Activities Requiring a Land Use Permit For Land Outside the Boundaries of a Local Government ACTIVITY

TYPE "A" PERMIT

TYPE "B" PERMIT

Explosives

Use of more than 150 kilograms in any 30-day period.

Use of more than 50 kilograms but less than 150 kilograms in any 30-day period.

Vehicles

Use of any vehicle or machine exceeding 10 t. net weight other than on a road, a community landfill, quarry site or airport.

Use of any vehicle weighing more than 5 t but less than 10 t net weight or exerting a pressure of more than 35 kilopascals (5 lbs psi), other than on a road or within a community landfill, quarry or airport.

Fuel Caches

The use of any single container for the storage of fuel that has a capacity of more than 4,000 litres.

Establishment of a storage facility with a capacity of 4,00080,000 litres, or use of a single container for the storage of fuel that has a capacity of 2,000 4,000 litres.

Machinery

The use of a self-propelled power-driven machine for moving earth or clearing land.

Lines, trails, or rights-of-way

The leveling, grading, cutting or snowplowing of any line, trail, or r-o-w, other than a road or existing access trail to a building, that exceeds 1.5 metres in width and 4 hectares in area.

Buildings

The leveling, grading, cutting or snowplowing of any line, trail, or r-o-w, other than a road or existing access trail to a building, that exceeds 1.5 metres in width but is less than 4 hectares in area. Construction of a building with a footprint of more than 100 m2 and a height of more than 5 m.


Activities Requiring a Land Use Permit For Land Within or Outside the Boundaries of a Local Government

ACTIVITY

TYPE "A" PERMIT

TYPE "B" PERMIT

Drilling

The use of power driven earth drilling equipment with an operating weight of more than 2.5 t, (not including drill rods, bits, pumps, etc.) for a purpose other than the drilling of holes for building piles or utility poles or the setting of explosives within the boundaries of a local government.

The use of power driven earth drilling equipment with an operating weight of more than 500 kg but less than 2.5 t, (not including drill rods, bits, pumps, etc.) for a purpose other than the drilling of holes for building piles or utility poles or the setting of explosives within the boundaries of a local government.

Campsites

The use of a campsite outside a territorial park for a duration of, or exceeding, 400 persondays.

The use of a campsite outside a territorial park for a duration of or exceeding 200 persondays but less than 400 person-days.