Issuu on Google+

MARS

MARS A R C H I T E T T I


Office Viale Liegi n째1 - 00198 Roma, Italy Tel: +39.06.45.43.62.96 Fax: +39.06.45.43.64.72 P.IVA 06 74 398 1000 e-mail: mars.architetti@fastwebnet.it


4 5 6 7 8 15 25 30 35 37

INDICE

PRESENTAZIONE CHI SIAMO MARS ARCHITETTI LO STUDIO REFERENZE & PUBBLICAZIONI MOSTRE, FIERE & CONVEGNI PROGETTAZIONE ARCHITETTONICA PROJECT MANAGEMENT - DIREZIONE LAVORI PROGETTAZIONE D’INTERNI - DESIGN PROGETTAZIONE SUPPORTO GARE E CONCORSI SIGNIFICATIVI PORTFOLIO SCHEDE LAVORI

3


RUGGERI SIMONA Born in Rome in 4.11.1971, she begins her professional training working for many architectural and urbanistical firms during university time. In 1999 she gets the Degree in Architecture, with maximum score, at the Faculty of Architecture of “La Sapienza” Rome University. In date 18 may 2000 she registers herself to the “Ordine degli Architetti di Roma e Provincia” with number 13291. Consequently she works, till 2000, for many Rome architectural firms making project design activities, architectural research, and many competitions. Since 2000 to 2002 she works with continuity for Erregi srl, Rome engineer and architectural company. She carries out at the same time, till 2003, research activity for Mongelli professor design Class at the Faculty of Architecture of “La Sapienza” Rome University. In 2001 she founds, with the architect Cosmo Antonello Magliozzi, the MARS ARCHITETTI studio associates.

MAGLIOZZI C. ANTONELLO

RUGGERI SIMONA

N

ata a Roma il 4.11.1971, dà inizio alla sua formazione professionale lavorando presso diversi studi di architettura ed urbanistica durante il periodo di studio. Nel 1999 consegue a pieni voti la Laurea in Architettura presso la facoltà di Architettura dell’Università “La Sapienza” di Roma. Il 18.05.00 si Iscrive all’Ordine degli Architetti di Roma e Provincia con il n° 13291.

ato a Gaeta (LT) il 28.01.1969, studia a Napoli dove consegue a pieni voti la Laurea in Architettura nel 1995, presso la Facoltà di Architettura dell’Università “Federico II”.

PRESENTAZIONE CHI SIAMO

MAGLIOZZI COSMO ANTONELLO Born in Gaeta (LT) in 28.01.1969, he gets his education and the Degree in Architecture, with maximum score, in Naples in 1995 at the Faculty of Architecture of University “Federico II”, following Nicola Pagliara professor class and teaching. In 1997 he begins his professional activities in U.S.A., in Boston (MA), through an architectural intership at Wallace & Floyd and Associates inc company, and working for Brian Healy Architects firm too, getting main parts of his architectural language. He registers himself to the “Ordine degli Architetti della Provincia di Latina” in date 30 march 1998 with number 626, and works consequently for many private purchaser, and like employee for Erregi srl engineer and architectural company, making architectural order management. In 2001 he founds, with the architect Simona Ruggeri, the MARS ARCHITETTI studio associates. He’s abilitate to the work security coordinations from 2005 (Dlgs. 494/96).

4

Nel 1997 inizia la sua attività professionale in U.S.A, a Boston (MA), attraverso uno stage in architettura, presso lo studio Wallace & Floyd and Associates inc, e lavorando, in seguito, per lo studio Brian Healy Architects, ove impronta i capisaldi del suo linguaggio architettonico. Si iscrive all’Ordine degli Architetti della Provincia di Latina il 30.03.98 con il n° 626, lavora successivamente a Roma per numerosi committenti privati e come dipendente dello studio di ingegneria ed architettura Erregi srl, occupandosi della gestione delle commesse architettoniche.

N

Successivamente, fino al 2000, lavora presso svariati studi di architettura di Roma, svolgendo attività di progettazione, ricerca architettonica e partecipando a diversi concorsi.

Nel 2001 fonda, insieme all’architetto Simona Ruggeri, lo studio associato MARS Architetti.

Dal 2000 al 2002 lavora con continuità, presso lo studio di ingegneria ed architettura Erregi S.r.l. di Roma. Contestualmente svolge, fino al 2003, attività di ricerca presso il corso di progettazione del prof. Mongelli della Facoltà di Architettura dell’Università “La Sapenza” di Roma.

Si abilita dal 2005 al Cordinamento della sicurezza dei cantieri edili (Dlgs. 494/96)

Nel 2001 fonda, insieme all’arch. Antonello Magliozzi, lo studio associato MARS Architetti.


MARS ARCHITETTI

• Edilizia pubblica; • Edilizia privata e aziendale; • Urbanistica e Trasporti; • Progettazione di interni; • Design. I servizi offerti da MARS sono i seguenti: • Project management; • Studi di fattibilità; • Progettazione preliminare, definitiva ed esecutiva; • Supporto alla progettazione; • Analisi ed approvvigionamento dati; • Direzione lavori, contabilità e Coordinamento della sicurezza. MARS coordina il lavoro di professionisti esterni in modo da formare raggruppamenti temporanei. DIREZIONE E CONTROLLO ATTIVITA’ SERVIZI DI SUPPORTO

SISTEMI CAD

STUDI GEOLOGICI

ELABORAZIONI GRAFICHE E FOTOGRAFICHE

RILIEVI TOPOGRAFICI

CONSULENTI

PROGETTAZIONE E VERIFICHE

PROGETTAZIONE E VERIFICHE

STRUTTURALI

IMPIANTISTICHE

CONSULENTI

PROGETTAZIONE INFRASTRUTTURE

GIS DATABASE

IMPRESE SPECIALIZZATE DI SETTORE

PROGETTAZIONE

SICUREZZA

DIREZIONE LAVORI

ARCHITETTURA - URBANISTICA - PROJECT MANAGEMENT - DESIGN

MARS ARCHITETTI

Svolge attività di progettazione e consulenza nei seguenti settori:

LO STUDIO

È

uno studio associato multidisciplinare, con sede a Roma, che fornisce servizi in progettazione architettonica, urbanistica, gestione della progettazione e della esecuzione, design e interior design. Fondato nel 2001 da Cosmo Antonello Magliozzi e Simona Ruggeri fornisce soluzioni creative, funzionali e tecnicamente accurate, attraverso le specializzazioni dei suoi progettisti che contribuiscono sinergicamente al raggiungimento degli obiettivi.

5

MARS ARCHITETTI is a multidisciplinary design consultancy providing professional services in architecture, town design, work management, graphic design and interior design from office in Rome. Founded in 2001 by Cosmo Antonello Magliozzi and Simona Ruggeri, Mars’s ethos is to provide responsive, creative solutions that are functional and technically sound and implemented by skilled designers acting as a unit. Mars is currently active in the following sectors: • Pubblic buildings; • Private and Companies buildings; • Landscape design; • Interior design; • Design; Mars services includes: • Project management; • Feasibility studies; • Preliminary, and final design; • Construction design; • Project support; • Surveys; • Accounting, works and security management MARS members may coordinate the work of external professional men, in way to create temporary teams.


