Page 1


1010 Sherbrooke Street West, 10th floor Montréal, Québec, Canada, H3A 0G4 T.: 514 398-4455

1

A-3.2

A

A.1

B

C

D

C.3

D.3 D.5

E

F

H

G

1330 2235

235

1360

2000

3990

2475 4920

3985

RSArchitecture inc

1705

2980

18835

NORD

2

1

A-4.2

A-4.2

X

6460

1

PLAN CLÉ G1/106 ATELIER D'ASSEMBLAGE / ASSEMBLY WORKSHOP

A-7.2

1010 1115 124

C2 1h

2800

G1/103

C1 0h

216

2800

rv

LABORATOIRE D'ANALYSE DES DONNÉES 2 / DATA ANALYSIS LAB 2 118

X

7682

A-5.X

X

2326

M1

1918

12129

A-8.2

C4 1h

3

G1/102

2755

A-5.4

A-4.1

1267

M1

de ite

B. No. de page où se trouve le détail

3267

2

2237

609

L'ORIGINAL SIGNÉ EST DISPONIBLE À LA GESTION DES INSTALLATIONS ET SERVICES AUXILIAIRES DE L'UNIVERSITÉ MCGILL

M1

A-5.3

1

M1

A-5.4

3

A-5.4

1

5

1223

3

1225

1200

2905

A. No. de détail

A B

SCEAU

A-4.1

1705

DESCRIPTION

942

2 1.6

DATE

5656

2174

2000

NO

PRÉLIMINAIRE POUR SERV. DES INCENDIES PRÉLIMINAIRE À 60% ESQUISSES POUR APPROBATION ESQUISSES POUR COORDINATION ESQUISSES POUR DISCUSSION

RÉVISIONS

C2 1h

2

2018/07/18 2018/07/09 2018/05/17 2018/05/10 2018/04/25

3490

7305

4

5 4 3 2 1

1225

LABORATOIRE D'ANALYSE DES DONNÉES 1/ DATA ANALYSIS LAB 1

2.7

Lim

A-8.X

1010

OUR

G1/102A

172

1

NE P

ER P

TILIS

AS U

1

A-3.1

2981

5079

C3 1h

LABORATOIRE DE TERRE VIVANTE ET LABORATOIRE DE PHYSIQUE DE LA TERRE / LIFE EARTH LAB AND PHYSICAL EARTH LAB

535

4.2

121

1250

1-STAIR1

1

A-7.1

5

1360

4717

2099

3039

A-3.1

A-5.3

C1 0h

%-

100

) 50% IN LIM EMENT À É E R P NC -09 RUIR (AVA 2018-08 CONST

≥300

4

STORAGE JANITOR

2815

2

E AIR

23704

G1/102B

C3 1h

M1

M1

C3 1h

124 C4 1h

A-5.3

1516

22504

6

A-4.1

1

G1/101

13329

SAS

1

C3 1h

A-7.1

3340

2

1-HALL1

TOILETTE

LIEU DU CHANTIER

ENTRÉE DE LA RÉSERVE

1588

M1

3339

G1/104

A-4.1

M2 2340

TOILETTE

1250

1

C3 1h

124

M1

1-STAIR2

A-8.1

3502

3267

4000

3340

2280

6.6

1

C1 0h

G1/105

2263

M3 M2

233

570

la

A-5.3

6.8

4

e

2

1-STAIR3

M2

se

1015

2

7

A-7.2

305

2

A-5.4

7108

A-X.X

3758

3658

X

A-X.X

305

6620

M2

18161

7108

3708

788

8

738

M2

A-5.3

PROJET :

CFI GYAKUM PROJECT

2

1

A-4.2 6130

NOUVEAU PAVILLON JOHN GYAKUM, 2018 ADAPTABLE EARTH OBSERVATION SYSTEM (EOS)

A-4.2 2006

1200

627

3693

GAULT RESERVE

5184 7133

5096 9957

8878

TITRE :

1225

18835

2

A-3.2

PLAN REZ-DE-CHAUSSÉE

1

With: RSA ARCHITECTURE PLAN REZ-DE-CHAUSSÉE Programme: Educational Status/phase: ongoing Responsibilities: Technical drafting DOSSIER MCGILL NO.

