throughout the region. 

The need for this project was  identified through the JTA's  Blueprint 2020 study and confirmed  as part of the planning process. 

Commuter Rail 

Blueprint 2020  and 2035 LRTP 

The project's purpose is the provide  accessibility to additional mobility  options for longer commuter trips  throughout the region. 

The need for this project was  identified through the JTA's  Blueprint 2020 study and confirmed  as part of the planning process. 

Commuter Rail 

Blueprint 2020  and 2035 LRTP 

The project's purpose is the provide  accessibility to additional mobility  options for longer commuter trips  throughout the region. 

The need for this project was  identified through the JTA's  Blueprint 2020 study and confirmed  as part of the planning process. 

61  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Southwest Extension (CSX) 

West (CSX) 

West Extension (CSX) 

I‐95

Cumberland Island Ferry 

County

Clay  

Duval

Baker

Duval

Nassau

Map ID 

2319

From

To

Palatka (Putnam County) 

Green Cove Springs (Clay County) 

2328

Baldwin (Duval County) 

Downtown Jacksonville (Duval  County) 

2301

MacClenny (Baker  County) 

2330

Downtown Jacksonville  (Duval County) 

2369

Fernandina

Baldwin (Duval County) 

Yulee (Nassau County) 

Cumberland Island 

Improvement Type 

Purpose

Need

Commuter Rail 

Blueprint 2020  and 2035 LRTP 

The project's purpose is the provide  accessibility to additional mobility  options for longer commuter trips  throughout the region. 

The need for this project was  identified through the JTA's  Blueprint 2020 study and confirmed  as part of the planning process. 

Commuter Rail 

Blueprint 2020  and 2035 LRTP 

The project's purpose is the provide  accessibility to additional mobility  options for longer commuter trips  throughout the region. 

The need for this project was  identified through the JTA's  Blueprint 2020 study and confirmed  as part of the planning process. 

Commuter Rail 

Blueprint 2020  and 2035 LRTP 

The project's purpose is the provide  accessibility to additional mobility  options for longer commuter trips  throughout the region. 

The need for this project was  identified through the JTA's  Blueprint 2020 study and confirmed  as part of the planning process. 

Blueprint 2020  

The project's purpose is the provide  accessibility to additional mobility  options for longer commuter trips  throughout the region. 

The need for this project was  identified through the JTA's  Blueprint 2020 study and confirmed  as part of the planning process. 

Nassau County 

The project's purpose is to provide  direct access to Cumberland Island from  Florida allowing travelers to avoid  crossing the St. Mary's River to access  this National Park. 

The need for this project was  identified based on the Florida East  Coast Greenway study and  confirmed as part of the planning  process. 

Express Bus Service 

Ferry Service 

62  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

SR A1A  St Johns River Ferry  

SR A1A  St Johns River Ferry  

SR A1A  St Johns River Ferry  

SR A1A  St Johns River Ferry  

SR A1A  St Johns River Ferry  

County

Duval

Duval

Duval

Duval

Duval

Map ID 

2331

2329

2333

2344

2345

From

 

 

Ft. George/Mayport 

JPA Property 

Mayport

To

 

 

 

Mayport Terminal 

Ft. George Island 

Improvement Type 

Purpose

Need

Ferry Slip Replacement 

This project's purpose is to provide  St. Johns River  safer and more efficient operations of  Ferry Commission  the St. Johns River Ferry.  The project  will replace the ferry slips. 

The need for this project was  identified through coordination  with the St. Johns River Ferry  Commission and confirmed as part  of the planning process. 

Drydock /  Ferry Repairs 

This project's purpose is to provide  St. Johns River  safer and more efficient operations of  Ferry Commission  the St. Johns River Ferry. 

The need for this project was  identified through coordination  with the St. Johns River Ferry  Commission and confirmed as part  of the planning process. 

Long Term Site Improvements 

This project's purpose is to provide  St. Johns River  safer and more efficient operations of  Ferry Commission  the St. Johns River Ferry by improving  the vehicular access and storage. 

The need for this project was  identified through coordination  with the St. Johns River Ferry  Commission and confirmed as part  of the planning process. 

Relocation of Ferry offices 

This project's purpose is to provide  St. Johns River  safer and more efficient operations of  Ferry Commission  the St. Johns River Ferry by improving  the vehicular access and storage. 

The need for this project was  identified through coordination  with the St. Johns River Ferry  Commission and confirmed as part  of the planning process. 

Service & Capital  Improvements 

This project's purpose is to provide  safer and more efficient operations of  St. Johns River  the St. Johns River Ferry by improving  Ferry Commission  the vehicular access and storage and  long‐term service. 

The need for this project was  identified through coordination  with the St. Johns River Ferry  Commission and confirmed as part  of the planning process. 

63  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

SR A1A  St Johns River Ferry  

Area wide **** 

US 90 

Area wide **** 

Area wide **** 

County

Duval

Putnam

Baker

Baker

Clay

Map ID 

2346

2374

2302

2303

2310

From

Ft. George/Mayport 

 

MacClenny (Baker  County) 

 

 

To

 

 

Downtown Jacksonville (Duval  County) 

 

 

Improvement Type 

Site Improvements 

Local Bus Service 

Local Bus Service 

Local Bus Service  

Local Bus Service  

64  

Source

Purpose

This project's purpose is to provide  safer and more efficient operations of  St. Johns River  the St. Johns River Ferry by improving  Ferry Commission  the vehicular access and storage with  short‐term enhancements. 