PRINCIPALI REFERENZE: • DIL Real Estate Consult Italy S.r.l. (Deutsche Bank) • Comune di Roma • Inarcassa • AVP Asset Value Partners • Provinciattiva spa (società unipersonale della Provincia di Roma)

REFERENZE

& PUBBLICAZIONI

PUBBLICAZIONI:

6

Supplemento 5/2009

“Ampliamento scuola Don Filippo Rinaldi a Roma” - sostenibilità costruita Arketipo - il Sole 24 ore

n. 313 - giugno 2009

“Ampliamento scuola Don Filippo Rinaldi a Roma” - gioco di volumi e sensibilità ecologica Costruire

marzo-giugno 2008

“Il Progetto sostenibile - Edilizia scolastica ecocompatibile ”Scuola elementare e materna Don Filippo Rinaldi EdicomEdizioni

ottobre 2006

“Edifici scolastici ecocompatibili Progetti per una scuola sostenibile” Scuola elementare e materna Don Filippo Rinaldi EdicomEdizioni

aprile 2006

“Ai bambini piacciono le scuole” Scuola media Giovanni Pascoli e scuola elementare e materna Don Filippo Rinaldi Gangemi Editore

dicembre 2004

“Cielo... l’Esquilino!” anno 2 - numero 2 Piazza Pepe: uno spazio per tutti. Una proposta sostenibile.

febbraio 2004

“L’Altra Roma” - Scuola media Giovanni Pascoli editore Samuel & Jhonson

dicembre 2003

“L’Altra Roma” - Unità e semplicità editore Samuel & Jhonson

novembre 2003

“L’Altra Roma” - Essenzialità e rigore editore Samuel & Jhonson


MOSTRE, FIERE, CONVEGNI e INAUGURAZIONI: settembre 2010

PISTOIA - Scuola Media Statale A. Roncagli Ordine degli architetti pianificatori e paesaggisti della provincia di Pistoia “Giornate dell’architettura 3GA” (Scuola Don Filippo Rinaldi)

settembre 2008

ROMA - Inaugurazione della Scuola Don Filippo Rinaldi. Tra i presenti: - arch. Cuccaro: Dir. VIII U.O. Ed. scolastici; - ass. Ghera: Ass. Lavori pubblici e periferie.

maggio 2006

ROMA - CASA DELL’ARCHITETTURA La cultura del progetto sostenibile. La qualita’ architettonica e “l’efficienza energetica” (Scuola Don Filippo Rinaldi)

ottobre 2006

ROMA - FIERA DI ROMA “42° settimana della vita collettiva salone specializzato progetto scuola” (Scuola Don Filippo Rinaldi)

ottobre 2006

BOLOGNA - SAIE 2006 “Edilizia scolastica ecocompatibile” (Scuola Don Filippo Rinaldi)

& CONVEGNI

“L’Altra Roma” - Un’esperienza architettonica Statunitense editore Samuel & Jhonson

MOSTRE, FIERE

ottobre 2003

7


Progetto:

SCUOLA MATERNA - Piano di Zona Romanina - Roma Risorse per Roma SpA per Comune di Roma Coordinamento progettazione bioclimatica 2009-2010 Progettisti incaricati (arch. Magliozzi) Progetto concluso.

Committente: Descrizione: Periodo: Posizione: Avanzamento:

Progetto: Committente: Descrizione: Periodo: Posizione: Avanzamento:

Progetto: Committente: Descrizione:

Periodo: Posizione: Classe prevalente: Importo: Avanzamento:

PARCO COMMERCIALE POLIFUNZIONALE - Catania Aspre srl Studio di fattibilità e progetto preliminare 2008 Progettisti incaricati (arch. Magliozzi) Progetto concluso.

LOCALI EX CINEMA TIFFANY - Roma. arch. Montenero per INARCASSA Progettazione esecutiva e direzione lavori per la riconvenzione funzionale dell’Ex Cinema Tiffany in Sala Prove del Teatro dell’Opera. 2007-2008 Collaborazione (arch. Ruggeri) progetto arch. A. Montenero I-b EURO 500.000,__ Progetto concluso.

ARCHITECTURAL DESIGN

ARCHITETTONICA

SCUOLA MEDIA PISACANE - ROMA Comune di Roma Progetto prevenzione incendi 2009 Progettisti incaricati Progetto concluso.

PROGETTAZIONE

Progetto: Committente: Descrizione: Periodo: Posizione: Avanzamento:

9

Project: Multifunctional building - Piazza Montegrappa- Rome. Customer: Montegrappa srl. Description: Defintive Project. Date: 2010. Position: Designers in charged. Status: carry off. Project: Offices and car boxes building - via di Vigna Rigacci- Rome. Customer: Box per Roma srl. Description: Defintive ProjectDate: 2010. Position: Designers in charged. Status: carry off. Project: Home for needy people -Monterotondo- Rome. Customer: Provincia Attiva spa per Rome Province. Description: Construction project. Date: 2010. Main Work class: I-b Amount: EURO 1.750.000,00. Position: Designers in charged (arch. Ruggeri). Status: carry off. Project: Multifunctional building in “Viale Trastevere” - Rome. Customer: Decima RE. Description: Definitive and construction project. Date: 2009. Main Work class: I-d Amount: EURO 3.000.000,00. Position: Designers in charged (arch. Magliozzi). Status: carry off. Project: High School “Pisacane” in Rome. Customer: Muncipality of Rome. Description: Fire prevention project. Date: 2009. Position: consultant designers. Status: carry off. Project: Nursery school at “Romanina” area in Rome. Customer: Risorse per Roma SPA. Description: Bioarchitecture project management. Date: 2009-2010. Position: Designers in charged. Status: carry off. Project: Polifunctional commercial buildings Customer: Aspre srl. Description: preliminary project. Date: 2008. Position: consultant designers. Status: carry off. Project: Ex Cinema Tiffany. Customer: arch. A. Montenero. Description: executive project. Date: 2007-2008. Position: consultant designers. Status: carry off. Project: S. Egidio International airport: Ecosfera S.p.A.. Description:


ARCHITETTONICA

SCUOLA DON FILIPPO RINALDI

PROGETTAZIONE

PIAZZA PEPE

TRASTEVERE

Progetto:

10

Committente:

Descrizione:

Periodo: Posizione: Avanzamento:

Progetto: Committente: Descrizione: Periodo: Posizione: Avanzamento:

Progetto: Committente: Descrizione: Periodo: Posizione: Avanzamento:

Progetto:

Committente:

Descrizione: Periodo:

AEROPORTO INTERNAZIONALE DELL’UMBRIA - S. Egidio Perugia. Ecosfera S.p.A. (Capo Gruppo Mandataria: Consorzio Stabile Centritalia S.C.P.A. Mandante: I.G.I.T. S.p.A.) Bando di procedura aperta per la progettazione ed esecuzione delle opere per il completamento dell’Aeroporto Internazionale dell’Umbria - S. Egidio Perugia. 2007 Consulenza grafica (arch. Ruggeri) Lavoro ultimato - gara aggiudicata.

MOTORCITY - CENTRO COMMERCIALE a Verona. Ecosfera S.p.A. per Coopsette Progettazione preliminare. Realizzazione degli elaborati grafici digitali. 2007 Supporto alla progettazione preliminare (arch. Ruggeri) Progetto concluso.

OUTLET SHOPPING a Maida (Catanzaro) Aspre S.r.l. Studio di fattibilità e progettazione preliminare. 2007-2008 Progettisti incaricati Progetto in corso di realizzazione.

GIARDINO DELLE MURA DELL’ACQUEDOTTO ROMANO LATO VIA F. TURATI - Roma. Comune di Roma - VI Dipartimento Politiche della Programmazione e Pianificazione delTerritorio - Roma Capitale. Progettazione esecutiva 2006


Progetto:

PIAZZA PEPE: LAVORI URGENTI DI BONIFICA EDILIZIA ED IGIENICA - Roma Riqualificazione di Via Giolitti ambito compreso tra Via Giolitti, l’acquedotto romano e Via Pepe Comune di Roma - VI Dipartimento Politiche della Programmazione e Pianificazione delTerritorio - Roma Capitale. Progettazione esecutiva 2005 Progettista incaricato (arch. Ruggeri) I-e EURO 337.344,__ (base d’asta) Opere concluse

Committente:

Descrizione: Periodo: Posizione: Classe prevalente: Importo: Avanzamento:

Progetto: Committente: Descrizione: Periodo: Posizione: Importo: Avanzamento:

Progetto:

Committente: Descrizione: Periodo: Posizione: Classe prevalente: Importo: Avanzamento:

STAZIONE IMPIANTO CARBURANTI AGIP - GAETA (LT) Turriziani petroli. Studio di fattibilità 2005-2007 Progettisti incaricati (arch. Magliozzi) non definito Progetto concluso

PIAZZA GUGLIELMO PEPE - Roma Idea progettuale per la riqualificazione urbana COGEIM - Teatro Ambra Jovinelli - ES Hotel Progettazione preliminare 2003-2004 Progettisti incaricati I-e Non definito Progetto donato al Comune di Roma

definitive project. Date: 2007. Position: consultant designers. Status: carry off.

