RATION PLAN 3.98 MW

ENE BIOMASS COG 16.6 MW thermal power

electrical pow

T

er

VECKROGELI BROCENI, LATVIA

Project put into commission in 2016 COMPLEX OF: • BIOMASS COGENERATION PLANT • PEAK BOILER HOUSE WITH OFFICE AREA • PELLET FACTORY

FACTS AND FIGURES

78 weeks construction time

EST G AR EY

TECHNOLOGY

2 01

in

du

en

6

Biomass steam boiler • Steam production - 20.7 Kg/h • Steam pressure - 61 barg • Steam temperature - 485 oC Steam turbine • Electric power - 3.98 MW Flue gas condenser - 4.3 MWth Process and plant automation and control system

e rg y

L

K T N R TU OJEC PR

s t r ial a n d

ENGINEERING Development of design: • Architecture • Process design • Engineering networks • Structural design Author Supervision CONSTRUCTION Glazed structures - 236 m2 Steel structures - 229 t Ready-mix concrete - 8000 m3 Prefabricated concrete structures - 830 t DELIVERY Cargo deliveries - 178 trucks GENERAL CONSTRUCTION From initial planning to completion MAINTENANCE

2017

Launch of equipment CHP power plant operation and maintenance 24/7

www.upb.eu.com

Distribution, copying, editing, preservation, archiving and complete or partial publishing without the written permission of UPB JSC is prohibited.

ENGINEERING I PRODUCTION I DELIVERY I ASSEMBLY I SERVICE

GENERAL CONSTRUCTION

DESIGN FACADE & FRAME STRUCTURES AND BUILD GLASS

STEEL

INNOVATIVE PRODUCTS

PFAFFENHOFEN 4x500 kW, Biogas

COGENERATION MODULES

CONCRETE

COMPLEX SOLUTIONS ENERGY MACHINERY

OEHNALAND 500 kW, Natural gas

BRIMI 600 kW, Natural gas

COGENERATION MODULE

COGENERATION MODULE WITH STEAM BOILER

I S E RV I C E Y L B M E S S A L I V E RY I E D I N O I T C U I PROD ENGINEERING

PARK TOWER

LYSAKER POLARIS OFFICE BUILDING

LEGEND

RESIDENTIAL BUILDING

GLASS Very Good

PUBLIC

MUNKSJOSTADEN

SUTTUNG

OFFICE BUILDING

HOTEL

CONCRETE

FBO

SODERTALJE SJUKHUS

PARK 49

HOSPITAL

OFFICE BUILDING

STUDIO

MACHINERY W TS E N UC OD R P

STEEL HAGAPLAN HOTEL

! PARKING LOT

RESIDENTIAL BUILDING

LIGNUM

IMPREGNATION FACTORY

PROCESS AUTOMATIZATION EQUIPMENT

KUNGLIGA MUSIKHOGSKOLAN EDUCATIONAL BUILDING

E V E RY 1 0 W E ETKIS DUC S N E W P REO D V E LO P E D

SORKEDALSVEIEN

SICKLA FRONT 2

KLOCKARBACKEN

OFFICE BUILDING

MULTIFUNCTIONAL COMPLEX

OFFICE AND RESIDENTIAL BUILDING

COURT HOUSE

eXlent Hyllie

1173

AIRCRAFT MAINTENANCE HANGAR IN RIGA INTERNATIONAL AIRPORT

TINGSRATTEN

RESIDENTIAL BUILDING

RESIDENTIAL BUILDING WITH PARKING LOT

RGEN MEDIA CITY BE BUILDING

CT FACADE PROJE T N E M E L E T S LARGE ELEMENTS

MANSPINNAREN

TAVERNAN

RESIDENTIAL AND OFFICE BUILDING

ENERGY

load capacity 30 000 kg


IM

ED

NT

35

S

MPLE CO

P R OJ E CT

X

PLEME

STEEL

ENERGY

CONCRETE

COMPARED TO 2015

GLASS

OFFICE BUILDING

UPB moves towards technological complexity in projects we implement. Our expertise and resources allows us to use synergy within the holding to create more added-value products. To support the innovation UPB continues making investments in the development of industrial infrastructure. MACHINERY