Need

The need for this project was  identified through coordination  with the St. Johns River Ferry  Commission and confirmed as part  of the planning process. 

Blueprint 2020  

The need for this project was  This project's purpose is to provide local  identified through coordination  bus service throughout the region to  with local governments and  enhance accessibility and mobility  confirmed as part of the planning  choices.  process. 

Blueprint 2020  

The need for this project was  This project's purpose is to provide local  identified through coordination  bus service throughout the region to  with local governments and  enhance accessibility and mobility  confirmed as part of the planning  choices.  process. 

Blueprint 2020  

The need for this project was  This project's purpose is to provide local  identified through coordination  bus service throughout the region to  with local governments and  enhance accessibility and mobility  confirmed as part of the planning  choices.  process. 

Blueprint 2020  

The need for this project was  This project's purpose is to provide local  identified through coordination  bus service throughout the region to  with local governments and  enhance accessibility and mobility  confirmed as part of the planning  choices.  process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Area wide **** 

Area wide **** 

Area wide **** 

Anastasia Island  (Amphitheatre) 

Center Street 

County

Duval

Nassau

St. John's  

St. John's  

Duval

Map ID 

2332

2370

2378

From

 

 

 

2380

 

2304

North of Drew Street  (Baldwin) 

To

 

 

 

 

 

Improvement Type 

Local Bus Service  

Local Bus Service  

Local Bus Service  

Park and Ride Lots 

Park and Ride Lots 

65  

Source

Purpose

Need

Blueprint 2020  

The need for this project was  This project's purpose is to provide local  identified through coordination  bus service throughout the region to  with local governments and  enhance accessibility and mobility  confirmed as part of the planning  choices.  process. 

Blueprint 2020  

The need for this project was  This project's purpose is to provide local  identified through coordination  bus service throughout the region to  with local governments and  enhance accessibility and mobility  confirmed as part of the planning  choices.  process. 

Blueprint 2020  

The need for this project was  This project's purpose is to provide local  identified through coordination  bus service throughout the region to  with local governments and  enhance accessibility and mobility  confirmed as part of the planning  choices.  process. 

Blueprint 2020  

The project's purpose is to provide off‐ site parking for the Amphitheatre to  provide additional transit access. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

CR 210 

CR 220  Doctors Inlet Road  

Drew Street 

Duval Road 

Mayport Road 

County

St. John's  

Clay

Duval

Duval

Duval

Map ID 

2381

2316

2305

2336

2338

From

east of US 1 

at Hollow Road 

at Center Street (Baldwin) 

at I‐95 

at SR A1A 

To

 

 

 

 

 

Improvement Type 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

66  

Source

Purpose

Need

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Racetrack Road  

South of Glen St. Mary 

SR 115   Lem Turner Road  

SR 115   Lem Turner Road  

SR 115   Lem Turner Road  

County

St. John's  

Baker

Duval

Duval  

Duval  

Map ID 

2382

2306

2337

2361

2362

From

at US 1 

 

at SR 104 Dunn Avenue 

at Soutel  

at I‐295 

To

 

 

 

 

 

Improvement Type 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

67  

Source

Purpose

Need

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

SR 134  103rd Street  

SR 16*** 

SR 200  SR A1A   

SR 200  SR A1A   

SR 207*** 

County

Duval

St. John's  

Nassau

Nassau

St. John's  

Map ID 

2334

2385

2371

2372

2386

From

at SR 228  Normandy  Boulevard   

 

at I‐95 

east of Yulee 

 

To

 

 

 

 

 

Improvement Type 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

68  

Source

Purpose

Need

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

SR 21  Blanding Boulevard   

SR 21  Blanding Boulevard   

SR 21  Blanding Boulevard   

SR 21  Blanding Boulevard   

SR 21  Blanding Boulevard   

County

Clay

Clay

Clay

Clay

Clay

Map ID 

2311

2312

2313

2314

2315

From

at Tanglewood 

at Old Jennings Road 

at Edson Drive 

at Wells Road 

To

 

 

 

 

at SR 224 Kingsley Avenue    

Improvement Type 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

69  

Source

Purpose

Need

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

SR 21  Blanding Boulevard   

SR 21  Blanding Boulevard   

SR 21  Blanding Boulevard   

SR 21  Blanding Boulevard   

SR 21  Blanding Boulevard   

County

Clay

Duval

Duval

Duval

Duval  

Map ID 

2318

From

North and South of Bolton     Road 

2335

at Weconnett Boulevard 

2340

North and South of  Wilson Boulevard 

2341

North and South of SR  134 103rd Street 

2360

To

at 105th Street 

 

 

 

 

Improvement Type 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

70  

Source

Purpose

Need

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

SR 21  Blanding Boulevard   

SR A1A 

SR A1A 

St. Augustine Airport 

US 1 

County

Duval  

Duval

St. John's  

St. John's  

St. John's  

Map ID 

From

2364

North of I‐295 

2343

North and South of SR  202 J. T. Butler Boulevard 

2379

2383

2384

at Palm Valley Road 

 

at Lewis Speedway Road 

To

 