ARCHITETTONICA

Progettista incaricato (arch. Ruggeri) I-e EURO 330.000,__ (base d’asta) Opere concluse

PROGETTAZIONE

Posizione: Classe prevalente: Importo: Avanzamento:

11

Project: Motorcity - Commercial Center (Verona). Customer: Ecosfera S.p.A.. Description: preliminary project. Date: 2007. Position: consultant designers. Status: carry off. Project: Outlet Shopping (Maida Catanzaro). Customer: Aspre S.r.l. Description: preliminary project. Date: 2007. Position: Designer in charged. Status: project in progress. Project: “Delle mura” garden of roman aqueduct - via Turati side (Rome). Customer: Comune di Roma - VI Dipartimento. Description: executive project. Date: 2006. Position: Designers in charged (arch. Ruggeri). Main Work class: I-e Amount: EURO 330.000,00. Status: carry off. Project: Guglielmo Pepe Square (Rome) - recovery urgent works. Customer: Comune di Roma - VI Dipartimento. Description: executive project. Date: 2005. Position: Designers in charged (arch. Ruggeri). Main Work class: I-e Amount: EURO 337.344,57 . Status: carry off. Project: Station system fuels. Customer: Turriziani petroli. Description: Study of feasibility. Date: 2005-2007. Position: Designers in charged. Status: carry off. Project: Urban restyling design idea of Guglielmo Pepe Square (Rome). Customer: COGEIM - Teatro Ambra Jovinelli - ES Hotel. Description: Preliminary project Date: 2003-2004. Position: Designers in charged. Main Work class: I-e. Status:carry off Project: Palazzo delle Esposizioni - Roma - restoration works, technical and functional adaptations. Customer: ABDR arch. associates - SAC Spa. Description: Construction system informations research. Date: 2003-2004. Position: consultant designers. Main Work class: I-e Amount: EUR 15.401.314,46. Sta-


Periodo: Posizione: Classe prevalente: Importo: Avanzamento:

Progetto:

Committente: Descrizione:

Periodo: Posizione: Importo: Avanzamento:

Progetto:

Committente: Descrizione: Periodo: Posizione: Classe prevalente: Avanzamento:

TORRETTA ALL’INGRESSO PRINCIPALE DEL CIMITERO DEL VERANO - destinata ad uffici dei VV.UU. - Roma Comune di Roma – Dip. XII Lavori Pubblici – IV U.O. – Edilizia Monumentale Progettazione Definitiva ai sensi della L109/94 per Progetto di Consolidamento e Restauro 2002 Progettisti incaricati (R.T.P.) non definito Progetto concluso

EDIFICIO DI CIVILE ABITAZIONE IN VIA DELLA RUSTICA ROMA (Variante del progetto autorizzato con concessione n° 1127/C del 1993 prorogata con D.D. n° 2061 del 1997). dott. Scalera e dott. Sebasti Scalera Progettazione Definitiva 2000 Progettista incaricato arch. Ruggeri con arch. Visentini I-b Progetto concluso

tus: carry off.

ARCHITETTONICA

Committente: Descrizione:

Attività propedeutiche per il completamento della progettazione della NUOVA CIRCONVALLAZIONE INTERNA e degli interventi connessi. PROGER S.p.A. per FS S.p.A. RFI Attività analitica: Approvvigionamento dei dati relativi ai sottoservizi. Sopralluoghi, rilievi ed elaborazioni grafiche. 2002 Progettisti incaricati VI-b non definito Progetto concluso

PROGETTAZIONE

Progetto:

13

Project: Don Filippo Rinaldi’s primary and asylum school reconstruction. Customer: Comune di Roma - Dip. XXII -VIII U.O. Description: Definitive and executive project. Date: 2003-2004. Position: Designers in charged (R.T.P.). Main Work class: I-b Amount: EUR 735.380,88. Status: carry off. Project: Extraordinary maintenance PASCOLI’s High school (Mun. IX Via Illiria). Customer: Comune di Roma - Dip. XXII - VIII U.O. Description: Definitive project, relief and editing. Date: 2003. Position: Designers in charged (R.T.P.). Main Work class: I-b Amount: EUR 1.258.094,99. Status: carry off. Project: FS S.p.A. RFI - Propedeutical activities about the new internal ring road and Rome-Tiburtina rail station project design. Customer: PROGER S.p.A. Description: Analytical activities about: plant subsystem date procure, measurements and work management assistance. Date: 2002. Position: Project consultants. Main Work class: VI-b Amount: not definite. Status: carry off. Project: Consolidation and restoration projects for the small tower at the principal entry of the Verano’s Cemetery – Rome. Customer: Municipality of Rome, XII Department - Monumental Architecture. Description: Definitive project (L109/94). Date: 2002. Position: Designers in charged (R.T.P.). Main Work class: I-b Amount: not definite. Status: carry off. Project: Civil building in via della Rustica Rome (Authorized concession n° 1127/C of 1993 varying with D.D n° 2061 of 1997). Customer: dott. Scalera and dott. Sebasti Scalera. Description: Definitive project. Date: 2000. Position: Designers in charged (arch. Ruggeri with arch. Visentini). Main Work class: I-b. Status: carry off. Project: Organization of the spaces in the tor cervara productive area Rome. Customer: dott. Scalera and


ARCHITETTONICA

TORRETTA DEL VERANO

PROGETTAZIONE

SCUOLA MEDIA PASCOLI

Progetto:

14

Committente: Descrizione: Periodo: Posizione: Avanzamento:

ORGANIZZAZIONE SPAZIALE DELL’AREA PRODUTTIVA DI TOR CERVARA - ROMA dott. Scalera e dott. Sebasti Scalera Studio di fattibilità 1999 Progettista incaricato arch. Ruggeri con arch. Visentini Progetto concluso


Committente: Descrizione: Periodo: Posizione: Classe prevalente: Importo: Avanzamento: Immobile: Committente: Descrizione:

EDIFICIO POLIFUNZIONALE VIALE TRASTEVERE - ROMA Decima RE Coord. Sicurezza D.lgs 494/96 2010-2011 Professionista incaricato (arch. Magliozzi) I-b EURO 3.000.000,__ Opere in corso di realizzazione

Periodo: Posizione: Valore stimato: Avanzamento:

PALAZZO BROQUIER D’AMELY - Trani Procura di Trani Consulenza tecnica: Stima del più probabile valore di mercato - Procedimento penale n. 5218/2007 2008-2009 Professionista incaricato (arch. Ruggeri) EURO 6.600.000,_ Concluso

Progetto: Committente: Descrizione: Periodo: Posizione: Classe prevalente: Avanzamento:

LOCALI EX CINEMA TIFFANY - Roma Inarcassa Coord. Sicurezza D.lgs 494/96 2008 Professionista incaricato (arch. Magliozzi) I-b Opere concluse

Progetto: Committente: Descrizione: Periodo: Posizione: Classe prevalente: Avanzamento:

LOCALI EX CINEMA TIFFANY - Roma arch. Alessandra Montenero supporto alla Direzione Lavori 2008 Professionista incaricato (arch. Ruggeri) I-b Opere concluse

Progetto:

RAGUSA HOTEL AND RESORTS Ragusa Committente: DIL Real Estate Consult Italy S.r.l. per RHR Periodo: 2007 Descrizione: Consulenza sullo Status Quo del progetto Classe prevalente: I-b Valore approssimativo: Non definito

PROJECT MANAGEMENT-DIREZIONE LAVORI

Progetto:

15

dott. Sebasti Scalera. Description: Study of feasibility. Date: 1999. Position: Designers in charged (arch. Ruggeri with arch. Visentini). Status: carry off. PROJECT MANAGEMENT - WORK MANAGEMENT Project: Edificio polifunzionale Viale Trastevere - Roma Customer: Decima RE. Description: Works management. Date: 2010-2011. Position: Designer in charged (arch. Magliozzi). Main Work class: I-b. Status: in progress. Building: Broquier d’Amely Palace Customer: Trani’s Court. Description: Technical advice: Estimate the most likely market value - No Criminal proceedings 5218/2007. Date: 20082009. Position: Designer in charged (arch. Ruggeri). Estimate market value: EUR 6.600.000. Status: carry off. Project: ex Cinema Tiffany. Customer: Inarcassa. Description: Works management. Date: 2008. Position: Designer in charged (arch. Magliozzi). Main Work class: I-b. Status: carry off. Project: ex Cinema Tiffany. Customer: arch. A. Montenero. Description: Works management. Date: 2008. Position: consultant designer (arch. Ruggeri). Main Work class: I-b. Status: carry off. Project: Ragusa Hotel and Resorts. Customer: DIL RECI S.r.l. for RHR Description: Preliminary Status Quo. Date: 2007. Main Work class: I-b Status: carry off. Project: IPI - Porta Vittoria. Customer: DIL RECI S.r.l. for IPI. Description: Preliminary Status Quo. Date: 2007. Main Work class: I-b Status: carry off. Project: L’OREAL building - via Primaticcio 155 - Milano. Customer: DIL RECI S.r.l. for Westinvest. Description: Consulting activities. Date: 2007. Main Work class: I-b Status: carry off. Project: INCIT - Golf Beach Resort. Customer: DIL RECI S.r.l. for INCIT


Progetto:

HOTEL TORRE DI OGNINA Provincia di Siracusa - Sicilia Committente: DIL Real Estate Consult Italy S.r.l. per INCIT Periodo: 2007 Descrizione: Consulenza sullo Status Quo del progetto Classe prevalente: I-d Valore approssimativo: Non definito Progetto:

CLUB MED - KAMARINA Provincia di Ragusa - Sicilia Committente: DIL Real Estate Consult Italy S.r.l. per The Ability group Periodo: 2007 Descrizione: Technical Due Diligence Classe prevalente: I-d Valore approssimativo: EURO 65.000.000,_ Progetto:

POLO FINANZIARIO SPA PARCHEGGIO MULTIPIANO INTERRATO SUL FRONTE DEL VIALE DEL LAVORO VERONA Committente: DIL Real Estate Consult Italy S.r.l. per POLO FINANZIARIO SPA Periodo: 2007 Descrizione: Consulenza sullo Status Quo del progetto Classe prevalente: I-b Valore approssimativo: EURO 40.000.000,_ Progetto:

Committente: Descrizione: Periodo: Posizione: Classe prevalente: Importo: Avanzamento:

SCUOLA MEDIA PASCOLI Roma - Mun. IX Via Illiria Lavori complementari alla manutenzione straordinaria Comune di Roma - Dip. XXII - Lavori Pubblici e Manutenzione Urbana - VIII U.O. D.L. - Coord. Sicurezza D.lgs 494/96 dic 2006 - mar 2007 Professionista incaricato (arch. Magliozzi) I-b EURO 445.465,__ Opere concluse

PROJECT MANAGEMENT-DIREZIONE LAVORI

Valore approssimativo: Non definito

17

. Description: Status Quo. Date: 2007. Main Work class: I-d Status: carry off. Project: INCIT - 5 Star Spa Resort. Customer: DIL RECI S.r.l. for INCIT . Description: Status Quo. Date: 2007. Main Work class: I-d Status: carry off. Project: INCIT - Hotel Torre di Ognina. Customer: DIL RECI S.r.l. for INCIT. Description: Status Quo. Date: 2007. Main Work class: I-d Status: carry off. Project: Famiglia Vita - Resort - Customer: DIL RECI S.r.l. for Famiglia Vita. Description: Status Quo. Date: 2007. Main Work class: I-d Status: carry off. Project: Club MED. Customer: DIL RECI S.r.l. for The Ability Group - Description: Status Quo. Date: 2007. Main Work class: I-d Approximate project value: EUR 65.000.000. Status: carry off. Project: Fiera Verona Sud - Multilevel parking Customer: DIL RECI S.r.l. Description: Status Quo. Date: 2007. Approximate project value: EUR 40.000.000. Status: carry off. Project: Complementary works of the extraordinary maintenance PASCOLI’s High school - Rome . Customer: Comune di Roma - Dip. XII - VIII U.O. Description: Works management. Date: 2006-07. Position: Designer in charged (arch. Magliozzi). Main Work class: I-b. Amount: EUR 445.465,88. Status: carry off. Project: Invesco - Immobiliare Deruta 2005 srl, via Deruta 19, Milano. Customer: DIL RECI S.r.l. for Invesco. Description: Tecnical Due Diligence. Date: 2006. Main Work class: I-d Status: carry off. Project: TMW - STODIEK Immobiliare Srl Milano 3 City - Basiglio (MI) Customer: DIL RECI S.r.l. for TMW. Description: Tecnical Due Diligence. Date: 2006. Main Work class: I-b. Status: carry off. Project: Jungheinrich - new filial in Rome. Customer: DIL RECI S.r.l. for


PROJECT MANAGEMENT-DIREZIONE LAVORI

KAMARINA - CLUB MEDITERRANEE GRAMMER IPI PORTA VITTORIA

18

Progetto:

INVESCO - IMMOBILIARE DERUTA 2005 S.r.l. - Via Deruta 19, Milano Committente: DIL Real Estate Consult Italy S.r.l. per Invesco Periodo: 2006 Descrizione: Technical Due Diligence Classe prevalente: I-b Valore approssimativo: Non definito Progetto:

TMW - STODIEK Immobiliare S.r.l. Milano 3 City - Basiglio (MI) Palazzo Galeno - Palazzo Fermi Committente: DIL Real Estate Consult Italy S.r.l. per TMW Periodo: 2006 Descrizione: Technical Due Diligence Classe prevalente: I-b Valore approssimativo: Non definito Progetto:

JUNGHEINRICH Nuova Filiale di Roma Via Martellona - Bagni di Tivoli - Roma Committente: DIL Real Estate Consult Italy S.r.l. per Jungheinrich Italiana srl Periodo: 2006 Descrizione: Analisi dei rischi sulla compravendita dell’edificio adibito ad uffici e magazzino Classe prevalente: I-b Valore approssimativo: Non definito Progetto: Committente:

WESTINVEST - Via Palestro, 81 Roma DIL Real Estate Consult Italy S.r.l. per WestInvest Periodo: 2005-2006 Descrizione: Due diligence e consulenza tecnica Classe prevalente: I-b Valore approssimativo: EURO 35.000.000,__ Progetto: Committente: Periodo: Descrizione:

PROGETTO LEGNANO 24 S.R.L. Ampliamento scuola germanica DIL Real Estate Consult Italy S.r.l. per Progetto Legnano 24 srl 2005-2006 Consulenza tecnica e verifica progettuale


Progetto:

Committente: Descrizione: Periodo: Posizione: Classe prevalente: Importo: Avanzamento:

SCUOLA MATERNA ED ELEMENTARE DON FILIPPO RINALDI - Roma - Mun. X Via Lemonia 226 Lavori di demolizione e ricostruzione Comune di Roma - Dip. XXII - Lavori Pubblici e Manutenzione Urbana - VIII U.O. Direzione lavori nov 2005 - lug 2007 Direttore dei lavori (arch. Magliozzi) I-b EURO 735.380,__ (base d’asta) Opere concluse

Progetto:

PARCHEGGIO MULTIPIANO FIERA VERONA SUD Committente: DIL Real Estate Consult Italy S.r.l. Periodo: 2005 Descrizione: Studio di fattibilità Valore approssimativo: EURO 40.000.000,__ Progetto:

Committente: Descrizione: Periodo: Posizione: Classe prevalente: Importo: Avanzamento: Progetto:

SCUOLA MEDIA PASCOLI - Roma - Mun. IX Via Illiria Manutenzione straordinaria Comune di Roma - Dip. XXII - Lavori Pubblici e Manutenzione Urbana - VIII U.O. D.L. - Coord. Sicurezza D.lgs 494/96 mag 2005 - dic 2006 Professionista incaricato (arch. Magliozzi) I-b EURO 1.258.094,__ (base d’asta) Opere concluse

INVESCO - Roma - Via Simone Martini 127-128 Committente: DIL Real Estate Consult Italy S.r.l. per Invesco Descrizione: Perizia Tecnica Periodo: 2004 Classe prevalente: I-b Valore approssimativo: Non definito