17-150

DOSSIER NO.

18-2257.2 C.D / D.D.B

DESSINÉ

ÉCHELLE

R.S. 1 : 75

DATE

2018-03-29

VÉRIFIÉ

DESSIN NO.

A-2.2 (4)


LÉGENDE GAZON GRAVIER

REMBLAIS

EXCAVATION

ARBRE EXISTANT

ARBRE NOUVEAU

REMETTRE EN ÉTAT L'ENSEMBLE DU CHEMIN D'ACCÈS APRÈS LES TRAVAUX

CLÔTURE EXISTANTE DALLE DE PROPRETÉ EN BÉTON (VOIR ING.)

35

min

54

3000

NOUVEAU PAVILLON JOHN GYAKUM, 2018

REMBLAIS COMPACTÉ (VOIR ING.)

REMBLAIS COMPACTÉ (VOIR ING.) ZONE À EXCAVER (VOIR ING.)

NIVELLEMENT DE TERRAIN

With: RSA ARCHITECTURE Programme: Educational Status/phase: ongoing Responsibilities: Technical drafting

BORDURE DE BÉTON

5 4 3 2 1

NO

REMBLAIS COMPACTÉ (VOIR ING.)

A

GLISSIÈRES EN ACIER AVEC BRANCHEMENTS ÉLECTRIQUES (VOIR ING.) NIVELLEMENT EN GRAVIER (VOIR ING.)

D

D

D

V

D


G

E

COUPE FROID CONTINU

B

2 (38x89mm) VOIR STRUCTURE

PIÈCE DE BOIS 38x140mm CONTINUE

NE PAS INSTALLER DE CONDUITS CHAUFFANTS DANS CETTE ZONE.

CADRE EN BOIS 2-CONTREPLAQUÉS 19 TYP. EXT. PIÈCE DE BOIS TRAITÉ 38x235mm CONTINU

370

386

294

197

7

510

6.6

COLONNE (voir ing. struc) SCELLER LA JONCTION ENTRE LE GYPSE ET LA COLONNE

ALIGNER LE GYPSE AVEC LA COLONNE SCELLER LA JONCTION ENTRE LE GYPSE ET LA COLONNE

CROIX DE SAINT-ANDRÉ HORIZONTALE EN BOIS

PORTE DE GARAGE EN ACIER ISOLÉE

38

13

PROTÈGE RAIL EN ACIER GALV. 6MM D'ÉPAIS. 1067 DE HAUT. (TYP.) BOULONNÉ AU PLANCHER

SCELLANT DE FINITION CONTINU

45

234 350

71

2-CONTREPLAQUÉS 19 TYP. EXT.

ASSURER L'ÉTANCHÉITÉ DES MEMBRANES

COMPOSITION TYPE "M3"

COMPOSITION TYPE "M2"

COMPOSITION TYPE "C3"

CONTREPLAQUÉ TYPE EXT. 16mm @ PÉRIMÈTRE DE L'OUVERTURE

PORTE EN ACIER ISOLÉE

CADRE EN ACIER ISOLÉ AVEC BRIS THERMIQUE

2-PIÈCE DE BOIS TRAITÉ 38x184mm CONTINU

COUPE FROID AU PÉRIMÈTRE DE LA PORTE

TÔLE D'ACIER ÉMAILLÉ CAL. 24

COMPOSITION TYPE "C1"

COMPOSITION TYPE "M1" MODIFIÉ

JOINT DE SCELLANT CONTINU

140

D

COMPOSITION TYPE "M2"

3

D COMPOSITION TYPE "C2-B"

COMPOSITION TYPE "C2 (RF 1H)" OPTION B (AVEC FOURRURES) COLONNE EN LAMELLÉ-COLLÉ 184x184mm

2

637

A.1

ÉTRIER ET BOULONS EN ACIER GALV. (VOIR ING. STRUC.)