 

 

 

 

Improvement Type 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

71  

Source

Purpose

Need

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

US 1/SR 15  New Kings Road   

US 17  Roosevelt Boulevard  

US 17  Roosevelt Boulevard  

US 90  Beach Boulevard  

US 90  Beach Boulevard  

County

Duval  

Clay  

Duval

Duval

Duval  

Map ID 

2363

From

Timucuan DRI 

2320

at Wells Road 

2342

at SR 128 San Juan  Avenue 

2339

West and East of Kernan  Boulevard 

2359

at San Pablo Road 

To

 

 

 

 

 

Improvement Type 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

Park and Ride Lots 

72  

Source

Purpose

Need

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Yellow Water Road 

Youngerman Circle 

Five Points/Core/Brooklyn 

Southbank/San Marco 

Downtown ‐ Sports Complex 

County

Duval

Clay

Duval

Duval

Duval

Map ID 

From

2307

North of I‐10 

2317

at Argyle Forest  Boulevard 

2347

2348

2349

Central Station 

Kings Avenue Station 

To

 

 

Brooklyn  Station  

Southwest  of Railroad Tracks  (Southbank) 

Downtown Jacksonville  Jacksonville Municipal Stadium  (Bay Street & Main Street) 

Improvement Type 

Park and Ride Lots 

Park and Ride Lots 

Skyway Extension ** 

Skyway Extension ** 

Streetcar ** 

73  

Source

Purpose

Need

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

Blueprint 2020  

The project's purpose is to provide  park‐and‐ride lots to promote  ridesharing and use of transit options  such as BRT. 

The project was identified in the  Blueprint 2020 Plan and the need  was confirmed as part of the  planning process. 

The project's purpose is to provide an  extension of the Automated Skyway  Express to the Five Points and Brooklyn  neighborhoods from the urban core. 

The need for enhanced transit  service to these areas was  confirmed through the planning  process.  ** The specific technology  that will be the efficient and cost  effective to provide this service will  be determined in subsequent  Alternatives Analysis phases. 

Blueprint 2020  and 2035 LRTP 

The project's purpose is to provide an  extension of the Automated Skyway  Express to the Southbank and San  Marco neighborhoods from the urban  core. 

The need for enhanced transit  service to these areas was  confirmed through the planning  process.  ** The specific technology  that will be the efficient and cost  effective to provide this service will  be determined in subsequent  Alternatives Analysis phases. 

Blueprint 2020  and 2035 LRTP 

The need for enhanced transit  service to these areas was  The project's purpose is to provide a  confirmed through the planning  streetcar or other fixed‐guideway  process.  ** The specific technology  transit service to the Downtown Sports  that will be the efficient and cost  Complex neighborhoods from the urban  effective to provide this service will  core.  be determined in subsequent  Alternatives Analysis phases. 

Blueprint 2020  and 2035 LRTP 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Five Points/Core/Brooklyn 

La Villa/Core 

Riverside/Avondale

Southbank/San Marco 

Springfield

County

Duval

Duval

Duval

Duval

Duval

Map ID 

2350

2351

2352

2353

2354

From

Five Points 

Transportation Center 

Riverside (King Street) 

Kings Avenue Station 

FSCJ Station 

To

Improvement Type 

Downtown Jacksonville (Bay Street  Streetcar **  & Main Street) 

Duval Street & Monroe Street to  Ocean 

Five Points 

Streetcar ** 

Streetcar ** 

Baptist Hospital / MOSH & Atlantic  Streetcar **  Boulevard 

8th Street/ Medical Complex 

Streetcar ** 

74  

Source

Purpose

Need

The project's purpose is to provide a  new streetcar service to the Five Points  and Brooklyn neighborhoods from the  urban core. 

The need for enhanced transit  service to these areas was  confirmed through the planning  process.  ** The specific technology  that will be the efficient and cost  effective to provide this service will  be determined in subsequent  Alternatives Analysis phases. 

The project's purpose is to provide a  new streetcar service to the La Villa  neighborhood from the urban core. 

The need for enhanced transit  service to these areas was  confirmed through the planning  process.  ** The specific technology  that will be the efficient and cost  effective to provide this service will  be determined in subsequent  Alternatives Analysis phases. 

Mobility 2030  Plan 

The project's purpose is to provide a  new streetcar service to the Riverside  and Avondale neighborhoods from the  urban core. 

The need for enhanced transit  service to these areas was  confirmed through the planning  process.  ** The specific technology  that will be the efficient and cost  effective to provide this service will  be determined in subsequent  Alternatives Analysis phases. 

Mobility 2030  Plan 

The need for enhanced transit  service to these areas was  The project's purpose is to provide a  confirmed through the planning  new streetcar service to the Southbank  process.  ** The specific technology  and San Marco neighborhoods from the  that will be the efficient and cost  effective to provide this service will  urban core.  be determined in subsequent  Alternatives Analysis phases. 

Mobility 2030  Plan 

The need for enhanced transit  service to these areas was  confirmed through the planning  process.  ** The specific technology  that will be the efficient and cost  effective to provide this service will  be determined in subsequent  Alternatives Analysis phases. 