PROJECT MANAGEMENT-DIREZIONE LAVORI

Classe prevalente: I-b Valore approssimativo: EURO 4.500.000,__

19

Jungheinrich Italiana srl. Description: Building purchase risk analysis. Date: 2006. Main Work class: I-b. Status: carry off. Project: Westinvest - Via Palestro, 81 Rome. Customer: DIL RECI S.r.l. for WestInvest. Description: Tecnical Due Diligence. Date: 2006. Main Work class: I-b. Approximate project value: EUR 35.000.000. Status: carry off. Project: Progetto Legnano 24 srlGerman School widening. Customer: DIL Real Estate Consult Italy S.r.l. for Progetto Legnano 24 srl- Description: Tecnical advising and project verification Date: 2005-06. Main Work class: I-b. Approximate project value: EUR 35.000.000. Status: carry off. Project: Don Filippo Rinaldi’s primary and asylum school reconstruction (Mun.X Via Lemonia 226). Customer: Comune di Roma - Dip. XXII - VIII U.O. Description: Works management. Date: 2003-08. Position: Designer in charged (arch. Magliozzi). Main Work class: I-b Amount: EUR 735.380,88 Status: carry off. Project: Fiera Verona Sud - Multilevel parking Customer: DIL RECI S.r.l. Description: Feasibility study. Date: 2005. Approximate project value: EUR 40.000.000. Status: carry off. Project: Extraordinary maintenance PASCOLI’s High school - Via Illiria - Rome . Customer: Comune di Roma -Dip. XII-VIII U.O. Description: Works management. Date: 2005-06. Position: Designer in charged (arch. Magliozzi). Main Work class: I-b. Amount: EUR 1.258.094,99 . Status: carry off. Project: Invesco - Via Simone Martini 127-128 - Rome. Customer: DIL RECI S.r.l. for Invesco. Description: Tecnical expert opinion. Date: 2004. Main Work class: I-d Amount: not definite. Status: carry off. Project: Palazzo delle Esposizioni - Roma - restoration works, technical and functional adaptations. Customer: Comune di Roma - Azienda


Progetto:

JUNGHEINRICH - Nuova filiale di Rosate (Milano) Committente: DIL Real Estate Consult Italy S.r.l. per Jungheinrich Italiana srl Descrizione: Gestione della progettazione e della esecuzione dell’opera - edificio industriale (uffici e magazzino) Periodo: 2002-2004 Classe prevalente: I-b Valore approssimativo: EURO 8.000.000,__

Progetto:

JUNGHEINRICH - Nuova filiale di Moncalieri (Torino) Committente: DIL Real Estate Consult Italy S.r.l. per Jungheinrich Italiana srl Descrizione: Gestionedella progettazione e della esecuzione dell’opera - edificio industriale (uffici e magazzino) Periodo: 2002-2004 Classe prevalente: I-b Valore approssimativo: EURO 4.000.000,__

Progetto:

PRIMATICCIO PROPERTIES - Sede dell’OreaI Italia (Milano) Committente: DIL Real Estate Consult Italy S.r.l. per WestInvest Descrizione: Tecnical Due Diligence, valutazione dei danni e consulenza tecnica Periodo: 2003-2005 Classe prevalente: I-d Valore approssimativo: EURO 40.000.000,__

PROJECT MANAGEMENT-DIREZIONE LAVORI

Knorr-Bremse sistemi per autoveicoli commerciali Descrizione: Gestione della progettazione - analisi dello status quo, assistenza al negoziato e alla stesura del Contratto d’Appalto. Periodo: 2003-2004 Classe prevalente: I-b Valore approssimativo: EURO 10.000.000,__

21

Speciale Palaexpo. Description: Support to works building tests. Date: 2004-2007. Position: Assistant in charged. Main Work class: I-e Amount: EUR 15.401.314,46. Status: carry off. Project: Knorr-Bremse - New headquarter in Arcore. Customer: DIL RECI S.r.l. for Knorr-Bremse. Description: Tecnical advising to the general construction project between the SPC and Knorr Bremse. Date: 2004. Main Work class: I-d Approximate project value: EUR 10.000.000. Status: carry off. Project: Rome - Tiburtina verification and integration of cartographies. GISrealization. Customer: Ferservizi spa for RFI Gruppo Gestione Tiburtina. Description: Management support. Date: 2003-04. Status: carry off. Project: Knorr-Bremse - New headquarter in Arcore. Customer: DIL RECI S.r.l. Description: Project Management - status quo analisys, negotiation assistance and making contract assistance. Date: 2003-04. Main Work class: I-d. Approximate project value: EUR 10.000.000. Status: carry off. Project: Jungheinrich - new headquarter and filial in Rosate (MI). Customer: DIL RECI S.r.l. for Jungheinrich Italiana srl. Description: Project Management - office, workshop and warehouse. Date: 2002-04. Main Work class: I-b Approximate project value: EUR 8.000.000. Status: carry off. Project: Jungheinrich - new filial in Moncalieri (TO). Customer: DIL RECI S.r.l. for Jungheinrich Italiana srl. Description: Project Management - office, workshop and warehouse. Date: 2002-03. Main Work class: Ib Approximate project value: EUR 4.000.000. Status: carry off. Project: Westinvest - Primaticcio Properties - Italian Oreal headquarter Customer: DIL RECI S.r.l. for WestInvest. Description: Tecnical Due Diligence, damages valuation and advising activities. Date: 2003-05. Main


III - Progetto Marelli Edificio 2 - Sesto S. Giovanni (MI) Committente: DIL Real Estate Consult Italy S.r.l. per iii GmbH Kapitalanlagegesellschaft Descrizione: Tecnical Due Diligence e attività di consulenza - edificio per uffici in costruzione Periodo: 2002-2004 Classe prevalente: I-d Valore approssimativo: EURO 37.000.000,__

Progetto:

BUTANGAS S.P.A. - Immobile per uffici a P.zza Foro Traiano, Roma Committente: Butangas S.p.A., Descrizione: Consulenza tecnico-estimativa per il recupero e risanamento di una unità immobiliare danneggiata Periodo: 2001 Posizione: Professionista incaricato (arch. Magliozzi) Classe prevalente: I-d Valore approssimativo: EURO 100.000,__

Progetto:

Committente: Descrizione: Periodo: Posizione: Classe prevalente: importo lavori: Avanzamento:

Progetto:

GUARDIA DI FINANZA - Roma Realizzazione di una cabina di lavaggio nell’autorimessa del Reparto Autieri del Comando Quartier Generale Guardia di Finanza - Caserma Piave, Roma Direzione lavori 2001 Direttore dei lavori (arch. Magliozzi) I-b EURO 75.000,__ opera realizzata

GUARDIA DI FINANZA - Roma Realizzazione della struttura, delle finiture e dell’arredo di tre tribune e tre torrette TV, erette in occasione della cerimonia del 226° anniversario della fondazione della Guardia di Finanza

PROJECT MANAGEMENT-DIREZIONE LAVORI

Progetto:

23

Work class: I-d. Approximate project value: EUR 40.000.000. Status: carry off. Project: Grammer - Monsano (AN) headquarter. Customer: DIL RECI S.r.l. for Grammer. Description: Valuation of three property lots. Date: 2003. Main Work class: I-b. Approximate project value: EUR 5.000.000. Status: carry off. Project: Westinvest - Bosch headquarter in Milan. Customer: DIL RECI S.r.l. for Westinvest. Description: Tecnical Due Diligence and advising activities. Date: 2002-03. Main Work class: I-d. Approximate project value: EUR 30.000.000. Status: carry off. Project: Jungheinrich - new filial in Moncalieri (TO) and Rosate (MI). Customer: DIL RECI S.r.l. for Jungheinrich Italiana srl. Description: Special equipments specifications, and construction project supervision. Date: 2002-04. Main Work class: Ib Approximate project value: EUR 1.000.000. Status: carry off. Project: Jungheinrich - filial in Villafranca Padovana (PD) Customer: DIL RECI S.r.l. for Jungheinrich Italiana srl. Description: Analysis and assistance to the purchase contract agreement; Project Management maintenance works and asbestos removing. Date: 2002-03. Main Work class: I-b Approximate project value: EUR 2.500.000. Status: carry off. Project: iii - Progetto Marelli Edificio 2 (MI). Customer: DIL RECI S.r.l. for iii GmbH Kapitalanlagegesellschaft. Description: Technical Due Diligence and advising activities. Date: 2002-04. Main Work class: I-b Approximate project value: EUR 37.000.000. Status: carry off. Project: Butangas spa - offices building - P.za Foro Traiano, Roma. Customer: Butangas spa. Description: Damages estimation; advice about the estimate works of a building improvement. Date: 2001. Main Work class: I-d. Approximate project value: EUR 100.000. Status: carry off.


