Page 1

MIRIAM JACOBSEN PORTFOLIO

1


A W

RESUME

2018 As a designer, I find stimulation when my knowledge is Los Angeles, CA expanded through my exposure to different fields. 2017 HKS ARCHITECTS | Architectural Designer 1-818-461-4975 As a multi-cultural person, I can relate to • Worked with designer leaders at the LA and Dallas offices. and adapt to almost any type of mimjacobsen@gmail.com • Conceptualized designs for venues in the U.S. and internationally. situation. I have shared tables • Designed sports and entertainment venues, residential, mixed- use, and urban. with NFL players, city mayors, Miriam Jacobsen • Continued research of technological applications to better implement design processes. 2018 influential professionals, • Involved in ACE mentorship for 2 years with high school students. Led design of final projects. 2017 HKS | Achievements travelers from around Wexford Research Lab • Winning office remodel proposal. the world as well as LASED Stadium Los Angeles Stadium at Hollywood Park • ACE mentor-ship coordinator and professor. with people from LASED Performance Venue Los Angeles, CA, USA shanty towns and LASED NFL Network 2015 ARCHIPRIX| Selection and Participation 300 acres, $5 billion, Entertainment District remote villages. Westfield Promenade 2035 • World’s best graduation projects . I consider every Hollywood Residential Tower • Developed exterior architecture sheets for construction 2014 AIA HENRY ADAMS CERTIFICATE | Award person a teacher; Barcelona Stadium documents in all design phases, required weekly • Certificate for excellence in the study of Architecture. a possibility that ACE Residential Tower and Museum coordination with structural and MEP engineers. Washington Lincoln Square FRANKEL DEGREE PROJECT | Award allows me to • Assisted lead designer in regular client meetings to discuss • Dean’s choice, best Degree Project. Jacksonville Practice Facility continue to design changes with landscape, lightning, and interior Yankees Training Facility expand my JULIUS SHULMAN EMERGING TALENT | Award architects. Canstruction-LA • Los Angeles Business Council. Winner team, 1st place. world-view. 2014

E

WOODBURY DWEL ON DESIGN | Exhibit

THINKWELL GROUP | Showset Associate Designer

• Degree Project.

• Worked together with theater designers, architects, and artists to develop 2D drawings and 3D visualization.

W.B. Theme Park

Warner Brothers Theme Park Yas Island, Abu Dhabi, UAE

1.65 million sq ft, $1 billion, Theme Park

2014

SWIFT LEE OFFICE | Summer Architectural Consultant

• Involved in the concept design proposal for the Guggenheim Helsinki Plan. • Schematic design involvement for an educational campus in Sacramento, CA.

Sacramento School

S

Guggenheim Helsinki Museum

2013

2012

• Publication and scholarship. 2011

2018

F

MAXI SPINA ARCHITECTS | Summer Research Assistant • Designed a publication for a fashion/architecture book. • Concept design for a terminal in Taiwan.

Revit Rhinoceros AutoCAD Sketchup 3DS Max Grasshopper Vray Photoshop Illustrator InDesign

Drawing Modeling Photography

2

2011

2018

2017

HKS | Fellowship Dallas, TX 3 month travel

Travel fellowship to work at other HKS locations.

FSA | Free School of Arch. Los Angeles, CA Free School of Architecture

2014

• Taught peers subjects in structures, physics, chemistry, calculus, algebra, statics, dynamics, drawing, 3D software, amongst others. 2012

2017

5,652 sq ft, $1 million, two buildings and outdoors

WOODBURY UNIVERSITY | Tutor

AWA | Scholarship

• Women in Architecture.

Sacramento High School and Middle School Sacramento, CA, USA

MAXINE FRANKEL AWARD | Scholarship

WOODBURY UNIVERSITY | B.Arch. Los Angeles, CA Honors: Magna Cum Laude. GPA: 3.8 Poland Germany Netherlands

Argentina Mexico

Peru

El Salvador

Nicaragua

2010

Study Abroad

UBA - Universidad de Buenos Aires URP - Universidad Ricardo Palma UNSAAC - Universidad Nacional de San Antonio Abad del Cusco

VIII Mundaneum Encounter

GLENDALE COMMUNITY COLLEGE | General Studies Los Angeles, CA GPA: 4.0 2005

U.C.S.M.| Civil Engineering Arequipa, Peru GPA: 3.79


INDEX

WORK EXPERIENCE

SCHOOL PROJECTS

SELECTED TRAVEL RESEARCH

2018

SELECTED HKS PROJECTS

2017

SELECTED SLO PROJECT

2014

SELECTED MSA PROJECT

2012

LOS ANGELES BUSINESS COUNCIL SELECTED WOODBURY UNIVERSITY PROJECTS

My Own Creations One Pacha One Pacha Travel

4 6

Architectural Designer Los Angeles Stadium at Hollywood Park FC Barcelona Others

12 16 20

Architectural Consultant Helsinki Guggenheim Competition

26

New Keelung Harbor Building A New Terminal in Taiwan

28

2014

Julius Shulman Emerging Talent Award Echo.Logic

30

2014

Degree Project Towards a Critical Globalism Germany Study Abroad Kultur.Ba(h)n Argentina Study Abroad Media.Cero Peru Study Abroad Reciprocal Layers Structures Studio Containing the Line Structures Studio Bifurcated Flow Program and Space Studio Bi-polar Order Program and Space Studio Archetypal Distortion

2014 2013 2013 2012 2013 2011 2011

32 34 36 38 40 42 44 46

Where I live

Los Angeles Where I was born

Peru

3


Consciously occupying time ...