Mobility 2030  Plan 

Mobility 2030  Plan 

The project's purpose is to provide a  new streetcar service to the Springfield  neighborhood from the urban core. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Downtown Facility 

County

Duval

Map ID 

2355

From

 

To

 

Improvement Type 

Transportation Center 

Source

Blueprint 2020  and 2035 LRTP 

Purpose

Need

The need for the construction of a  This project's purpose is to construct a  new Downtown transit hub was  new Downtown Transit hub to integrate  confirmed during the planning  services between all modes.  process. 

Transit Capacity Projects 

CSX Transportation 

CSX Transportation 

CSX Transportation 

CSX Transportation 

Clay

Clay

Duval

Nassau

2200

2201

2202

2203

at Wells Road 

 

at SR 224 Kingsley Avenue    

at SR 104  Busch Drive 

 

at SR A1A (SR 200) / Yulee    

Grade Separation 

Grade Separation 

Grade Separation 

Grade Separation 

75  

SIS Multimodal  Needs Plan 

SIS Multimodal  Needs Plan 

SIS Multimodal  Needs Plan 

SIS Multimodal  Needs Plan 

This project's purpose is to construct a  highway‐rail grade separation to  improve safety and traffic flow. 

The need for this project was  identified through the SIS  Multimodal Needs Planning process  which included an analysis of the  safety record and crossroad  congestion.  The need was  confirmed as part of this planning  process. 

This project's purpose is to construct a  highway‐rail grade separation to  improve safety and traffic flow. 

The need for this project was  identified through the SIS  Multimodal Needs Planning process  which included an analysis of the  safety record and crossroad  congestion.  The need was  confirmed as part of this planning  process. 

This project's purpose is to construct a  highway‐rail grade separation to  improve safety and traffic flow. 

The need for this project was  identified through the SIS  Multimodal Needs Planning process  which included an analysis of the  safety record and crossroad  congestion. 

This project's purpose is to construct a  highway‐rail grade separation to  improve safety and traffic flow. 

The need for this project was  identified through the SIS  Multimodal Needs Planning process  which included an analysis of the  safety record and crossroad  congestion.  The need was  confirmed as part of this planning  process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

CSX Transportation 

CSX Transportation 

CSX Transportation 

Florida East Coast Railway 

Florida East Coast Railway 

County

Duval

Duval

Duval

Duval

Duval

Map ID 

2204

2205

2206

2207

2208

From

Beaver Street Interlocking 

To

 

North Rail Corridors Phase 1 

at Jacksonville Bridge 

Capacity Upgrade 

Multi Modal Corridor 

Westlake Cecil Commerce Connector 

at Bowden Intermodal 

Improvement Type 

 

 

Multi Modal Corridor 

Capacity Upgrade 

Bridge

76  

Source

Purpose

Need

SIS Multimodal  Needs Plan 

This project's purpose is to improve  capacity at the Beaver Street interlock  to enhance service reliability. 

The need for this project was  identified based on coordination  with railroads during the  development of the SIS Multimodal  Plan. The need was confirmed as  part of this planning process. 

North Rail  Corridor  Feasibility Study 

This project's purpose is the construct a  new rail connector to reduce rail traffic  through downtown which will improve  safety.  The project will also enhance  rail access to the Dames Point and  Blount Island terminals. 

The need for this project was  identified based on coordination  with railroads during the  development of the SIS Multimodal  Plan. The need was confirmed as  part of this planning process. 

SIS Multimodal  Needs Plan 

This project's purpose is the enhance  access to the Westlake and Cecil  Commerce center to support economic  development. 

The need for this project was  identified based on coordination  with railroads during the  development of the SIS Multimodal  Plan. The need was confirmed as  part of this planning process. 

SIS Multimodal  Needs Plan 

This project's purpose is to improve  track capacity near the Bowden  Intermodal Yard to reduce rail crossing  blockings and enhance service quality. 

The need for this project was  identified based on coordination  with railroads during the  development of the SIS Multimodal  Plan. The need was confirmed as  part of this planning process. 

The project will provide repairs and  train control technologies on the St.  Johns River bridge. 

The need for this project was  identified based on coordination  with railroads during the  development of the SIS Multimodal  Plan. The need was confirmed as  part of this planning process. 

SIS Multimodal  Needs Plan 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Jacksonville International  Airport 

Jacksonville International  Airport 

Jacksonville International  Airport 

Jacksonville International  Airport 

Jacksonville International  Airport 

County

Duval

Duval

Duval

Duval

Duval

Map ID 

2209

2210

2211

2212

2213

From

To

Construction of Runway 7R/25L 

Air Cargo Ramp Improvements 

Air Cargo Surface Storage 

 

Design & Construct By‐Pass Taxiways 

Intermodal Terminal Facility Development 

Improvement Type 

Construct Runway 

Expand Apron 

Expand Apron 

Construct Taxiway 

Terminal Development 

77  

Source

Purpose

Need

SIS Multimodal  Needs Plan 

The project need was identified as  part of the Jacksonville  This project will construct a new  International Airport's planning  parallel runway to meet future demand.  process. The need was confirmed  as part of this planning process. 