Cliente: Progetto:

Periodo: Luogo: Descrizione:

Cliente: Progetto: Periodo: Luogo: Descrizione:

Cliente: Progetto:

Periodo: Luogo: Descrizione:

Cliente: Progetto:

Periodo: Luogo: Descrizione:

sig. Cristian Guardo Ristrutturazione. Ristrutturazione. Progettazione di svariati complementi d’arredo in legno e muratura. 2008 Catania Appartamento di civile abitazione

sig. Panariello Francescopaolo Progettazione di un garage pertinenziale interrato e sistemazione delle aree esterne. 2007-2009 Roma Proprietà privata

sig.ra Ricciardi Laura Ristrutturazione e direzione lavori appartamento. Progettazione di svariati complementi d’arredo in legno e muratura. 2006 Roma Appartamento di civile abitazione

sig.ra Cossu Martina Ristrutturazione e direzione lavori appartamento. Progettazione di svariati complementi d’arredo in legno e muratura. 2006 Roma Appartamento di civile abitazione

D’INTERNI - DESIGN

Periodo: Luogo: Descrizione:

sig. Salvatore Guardo Ristrutturazione. Ristrutturazione. Progettazione di svariati complementi d’arredo in legno e muratura. 2008 Milano Appartamento di civile abitazione

PROGETTAZIONE

Cliente: Progetto:

25

Project: Guardia di Finanza – carwash plant into the garage of the Service Corps atthached to the headquarters Command, Roma. Customer: Guardia di Finanza. Description: Works management. Date: 2001. Main Work class: I-b Amount: EUR 75.000. Status: carry off. Project: Guardia di Finanza – realization of the structures, the finishings and the furnishing. Customer: Guardia di Finanza. Description: Works management. Date: 2000. Main Work class: I-b. Amount: EUR 45.000. Status: carry off.


Cliente: Progetto:

Periodo: Luogo: Descrizione:

sig. Scocchera Claudio Ristrutturazione e direzione lavori appartamento. Progettazione di svariati complementi d’arredo in legno e muratura. 2001-2002 Roma Appartamento di civile abitazione

Cliente: Progetto: Periodo: Luogo: Descrizione:

Mediatica spa Ristrutturazione e direzione lavori . 2002 Roma Locali ufficio

Cliente: Progetto:

Colonello Ostoni Antonio Ristrutturazione e direzione lavori appartamento. Progettazione di svariati complementi d’arredo in legno e muratura. 2001 Roma Appartamento di civile abitazione

Periodo: Luogo: Descrizione:

Cliente: Progetto:

Periodo: Luogo: Descrizione:

Sig.ra D’Agnese Marina Ristrutturazione e direzione lavori appartamento. Progettazione di svariati complementi d’arredo in legno e muratura. 2001 Gaeta Appartamento di civile abitazione

D’INTERNI - DESIGN

Periodo: Luogo: Descrizione:

dott. Sorrentino Marco Ristrutturazione e direzione lavori appartamento e delle aree esterne. Progettazione di svariati complementi d’arredo in legno e muratura. 2001-2002 Roma Appartamento di civile abitazione

PROGETTAZIONE

Cliente: Progetto:

27


Cliente: Progetto:

Periodo: Luogo: Descrizione: Cliente: Progetto:

Periodo: Luogo: Descrizione:

Cliente: Progetto:

Periodo:

Sig. De Meo Luca Ristrutturazione e direzione lavori appartamento. Progettazione di svariati complementi d’arredo in legno e muratura. 1998 Formia Appartamento di civile abitazione dott. Anna Rita Schober Ristrutturazione e direzione lavori appartamento. Progettazione di camini e di svariati complementi d’arredo in muratura e legno. 1997-1999 Civitella Benazzone (PR) Appartamento di civile abitazione (casa colonica) Studio di architettura Lugli Elaborazioni grafiche (Elaborazione computerizzata dei disegni presenti sul libro “Urbanistica di Roma” trenta planimetrie per trenta secoli di storia” di Piero Maria Lugli Bardi Editore - Roma 1998. 1996-1997

D’INTERNI - DESIGN

Periodo: Luogo: Descrizione:

dott. Anna Rita Schober Ristrutturazione appartamento. Progettazione di un soppalco realizzato in legno. Progettazione di svariati complementi d’arredo in legno. 1999 Roma Appartamento di civile abitazione

PROGETTAZIONE

Cliente: Progetto:

29


Progetto Se.i.co:

Periodo:

PROGETTAZIONE

SUPPORTO

Progetto Se.i.co:

30

Periodo:

Progetto Se.i.co: Periodo:

Progetto Se.i.co:

Periodo:

Progetto Se.i.co:

Periodo:

Se.i.co. S.r.l. per Svei SCUOLA MARESCELLI CARABINIERI Firenze Carpenteria impalcato edifici L10 e L11 2007 Se.i.co. S.r.l. per RAI Seim TEATRO DELLE VITTORIE - Roma Carpenteria nuova copertura e particolari. 2007 Se.i.co. S.r.l. per Sviluppo Italia S.p.A. VILLAGGIO TURISTICO - Sciacca progetto strutturale esecutivo 2006-2007 Se.i.co. S.r.l. per Società Italiana per Condotte d’Acqua S.p.A.- Piazzarotti S.p.A. Progetto strutturale preliminare gara per affidamento in concessione della realizzazione e gestione della METRO D - Roma Fasi di traffico ed impianti di cantiere Stazione Sonnino, Fiume, Buenos Aires e Trastevere. 2006 Se.i.co. S.r.l. per Design 2000 international S.p.A. PRESIDENTIAL VILLA IN LIBIA Prototipo di villa da realizzare in Libia in 50 esemplari. 2002-2003

Periodo:

Erregi S.r.l. per Rodano Consortile Scarl Progetto costruttivo della NUOVA STAZIONE ALTA VELOCITÀ DI REGGIO EMILIA 2002 - presso lo studio Erregi S.r.l.

Progetto Erregi:

Erregi S.r.l. per Grandi Stazioni S.p.a. Progetto esecutivo della ristrutturazione

Progetto Erregi:


Periodo:

Progetto Erregi:

Periodo:

Progetto Erregi:

Periodo:

Progetto Erregi:

Periodo:

Progetto Moroli:

Periodo:

Erregi S.r.l. per Grandi Stazioni S.p.A. Progetto esecutivo della ristrutturazione di UN’ALA DEL FABBRICATO DELLA STAZIONE TERMINI PER LA REALIZZAZIONE DEL NUCLEO CARABINIERI 2001 - presso lo studio Erregi S.r.l. Erregi S.r.l. per S.T.A. (Comune di Roma) Progetto architettonico definitivo della LINEA C DELLA METROPOLITANA DI ROMA 2001 - presso lo studio Erregi S.r.l. Erregi S.r.l. per Metropolitane Milanesi S.p.A. Progetto preliminare e definitivo della METROPOLITANA LEGGERA DI BOLOGNA 2001 - presso lo studio Erregi S.r.l. Erregi S.r.l. per Italferr S.p.A. Progetto esecutivo delle opere civili della NUOVA STAZIONE ALTA VELOCITÀ CAMPANIA AFRAGOLA 2001 - presso lo studio Erregi S.r.l. studio di architettura Moroli per Parco Nazionale delle Cinque Terre Progetto delle STAZIONI FERROVIARIE DI MANAROLA, VERNAZZA, CORNIGLIA, MONTEROSSO, RIOMAGGIORE. 2000 - presso lo studio Moroli (arch. Ruggeri) Studio di ingegneria Lacava per Comune di Ancona

SUPPORTO

Progetto Erregi:

PROGETTAZIONE

Periodo:

di UN’ALA DEL FABBRICATO DELLA STAZIONE TERMINI PER LA REALIZZAZIONE DI UNA SCUOLA PROFESSIONALE 2001 - presso lo studio Erregi S.r.l.