4


One Space - One Time - One Consciousness The Quechua word “pacha” is a bringing together of three of our western concepts, an integration of space, time, and consciousness. One Pacha reminds us that space, time, and consciousness are one. We all come from the same space (womb), and live in it for the same time to become consciousness. One Pacha investigates how culture and context adapt our habits due to the space and time we occupy. From the moment we are being fed through the umbilical cord; what about our cultural histories dictate about why we eat the way we do? How does the substance of a culture’s “pacha” creates relationships within its inhabitants? How are these relationships similar or different throughout the world? How is this reflected in the architecture of a place? 5


One Pacha Travel

Art | Design | Photography PERSONAL RESEARCH

Design research trip where I looked to re-connect with the land I was born in through art, design, and photography. Spent many months traveling to remote places, working with local artisans, learning about techniques which are getting lost in the present. Outcome of trip in process, continue to explore different ways of creating new links between Peru and California.

Arequipa Ayacucho Cajamarca Chavin Chiclayo Cuzco Huanchaco Huaraz Ica Lunahuana Pisco Trujillo San Andres Socota 6


7


8

Arequipa - Arequipa

Lunahuana - Lima

Bioconstruction

Permaculture


Socota - Cajamarca

Socota - Cajamarca

Callua textile design

Pattern architecture

9


10

Socota - Cajamarca

Cajamarca - Cajamarca

Cultural architecture

Stone sculptures


Huamanga - Ayacucho

Huamanga - Ayacucho

Clothing design

Pottery design

11


WORK: HKS LOS ANGELES - DALLAS - ALL DESIGN PHASES 300 acres, $5 billion, Sport and Entertainment District

Developed exterior architecture sheets for construction documents in all design phases. Worked on all VIP entries, concessions, ramps, and column design. Participated in required weekly coordination with structural and MEP engineers. Assisted lead designer in regular client meetings to discuss design changes with landscape, lightning, and interior architects. All images are property of HKS.

12


11

42

40 41

44

43

1

2

12

5

4.5

40.5

40.1

01

3 4

4.9

39.9

T4

5.1

T1

J

39.5

T2

T3

T5

T6

T7

T8

5.5

CONCESSION/ BAR

6 39

S-04 STAIR 16

VENDOR DEPOT

F-04

P-11

BEVERAGE PANTRY

WOMEN

CLUB KITCHEN

WOMEN

FAMILY

EAST MAIN CONCOURSE CLUB

CLUB BAR AREA

CLUB CONCESSION

CLUB CONCESSION

TB

OFFICE OFFICE

KITCHEN

TC

FIRE STORAGE COMMAND

TD

TOILET

MEN

TOILET

7

TE SECURITY

TRASH

STORAGE WOMEN

CONCESS

FAM

E

FAM

EVENTS SERVICES

JAN

KEG COOLER

8

FOOD SERVICE

RICCA DESIGN STUDIO 5325 S. VALENTIA WAY GREENWOOD VILLAGE

TH

8.5

WOMEN

FOOD OPS AND ST

HOWARD AND SERGI 30 BLUE HERON LAND HARWICH MA 02645

BS

ADA CONSULTANT

VB H.2

AN

MEN

ACCESS BY DESIGN 12720 HILLCREST PLAZ DALLAS TX 75230

BE

BE

36

EXTERIOR LIGHTIN

9

AS

AE

LAM PARTNERS INC 84 SHERMAN ST CAMBRIDGE MA 02140

INTERIOR LIGHTIN

AE

KAPLAN GEHRING MCC 249 WEST 34th ST, SUI NEW YORK NY 10001

? RETAIL

35.5

DAVID EVANS AND ASS 145 S. SPRING STREET LOS ANGELES CA 9001

RWDI CONSULTING EN 650 WOODLAWN ROAD GUELPH ONTARIO CAN

STORAGE

BN

HENDERSON ENGINEE 8345 LENEXA DR, SUIT LENEXA KS 66214

CIVIL ENGINEER

WIND LOADING / P

CONCESSION

CONCESS

WALTER P. MOORE 11900 WEST OLYMPIC LOS ANGELES CA 9006

MEP / FP / TECH / S

HOWE ENGINEERS, IN 101 LONGWATER CR, S NORWALL MA 02061

TG

VENDOR DEPOT

C

J.2

WALTER P. MOORE 221 WEST 6TH ST, SUI AUSTIN TX 78701

STRUCTURAL ENG

CODE / FIRE / LIFE

STAIR 14

36.5

WALTER P. MOORE 1845 WOODALL ROGE DALLAS TX 75201

STRUCTURAL ENG

WRIGHTSON, JOHNSO 3424 MID-COURT RD, S CARROLLTON TX 7500

EVENTS

STOR

MECH SHAFT

37

HKS, INC 10880 WILSHIRE BLVD LOS ANGELES CA 9002

STRUCTURAL ENG

BOWL A/V / BROAD

MEN

D

HKS, INC 350 N. ST. PAUL ST, SU DALLAS TX 75201

ARCHITECT - SHEL

MIA LEHRER & ASSOC 185 S. MYERS STREET LOS ANGELES CA 9003

7.5

MEN

WOMEN

ARCHITECT - BOW

LANDSCAPE ARCH

TF

FIRST AID

AV/DATA FAM

EMPLOYEE CHECK-IN

F-01

WOMEN

JAN

FAM

FIRE PROTECTION SERVICE ENTRY

GUEST SERVICES

CLUB KITCHEN

F

TAH

TOILET AV/DATA

FAMILY

VIP LOBBY

MEN

ELEC.

