PROJECT CONCEPT # 4 Pine St., Central St., & Bridge St.

PROPOSED CURB RAMPS

LS

A TR

N

CE

T REE BRID

GE S T

NN

ON

E

ET

W

AY

TS

TR E

ET

INSTALL TACTICAL ROUNDABOUT WITH PAVEMENT MARKINGS AND FLEX POSTS

BE

www.tooledesign.com

ET

E TR

INSTALL TACTICAL DIVERTER WITH PAVEMENT MARKINGS AND FLEX POSTS

MANCHESTER-BY-THE-SEA COMPLETE STREETS CONCEPT DESIGNS

ET

E TR

Note: x Final design of roundabout will consider historic context

DEMARCATE SIDEWALK WITH COLORED PAINT

NOT TO SCALE

PREPARED: TD AB

CHECKED: DATE

06/08/2017

PROPOSED CURB EXTENSION AND CURB RAMPS

REV 1

-

REV. 2

-

REV. 3

-

SHEET NAME

PINE ST, CENTRAL ST & BRIDGE ST

CONCEPT NOT FOR CONSTRUCTION

30 COMPLETE STREETS I AUG. 2017

2 OLIVER STREET, SUITE 305, BOSTON, MA 02109 PHONE: (617) 619-9910 FAX: (301) 927-2800

ES

PIN

Location Challenges: x Confusing, long intersection