31


Progetto Erregi:

Periodo:

Progetto Erregi: Periodo:

Progetto Erregi:

Periodo:

Progetto Moroli: Periodo:

Progetto Passarelli:

Erregi S.r.l. per Ferrovie dello Stato S.p.A. Direzione Potenziamento e Sviluppo di Ancona Progetto definitivo ed esecutivo della STAZIONE FERROVIARIA DI ASSISI, OPERE DI MANUTENZIONE ORDINARIA E STRAORDINARIA. 1999 - presso lo studio Erregi S.r.l. (arch. Magliozzi) Erregi S.r.l. per Ferrovie dello Stato S.p.A. Progetto esecutivo della FERMATA DI TOR VERGATA A ROMA. 1999 - presso lo studio Erregi S.r.l. (arch. Magliozzi) Erregi S.r.l. per Seico S.r.l. Progetto esecutivo delle OPERE CIVILI ED IMPIANTI DEGLI EDIFICI SCC DEI NODI FERROVIARI DI NAPOLI E BARI. 1998-1999 - presso lo studio Erregi S.r.l. (arch. Magliozzi) arch. Moroli Concorso di architettura (Comune di Roma) Motto: mirang raming Segnalato CONCORSO INTERNAZIONALE “CENTRO CONGRESSI ITALIA - ROMA”. 1998 - presso lo studio Moroli (arch. Ruggeri) Studio di architettura Passarelli Concorso di architettura (Comune di Roma) Vince il 2° premio “CONCORSO DI IDEE PER LA

SUPPORTO

Periodo:

industrializzazione della Valle del Biferno Progetto definitivo delle INFRASTRUTTURE E DELLE OPERE CIVILI DELL’INTERPORTO DI TERMOLI. 1999 - presso lo studio Erregi S.r.l. (arch. Magliozzi)

PROGETTAZIONE

Progetto Erregi:

33


PROGETTAZIONE

SUPPORTO

Periodo:

34

Progetto Erregi:

Periodo:

Progetto Healy:

Periodo:

Progetto Healy: Periodo:

Progetto W&F: Periodo:

SISTEMAZIONE FUNZIONALE ED AMBIENTALE DELLA SS.26 DIR NEL TRATTO FINALE DI ADDUZIONE AL TRAFORO DEL MONTE BIANCO. 1998 (arch. Ruggeri) Erregi S.r.l. per Rocksoil S.p.A. & Studio 80 Engineering Progetto definitivo della STAZIONE CONCA D’ORO DELLA LINEA MB1 DELLA METROPOLITANA DI ROMA. 1998 - presso lo studio Erregi S.r.l. (arch. Magliozzi) Brian Healy architects U.S.A. Boston, MA 51 Melcher Street Progetto di restauro innovativo di un EDIFICIO POLIFUNZIONALE IN DOWNTOWN BOSTON (19 Lincoln St.) 1996 - presso lo studio Brian Healy (arch. Magliozzi) Brian Healy architects U.S.A. Boston, MA 51 Melcher Street Progetto di una VILLA UNIFAMILIARE A PECONIC BAY (N.Y.) 1996 - presso lo studio Brian Healy (arch. Magliozzi) Wallace & Floyd and associates inc. U.S.A. Boston, MA 126 Congress Street Progetto di una CENTRO INTERMODALE A WEELING (WEST VIRGINIA) 1996 - presso lo studio Wallace & Floyd (arch. Magliozzi)

Tutti i lavori della sezione “Progettazione supporto” sono stati svolti dai singoli professionisti in qualità di collaboratori e/o dipendenti delle società o studi affidatari dell’incarico.


Indetta da: A.T.I. : Periodo: Esito: Concorso di idee: Indetta da: Descrizione: Periodo: Esito:

Servizi di ingegneria riguardanti la progettazione preliminare e definitiva ed eventuale esecutiva delle opere di ristrutturazione architettonica, messa a norma degli impianti, l’abbattimento delle barriere architettoniche per le Stazioni di: Cancello - Nocera Inferiore S. Maria Capua Vetere - Torre Annunziata Centrale RETE FERROVIARIA ITALIANA S.p.A. MARS architetti con Società Infrastrutture & Impianti S.r.l. 2007 non vinta Piccole Stazioni Ferroviarie. Sezione “Junior/under 39” RETE FERROVIARIA ITALIANA S.p.A. Ideazione di una stazione ferroviaria tipo. MARS architetti 2007 Progetto pubblicato

Gara per affidamento incarichi di progettazione: SCUOLA MATERNA ED ELEMENTARE DON FILIPPO RINALDI - Roma - Mun. X Via Lemonia 226 Lavori di demolizione e ricostruzione: Progettazione definitiva, esecutiva, sicurezza in fase di progettazione. Indetta da: Comune di Roma R.T.P: MARS architetti con R.T.P. Capogruppo C. Magliozzi (MARS architetti) Periodo: 2003 Esito: Miglior punteggio attenuto -> progettisti incaricati Gara per affidamento incarichi di progettazione: SCUOLA MEDIA PASCOLI - Roma Mun. IX Via Illiria Manutenzione straordinaria Progettazione

GARE & CONCORSI

Gara su invito:

SIGNIFICATIVI

GARE & CONCORSI SIGNIFICATIVI

35


SIGNIFICATIVI

GARE & CONCORSI 36

Indetta da: R.T.P: Periodo: Esito:

Concorso di idee:

Descrizione: Indetta da: R.T.P: Periodo: Esito:

definitiva, rilievi e restituzione grafica, sicurezza in fase di progettazione Comune di Roma MARS architetti con R.T.P. Capogruppo arch. F. Zamponi 2003 Miglior punteggio attenuto -> progettisti incaricati “Second european design competition: Lights of the future” Concorso internazionale per la progettazione di una lampada da sospensione “Illuminotto” prototipo di lampada. Enea tramite aedoto.com MARS architetti con arch. Antonio Las Casas e arch. Francesca Bet 2001 Progetto pubblicato

Gara per affidamento incarichi di progettazione: “RESTAURO EDILIZIA MONUMENTALE VINCOLATA” INTERVENTO 3 VILLA PHAMPHILI CASCINA FLORIDI, RESTAURO E RISTRUTTURAZIONE. Descrizione: Concorso per l’affidamento di incarichi di progettazione: Categoria B Indetta da: Comune di Roma R.T.P: arch. Ruggeri con R.T.P. Capogruppo arch. Alfredo Passeri Periodo: 2000 Esito: Miglior punteggio attenuto -> non estratti Concorso internazionale di architettura: “SARAJEVO CONCERT HALL” Descrizione: Concorso internazionale di architettura per la Biennale dei giovani artisti dell’Europa e del Mediterraneo. Motto: 999 milleculur arch. Magliozzi Periodo: 1998 Esito: Progetto pubblicato

P T L


POR TFO LIO MARS

SCHEDE LAVORI 37


Edificio per uffici e box Via di Vigna Rigacci - RM PROGETTO DEFINITIVO PER RILASCIO DEL PERMESSO DI COSTRUIRE

2010-2011

L

’area interessata dal progetto, un lotto intercluso tra palazzine residenziali di 4-5 piani, è localizzata in un ambito urbanizzato, privo di elementi e caratteri di valenza paesaggistica, storico - archeologica o culturale. Il lotto è caratterizzato da presenza di essenze arbustive spontanee, prive di pregio. L’edificio, progettato nel massimo rispetto dell’orografia e della morfologia dell’area, è composto da un piano parzialmente entroterra per garage ed una parte a servizi alle persone e/o attrezzature collettive, da un piano fuori terra e da un piano sovrastante solo una parte del volume circolare dell’edificio; entrambi i piani sono destinati a servizi alle persone e/o attrezzature collettive. L’area esterna all’edificio avrà dunque le stesse caratteristiche altimetriche di quelle attuali. A fronte di una superficie complessiva del lotto di circa 1.800mq si prevede la realizzazione di una SUL di circa 515mq; il basso indice di edificabilità dell’area comporta una limitata edificazione dell’area con un rapporto di copertura modesto, infatti al piano terreno a fronte di circa 380mq edificati ne restano circa 1.420mq non edificati.