J.2

GUEST SERVICES LOBBY TICKET OFFICE

6.5

ELEC.

STAIR 01

S-01

38

37.5

P-02 VIP LOBBY

STAIR 15

CONCESS / BAR

P-01

G

P-12

JAN

AHU

AV

AV

BEVERAGE PANTRY

MECH

GUEST SERVICES

38.5

ELECTRICAL ROOF DISTRIBUTION

TA

H

COAT

NOT FOR CONSTRUCTION

10

9.5

H.2

09

16

35

13

02

10

CONCOURSE

CONCOURSE

34.1

10.9 11

34 33.9

11.1

33

12

V1

08

15

32 SPONSORED CONCOURSE

14

13

03

BAR

P-14 BAR BOH

INTERIM 31.5

13.5

CLOSED CONCESSION KITCHEN

AW

These documents

are released for in

are not intended f

AW

permit, or constru

V2

SCO Architect: Arch. Reg. No.: AN

31

AS

14

BW

Date: 05/25/201

VD

BW KEY PLAN

VA BN

BS

30.5

C J.2

BAR

AV/DATA

30

WOMEN

D WOMEN

MEN

FAM

FAM MEN

ELECTRICAL ROOF DISTRIBUTION

WOMEN WOMEN

S-03

29

F-03

MEN

28.5

J.2

ELEC. P-07 AV/DATA

CLUB CONCESSION

CLUB BAR AREA

WEST MAIN CONCOURSE CLUB

06

16 ELEC. ELECTRICAL ROOF DISTRIBUTION

REFLECTED CEILING PLAN GENERAL NOTES

S-02

VC

AV/DATA F-02

ELEVATOR LOBBY

G

16.5

STAIR 05

1. 2.

STAIR 06

P-06

AV

H.8

BEV PANTRY

P-05

P-04

3.

H.8

H

H.8

28

AHU'S

MEN

CLUB KITCHEN

FAMILY

NW VIP LOBBY ENTRY

W1

TEMPLATE VERSION: 2.6.7.20140608

F CLUB CLUB KITCHEN CONCESSION

FAM

STAIR 11 STAIR 10

5/25/2016 9:01:22 AM

15

07

FIRST AID

WOMEN

AV JAN

TRASH

WA

JAN STAIR 31

JAN

STORAGE

15.5

FAM

E

PLOT DATE:

16

08

17

H.8

4. 5.

W2 27.5

17.5

J

6.

27.1

W3

17.9 26.9

27

26.5

18.5

WC

26 25

W4

W5

06

24

23

21

22

WC WB

05 WA

W15

WB

20 WA

W16

REVISION NO. DESCRIP

04

MEN

29.5

AHU

07

11

09

STO

CONCOURSE

FAM

WC

15

CONCESS

STAIR 12 JAN

WB

10 14.5

19

18.1 18

7. 8. 9. 10. 11. 12. 13. 14. 15.

ALL CEILINGS SHALL BE 9' - 0" ABOVE FINISH FLOOR, U.N.O. (COORDINATE WITH OWNERFURNISHED VENDOR DRAWINGS AND EQUIPMENT. IN THE CASE OF MINOR DISCREPANCIES BETWEEN MEP AND ARCHITECTURAL DOCUMENTS IN THE LOCATION OF CEILING MOUNTED COMPONENTS, THE ARCHITECTURAL REFLECTED CEILING PLAN SHALL GOVERN. IN THE CASE OF MAJOR DISCREPANCIES, THE ARCHITECT SHALL BE NOTIFIED AS SOON AS THE DISCREPANCY IS DISCOVERED PRIOR TO PROCEEDING WITH THE WORK. REFERENCE MECHANICAL AND ELECTRICAL DRAWINGS FOR MOUNTING LOCATIONS OF ITEMS WHERE NO CEILING IS REQUIRED OR INDICATED. LIGHTS, DIFFUSERS, EXIT SIGNS, SMOKE DETECTORS, SPEAKERS, STROBES AND MISCELLANEOUS DEVICES SHALL BE CENTERED IN THE CEILING TILE IN WHICH THEY OCCUR, U.N.O. ALL CORRIDOR SPRINKLER HEADS SHALL BE ALIGNED IN THE SAME LOCATION PARALLEL TO THE WALL WITHIN EACH SPECIFIC CEILING CONSTRUCTION. SPRINKLER HEADS SHOWN ON THIS SHEET ARE WHERE ARCHITECTURALLY SIGNIFICANT AND FOR DESIGN INTENT ONLY. ACCESS DOOR LOCATIONS IN GYPSUM BOARD CEILINGS ARE INDICATED ON RCP'S ONLY WHERE ARCHITECTURALLY SIGNIFICANT. REFERENCE SPECIFICATIONS AND MEP DRAWINGS FOR OTHER ACCESS DOOR LOCATIONS. EXIT SIGNS ARE SHOWN ON REFLECTED CEILING PLAN ONLY WHERE LOCATION IS ARCHITECTURALLY SIGNIFICANT. DIMENSIONS AT CUBICLE CURTAIN TRACKS ARE TO CENTER OF TRACK, TYP. ALL CUBICLE CURTAIN TRACKS MUST CLEAR DOOR SWINGS BY 3' MINIMUM. REFERENCE A0.10 FOR CEILING SYMBOL LEGEND. REFERENCE A3.03 FOR CONTROL JOINT DETAILS. REFERENCE A3.06 FOR EXPANSION JOINT TYPES AND DETAILS. REFERENCE A3.08 & A3.09 FOR METAL FABRICATION DETAILS. REFERENCE A8.300 SERIES FOR ELEVATOR CAB REFLECTED CEILING PLANS. REFERENCE A4.8001 & A4.8002 FOR TYPICAL CEILING DETAILS.

