Page 1


Malthouse

Biomass Distillery

Processing Building

Castle


Big Iso


Malthouse

Third Floor 1:200


Basement Ground Floor 1:500

First Floor


Second Floor

1:500

Fourth Floor


East Elevation

1:200

West Elevation

1:200


North Elevation

1:200


South Elevation

1:200


Section A-A’ 1:200


Section B-B’ 1:200


Processing Building


South Elevation 1:100


East Elevation 1:100


West Elevation 1:100


Section C-C’ 1:100


Section D-D’ 1:100


Section E-E 1:100


Section F-F 1:100


Biomass Distillery


Castle


Ground Floor

1:200

1. Individual Huts 2. Toilets and Showers


East Elevation 1:200


North Elevation 1:200


South Elevation 1:200


West Elevation 1:200


Section H-H ’ 1:100


Section J-J ’ 1:100


Section I-I ’ 1:100


Views of Rebuilt Castle


Construction

The construction of the buildings proposed is low-tech, using salvaged materials and simple detailing. All the required materials can be found within a couple of miles of the site


Ventilation of Processing Building


Timber Frame on Processing Building


Design Resolution  

Plans, sections and elevations of the buildings within the masterplan.