Page 16

METHODOLOGY Evaluation Criteria Categories Continued

Opportunities & Constraints Factor

Rank Description

Construction Cost

0 2 3

Construction cost exceeds $400,000 Construction cost is under $400,000 Construction cost is under $100,000

Design Complexity

0 3

Additional design needed No additional design needed

Timeline Constraints

0 2 3

Design & construction timeline exceeds 1 year Design & construction timeline is between 3 months and 1 year Design & construction timeline is under 3 months

Jurisdictional Constraints

0 3

Not entirely located on Town-owned roadway Located entirely on Town-owned roadway

Cost Reduction due to Existing or Upcoming Projects

0 3

Minimal or No Cost Reduction Cost Reduction

Total Points Available

15 Table 4: Opportunities & Constraints Category of Evaluation Criteria.