01 OVERALL MAIN CONCOURSE LEVEL RCP 1/32" = 1'-0"

W14

W6 WB W7

WB

© 2016 HKS, INC.

WA

W13

HKS PROJECT NUM

18300.00 DATE

MAY 25, ISSUE

65% CON DOCUME SHEET TITLE

MAIN CO LEVEL SHEET NO.

A4.0

WA W12

13


3/4" THICK TEMPERED GLASS GUARDRAIL4' LONG SEGMENTS

1/4" DIAM. STAINLESS STEEL CABLE; 3" SPACING AT TOP AND INCREMENTALLY DECREASING SPACING TO 1" AT BOTTOM- SEE 5/ A6.921

ARCHITECT - SHELL / ROOF HKS, INC 10880 WILSHIRE BLVD, SUITE 1850 LOS ANGELES CA 90024

STRUCTURAL ENGINEER - BOWL WALTER P. MOORE 1845 WOODALL ROGERS FWY, SUITE 1650 DALLAS TX 75201

STRUCTURAL ENGINEER - FACADE

FASCIA MOUNTED ALUMINUM GLASS GUARDRAIL SHOE- 4' LONG SEGMENTS

5/8

HENDERSON ENGINEERS INC. 8345 LENEXA DR, SUITE 300 LENEXA KS 66214

A6.921/ 05

CONTINUOUS LIFELINE FALL PROTECTION SYSTEM- SEE 02/ A6.951

"

1/2" X 6" THICK CONTINUOUS STEEL TOP RAIL PTD WHITE

3

WALTER P. MOORE 11900 WEST OLYMPIC, SUITE 750 LOS ANGELES CA 90064

MEP / FP / TECH / SECURITY

1/2" X APPROX/ 4" CUSTOM SHAPED STEEL GUARDRAIL POST PTD WHITE. SPACED AT 4' INTERVALS. DOUBLE POST EVERY 50' AT STEEL CABLE TERMINATION 3' - 6"

CONCOURSE EDGE STEEL ANGLE PER STRUCTURESEGMENTED IN PLAN IN 4' GLASS GUARDRAIL SHOE INCREMENTS

WALTER P. MOORE 221 WEST 6TH ST, SUITE 800 AUSTIN TX 78701

3' - 6"

STRUCTURAL ENGINEER - SHELL

PLANTER IRRIGATION- SEE LANDSCAPE 1/4"

CIVIL ENGINEER

CORE AND GROUT GUARDRAIL POST AT TOP OF CONCRETE CURB; GROUT SOLID WITH NON-SHRINK, NON-METALLIC GROUT; COLOR TO MATCH CONCRETE

2-TIERED PLANTER DRAIN- SEE MEP

10 1/2"

4" TALL X 10 1/2" WIDE CONCRETE CURB WITH CHAMFER CORNERS.

6" SOIL ON DRAINAGE MAT, INSULATION, AND WATERPROOF MEMBRANE- SIMILAR TO HYDROTECH EXTENSIVE GARDEN ROOF ASSEMBLY 2"

MIA LEHRER & ASSOCIATES 185 S. MYERS STREET LOS ANGELES CA 90033

A6.951/ 09 4"

BOWL A/V / BROADCAST

WRIGHTSON, JOHNSON, HADDON & WILLIAMS, INC. 3424 MID-COURT RD, SUITE 124 CARROLLTON TX 75006

A6.961/ 03

° 77

LANDSCAPE- SEE LANDSCAPE

DAVID EVANS AND ASSOCIATES, INC. 145 S. SPRING STREET, SUITE 120 LOS ANGELES CA 90012

LANDSCAPE ARCHITECT

07 MTL PANEL CEILING - SEE SHEET A4.500 FOR MORE INFORMATION

1/2" X 6" THICK CONTINUOUS STEEL TOP RAIL PTD WHITE

HKS, INC 350 N. ST. PAUL ST, SUITE 100 DALLAS TX 75201

50°

TOP OF PARAPET, TOP OF GLASS, SOFFITS, SOFFIT HEIGHTS, SOFFIT DEPTHS, AND TOP AND BOTTOM OF PLASTER "PEELS" ARE CONTINUALLY SLOPING AND CHANGING IN ELEVATION. REFER TO 3D MODEL FOR DIMENSIONAL INFORMATION.

1/2" X 3/4" CONT. STAINLESS STEEL CAP

ARCHITECT - BOWL / INTERIOR / BRAND

1 1/2 "

METAL STUDS SHOWN ARE DIAGRAMMATIC. REFER TO METAL STUD FRAMING DWGS FOR ACTUAL STUD SIZE, GAUGE, AND LOCATION.

