PROJECT RANKING

Rank 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Project Location Beach St. & Union St. Central St., Union St., & School St. Washington St., Summer St., & Sea St. Pine St., Central St., & Bridge St. Route 127 School St. Norwood Ave. & Brook St. Pine Street Corridor Washington St. & Norwood Ave. Tappan St. & Sea St. Harbor St. & Bridge St. Beach St. & Summer St. Pine St., Pleasant St., & School Street Bike Racks Benches Beach St. Pine St. & Pleasant St. School St. & Lincoln St.

Final Score 0.675 0.608 0.604 0.596 0.583 0.519 0.517 0.508 0.504 0.488 0.442 0.429 0.425 0.408 0.404 0.396 0.358 0.354

Demand Points 15 16 13 15 15 16.5 14 17 13 13 8 12 14 14 15 12 5 10

Total 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20

Safety Score 0.188 0.200 0.163 0.188 0.188 0.206 0.175 0.213 0.163 0.163 0.100 0.150 0.175 0.175 0.188 0.150 0.063 0.125

Points 9 6 6 6 3 3 6 3 6 6 6 3 0 0 0 3 3 3

Total 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12

Stakeholder Input Score 0.188 0.125 0.125 0.125 0.063 0.063 0.125 0.063 0.125 0.125 0.125 0.063 0.000 0.000 0.000 0.063 0.063 0.063

Points 10 9 11 9 8 3 5 9 5 5 5 1 3 2 1 4 6 2

Total 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15

Score 0.167 0.150 0.183 0.150 0.133 0.050 0.083 0.150 0.083 0.083 0.083 0.017 0.050 0.033 0.017 0.067 0.100 0.033

Opportunities & Constraints Points 8 8 8 8 12 12 8 5 8 7 8 12 12 12 12 7 8 8

Total 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15

Score 0.133 0.133 0.133 0.133 0.200 0.200 0.133 0.083 0.133 0.117 0.133 0.200 0.200 0.200 0.200 0.117 0.133 0.133

Table 6: Final project rank is based on four equally weighted evaluation criteria.