SIS Multimodal  Needs Plan 

This project will construct additional air  cargo capacity to meet future demand. 

The project need was identified as  part of the Jacksonville  International Airport's planning  process. The need was confirmed  as part of this planning process. 

SIS Multimodal  Needs Plan 

This project will construct additional air  cargo capacity to meet future demand. 

The project need was identified as  part of the Jacksonville  International Airport's planning  process. The need was confirmed  as part of this planning process. 

SIS Multimodal  Needs Plan 

This project will construct by‐pass  taxiways to improve the operational  efficiencies. 

The project need was identified as  part of the Jacksonville  International Airport's planning  process. The need was confirmed  as part of this planning process. 

This project will construct additional air  cargo capacity to meet future demand. 

The project need was identified as  part of the Jacksonville  International Airport's planning  process. The need was confirmed  as part of this planning process. 

SIS Multimodal  Needs Plan 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Norfolk Southern 

Jacksonville Port Authority 

Jacksonville Port Authority 

Jacksonville Port Authority 

Jacksonville Port Authority 

County

Duval

Duval

Duval

Duval

Duval

Map ID 

2214

2215

2216

2217

2218

From

To

at Norfolk Southern Railway (Near Simpson Yard) 

Blount Island / Dames Point Marine Terminals Rail 

Blount Island Marine Terminal Berth Upgrades 

Blount Island Marine Terminal Facility Upgrades 

Dames Point Marine Terminal Berth Upgrades 

Improvement Type 

Grade Separation 

Internal Rail 

Docks

Intermodal Transfer  Improvement 

Docks

78  

Source

Purpose

Need

NS CSX SIS  Intermodal  Connector PD&E 

This project's purpose is to construct a  highway‐rail grade separation to  improve safety and traffic flow. 

The need for this project was  identified through the SIS  Multimodal Needs Planning process  which included an analysis of the  safety record and crossroad  congestion. The need was  confirmed as part of this planning  process. 

JAXPORT Master  Plan 

This project will provide additional on‐ dick rail capacity to meet future  demand. 

The need for the project was  defined during the development of  the JAXPORT Master Plan. The need  was confirmed as part of this  planning process. 

JAXPORT Master  Plan 

This project will provide additional  capacity at berths in the Blount Island  marine terminal to improve efficiencies  and meet future demand. 

The need for the project was  defined during the development of  the JAXPORT Master Plan. The need  was confirmed as part of this  planning process. 

JAXPORT Master  Plan 

This project will provide on‐dock rail  capacity at berths in the Blount Island  marine terminal to improve efficiencies  and meet future demand. 

The need for the project was  defined during the development of  the JAXPORT Master Plan. The need  was confirmed as part of this  planning process. 

JAXPORT Master  Plan 

This project will provide additional  capacity at berths in the Blount Island  marine terminal to improve efficiencies  and meet future demand. 

The need for the project was  defined during the development of  the JAXPORT Master Plan. The need  was confirmed as part of this  planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Jacksonville Port Authority 

Jacksonville Port Authority 

Jacksonville Port Authority 

Jacksonville Port Authority 

Jacksonville Port Authority 

County

Duval

Duval

Duval

Duval

Duval

Map ID 

2219

2220

2221

2222

2223

From

To

Dames Point Marine Terminal Facility Upgrades 

New Cranes for Talleyrand and Blount Island Marine Terminals 

Talleyrand Marine Terminal Berth Upgrades 

Talleyrand Marine Terminal Facility Upgrades 

Talleyrand Marine Terminal Rail 

Improvement Type 

Intermodal Transfer  Improvement 

Intermodal Transfer  Improvement 

Docks

Intermodal Transfer  Improvement 

Internal Rail 

79  

Source

Purpose

Need

JAXPORT Master  Plan 

The need for the project was  This project will provide gates and other  defined during the development of  facilities within the marine terminal to  the JAXPORT Master Plan. The need  improve efficiencies and meet future  was confirmed as part of this  demand.  planning process. 

JAXPORT Master  Plan 

This project will provide new cranes to  meet future demand at the port. 

The need for the project was  defined during the development of  the JAXPORT Master Plan. The need  was confirmed as part of this  planning process. 

JAXPORT Master  Plan 

This project will provide additional  capacity at berths in the Talleyrand  marine terminal to improve efficiencies  and meet future demand. 

The need for the project was  defined during the development of  the JAXPORT Master Plan. The need  was confirmed as part of this  planning process. 

JAXPORT Master  Plan 

The need for the project was  This project will provide gates and other  defined during the development of  facilities within the marine terminal to  the JAXPORT Master Plan. The need  improve efficiencies and meet future  was confirmed as part of this  demand.  planning process. 

JAXPORT Master  Plan 

This project will provide on‐dock rail  capacity at berths in the Blount Island  marine terminal to improve efficiencies  and meet future demand. 