NOT FOR CONSTRUCTION

08 - UPPER CONCOURSE 238' - 3"

A6.933/ 03

CODE / FIRE / LIFE SAFETY HOWE ENGINEERS, INC 101 LONGWATER CR, SUITE 203 NORWALL MA 02061

3"

A6.951/ 13

WIND LOADING / PATRON COMFORT RWDI CONSULTING ENGINEERS 650 WOODLAWN ROAD W GUELPH ONTARIO CANANDA N1K1B8

CUSTOM SHAPED METAL PANEL FASCIA PTD WHITE- REFERENCE 07 CEILING 3D DIGITAL MODEL

FOOD SERVICE

RICCA DESIGN STUDIOS 5325 S. VALENTIA WAY GREENWOOD VILLAGE CO 80111

A6.951/ 07

A6.951/ 13

FOOD OPS AND STRATEGY 07 - UPPER SUITE 220' - 8 1/2"

3"

HOWARD AND SERGI 30 BLUE HERON LANDING HARWICH MA 02645

2 1/2" METAL STUD FRAMING TO SUPPORT METAL PANEL

1/4" DIAM. STAINLESS STEEL CABLE; 3" SPACING AT TOP AND INCREMENTALLY DECREASING SPACING TO 1" AT BOTTOM- SEE 5/ A6.921

ADA CONSULTANT

ACCESS BY DESIGN 12720 HILLCREST PLAZA DR, SUITE 580 DALLAS TX 75230

CONCOURSE EDGE BEAM TO SUPPORT STRUCTURE; SEE STRUCTURE

EXTERIOR LIGHTING DESIGN LAM PARTNERS INC 84 SHERMAN ST CAMBRIDGE MA 02140

CONCOURSE EDGE BEAM TO SUPPORT STRUCTURE; SEE STRUCTURE

2 1/2" METAL STUD FRAMING TO SUPPORT SHEATHING AND PLASTER 3"

A6.931/ 20

INTERIOR LIGHTING DESIGN

LIME CONCRETE PLASTER SYSTEM ON 5/8" EXTERIOR SHEATHING- CURVED IN PLAN

KAPLAN GEHRING MCCARROLL 249 WEST 34th ST, SUITE 707 NEW YORK NY 10001

3"

NOTE: REFER TO LIME CONCRETE PLASTER SYSTEM COMPONENTS DETAIL FOR TYPICAL LIME CONCRETE PLASTER SYSTEM COMPONENTS.

3"

LIME CONCRETE PLASTER SYSTEM ON 5/8" EXTERIOR SHEATHING- CURVED IN PLAN

04 CANYON GLASS GUARDRAIL AT PLANTER

GS01 SEE A6.96 SERIES SHEETS

02 08 CONCOURSE GUARDRAIL

1 1/2" = 1'-0"

1 1/2" = 1'-0"

A6.951/ 09

3"

A6.951/ 13

1/2" X 3/4" CONT. STAINLESS STEEL CAP

1/2" X 6" THICK CONTINUOUS STEEL TOP RAIL PTD WHITE

3/4" THICK TEMPERED GLASS GUARDRAIL4' LONG SEGMENTS

1/4" DIAM. STAINLESS STEEL CABLE; 3" SPACING AT TOP AND INCREMENTALLY DECREASING SPACING TO 1" AT BOTTOM- SEE 5/ A6.921

06 - MAIN CONCOURSE 207' - 2 1/2"

2 3/4"

1/2" X APPROX. 4" CUSTOM SHAPED STEEL GUARDRAIL POST PTD WHITE. SPACED AT 4' INTERVALS. DOUBLE POST EVERY 50' AT STEEL CABLE TERMINATION

A6.931/ 20

INTERIM REVIEW ONLY are released for interim review only and permit, or construction purposes. Architect: SCOTT HUNTER Arch. Reg. No.: C-27194

3' - 6"

2 1/2"

are not intended for regulatory approval,

1/2" X APPROX/ 4" CUSTOM SHAPED STEEL GUARDRAIL POST PTD WHITE. SPACED AT 4' INTERVALS. DOUBLE POST EVERY 50' AT STEEL CABLE TERMINATION

3' - 6"

These documents are incomplete, and

A6.921/ 05

Date: 05/25/2016

CORE AND GROUT GUARDRAIL POST AT TOP OF CONCRETE CURB; GROUT SOLID WITH NON-SHRINK, NON-METALLIC GROUT; COLOR TO MATCH CONCRETE

2 1/4"

KEY PLAN

4" TALL X 10 1/2" WIDE CONCRETE CURB WITH CHAMFER CORNERS.

10 1/2"

° 77

FASCIA MOUNTED ALUMINUM GLASS GUARDRAIL SHOE- 4' LONG SEGMENTS

1 3/4"

4"

2"

1/4" STEEL PLATE- VARYING WIDTHS- RECONCILES PLASTER CURVE WITH GLASS GUARDRAIL SEGMENTATION

CORE AND GROUT GUARDRAIL POST AT TOP OF CONCRETE CURB; GROUT SOLID WITH NON-SHRINK, NON-METALLIC GROUT; COLOR TO MATCH CONCRETE

2 1/2" METAL STUD FRAMING TO SUPPORT SHEATHING AND PLASTER 2 1/2" METAL STUD FRAMING TO SUPPORT METAL PANEL

1/8" 1"

4" TALL X 10" WIDE CONCRETE CURB WITH CHAMFER CORNERS.

