Central Avenue Connector Trail Feasibility Study

Page 13

Existing Conditions

Map 1 - Existing conditions along the proposed trail alignment were grouped into four sections.

HW

CAB IN

TH

ER

G

JR

FedEx Field

AD

AR T

CH

BRIGHTSEAT RD

AN

IN

BR

LU

N KI

M

D IS ON

OR D LO T

ILL DR PEPPER M

GARRET T

R NT D

TS F

RD

SA PLE A

Morgan Boulevard

D Y G LEN DR

RD

CH

DR

Morgan Boulevard Metrorail station (between Pepper Mill Drive and a point just west of Brightseat Road) SH A

TS

L

SO U

CA

PIT

H

OL HEI GH

NC

AN

B

Addison Road-Seat Pleasant Metrorail station (between Addison Road and Pepper Mill Drive)

W ALKER M IL

CAB

LVD

S

S AV E

TT

S N RD

ROLLIN

WA

Capitol Heights Metrorail station (between Capitol Heights Boulevard and Addison Road)

Road

K BLVD PA R

332 T S

E AL AV CEN TR

214 S T

M Æ Addison

ON

OL S T

PT

PIT

D IE R

U

CH

ST CA

E CENTRAL AV

R IT

EA

LN PER

RN

O ADDIS

SO

E TH

CARMODY HILLS-PEPPER MILL VILLAGE

H AM

214 T S SO

Æ

HEIGHTS Focus LEGEND

Connector Trail Alignment

The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department

In order to develop a recommended design and implementation strategy for the Connector Trail, the project team conducted field work and gathered input from M-NCPPC staff about existing conditions along the alignment. Because transit access is a key objective of the Connector Trail, findings from the existing conditions analysis are grouped into sections based on the nearest Metro station.

M Æ

Capitol Heights

EM ST AV DA VE Y

M Æ

A M OR G AN

HILL

T S EA

BLVD

RD

T S 704

Largo Town Center

95

RD

RD

Y

R IF F

DR VEN E HA BELL

SHE

Central Avenue Connector Trail

Largo Town Center Metrorail station (between a95point just west of Brightseat Road and Harry S. Truman Drive N.

Existing and Planned Facilities Existing Hard Surface Trail; Existing Side Path Planned Hard Surface Trail; Planned Side Path

M Æ

Metro Stations Railroads

Planned Bike Lane Planned Shared Roadway

Existing Conditions 0

500

1,000

2,000 Fe e t

Date: 9/9/2015

Central Avenue Connector Trail: Feasibility Study and Implementation Plan