Page 1

Architecture Work Portfolio


Client Name - Mr Pujari . Year of Completion – 2013 Budget – 7.00Lakhs Work Scope – Planning according to Vaastu principles and interior designing the space Duration of completion – 7 Months Following next slide is of residences designed during 2011-2014


Client Name - Mr Parekh . Year of Completion – 2018 Budget – 20.00Lakhs Work Scope – Planning according to Vaastu principles and interior designing the space Duration of completion – 6 Months


Client Name - Mr Rakesh . Year of Completion – 2018 Budget – 15.00Lakhs Work Scope – Interior designing the space as per Vaastu Principles . Duration of completion – 4 Months


Client Name – Nakoda Group Project – Nakoda Heights – Solapur Year of Completion – 2015 Budget – 15 Cr . Work Scope – Planning according to Vaastu principles Duration of completion – 2 Years 3 Months.


Client Name – Nakoda Group Project Name – Club House - Gubarga Year of Completion – 2016 Budget – 30 lakhs . Work Scope – Planning according to Vaastu principles Duration of completion – 7 Months.


Client Name – Nakoda Group Project – Green City – Bijapur Proposed Layout


• • • • • • • • • • • • • • • • • • • • • • • • •

Professional BIM Experience : (2013 -Present) Dar Al - Handasah - Shair and Partners Pvt. Ltd & WS ATKINS

9. Al - khail Avenue – Dubai

10. Nas Arena Stadium - Dubai

11. Ibn Batuta Mall - Extension – Dubai

12. Abraj kudai - Makkah ,Saudi Arabia

13. Somatek Commercial Building - Angola – Africa

14. Minfin Headquarters - Angola – Africa

15 .School of Music and Arts - Angola – Africa

16 .CCNC Commercial and Night club - Angola - Africa

17. Hinckley Power Point C - London – UK

18. Colombo Port City - Sri Lanka

19. Expo Link 2020 - Dubai

BIM Architect - August 2013 - March 2017 Senior BIM Architect - March 2017 - Present Revit Projects Undertaken: Worked on various projects such as Mosques, Stadiums, Mall, Airports, Hotels Cities and Thermal power plants. Major Revit (BIM) project includes; 1. Mosque - Uzbekistan

2. Al - Khor - FIFA World Cup Stadium 3 GAC Mosque Project - Saudi Arabia 4 Dubai Airport (Upcoming World’s Largest Airport) 5 Makkah hotels and Commercial Complex . 6 Public Investment fund at Madina Hajj City - Ministry of Finance - Saudi Arabia 7 Dubai Arena - Dubai 8 King Abdullah Mosque - Saudi Arabia


• BIM Architect Roles and Responsibilities - DAR • • • • • • • •

Co-ordination with designers, detailers and MEP trades for interrelated work and better output, to meet the deadlines and timeliness. Attending co-ordination meetings with various trades in office and resolving design related queries. Designing interior spaces providing detailed Architectural Interior drawings for preparing FINAL DRAFT drawings. Efficiently extracting and working on Architectural and structural GFC drawings from Revit. Clash detection and resolution of MEP services using Navisworks. Reviewing DSR drawing adhering the Quality Procedures. Perform 100% self-checking of hard copy of our project work. Responsible for timely delivery , quality checking of the deliverables and publishing project central files .

• Senior BIM Architect Roles and Responsibilities - WS. Atkins • • • • • • •

Preparing Parametric families of Doors and Windows. Modeling and Rendering Conceptual design Models. Preparing BIM Displaced Model for Project Design Presentation. Preparing Design Options for Roof . Following standard protocol for BIM Projects initiation Making Central Model files for initiating Project work. Co-coordinating with the BIM managers for progressive submission deliveries.

• Senior BIM Architect Roles and Responsibilities – Studio Parametric Architects • •

Planning and Preparing a BIM Model for 6th Avenue – FX FOWLE Architects - New York . Preparing BIM Model for Luxury Apartments – WMK Architects - Australia .


MBR –STADIUM The 60,000-capacity arena will be capable of holding international sports events like athletic meetings and football tournaments, and will be named after His Highness Sheikh Mohammed Bin Rashid Al Maktoum, Vice-President and Prime Minister of the UAE and Ruler of Dubai. Set to be built in Al Aweer behind Mushrif Park - the project will cost around Dhs3 billion and is the first of a ninepoint plan to revolutionize how sport is performed, trained for and delivered in Dubai. The international Dubai Future Sports competition, which will take place in 2017, was also confirmed. No date has been put on completion for the stadium, but the following details have been confirmed: - it will be full air-conditioned, making it usable year-round - complies with FIFA standards, football's governing body - includes a training hall, 5,000 space car park . .


AL – KHOR STADIUM A year after construction first began on the Al Bayt Al Khor stadium, the structure is now taking shape. The venue will host matches up to the semifinals of the 2022 World Cup, and is being designed to resemble an Arabian tent. The foundation of the stadium in northern Qatar is now 95 percent complete, and support columns are being put into place.


Chec Port City Bridges- Colombo . A conceptual bridge design proposed for preliminary design - FB – 02 Option – 01,worked on design of bridges during my Atkins tenure .


ChecPort City Bridges - Colombo . The Port City was claimed to be a concept of former PresidentMahindaRajapaksa, who was apparently inspired while inspecting the landfill being constructed for the Colombo South port. The modern Port City was in fact an unsolicitated proposal submitted by China Harbor Engineering Company based on previous proposals.[ The construction was set to begin in March 2011 but due to several circumstances the project was stopped. In mid 2012, the Sri Lankan PortAuthority, better known as SLPA, announced that the construction of the then Colombo Port City project would commence on 17 September 2014. The budget is estimated to be US$1.5 billion The reclamation was to be carried out by China Harbor Engineering Corporation, who has been engaged by the investor. 125 ha was the land was given to government as well as while owned by the government was planned to be leased for 99 years to the Chinese company. 20 ha was planned to be given freehold to the Chinese company. Construction of the Colombo Port City project was launched on 17 September 2014 A conceptual bridge designed was proposed for preliminary design and was selected Proposed designed during myAtkins tenure -2017


Revit Designed , Modeled and Rendered .


Revit Modeled and Rendered .


Revit Modeled and Rendered – Bijapur Project


Revit Modeled and Rendered – Bijapur Project


Thank You . Architect Nilam Architect Niket

Architecture portfolio 2010-2018  

Please review the architectural works and BIM works

Architecture portfolio 2010-2018  

Please review the architectural works and BIM works

Advertisement