1015

239

JOINT DE SCELLANT CONTINU SUR BOUDIN COMPRESSIBLE

259

6 CORNIÈRE EN "L" (VOIR ING. STRUC.) ALIGNER LE GYPSE AVEC LA COLONNE SCELLER LA JONCTION ENTRE LE GYPSE ET LA COLONNE COMPOSITION TYPE "M1"

COMPOSITION TYPE "M1"

JOINT DE SCELLANT CONTINU

1.6

COMPOSITION TYPE "M1"

ISOLANT POLYURÉTHANE À FAIBLE EXPANSION

COMPOSITION TYPE "M1"

1.6


COMPOSITION DES MURS EXTÉRIEURS

C COUPE

350

MIROIR 6mm

MIROIR 6mm

CL

CL

DISTRIBUTEUR DE SAVON MOUSSE TORK

153

DISTRIBUTEUR DE SAVON MOUSSE TORK TORK

URINOIR MURAL VOIR ING.

806 600 433

468

800

ÉLÉVATION ECH: 1/25

457

DISTRIBUTEUR DE PAPIER Servicorp model Tork 56 TR CUVETTE MURALE VOIR ING.

1785 1535 1200 1083 1043

CUVETTE MURALE VOIR ING.

LAVABO À MONTAGE MURAL- Z5364 ZURN

915 1000 1200

DISTRIBUTEUR DE PAPIER HYGIÉNIQUE SERVICORP MODEL TORK 56 TR

375

432

CL

915

ÉLÉVATION ECH: 1/25

9

6

ÉLÉVATION ECH: 1/25

3

591

900

SÉPARATEUR D'URINOIR FIXÉ AU MUR1067x 305mm

F -

111 479

491

EXT

M1 ÉPA. RSI R -PAREMENT VERTICAL Street West, 10th floor EN BOIS 1010 Sherbrooke 19mm Québec, Canada, H3A 0G4 -FOURRURES Montréal, HORIZONTALE 19mm 398-4455 -FOURRURE VERTICALET.: 51419mm -PARE-AIR -CARTONFIBRE 13mm -SOLIVES EN "I" VERTICALES 302mm @ 610mm c/c -LAINE DE ROCHE AVEC AGRAFES HORIZONTALES ET JOINTS CROISÉS 152mm -LAINE DE ROCHE AVEC AGRAFES HORIZONTALES R S A r c hETi t e c t u r e i n c JOINTS CROISÉS 152mm -CROIX DE SAINT-ANDRÉ HORIZONTALE EN BOIS @ 2420mm c/c -CONTREPLAQUÉ 16mm -COLONNES EN LAMELLÉ-COLLÉ (voir Ing. Struc) -COLOMBAGES @ 610mm c/c 140mm -ISOLANT DE LAINE ''COMFORTBATT'' AVEC AGRAFES HORIZONTALES 140mm -PARE-VAPEUR -FOURRURE HORIZONTALE 89mm @ 406mm c/c -GYPSE TYPE X 13mm -GYPSE TYPE X 13mm -TOTAL

INT

-

-

-

-

F -

EXT

1200 865

LAVABO À MONTAGE MURAL VOIR ING.

1083

CUVETTE MURALE VOIR ING.

miroir 14''

TORK

433

ÉLÉVATION ECH: 1/25

5

19mm 13mm 13mm

2

384

A-X.1 13,443

513

817

1,02 0,57 0,57 0,91

305

0,18 0,1 0,1 0,16

INT

A-X.1

EXT

R

GARAGE

GARAGE

415

4

A-X.1

10,2

1,121 1,795

6,37 10,2

4,711

26,76

D1ÉPA. RSI -PARE-VAPEUR -POLYSTYRÈNE 102mm 3,59 EXTRUDÉ -POLYSTYRÈNE 102mm 3,59 EXTRUDÉ -POLYSTYRÈNE 102mm 3,59 EXTRUDÉ -BÉTON 102mmCOULÉ 0,375 -LAME D'AIR 0,12 -TOTAL 408mm 11,226

R

ÉPA.