PRODUCTS ALUMINIUM & WOOD ALUMINIUM GLAZED STRUCTURES BESPOKE GLASS SOLUTIONS HEAVY AND COMPLEX STEEL STRUCTURES EXPLOSION RESISTANT CONTAINERS PRESSURE TANKS

GLASS

jects First glass pro eland Ir in implemented

+30

The expansion and modernisation project of steel production units with investments of 2 million euros is completed

+48%

Precast concrete production units

CONCRETE

FACADE AND FRAME STRUCTURES

PRECAST BUILDING CONSTRUCTIONS OF ALL KINDS REDY-MIX CONCRETE SUPPLIES

TOTAL CAPACITY HAS INCREASED

STEEL

% GROWTH OF THE SALES VOLUMES Element facades and wood-aluminium glazed structures

*

ENGINEERING | PRODUCTION | DELIVERY | CONSTRUCTION AND ASSEMBLY | SERVICE

Complex solution including glass, steel and concrete structures designed, produced and assembled by UPB.

ASSEMBLY TEAM OF 360 PROFESSIONALS

MUNKSJOSTADEN, SWEDEN

COMPLEX SOLUTIONS

egion ss CHP in the r

Largest bioma

O

LI

2016

MACHINERY

N

MECHANICAL ENGINEERING

AB

HEAVY PEEL GR

IONS T U L SO TING MEE E N T CLI DS NEE

INNOVATIVE PRODUCTS

WHITE, RED, GREEN, BLACK, EXPOSED, GRAPHIC CONCRETE AND DESIGN SOLUTIONS FOR FACADES

I

FUTURE BUILT GREEN CONSTRUCTION SYSTEM IN NORWAY

MOTORISED FACADE

NORSOK QUALITY STANDARDS BY THE NORWEGIAN PETROLEUM INDUSTRY

SUSTAINABLE CONSTRUCTION

PRODUCT REGISTRATION AND ASSESSMENT SYSTEM FOR CONSTRUCTION PRODUCTS, SWEDEN

UPB have a high competence in sustainable and energy efficient construction. As one of the largest construction holdings in the Baltics, we care about the impact we make on the environment and on the needs of stakeholders.

LIGHT TRANSMITTING CONCRETE

PRODUCT REGISTRATION AND ASSESSMENT SYSTEM FOR CONSTRUCTION PRODUCTS, SWEDEN

BRICK FACADE IMITATION AND PRECAST CONCRETE FACADE PANELS WITH IN-BUILT ALUMINIUM WINDOWS

PRODUCT REGISTRATION AND ASSESSMENT SYSTEM FOR CONSTRUCTION PRODUCTS, SWEDEN

VINA STUDIJA

WINE SHOP, BAR, RESTAURANT

s for n o i t u l o s lops G UPB deve UCTURE MODELIN TR GLAZED S ekla Structures in T

UPB HOLDING

EMPLOYEES

DENMARK

NCE

E

60%

Export markets

S LO VAK IA

ITA LY

UPB enterprises UPB agencies UPB export markets

THE MARKET STRUCTURE

HOLLA ND

40%

Latvian market

EXPORT MARKETS

TABLIS ES IJAN

AZERBA

IN A

SWEDEN

UNITED KINGDOM

CROATIA

DENMARK

NORWAY

IRELAND

USA

ITALY

LEGAL ENTERPRISES

DENMARK

ACHIEVEMENTS

ENTERPRISES AND AGENCIES

D

1500 +

MILLION TURNOVER EURO IN10 COUNTRIES

TNER

HE

142 142

MENT PAR

N

1500 MILLION EMPLOYEES EURO TURNOVER

+31%

PERI

D E V E LO P

IJA

+

6 2 X

COMPARED TO 2015

MAIN INFORMATION

MAIN INFORMATION

S OF

Z E R BA

*

142 MAIN INFORMATION

AR

E

UPB is an industrial holding, whose core business is complex building MAINthe INFORMATION construction, including design, production and assembly of structures. The company incorporates glass, steel and concrete structure MILLION production units, a cogeneration station production unit and a mechanical engineering production unit. EURO TURNOVER *