39


2010-2011

I

l progetto dell’edificio che ospita la mensa e la casa di accoglienza per bisognosi prevede la sistemazione generale dell’area, con un livellamento del terreno e la formazione di una paratia per il contenimento del terreno lungo la strada che conduce al villino “Palmer”, la già citata “Casa delle case”.

Casa di accoglienza Monterotondo - Roma

PROGETTO ESECUTIVO - COORDINEMENTO DELLA SICUREZZA IN FASE DI PROGETTAZIONE

L’intervento riguarda un’area che ha superficie complessiva di circa 1.130 mq, e l’edificio previsto, che si sviluppa su n.4 livelli fuori terra incluso il piano tecnico in corrispondenza delle coperture, ha una superficie totale di circa 950 mq. L’immobile ha una forma assimilabile ad un poligono costituito dalla intersezione di due rettangoli, con le seguenti dimensioni massime: 32,5 mt (longitudinale) e 12,5 mt (trasversale). Volumetricamente i due rettangoli sono differenziati sia da differenti funzioni interne che differenti trattamenti di facciata. Il volume che ospita le attività polifunzionali è caratterizzato da una copertura inclinata e da un trattamento superficiale a tinta colore bianco. Il volume rettangolare che ospita le camere da letto è invece evidenziato oltre che da una copertura piana anche da una colorazione color cioccolato e dall’utilizzo di elementi di rivestimento in terracotta in prossimità delle logge sul fronte principale. La copertura inclinata è interamente coperta da pannelli fotovoltaici. Sulla medesima copertura sono posizionati due lucernari, uno posto in corrispondenza della scala principale e l’altro in pozione baricentrica rispetto allo spazio interno a tutta altezza.

É in corso la gara per l’affidamento dei lavori

40


2007-2008

Outlet Shopping - Maida

STUDIO DI FATTIBILITA’ E PROGETTAZIONE

42


Teatro dell’Opera - Roma COLLABORAZIONE PER LA PROGETTAZIONE ESECUTIVA E D.L. COORDINAMENTO DELLA SICUREZZA IN FASE DI PROGETTAZIONE ED ESECUZIONE

43

2007-2008


Scuola RINALDI RM

2003-2008

PROGETTEZIONE DEFINITIVA, ESECUTIVA, SICUREZZA IN FASE DI PROGETTAZIONE E DIREZIONE LAVORI l progetto del nuovo padiglione, ha uno schema funzionale analogo a quello del padiglione da demolire; sono stati però, rispetto a questo ultimo, ottimizzati e riconfigurati gli spazi interni secondo le esigenze normative e del Dirigente Scolastico.

I

Il padiglione si sviluppa su un unico livello e comprende n.10 aule, un ambiente per il refettorio, uno spazio per l’interciclo utilizzabile dalle quattro classi del primo ciclo, i servizi igienici per gli alunni e per gli insegnanti, l’infermeria, l’aula di sostegno, depositi e ambienti minori. Il fabbricato è diviso in due separate unità funzionali, collegate da un atrio/ingresso, che corrispondono a due diversi volumi: unità relativa al primo ciclo (classi 1° e 2°) e unità relativa secondo ciclo (classi 3°,4° e 5°). il progetto si configura come un intervento di bio-architettura “eco-sostenibile” con sistemi di contenimento energetico per i due assetti climatici principali, quello estivo e quello invernale. Mediante un modello computerizzato che tiene conto delle geometrie di progetto nella specifica localizzazione, sono state effettuate le scelte tecnologiche di progetto. Durante il periodo caldo, l’assetto dell’edificio consente il massimo sfruttamento delle fonti di raffrescamento e la protezione dei raggi solari; così come durante il periodo freddo consente di evitare le dispersioni termiche e di accumulare calore solare con sistemi passivi. Lavori ultimati

45


LA RUSTICA Roma

2000-2001

PROGETTEZIONE DEFINITIVA DELL’EDIFICIO DI CIVILE ABITAZIONE

46


Torretta VERANO RM

2002-2003

PROGETTAZIONE DEFINITIVA DI CONSOLIDAMENTO E RESTAURO

I

l progetto di manutenzione straordianaria e di consolidamento della Torretta del Verano ha l’obiettivo di mettere a norma ed in sicurezza l’immobile per ubicarvi gli uffici dei Vigili Urbani e una piccola esposizione relativa al Cimitero del Verano. Viene introdotto un ascensore che collega i 4 livelli, compreso il livello soppalco completamente rimodellato, con la demolizione della scala in ferro di recente realizzazione e l’inserimento di una porzione di solaio in acciaio e laterizi in corrispondenza della scala principale. Vengono completamente riprogettati i servizi iginici con una nuova ubicazione all’interno dello stabile. Si prevede la sostituzione di alcuni serramenti fatiscenti con altri della medesima forma. Il consolidamento prevede l’inserimento di una coppia di catene in acciaio inox poste in corrispondenza dell’intradosso della volta del primo piano

47


Gis TIBURTINA RM

2001-2002

APPROVVIGIONAMENTO DATI RELATIVI AI SOTTOSERVIZI: SOPRALLUOGHI, RILIEVI ED ELABORAZIONI GRAFICHE

48


PIAZZA PEPE Roma

2003-2006

PROGETTEZIONE ESECUTIVA

L

’idea di riqualificazione dell’area delimitata dall’ex caserma Pepe, dal Teatro Ambra Jovinelli, dall’Hotel ES e da Via Giolitti è volta al soddisfacimento di specifiche esigenze della collettività. Nasce dalla volontà di migliorare le caratteristiche funzionali dello spazio adiacente ad edifici importanti come il teatro, il mercato, l’università e l’albergo, attribuendogli un’identità di “luogo” urbano e dalla necessità di preservare i valori del passato, come le vestigia dell’acquedotto romano. È la naturale conseguenza e l’interpretazione di una politica di sviluppo e riuso praticata nelle aree limitrofe ed in tutto il quartiere Esquilino; compimento e prosecuzione, quindi, degli interventi effettuati nei restauri e manutenzioni degli adiacenti edifici. Soluzione definitiva per le aree che hanno ospitato provvisoriamente una porzione del mercato in un “plateatico” all’aperto, attualmente trasferito nell’area dell’ex caserma Pepe di Via Turati, e che risultano oggi prive di alcun significato. Le esigenze funzionali ed estetiche configurano l’idea di una “piazza” che è presente anche nei racconti di Ettore Petrolini e nelle fotografie di inizio secolo scorso, con una molteplicità di figuri e immagini legate al mondo dello spettacolo: saltimbanchi, baracconi temporanei, tiri al bersaglio, giostre e innumerevoli persone e spettatori. Una piazza che restituirebbe ai cittadini un luogo lentamente andato perso.

Lavori ultimati

49


2001-2002

SORRENTINO Roma

RISTRUTTURAZIONE E DIREZIONE LAVORI APPARTAMENTO DI CIVILE ABITAZIONE

50


LEE Roma

2006-2007

RISTRUTTURAZIONE APPARTAMENTO DI CIVILE ABITAZIONE

51


DEL CANUTO Roma

2002-2003

RISTRUTTURAZIONE E DIREZIONE LAVORI APPARTAMENTO DI CIVILE ABITAZIONE

52


RICCIARDI Roma

2005-2006

RISTRUTTURAZIONE E DIREZIONE LAVORI APPARTAMENTO DI CIVILE ABITAZIONE

53


COSSU Roma

2005-2006

RISTRUTTURAZIONE E DIREZIONE LAVORI APPARTAMENTO DI CIVILE ABITAZIONE

54


“ILLUMINOTTO”

2001-2002

CONCORSO INTERNAZIONALE DI DESIGN PER LA PROGETTAZIONE DI UNA LAMPADA DA SOSPENSIONE

55


MARS

Office Viale Liegi n째1 - 00198 Roma, Italy Tel: +39.06.45.43.62.96 Fax: +39.06.45.43.64.72 P.IVA 06 74 398 1000 e-mail: mars.architetti@fastwebnet.it

Realizzazione grafica MARS architetti Si autorizza a trattare i dati personali in forma strettamente confidenziale e nel rispetto della Legge 675/1996 (Tutela della privacy)


brochure