20,39 102mm 20,39 102mm 20,39 102mm 2,13 102mm 0,68 63,991 408mm

RSI 3,59 3,59 3,59 0,375 0,12 11,226

C4 (RF 1H)

337 254 83 e rv se ré

C3ÉPA. (RF 1H)

@610mm c/c -LAINE DE ROCHE ENTRE COLOMBAGE -GYPSE 16mm TYPE X -TOTAL 124mm

-

-

R S A r c h i t e c t u-

-

-

ÉPA. 16mm 92mm

T -

PLAN CLÉ

17-150

C4ÉPA. (RF 1H)

18-2257.2 -PANNEAU 25mm CGC -COLOMBAGE D'ACIER C.D CH /-COLOMBAGE 64mm D'ACIER CH D.D.B DESSINÉ

DOSSIER NO.CGC -PANNEAU

R 20,39 20,39 20,39 2,13 0,68 63,991

T -

1010 Sherbrooke Street W Montréal, Québec, Canad T.: 514 398-44

PLAN D'AMÉNAGEMENT 16mm 124mm

DOSSIER MCGILL NO.

AMÉNAGEMENT DES TOILETTE COMPOSITION COMPOSITION DES DALLES DE DESPLANCHER DALLES DE PLANCHER ECH: 1/25 D1 -PARE-VAPEUR -POLYSTYRÈNE EXTRUDÉ -POLYSTYRÈNE EXTRUDÉ -POLYSTYRÈNE EXTRUDÉ -BÉTON COULÉ -LAME D'AIR -TOTAL

-

-

16mm TYPE X GAULT-GYPSE RESERVE -COLOMBAGE 92mm D'ACIER

203 211

415

%

408

RSI

R TE 1

1,795

P -

A. No. de(RF détail C1 (RF 0H) C1ÉPA. 0H) ÉPA. A -GYPSE TYPE X -GYPSE 13mm TYPE X 13mm B. No. de page où D'ACIER se trouve le détail B D'ACIER -COLOMBAGE -COLOMBAGE 92mm 92mm @610mm c/c @610mm c/c -LAINE DE ROCHE -LAINE DE ROCHE ENTRE COLOMBAGE ENTRE COLOMBAGE SCEAU -GYPSE TYPE X -GYPSE 13mm TYPE X 13mm -TOTAL 118mm -TOTAL 118mm

C3 (RF 1H) -GYPSE TYPE X -COLOMBAGE D'ACIER @610mm c/c -LAINE DE ROCHE TITRE : COLOMBAGE ENTRE -GYPSE TYPE X -TOTAL

N

203 211

4

INT

CFI GYAKUM PROJECT

161

PE

RSI

408

ÉLÉVATION ECH: 1/25

1%

NCE

(AVA

D -

GARAGE

ADAPTABLE EARTH OBSERVATION SYSTEM (EOS)

5

F2ÉPA. RSI R ÉPA. ENTE P -REMBLAIS -MEMBRANE GÉOTEXTILE -PANNEAU 8mm DE DRAINAGE 8mm -POLYSTYRÈNE 51mm 1,795 EXTRUDÉ 10,251mm -ENDUIT D'ÉTANCHÉITÉ -BÉTON 305mm COULÉ 1,121 6,37 305mm -POLYSTYRÈNE 51mm 1,795 EXTRUDÉ 10,251mm -REMBLAIS COMPACTÉ -TOTAL 415mm 4,711 26,76 415mm

)

50%

INT

RENVOI DE PLANCHER VOIR ING.

