Work on the monument should be limited to concentrated, recognizable and contemporary additions or modifications to solve architectural or building-physical related problems. The addition of new material will be limited to the necessary, installations may be visible and the layers of time are becoming visible again by removing any masking adjustments from the past.
figure 1 rendering figure 2 functions ground floor figure 3 functions 1st floor
FUNCTIES EERSTE VERDIEPING
cacao - kas
horeca: serreruimte
balkon poppodium
hotel
+ nog een verdieping
filmcabine
bioscoopzaal 60 stoelen
creatieve economie
stijgpunt + incissie
gez. ruimte:
Stichting Nederlandsche Cacaofabriek
creatieve ruimtes
Gezamenlijke ruimtes
Creatieve economie
Lakei: podium en podium gerelateerde ruimtes
Overige ruimten
Filmhuis Stichting Nederlandsche Cacaofabriek
3
gezamenlijke ruimtes toiletten
toiletten
Horeca
hotel