The need for the project was  defined during the development of  the JAXPORT Master Plan. The need  was confirmed as part of this  planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Jacksonville Port Authority 

Jacksonville Port Authority 

Jacksonville Port Authority 

Jacksonville Port Authority 

Jacksonville Port Authority 

County

Duval

Duval

Duval

Duval

Duval

Map ID 

2224

2225

2226

2227

2228

From

To

Blount Island Marine Terminal Facility Upgrades 

Dames Point Marine Terminal Facility Upgrades 

New Cranes for Talleyrand and Blount Island Marine Terminals 

Talleyrand Marine Terminal Facility Upgrades 

Blount Island / Dames Point Terminals ‐ Rail and Bridge 

Improvement Type 

Intermodal Transfer  Improvement 

Intermodal Transfer  Improvement 

Intermodal Transfer  Improvement 

Intermodal Transfer  Improvement 

Internal Rail 

80  

Source

Purpose

Need

JAXPORT Master  Plan 

The need for the project was  This project will provide gates and other  defined during the development of  facilities within the marine terminal to  the JAXPORT Master Plan. The need  improve efficiencies and meet future  was confirmed as part of this  demand.  planning process. 

JAXPORT Master  Plan 

The need for the project was  This project will provide gates and other  defined during the development of  facilities within the marine terminal to  the JAXPORT Master Plan. The need  improve efficiencies and meet future  was confirmed as part of this  demand.  planning process. 

JAXPORT Master  Plan 

This project will provide new cranes to  meet future demand at the port. 

The need for the project was  defined during the development of  the JAXPORT Master Plan. The need  was confirmed as part of this  planning process. 

JAXPORT Master  Plan 

The need for the project was  This project will provide gates and other  defined during the development of  facilities within the marine terminal to  the JAXPORT Master Plan. The need  improve efficiencies and meet future  was confirmed as part of this  demand.  planning process. 

JAXPORT Master  Plan 

This project will provide on‐dock rail  capacity at berths in the Blount Island  marine terminal to improve efficiencies  and meet future demand. 

The need for the project was  defined during the development of  the JAXPORT Master Plan. The need  was confirmed as part of this  planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Jacksonville Port Authority 

Jacksonville Port Authority 

Jacksonville Port Authority 

Jacksonville Port Authority 

Jacksonville Port Authority 

County

Duval

Duval

Duval

Duval

Duval

Map ID 

2229

2230

2231

2232

2233

From

To

Blount Island Marine Terminal Berth Upgrades 

Blount Island Marine Terminal Facility Upgrades 

Dames Point Marine Terminal Berth Upgrades 

Dames Point Marine Terminal Facility Upgrades 

Harbor Deepening 

 

Improvement Type 

Docks

Intermodal Transfer  Improvement 

Docks

Intermodal Transfer  Improvement 

Dredging Harbor 

81  

Source

Purpose

Need

The need for the project was  defined during the development of  the JAXPORT Master Plan. The need  was confirmed as part of this  planning process. 

JAXPORT Master  Plan 

This project will provide additional  capacity at berths in the marine  terminal to improve efficiencies and  meet future demand. 

JAXPORT Master  Plan 

The need for the project was  This project will provide gates and other  defined during the development of  facilities within the marine terminal to  the JAXPORT Master Plan. The need  improve efficiencies and meet future  was confirmed as part of this  demand.  planning process. 

JAXPORT Master  Plan 

This project will provide additional  capacity at berths in the marine  terminal to improve efficiencies and  meet future demand. 

JAXPORT Master  Plan 

The need for the project was  This project will provide gates and other  defined during the development of  facilities within the marine terminal to  the JAXPORT Master Plan. The need  improve efficiencies and meet future  was confirmed as part of this  demand.  planning process. 

JAXPORT Master  Plan 

This project will deepen the St. Johns  River main channel to 48‐ft to meet  demand for post‐Panamax ships. 

The need for the project was  defined during the development of  the JAXPORT Master Plan. The need  was confirmed as part of this  planning process. 

The need for the project was  defined during the development of  the JAXPORT Master Plan. The need  was confirmed as part of this  planning process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Jacksonville Port Authority 

Jacksonville Port Authority 

Jacksonville Port Authority 

Jacksonville Port Authority 

CSX Transportation 

County

Duval

Duval

Duval

Duval

Duval/Baker

Map ID 

2234

2235

2236

2237

2238

From

To

New Cranes for Talleyrand and Blount Island Marine Terminals 

Talleyrand Marine Terminal Berth Upgrades 

Talleyrand Marine Terminal Facility Upgrades 

Talleyrand Marine Terminal Rail 

MacClenny  to  Jacksonville 

 

Improvement Type 

Intermodal Transfer  Improvement 

Docks

Intermodal Transfer  Improvement 

Internal Rail 

Purpose

Need

JAXPORT Master  Plan 

This project will provide new cranes to  meet future demand at the port. 

The need for the project was  defined during the development of  the JAXPORT Master Plan. The need  was confirmed as part of this  planning process. 

JAXPORT Master  Plan 

This project will provide additional  capacity at berths in the marine  terminal to improve efficiencies and  meet future demand. 

The need for the project was  defined during the development of  the JAXPORT Master Plan. The need  was confirmed as part of this  planning process. 

JAXPORT Master  Plan 

The need for the project was  This project will provide gates and other  defined during the development of  facilities within the marine terminal to  the JAXPORT Master Plan. The need  improve efficiencies and meet future  was confirmed as part of this  demand.  planning process. 