YE

MULTIFUNCTIONAL COMPLEX

W E

MILJOBYGGNAD SUSTAINABLE BUILDING CERTIFICATION SCHEME, SWEDEN ENVIRONMENTAL PRODUCT DECLARATION

STUDIO, SWEDEN

2

BRANCH

GREEN B

EXPOR

W

H

SUSTAINABLE BUILDING CERTIFICATION SCHEME - LEED

N

T

SUSTAINABLE BUILDING CERTIFICATION SCHEME - BREEAM

AT I O

RTFO

ISO 9001, ISO 14001 ENVIRONMENTAL AND QUALITY MANAGEMENT SYSTEMS

FIC

T AC

PO

2400 m

CARGO LIFTS / WIND TUNNEL VENTILATORS HEAVY MACHINERY FOR METALLURGICAL PLANTS GRABS AND THEIR ROTARY DRIVES CONVEYOR SYSTEMS

ILITARY EXPERTISE IN M JECTS INDUSTRY PRO

TI

42%

FROM IDEA TILL FACTORY ACCEPTANCE TEST

(Germany)

up to

Participates in EXHIBITION KWF

PRODUCTS

NEW HIGHLY COMPLEX AND FULLY AUTOMATED PRODUCTS DEVELOPED

DING CER

ONTR

ENERGY SOLUTIONS

50-4000kW power range

Machinery production area doubled

CERTIFICATIONS AND SYSTEMS TC

ENERGY

FINLAND NETHERLANDS SLOVAKIA

IRAQ

AZERBAIJAN

CHINA

ESTONIA

BELARUS

SLOVENIA

RUSSIA

VIETNAM

EGYPT

LITHUANIA

HUNGARY

BULGARIA

SERBIA

CHILE

PERU

HO LLA ND

SLOVAK IA

I TA LY

60000m2 10 +PRODUCTION AREA

1500 IN COUNTRIES LEGAL ENTERPRISES

EMPLOYEES 60000m2 PRODUCTION AREA

90 PROFESSIONAL ENGINEERS www.upb.eu.com

GERMANY

ICELAND SWITZERLAND AUSTRIA

B E S T R E P U TAT I O N

CONSTRUCTION AND REAL ESTATE SECTOR

TARGET MARKETS

NIGERIA SOUTH AFRICA

IRAN

KAZAKHSTAN

GHANA

INDIA

SOLUTIONS

25 YEAR EXPERTISE IN PROJECT MANAGEMENT

k wor les r e p High princi d e ty safe ntroduc i

GENERAL CONSTRUCTION

U

Combined heat and power modules

Competence and solutions for adding value to renewables market in Germany

INDUSTRIAL BUILDINGS MILITARY BUILDINGS COMMERCIAL BUILDINGS RESIDENTIAL BUILDINGS PUBLIC BUILDINGS

IL

TURNKEY ENERGY PROJECTS COGENERATION MODULES TRIGENERATION SOLUTIONS

CUSTOM ENGINEERING

DESIGN AND BUILD

% SALES VOLUMES HAS GROWN

*

PROJECT EXECUTION CAPACITY DOUBLED

PRODUCTS

+43

COMPARED TO 2015

DESIGN AND BUILD TEAM WORKS UNDER A SINGLE CONTRACT ONE ENTITY, ONE CONTRACT, ONE UNIFIED FLOW OF WORK REDUCES OVERALL PROJECT DELIVERY TIME AND COST