76.355

A-X.1

F2 -REMBLAIS -MEMBRANE GÉOTEXTILE -PANNEAU DE DRAINAGE -POLYSTYRÈNE EXTRUDÉ -ENDUIT D'ÉTANCHÉITÉ -BÉTON COULÉ -POLYSTYRÈNE EXTRUDÉ -REMBLAIS COMPACTÉ -TOTAL

TÀ MEN

C2 (RF 1H) C2ÉPA. (RF 1H) ÉPA. -GYPSE TYPE X -GYPSE 16mm TYPE X 16mm -COLOMBAGE DEL'ORIGINAL BOIS -COLOMBAGE 185mm DE BOIS 185mm SIGNÉ EST DISPONIBLE À LA 2''x6'' 92mm @610mm c/cDES 2''x6'' 92mm @610mm c/c AUXILIAIRES GESTION INSTALLATIONS ET SERVICES -LAINE DE ROCHEDE L'UNIVERSITÉ -LAINE DE ROCHE MCGILL ENTRE COLOMBAGE ENTRE COLOMBAGE -GYPSE TYPE X -GYPSE 16mm TYPE X 16mm -TOTAL 216mm -TOTAL 216mm PROJET :

1%

3

513

24,03

TE

TE

PEN

4,23

1%

184mm 184mm

76.355 829mm

E

13mm

13,443

NT

19mm 19mm 19mm 38mm

-TOTAL 829mm

PE

ÉPA.

8,47

%

-TOTAL

EXT M2 M2 ÉPA. RSI R -PAREMENT VERTICAL -PAREMENT VERTICAL EN BOIS EN 19mm BOIS -FOURRURES HORIZONTALE-FOURRURES 19mm HORIZONTALE -FOURRURE VERTICALE -FOURRURE 19mm VERTICALE -ISOLANT SEMI-RIGIDE -ISOLANT 38mm SEMI-RIGIDE -PARE-AIR -PARE-AIR -CONTREPLAQUÉ -CONTREPLAQUÉ 13mm -COLONNES EN -COLONNES EN LAMELLÉ-COLLÉ LAMELLÉ-COLLÉ (voir Ing. Struc) (voir Ing. Struc) -COLOMBAGES -COLOMBAGES @ 610mm c/c @ 184mm 610mm c/c -ISOLANT EN MATELAS -ISOLANT 184mm EN MATELAS -PARE-VAPEUR -PARE-VAPEUR -FOURRURE HORIZONTALE -FOURRURE HORIZONTALE @ 406mm c/c @ 19mm 406mm c/c -GYPSE TYPE X -GYPSE 13mm TYPE X -GYPSE TYPE X -GYPSE 13mm TYPE X

1,492

E1

1%

759

EXT

SEUIL EN MARBRE BLANC

PE N

591

111 479

CUVETTE MURALE VOIR ING.

10,2 10,2 20,39

NT

7

DISTRIBUTEUR DE PAPIER Servicorp model Tork 56 TR

EXT

R

SEUIL EN MARBRE BLANC

1,795 1,795 3,59

PE

ÉLÉVATION ECH: 1/25

307

INT

RSI

% TE 1

URINOIR MURAL VOIR ING.