JAXPORT Master  Plan 

This project will provide on‐dock rail  capacity at berths in the Blount Island  marine terminal to improve efficiencies  and meet future demand. 

The need for the project was  defined during the development of  the JAXPORT Master Plan. The need  was confirmed as part of this  planning process. 

This project will improve track capacity  to accommodate future passenger rail  and meet freight capacity needs. 

The need for additional track  capacity to accommodate freight  and transit operations was  identified in the SIS Multimodal  Needs Plan and confirmed through  the Blueprint 2020 and Commuter  Rail feasibility studies. 

Upgrade to Accommodate  Blueprint 2020  Freight and Passenger Service* 

82  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

CSX Transportation 

CSX Transportation 

Florida East Coast Railway 

CSX Transportation 

CSX Transportation 

County

Duval/Clay

Duval/Nassau

Duval/St. Johns 

Duval

Nassau

Map ID 

2239

2240

2241

2242

2243

From

To

Green Cove Springs to Jacksonville 

Jacksonville to Yulee 

 

Upgrade to Accommodate  Freight and Passenger Service 

Upgrade to Accommodate  Freight and Passenger Service 

Upgrade to Accommodate  Freight and Passenger Service 

St. Augustine to Jacksonville 

at US 301 SR 200  Baldwin 

Improvement Type 

 

at US 301  Crawford Diamond 

Grade Separation 

Grade Separation 

83  

Source

Blueprint 2020 

Blueprint 2020 

Blueprint 2020 

 

 

Purpose

Need

This project will improve track capacity  to accommodate future passenger rail  and meet freight capacity needs. 

The need for additional track  capacity to accommodate freight  and transit operations was  identified in the SIS Multimodal  Needs Plan and confirmed through  the Blueprint 2020 and Commuter  Rail feasibility studies. 

This project will improve track capacity  to accommodate future passenger rail  and meet freight capacity needs. 

The need for additional track  capacity to accommodate freight  and transit operations was  identified in the SIS Multimodal  Needs Plan and confirmed through  the Blueprint 2020 and Commuter  Rail feasibility studies. 

This project will improve track capacity  to accommodate future passenger rail  and meet freight capacity needs. 

The need for additional track  capacity to accommodate freight  and transit operations was  identified in the SIS Multimodal  Needs Plan and confirmed through  the Blueprint 2020 and Commuter  Rail feasibility studies. 

This project's purpose is to construct a  highway‐rail grade separation to  improve safety and traffic flow. 

The need for this project was  identified through the SIS  Multimodal Needs Planning process  which included an analysis of the  safety record and crossroad  congestion. 

This project's purpose is to construct a  highway‐rail grade separation to  improve safety and traffic flow. 

The need for this project was  identified through the SIS  Multimodal Needs Planning process  which included an analysis of the  safety record and crossroad  congestion. The need was  confirmed as part of this planning  process. 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Port of Fernandina 

Port of Fernandina 

Port of Fernandina 

Port of Fernandina 

City of Palatka 

County

Nassau

Nassau

Nassau

Nassau

Putnam

Map ID 

2244

2245

2246

2247

2248

From

Berth Improvements 

Cruise / Cargo Berth 

Rail Track Improvements 

at Fernandina Port 

SR 100 CR 309D 

To

 

 

 

 

 

Improvement Type 

Docks

Docks

Internal Rail 

Access Improvements 

Runway expansion 

84  

Source

Purpose

Need

Port Master Plan 

This project will provide additional  capacity at berths in the marine  terminal to improve efficiencies and  meet future demand. 

The need for the project was  defined during the development of  the OHPA Master Plan. The need  was confirmed as part of this  planning process. 

Port Master Plan 

The project will construct new berths  needed to accommodate cruise and  larger cargo ships. 

The need for the project was  defined during the development of  the OHPA Master Plan. The need  was confirmed as part of this  planning process. 

Port Master Plan 

This project will enhance near‐dock and  on‐dock rail services. 

The need for the project was  defined during the development of  the OHPA Master Plan. The need  was confirmed as part of this  planning process. 

Port Master Plan 

This project's purpose is to improve  truck access to the port within the  context of the historic district in  Fernandina. 

The need for the project was  defined during the development of  the OHPA Master Plan. The need  was confirmed as part of this  planning process. 

This project's purpose is to expand the  runway. 

The need for the project was  defined during the development of  airport master plan. The need was  confirmed as part of this planning  process. 

SIS Multimodal  Needs Plan 


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Nassau County 

CSX Transportation 

City of Saint Augustine 

Florida East Coast Railway 

Florida East Coast Railway 

County

Putnam

Putnam

St. Johns 

Statewide

Statewide

Map ID 

2249

2250

2251

2252

2253

From

Barge Port 

at  SR 15 Reid Street 

To

 

 

Historic Commercial Areas    

Amtrak Service Miami to Jacksonville 

Miami to Jacksonville Upgrade Bolt and Clip System 

Improvement Type 

Operational and Capital  Improvements 

SIS Multimodal  Needs Plan 

Purpose

Need

This project's purpose is to construct  capital improvements to improve the  operations at the port. 

The need for the project was  defined during the development of  airport master plan. The need was  confirmed as part of this planning  process. 