18300.000

4 1/2"

HKS PROJECT NUMBER

LIME CONCRETE PLASTER SYSTEM ON 5/8" EXTERIOR SHEATHING- CURVED IN PLAN

DATE

MAY 25, 2016

NOTE: REFER TO LIME CONCRETE PLASTER SYSTEM COMPONENTS DETAIL FOR TYPICAL LIME CONCRETE PLASTER SYSTEM COMPONENTS.

TEMPLATE VERSION: 2.6.8.20141012

ISSUE

05 - MID-UPPER SUITE 185' - 0"

1/2" = 1'-0"

14

5/24/2016 2:14:11 PM

65% CONSTRUCTION DOCUMENTS

1' - 0"

SHEET TITLE

VIP - WALL SECTIONS 4"

2 1/2"

4"

LIME CONCRETE PLASTER SYSTEM ON 5/8" EXTERIOR SHEATHING- CURVED IN PLAN

SHEET NO.

© 2016 HKS, INC.

PLOT DATE:

01

WALL SECTION

CONCOURSE EDGE BEAM TO SUPPORT STRUCTURE; SEE STRUCTURE

4"

CONCOURSE EDGE BEAM TO SUPPORT STRUCTURE; SEE STRUCTURE

A6.931/ 11

3' - 3"

10 1/2"

° 77

1 1/4"

1 1/2"

LIME PLASTER SYSTEM ON MTL STUD

METAL PANEL FASCIA PAINTED WHITE

CONCOURSE EDGE STEEL ANGLE PER STRUCTURESEGMENTED IN PLAN IN 4' GLASS GUARDRAIL SHOE INCREMENTS

DATE

3' - 10"

REVISION NO. DESCRIPTION

A6.201 05 GUARDRAIL POST DETAIL AT CONCOURSE 6" = 1'-0"

03 CANYON GLASS GUARDRAIL 1 1/2" = 1'-0"

01 07 CONCOURSE GUARDRAIL 1 1/2" = 1'-0"


A5.203 / 04

A5.203 / 06

NOT FOR CONSTRUCTION

ELEVATIONS ARE FOR REFERENCE ONLY. SURFACES THAT APPEAR FLAT ON PAPER ARE CURVING AND SLOPING IN REALITY. REFER TO 3D DIGITAL MODEL FOR DIMENSIONAL INFORMATION. ALL SURFACES LIME CONCRETE PLASTER U.N.O.

ARCHITECT - BOWL / INTERIOR / BRAND HKS, INC 350 N. ST. PAUL ST, SUITE 100 DALLAS TX 75201

ARCHITECT - SHELL / ROOF HKS, INC 10880 WILSHIRE BLVD, SUITE 1850 LOS ANGELES CA 90024

STRUCTURAL ENGINEER - BOWL WALTER P. MOORE 1845 WOODALL ROGERS FWY, SUITE 1650 DALLAS TX 75201

STRUCTURAL ENGINEER - SHELL WALTER P. MOORE 221 WEST 6TH ST, SUITE 800 AUSTIN TX 78701

STRUCTURAL ENGINEER - FACADE WALTER P. MOORE 11900 WEST OLYMPIC, SUITE 750 LOS ANGELES CA 90064

MEP / FP / TECH / SECURITY HENDERSON ENGINEERS INC. 8345 LENEXA DR, SUITE 300 LENEXA KS 66214

CIVIL ENGINEER

DAVID EVANS AND ASSOCIATES, INC. 145 S. SPRING STREET, SUITE 120 LOS ANGELES CA 90012

LANDSCAPE ARCHITECT MIA LEHRER & ASSOCIATES 185 S. MYERS STREET LOS ANGELES CA 90033

BOWL A/V / BROADCAST

WRIGHTSON, JOHNSON, HADDON & WILLIAMS, INC. 3424 MID-COURT RD, SUITE 124 CARROLLTON TX 75006

A5.204 / 14

CODE / FIRE / LIFE SAFETY HOWE ENGINEERS, INC 101 LONGWATER CR, SUITE 203 NORWALL MA 02061

A5.204 / 08

A5.204 / 13

A5.203 / 07

WIND LOADING / PATRON COMFORT RWDI CONSULTING ENGINEERS 650 WOODLAWN ROAD W GUELPH ONTARIO CANANDA N1K1B8

FOOD SERVICE

A5.204 / 12

RICCA DESIGN STUDIOS 5325 S. VALENTIA WAY GREENWOOD VILLAGE CO 80111

A5.204 / 09

A5.204 / 08 A5.204 / 10

A5.204 / 11

09 SOUTHWEST VIP AXONOMETRIC

FOOD OPS AND STRATEGY HOWARD AND SERGI 30 BLUE HERON LANDING HARWICH MA 02645

ADA CONSULTANT

08 SOUTHWEST VIP AXONOMETRIC

ACCESS BY DESIGN 12720 HILLCREST PLAZA DR, SUITE 580 DALLAS TX 75230

EXTERIOR LIGHTING DESIGN LAM PARTNERS INC 84 SHERMAN ST CAMBRIDGE MA 02140

INTERIOR LIGHTING DESIGN KAPLAN GEHRING MCCARROLL 249 WEST 34th ST, SUITE 707 NEW YORK NY 10001

03

02

02

A6.201

A6.201

A6.203

07 MTL PANEL CEILING - SEE SHEET A4.500 FOR MORE INFORMATION

07 - UPPER SUITE 220' - 8 1/2"