INT

URINOIR MURAL Z5738-U Zurn

F1 F1ÉPA. RSI R ÉPA. -REMBLAIS -REMBLAIS -MEMBRANE GÉOTEXTILE -MEMBRANE GÉOTEXTILE -PANNEAU DE DRAINAGE -PANNEAU 8mm DE DRAINAGE 8mm -POLYSTYRÈNE EXTRUDÉ 6 -POLYSTYRÈNE 51mm 1,795 EXTRUDÉ 10,251mm -POLYSTYRÈNE EXTRUDÉ -POLYSTYRÈNE 51mm 1,795 EXTRUDÉ 10,251mm A-X.1 7 -POLYSTYRÈNE EXTRUDÉ -POLYSTYRÈNE 102mm 3,59 EXTRUDÉ 20,39 102mm A-X.1 -PANNEAU DE DRAINAGE -PANNEAU 8mm DE DRAINAGE 8mm -BÉTON COULÉ -BÉTON 406mm COULÉ 1,492 8,47 406mm 1% E -COLOMBAGE DE BOIS AU -COLOMBAGE DE BOIS AU NT E P 400mm c/c 400mm 140mm c/c 140mm -ISOLANT COMFORTBATT -ISOLANT COMFORTBATT 9 ENTRE LES COLOMBAGES ENTRE LES COLOMBAGES 4,23 24,03 A-X.1 -PARE-VAPEUR -PARE-VAPEUR -FOURRURE DE BOIS AU -FOURRURE DE BOIS AU 400mm c/c 8 400mm 19mm c/c 0,18 1,02 19mm A-X.1 -GYPSE TYPE X -GYPSE 16mm TYPE X0,1 0,57 16mm -GYPSE TYPE X -GYPSE 16mm TYPE X0,1 0,57 16mm -PEINTURE (LAME D'AIR) -PEINTURE (LAME 0,16 D'AIR) 0,91

%-

100 IRE

COMPOSITION COMPOSITION DES CLOISONS DES CLOISONS RÉVISIONS

COUPE

PEN

LAVABO À MONTAGE MURAL VOIR ING.

337 254 83

DISTRIBUTEUR DE SAVON MOUSSE TORK

EXT

400 600 807

MIROIR 6mm

EXT

R

111 479

497

932

RSI

591

CL

1200

364

865 1000

CL CL

M1 M1 ÉPA. RSI R ÉPA. -PAREMENT VERTICAL -PAREMENT VERTICAL EN BOIS EN 19mm BOIS 19mm -FOURRURES HORIZONTALE-FOURRURES 19mm HORIZONTALE 19mm -FOURRURE VERTICALE -FOURRURE 19mm VERTICALE 19mm -PARE-AIR -PARE-AIR -CARTONFIBRE -CARTONFIBRE 13mm 13mm -SOLIVES EN "I" VERTICALES-SOLIVES 302mm EN "I" VERTICALES 302mm @ 610mm c/c @ 610mm c/c -LAINE DE ROCHE AVEC -LAINE DE ROCHE AVEC AGRAFES HORIZONTALES ETAGRAFES HORIZONTALES ET JOINTS CROISÉS JOINTS 152mmCROISÉS 152mm -LAINE DE ROCHE AVEC -LAINE DE ROCHE AVEC AGRAFES HORIZONTALES ETAGRAFES HORIZONTALES ET JOINTS CROISÉS JOINTS 152mmCROISÉS 152mm -CROIX DE SAINT-ANDRÉ -CROIX DE SAINT-ANDRÉ HORIZONTALE EN BOIS @ HORIZONTALE EN BOIS @ 2420mm c/c 2420mm c/c -CONTREPLAQUÉ -CONTREPLAQUÉ 16mm 16mm -COLONNES EN -COLONNES EN LAMELLÉ-COLLÉ LAMELLÉ-COLLÉ (voir Ing. Struc) (voir Ing. Struc) -COLOMBAGES -COLOMBAGES @ 610mm c/c @ 140mm 610mm c/c 140mm -ISOLANT DE LAINE -ISOLANT DE LAINE ''COMFORTBATT'' AVEC ''COMFORTBATT'' AVEC AGRAFES HORIZONTALES AGRAFES 140mm HORIZONTALES 140mm -PARE-VAPEUR -PARE-VAPEUR -FOURRURE HORIZONTALE -FOURRURE 89mm HORIZONTALE 89mm @ 406mm c/c @ 406mm c/c -GYPSE TYPE X -GYPSE 13mm TYPE X 13mm -GYPSE TYPE X -GYPSE 13mm TYPE X 13mm -TOTAL -TOTAL

