Page 1

tanzakademie

michael nunnink spring 2014 new orleans, la


building + conceptual diagrams


synthesis / transparent

dance studio

dance support

administration

educational

theater support

theater

public entrance

mechanical/support

vertical circulation

dichotomous / opaque


building drawings + renderings


C

1

C

2

3

4

5

1

A

2

3

4

5

A

ddressing ingg in room m

ddressing ingg in room m

costume shop / laundry

mech.

mechanical room

scene shop / storage

B

B

C

C

bar / cafe

auditorium ud riu iu

administration

B

D

B D

E

A

waste / recycling

E

storage

A

dance school entrance

floor plan 1

floor plan 2


C

1

C

2

3

4

5

1

A

2

3

4

5

A

dance studio

mech

dance studio dressing room

mech

dressing room black box theatre

B

B

C

C

dance studio

dance studio B

D

B D

dance studio

dance studio

E

A

E

A

lecture c u ha ct hhall a

teacherl ea

lecture c u hall ct ha ha

teacherl ea teacherl he

floor plan 3

teacherl he

floor plan 4


1

2

3

4

5

+ 65’ - 00”

+ 45’ - 00”

+ 25’ - 00”

+ 13 - 03”

+ 1’ - 06”

- 80’ - 00”


1

2

3

4

5

+ 65’ - 00”

+ 45’ - 00”

+ 25’ - 00”

+ 13 - 03”

+ 1’ - 06”

- 80’ - 00”


A

+ 65’ - 00”

+ 45’ - 00”

+ 25’ - 00”

+ 13 - 03”

+ 1’ - 06”

- 80’ - 00”

B

C

D

E


building systems + details


Atrium / Dance School Stairs

Fire Stair Core

Main Circulation

Elevator Core

Floor 1

Floor 2

Floor 3

Floor 4


Mechanical Room

Vertical Chase

HVAC Send

HVAC Return

Floor 1

Floor 2

Floor 3

Floor 4


Horizontal members reinforced, site cast, post-tensioned, concrete one-way slab 18” depth 36” depth above auditorium

Vertical members 14” reinforced concrete columns concrete load bearing wall

Foundation Concrete slab on grade Concrete footing / pile caps Friction piles

35’

40’

45’

45’

10’ 10’

10’

35’ 45’

30’

45’

35’

40’

30’

7’


Roof Membrane Moisture Barrier Metal Plate Connection VAV Cooling 18” Mechanical Space Drop Ceiling Cable 1/8” Perforated Metal Drop Ceiling

Detail A

1/2” Steel Plate

1/2” Steel Bolt Connection 6” Rigid Foam Insulation

1/2” Steel Bolt Connection 1/2” Extruded Aluminium C-Channel 1/2” Sand-Blasted Channel Glass A

Detail B

3/4” Wood Finished Floor 3/4” Plywood Subfloor 2” Reinforced Concrete Topping 18” Concrete One-Way Slab (Hollow Core at Exterior

B

Steel Rebar

Detail C

C

1/2” Clear Glazing

2-1/2” x 5” Extruded Aluminium Mullion Steel Rebar Reinforced Concrete Slab on Grade Gravel 1/4” Vapor Barrier

Grade


models + material explorations


Tanzakademie  

Tulane University 3rd year, second semester comprehensive studio project.

Advertisement
Read more
Read more
Similar to
Popular now
Just for you