06 - MAIN CONCOURSE 207' - 2 1/2"

02 0307

INTERIM REVIEW ONLY These documents are incomplete, and are released for interim review only and are not intended for regulatory approval, permit, or construction purposes. Architect: SCOTT HUNTER Arch. Reg. No.: C-27194

05 - MID-UPPER SUITE 185' - 0"

Date: 05/25/2016

07 SOUTHWEST VIP 07

KEY PLAN

1/8" = 1'-0"

15.5

03 A6.203

02 0306

REVISION NO. DESCRIPTION

02 0304 06 - MAIN CONCOURSE 207' - 2 1/2"

DATE

06 - MAIN CONCOURSE 207' - 2 1/2"

06 SOUTHWEST VIP 06

04 SOUTHWEST VIP 04

1/8" = 1'-0"

1/8" = 1'-0"

04

02

A6.204

A6.204

02 0303

02 0302

02 0301

PLOT DATE:

DATE

GUARDRAIL IN FRONT

MAY 25, 2016 ISSUE

05 - MID-UPPER SUITE 185' - 0"

05 - MID-UPPER SUITE 185' - 0"

05 - MID-UPPER SUITE 185' - 0"

65% CONSTRUCTION DOCUMENTS

05 - MID-UPPER SUITE 185' - 0"

SHEET TITLE

SOUTHWEST VIP ENTRY- ELEVATIONS

5/24/2016 12:22:55 PM

South West VIP entry

TEMPLATE VERSION: 2.6.8.20141012

HKS PROJECT NUMBER

18300.000

02 0305

05 SOUTHWEST VIP 05

03 SOUTHWEST VIP 03

1/8" = 1'-0"

01 SOUTHWEST VIP 01

02 SOUTHWEST VIP 02

1/8" = 1'-0"

SHEET NO.

1/8" = 1'-0"

1/8" = 1'-0"

A5.203

© 2016 HKS, INC.

02

SIM

ELEVATIONS ARE FOR REFERENCE ONLY. SURFACES THAT APPEAR FLAT ON PAPER ARE CURVING AND SLOPING IN REALITY. REFER TO 3D DIGITAL MODEL FOR DIMENSIONAL INFORMATION. ALL SURFACES LIME CONCRETE PLASTER U.N.O.

A6.205 07 MTL PANEL CEILING - SEE SHEET A4.500 FOR MORE INFORMATION

A5.201 / 01

07 - UPPER SUITE 220' - 8 1/2"

A5.201 / 10

09 NORTHEAST VIP 09

A5.201 / 04

A5.201 / 09

1/8" = 1'-0"

A5.201 / 08

A5.201 / 07

NOT FOR CONSTRUCTION

ARCHITECT - BOWL / INTERIOR / BRAND HKS, INC 350 N. ST. PAUL ST, SUITE 100 DALLAS TX 75201

ARCHITECT - SHELL / ROOF HKS, INC 10880 WILSHIRE BLVD, SUITE 1850 LOS ANGELES CA 90024

STRUCTURAL ENGINEER - BOWL WALTER P. MOORE 1845 WOODALL ROGERS FWY, SUITE 1650 DALLAS TX 75201

STRUCTURAL ENGINEER - SHELL WALTER P. MOORE 221 WEST 6TH ST, SUITE 800 AUSTIN TX 78701

STRUCTURAL ENGINEER - FACADE WALTER P. MOORE 11900 WEST OLYMPIC, SUITE 750 LOS ANGELES CA 90064

MEP / FP / TECH / SECURITY HENDERSON ENGINEERS INC. 8345 LENEXA DR, SUITE 300 LENEXA KS 66214

CIVIL ENGINEER

DAVID EVANS AND ASSOCIATES, INC. 145 S. SPRING STREET, SUITE 120 LOS ANGELES CA 90012

LANDSCAPE ARCHITECT MIA LEHRER & ASSOCIATES 185 S. MYERS STREET LOS ANGELES CA 90033

A5.201 / 05

A5.201 / 06

BOWL A/V / BROADCAST

07 MTL PANEL CEILING - SEE SHEET A4.500 FOR MORE INFORMATION

12 NORTHEAST VIP AXONOMETRIC

WRIGHTSON, JOHNSON, HADDON & WILLIAMS, INC. 3424 MID-COURT RD, SUITE 124 CARROLLTON TX 75006

06 - MAIN CONCOURSE 207' - 2 1/2"

CODE / FIRE / LIFE SAFETY HOWE ENGINEERS, INC 101 LONGWATER CR, SUITE 203 NORWALL MA 02061

08 NORTHEAST VIP 08

WIND LOADING / PATRON COMFORT

1/8" = 1'-0"

07 - UPPER SUITE 220' - 8 1/2"

RWDI CONSULTING ENGINEERS 650 WOODLAWN ROAD W GUELPH ONTARIO CANANDA N1K1B8

FOOD SERVICE

RICCA DESIGN STUDIOS 5325 S. VALENTIA WAY GREENWOOD VILLAGE CO 80111

A5.201 / 02

FOOD OPS AND STRATEGY HOWARD AND SERGI 30 BLUE HERON LANDING HARWICH MA 02645

03

ADA CONSULTANT

SIM

A6.204

06 - MAIN CONCOURSE 207' - 2 1/2"