337 254 83

SÉPARATEUR D'URINOIR FIXÉ AU MUR1067x 305mm

2

COMPOSITION COMPOSITION DES MURS DEDES FONDATION MURS DE FONDATION COUPE

817

COMPOSITION COMPOSITION DES MURS EXTÉRIEURS DES MURS EXTÉRIEURS

COUEP-ÉLÉVATION ECH: 1/25

305

8

LIEU DU CHANTIER

M3 (GARAGE / INT) -COLONNES EN LAMELLÉ-COLLÉ UIRE 200mm X 200mm (voir Ing. Str) 8-08-09 STR 201 CON -GYPSE DE13mm OUR P R -GYPSE DE13mm E TILIS -FOURRURES HORIZONTALE AS U 19 X 38 @ NE P 610mm c/c - PARE-AIR -COLOMBAGES DE 38X140 @ 610mm c/c -ISOLANT DE LAINE ''COMFORTBATT'' 140mm AVEC AGRAFES HORISONTALES-PARE-AIR -CARTON FIBRE13mm -SOLIVES EN "I" VERTICALES 302mm @ 610mm c/c -LAINE DE ROCHE 152mm AVEC AGRAFES HORIZONTALES ET JOINTS CROISÉS -LAINE DE ROCHE 152mm AVEC AGRAFES 2 2018/07/18 PRÉLIMINAIRE POUR SERV. DES INCENDIES HORIZONTALES ET JOINTS CROISÉS 1 2018/07/09 PRÉLIMINAIRE À 60% -CONTREPLAQUÉ 16mm -PARE-VAPEUR AUTOCOLLANT ''BLUESKIN'' DESCRIPTION NO DATE -FOURRURES HORIZONTALES 38 X 89 @ 610mm c/c -GYPSE DE16mm

P

ÉLÉVATION ECH: 1/25

19mm 13mm 13mm

INA

IM RÉL

D -

184mm 184mm

570

URINOIR MURAL VOIR ING.

C

GARAGE

13mm

486 83

DISTRIBUTEUR DE SERVIETTES À MAINS EN ROULEAU TORK

350

19mm 19mm 19mm 38mm

la

480

R

de

DISTRIBUTEUR DE SAVON MOUSSE TORK

900

RSI

ite

CL

-PAREMENT VERTICAL EN BOIS -FOURRURES HORIZONTALE -FOURRURE VERTICALE -ISOLANT SEMI-RIGIDE -PARE-AIR -CONTREPLAQUÉ -COLONNES EN LAMELLÉ-COLLÉ (voir Ing. Struc) -COLOMBAGES @ 610mm c/c -ISOLANT EN MATELAS -PARE-VAPEUR -FOURRURE HORIZONTALE ENTRÉE DE @ 406mm c/c LA RÉSERVE -GYPSE TYPE X -GYPSE TYPE X -TOTAL

ÉPA.

Lim

M2 CLÉ PLAN

1

@610mm c/c

@610mm c/c R.S. -LAINE DE ROCHE ENTRE COLOMBAGE 1 : 50ENTRE COLOMBAGE ÉCHELLE -GYPSE TYPE X -GYPSE 16mm TYPE X DATE 2018-03-29 -TOTAL -TOTAL 105mm

ÉPA. 25mm 64mm

P PLAN CL-

-

VÉRIFIÉ -LAINE DE ROCHE

DESSIN NO.

16mm 105mm

A-8.1 (17)

?

?

ENTRÉE DE LA RÉSERVE

E LA


légende mobilier

Cafe Aunja, 2016

A

1448 Sherbrooke ouest, Montreal Program: Cafe Status/phase: Realised Responsibilities: Technical drafting, Coordination, site supervision

The outer part of the building has a Victorian architectural style, thus the interior decoration becomes the main tool for demonstrating the Iranian culture. The decoration and the foods are a fusion of Iran and the current context. The design strives to find a connection between the past and new place and what they have experienced before. The process of creating a ‘living' environment for an immigrant community is not the simple ‘transplanting' of the physical reality they left behind. A different set of forces begins to interact with the original model, transforming it into something unique in the new situation." This tiny cafe a few steps down 102 from the sidewalk on Sherbrooke Street close to the Museumplonge/cuisine of Fine Arts is always filled with tourists and international students.

