Issuu on Google+

DESIGN PORTFOLIO MARCOS CORBAL CABALLE M.ARCHITECT

www.issuu.com/mondariz


PERSONAL INFORMATION

Professionally qualified architect with four years experience. I am looking for a employment as an architect. I have a work visa and recent working experience as an architect in Beijing and Shanghai, so I already have a good understanding of the working environment in China and I could start work at short notice. I enjoyed the challenges asociated with my previous work and I’m now eager to work on projects that will further develop my experience as a designer and I’m particularly interested in any opportunities that would enable me to take advantage of my specialization in sustainable architecture. MARCOS CORBAL CABALLE 11/11/1989, Vigo (Spain)

marcoscorbal@gmail.com

marcoscorbalcaballe

issuu.com/mondariz

+86 18510041532

STUDENT AND WORKING EXPERIENCES

VIGO (SPAIN)

PORTO (PORTUGAL)

SHANGHAI (CHINA)

BEIJING (CHINA)

Start Master in Architecture and

Obtain Master in Architecture

Junior Architect in

Architect in WTL Design

Urban Planning (ESG)

and Urban Planning (ESG)

WoWA (Shanghai)

(Beijing)

2007

2012

Start Bachelor in Architecture

2010

ESG (Portugal)

2013

2015

Internship in Alfonso

Junior Architect in

Architect in Picazo

Penela Arquitectos (Spain)

Morris-UK (Shanghai)

Arquitectos (Beijing)

LANGUAGES

PROFESIONAL SKILLS

2017

2014

2013

PERSONAL SKILLS

Auto CAD 2D

(Advance)

Spanish

(Native speaker)

Communication

Rhinoceros

(Advance)

Galician

(Native speaker)

Team Work

Photoshop

(Advance)

English

(Advance)

Public Speaking

Illustrator

(Advance)

Portuguese

(Advance)

Free Hand drawing

Indesign

(Advance)

Italian

(Intermediate)

Physical Models

SketchUp

(Advance)

Chinese

(Basic)

Writing

Grasshopper

(Basic)

French

(Basic)


WORKING EXPERIENCE


PROJECT NAME: JD.com Headquarters II LOCATION: Beijing YEAR: 2016 BUILDING: Offices ROLE: Project Assistant PROJECT STATUS: Winning Competition SURFACE: 60.000 m2


Atrium View


A

Ground Floor Plan

Section A-A’

A’


Atrium View


PROJECT NAME: VR Cinema LOCATION: Beijing YEAR: 2016 BUILDING: Commercial ROLE: Project Manager PROJECT STATUS: Construction SURFACE: 200 m2


Viewing area view


Viewing area and VIP view


Viewing Area view

Floor Plan Cinema

Inside VIP area


PROJECT NAME: CCTQ Headquarters LOCATION: Nanjing YEAR: 2016 BUILDING: Offices ROLE: Project Assistant PROJECT STATUS: Winning Competition SURFACE: 40.000 m2


Ground Floor Plan


Ground floor atrium view


Staircase reading area view


Reception Desk Details


PROJECT NAME: BONC Headquarter LOCATION: Beijing YEAR: 2015-2017 BUILDING: Offices ROLE: Project Assistant PROJECT STATUS: Constructed SURFACE: 40.000 m2


Building structure facade

Render proposed facade

Project completion facade

Construction side visit


Facade Day View

Facade Night View

Logo Facade View


NC Offices

国信 办公楼

PROPOSED canopy

提议

Structure louver detail

Structure of louver detail

Detailed project facade


Ground floor plan

2F - Meeting Rooms Plan

3F-6F Typical Office Floor


Lobby Current State


Lobby Reception Desk


Project Completion State

PROJECT NAME: Lijing Kindergarten LOCATION: Beijing YEAR: 2015 BUILDING: Education ROLE: Project Manager PROJECT STATUS: Constructed SURFACE: 5.000 m2


Old kindergarten facade

Render proposed facade

Project completion facade

Detailed project facade


2F Classroom corridor

Staircase lobby


PROJECT NAME: Beijing Philarmonic LOCATION: Beijing YEAR: 2015 BUILDING: Cultural ROLE: Project Assistant PROJECT STATUS: Competition SURFACE: 32.000 m2


B

A

A’

B’ Ground Floor Plan

2 Floor Plan


A-A’ Section

B-B’ Section


Ghosted diagram

Uses diagram

Vertical circulation diagram

Horizontal circulation diagram


PROJECT NAME: Barack Obama Presidential Library LOCATION: Chicago (Illinois) YEAR: 2015 BUILDING: Cultural, Museum ROLE: Project Assistant PROJECT STATUS: Competition SURFACE: 7.000 m2


Areas Presidential Suite Museum Internet Cafe Learning Room

Presidential Suite L06 +78’-00”

8,514.30 ft² 4,122.60 ft²

Lobby Auditorium Library Archives

3,229.00 ft² 14,552.00 ft² 5,661.80 ft² 12,366.00 ft²

Total Area

11,248.60 ft² 8,944.80 ft² 68,639.10 ft²

Museum L05 +65’-00”

Museum L04 +52’-00” Solid Plaza

Internet Cafe L03

+65’-70”

+39’-00”

Learning Room L02 +26’-00”

Public Entrance

Learning Room L01 +13’-00”

+00’-00”

Private Entrance Lobby +00’-00” GF

Loading Area

Archives

Storage Room

Auditorium B01 -13’-00” Library B01 -13’-00” Landscape

Train trucks

River Entrance Movement lines Auxiliary lines


Interior View


Lobby View


View from the river


PROJECT NAME: Nanjing Tower LOCATION: Nanjing (China) YEAR: 2014 BUILDING: Mixed Use ROLE: Project Assistant PROJECT STATUS: Schematic Design SURFACE: 300.000 m2 (92.000 m2 high-rise)


Shopping Mall Entrance

Tower Entrance


N

Side Plan

5

10

20m


N

1st Floor

5

10

20m


West Elevation


Tower Section


Curtine Wall Detail


PROJECT NAME: Sheng’an Metro Station LOCATION: Wuxi (China) YEAR: 2014 BUILDING: Mixed Use ROLE: Project Assistant PROJECT STATUS: Competition SURFACE: 500.000 m2


Section diagram

Shape Diagram

Circulation Diagram

1st Floor Plan


Automobile City

PROJECT NAME: Xi’an Automobile City LOCATION: Xi’an (China) YEAR: 2013 BUILDING: Automobile, Cultural, Recreation ROLE: Project Assistant PROJECT STATUS: Competition SURFACE: 600.000 m2


Automobile City


Auditorium Section

Exposition Building Section


Marcos Corbal Caballe 2017