ACCESS BY DESIGN 12720 HILLCREST PLAZA DR, SUITE 580 DALLAS TX 75230

EXTERIOR LIGHTING DESIGN LAM PARTNERS INC 84 SHERMAN ST CAMBRIDGE MA 02140

A5.201 / 03

INTERIOR LIGHTING DESIGN KAPLAN GEHRING MCCARROLL 249 WEST 34th ST, SUITE 707 NEW YORK NY 10001

A5.201 / 05 05 - MID-UPPER SUITE 185' - 0"

A5.201 / 04

11 NORTHEAST VIP AXONOMETRIC

05 - MID-UPPER SUITE 185' - 0"

10 NORTHEAST VIP 10

05 - MID-UPPER SUITE 185' - 0"

07 NORTHEAST VIP 07

1/8" = 1'-0"

1/8" = 1'-0"

06 NORTHEAST VIP 06 1/8" = 1'-0"

04 01 04 A6.201

SIM

07 MTL PANEL CEILING - SEE SHEET A4.500 FOR MORE INFORMATION

A6.203

04

A6.203

SIM

A6.202 07 MTL PANEL CEILING - SEE SHEET A4.500 FOR MORE INFORMATION

07 - UPPER SUITE 220' - 8 1/2"

07 - UPPER SUITE 220' - 8 1/2"

02 0104

02 0105

GLASS GUARDRAIL (REMOVED FOR CLARITY)

INTERIM REVIEW ONLY These documents are incomplete, and

06 - MAIN CONCOURSE 207' - 2 1/2"

06 - MAIN CONCOURSE 207' - 2 1/2"

are released for interim review only and are not intended for regulatory approval, permit, or construction purposes. Architect: SCOTT HUNTER Arch. Reg. No.: C-27194 Date: 05/25/2016

RETAINING WALL FOR SEISMIC SEPARATION REFER TO STRUCTURAL DWGS.

KEY PLAN

05 - MID-UPPER SUITE 185' - 0"

05 NORTHEAST VIP 05

04 NORTHEAST VIP 04

1/8" = 1'-0"

1/8" = 1'-0"

REVISION NO. DESCRIPTION

03

DATE

SIM

A6.202 03 A6.205

PLOT DATE:

5/24/2016 12:22:21 PM

TEMPLATE VERSION: 2.6.8.20141012

North east VIP entries

07 - UPPER SUITE 220' - 8 1/2"

07 - UPPER SUITE 220' - 8 1/2"

07 - UPPER SUITE 220' - 8 1/2"

06 - MAIN CONCOURSE 207' - 2 1/2"

06 - MAIN CONCOURSE 207' - 2 1/2"

06 - MAIN CONCOURSE 207' - 2 1/2"

HKS PROJECT NUMBER

18300.000 DATE

MAY 25, 2016 ISSUE

03 NORTHEAST VIP 03 1/8" = 1'-0"

02 NORTHEAST VIP 02 1/8" = 1'-0"

01 NORTHEAST VIP 01 1/8" = 1'-0"

© 2016 HKS, INC.

65% CONSTRUCTION DOCUMENTS SHEET TITLE

NORTHEAST VIP ENTRY- ELEVATIONS SHEET NO.

A5.201

15


FC Barcelona

Stadium Competition WORK: HKS LOS ANGELES - DALLAS - LONDON 2ND PLACE

Worked on a concept proposal for the renovation of the FC Barcelona Stadium together with designers and architects from different HKS offices.

1. Ameba Concept

AMEBA CONCEPT

Ameba concept as a dichotomy to the circumscribed nature of the circle. Overreaches, uncircumscribed.

2. Ameba on site

3. Ameba as response to context

16

4. Ameba as dynamic element

A


Main design tasks were to focus on the proposed elevated plinth, which contained a tower museum as well as all the other support program for the renovated stadium.

Museum tower

Elevated plinth

17


Others Physical models

A A - LASED stadium concesion study

NFL Network concept design

18

B

C

B - Jacksonville stadium addition study

C - Jacksonville stadium addition study

LASED Performance venue concept design


LA office design charrette

Exploring programmatic zones into the office addition.

Westfield Promenade 2035

Concept sketch of office addition.

This spread shows some other design examples done at HKS. From Sports and Entertainment, to the renovation and addition of an interior office space. Different techniques and methods of exploring and representation were embedded in the design process, from concept diagramming to physical modelling and rendering.

19


20


From Urban Scale... Most projects required urban studies in order to respond to site forces. Due to the scale of some of the Sports and Entertainment projects, movement and programming diagrams helped the project pieces fall into place, thus estimating behaviour for day and night-time use as well as game day and non-game day use.

21


22


...to Graphic Design Re-branding exercise. Marketing exercise through proposal for business cards.

23


24


25


26


27


28


29


30


31


32


33


34


35


36


37


38


39


40


41


42


43


44


45


46


47


48


49


50


51


52

Miriam Jacobsen Design Portfolio  

Design projects done independently, at different offices and school throughout the years. Focus on architecture, urban studies, graphic desi...

Miriam Jacobsen Design Portfolio  

Design projects done independently, at different offices and school throughout the years. Focus on architecture, urban studies, graphic desi...

Advertisement