Table, (voir A307) Pied: base ronde récupéré de l'existant prévoir enlever peinture, préparer la surface et peindre powdercoat noir quantité: 7

B

34

Table, (voir A307) Pied: base ronde récupéré de l'existant prévoir enlever peinture, préparer la surface et peindre powdercoat noir quantité: 6

105

circulation 131 SF

C

34

D

1 A306

APPAR

quantité: 3

APPAREIL Kim Parise 309, rue G Montréal, Q T 438.8

Table, (voir A307) Pied: base triangulaire récupéré de l'existant prévoir enlever peinture, préparer la surface et peindre powdercoat noir quantité: 8

E

103

Table, (voir A307) Pied: base ronde récupéré de l'existant prévoir enlever peinture, préparer la surface et peindre powdercoat noir

wc

Table, (voir A307) Pied: base en acier vernis, tubulaire carré 1"x1" quantité: 1

F

Chaise en bois existante restaurer et refaire le rembourrage et le recouvrement de l'assise

1 A304 I

architectu Architecte

Projet

restauran

425 Rue M QC H2Y 2G

Notes générale

L'architecte ne structure. L'entrepreneu coordination d erreurs observ les plans et le Tous les trava l'édition la plus L’ensemble du sur le droit d’a plan, en totalit écrit par leur a Le contenu de Kim Pariseau

E

C

quantité: 29

H

A

G

Chaise en bois existante restaurer et refaire le rembourrage et le recouvrement de l'assise

A A B

B

B

A G

A F

B

B

Client

2 A308

D

B

H

C

D

D

quantité: 24

Contrat 160105_restaur

tabouret en bois existant restaurer le recouvrement de l'assise

Échelle

100

A

vestibule

esquisse préliminaire préliminaire préliminaire définitif

D D

D quantité: 9

D I

tabouret existant restaurer, refaire le rembourrage et le recouvrement de l'assise Pied: préparer la surface et peindre

1

Phase du proje

Dossier

F

A C

Valier Dufo vallier@se

D


S 04

S 04 W 03

E 803

SECTION

1 1/2" = 1'-0"

G 803

SECTION

1 1/2" = 1'-0"


RÊsidence Multifamiliale, 2014 EMSOM Location: Montreal Building area: 8604 m² Programme: Residential Status/phase:


RÊsidence Multifamiliale, 2014 EMSOM Location: Montreal Building area: 8604 m² Programme: Residential Status/phase:


Restaurant M.Mme - Bars Ă vins, 2016 240 Rue Laurier ouest, Montreal With: Vinum Design+ Dimarco Ferrao Design Program: Wine Cellar Status/phase: Realised Responsibilities: Technical drafting, Coordination, site supervision


Apartment # 136, 2012 Building area: 1,000 m2 Programme: Residential Responsibilities: Technical drafting, site supervision Status/phase: Released


4½ Chambord, 2015 Independent 4661 Rue Chambord, Montreal Program: Residential Renovation Status/phase: Realised Responsibilities: Design, drafting


Centre Commercial, 2014 EMSOM Location: Montreal Building area: 8604 m² Programme: Commercial Status/phase:


Kadous Educational Asscociation, 2011 with MASSS Location: Rasht Building area: 100m2 Programme: Renovation and interior design Status/phase: Realised


Mahmoudi Residence, 2015 Independent Building surface: 4000 m2 Program: Residential Status: In progress Responsibilities: Design, Modeling, Drafting


The Klein Tube, 2011 Architectures of Interdisciplinarity Design Studio, Project 1 Information, Deformation and Synthesis Supervisors: Hanif Kara & Jonas Runberger


IGLOOPIA, 2016 TorontoCanada,

Winter Stations Design, Competition Entry


Design Portfolio- Maz Mojdehi- 2018  
Design Portfolio- Maz Mojdehi- 2018  
Advertisement