Grade Separation 

SIS Multimodal  Needs Plan 

This project's purpose is to construct a  highway‐rail grade separation to  improve safety and traffic flow. 

The need for this project was  identified through the SIS  Multimodal Needs Planning process  which included an analysis of the  safety record and crossroad  congestion. 

Mobility & Distribution  Improvements 

SIS Multimodal  Needs Plan 

This project's purpose is to develop  strategies to improve parking  management within the historic district  of St. Augustine. 

The need was identified by the City  of St. Augustine. The need was  confirmed as part of this planning  process. 

New Passenger Service 

SIS Multimodal  Needs Plan 

This project will improve track capacity  to accommodate future passenger rail  and meet freight capacity needs. 

The need was identified through  the SIS Multimodal Needs Plan. The  need was confirmed as part of this  planning process. 

Track Upgrade 

SIS Multimodal  Needs Plan 

This project will improve track capacity  to accommodate future passenger rail  and meet freight capacity needs. 

The need was identified through  the SIS Multimodal Needs Plan. The  need was confirmed as part of this  planning process. 

85  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Intercity Passenger Rail 

Intercity Passenger Rail 

Intercity Passenger Rail 

Norfolk Southern 

CSX Transportation 

County

Statewide

Statewide

Statewide

Duval

Duval

Map ID 

2254

2255

2256

2257

2258

From

To

New Orleans to Jacksonville 

Jacksonville to Savannah 

Orlando to Jacksonville 

 

 

Soutel Drive to Norfolk Southern Intermodal Yard 

North Rail Corridors Phase 2 

Improvement Type 

Purpose

Need

New Passenger Service 

SIS Multimodal  Needs Plan 

This project will improve track capacity  to accommodate future passenger rail  and meet freight capacity needs. 

The need was identified through  the SIS Multimodal Needs Plan. The  need was confirmed as part of this  planning process. 

New Passenger Service 

SIS Multimodal  Needs Plan 

This project will improve track capacity  to accommodate future passenger rail  and meet freight capacity needs. 

The need was identified through  the SIS Multimodal Needs Plan. The  need was confirmed as part of this  planning process. 

New Passenger Service 

SIS Multimodal  Needs Plan 

This project will improve track capacity  to accommodate future passenger rail  and meet freight capacity needs. 

The need was identified through  the SIS Multimodal Needs Plan. The  need was confirmed as part of this  planning process. 

SIS Multimodal  Needs Plan 

This project will improve track capacity  to accommodate future passenger rail  and meet freight capacity needs. 

The need was identified through  the NS CSX SIS Connector study  performed by FDOT to improve  access and operations of the  Norfolk Southern intermodal yard.  

North Rail  Corridor  Feasibility Study 

The purpose of this project is to  consider extensions of the North Rail  corridor and to construct a two‐lane  roadway within the corridor right of  way. 

This need was identified through  the freight capacity analysis  performed in the LRTP to address  future rail and truck access needs.  The need was confirmed as part of  this planning process. 

New Connector 

Multi Modal Corridor 

86  

Source


Table 2. Project Purpose and Need Statements for Major Capacity Projects  Facility 

Florida East Coast Railway 

Downtown Transportation  Center 

Jacksonville Port Authority 

Florida East Coast Railway 

Intermodal Logistics Center 

County

Duval

Duval

Duval

Duval

 

Map ID 

2259

2355

1006

2260

 

From

at Sunbeam Road  

Downtown Facility 

To

 

 

Spoil Island Connector Bridge 

at Shad Road 

Intermodal Logistics  Center 

 

 

Improvement Type 

Purpose

Need

This project's purpose is to construct a  highway‐rail grade separation to  improve safety and traffic flow. 

The need for this project was  identified through the SIS  Multimodal Needs Planning process  which included an analysis of the  safety record and crossroad  congestion. The need was  confirmed as part of this planning  process. 

Transportation Center 

SIS Multimodal  Needs Plan 

This project's purpose is to construct a  downtown intermodal facility where  multiple transit modes can be  connected. 

This project's need was identified in  the 2035 LRTP and confirmed as  part of the Blueprint 2020 plan to  provide greater systems integration  of the transit modes. The need was  confirmed as part of this planning  process. 

New 2 Lane Bridge 

New need  identified in the  2040 LRTP by  JAXPORT. 

This project's purpose is to construct a  new bridge for the management and  distribution of spoil material associated  with dredging the St. Johns River. 

The need for this project was  identified by JAXPORT as an  opportunity to better manage spoil  and reduce environmental impacts.  

Grade Separation 

New need  identified in the  2040 LRTP. 

This project's purpose is to construct a  highway‐rail grade separation to  improve safety and traffic flow. 

The need for this project was  identified through a process which  included an analysis of the safety  record and crossroad congestion.  

New need  identified in the  2040 LRTP. 

This project's purpose is to construct an  intermodal logistics center in North  Florida to improve rail efficiencies and  the interchange of intermodal traffic  between railroads and over the road  trucking. 

The need for this project was  identified as part of the rail system  capacity analysis performed during  the planning process.  

Grade Separation 

New capacity 

87  

Source

SIS Multimodal  Needs Plan 


This page is intentionally blank.