Sample of a rooms based college condition survey

Page 256

EstateManager

Property Appraisal - Detail Report Cond. 02 - Ceiling 03 - Floor

Cost to B Rem Life Priority C L

R

Year

C

£100

0

3

0 0

0

2009

B(C)

£350

4

3

0 0

0

2013

B(C)

£312

3

4

0 0

0

2012

C

£100

0

3

0 0

0

2009

B(C)

£420

4

3

0 0

0

2013

B(C)

£1,430

3

4

0 0

0

2012

£0

15

0

0 0

0

2024

Notes

Remedial Action

Suspended ceiling: Replace water damaged tiles. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-07-0-071 01 - Decorations

02 - Ceiling 03 - Floor

Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.

Location: 001-07-0-072 01 - Decorations

02 - Ceiling

B

03 - Floor

B(C)

£1,925

4

3

0 0

0

2013

03 - Floor

B(C)

£1,925

4

3

0 0

0

2013

£0

6

0

0 0

0

2015

£5,000

2

2

0 0

0

2011

05 - Condition of Internal Walls 08 - Fixed Units

Sample College Physical Condition Survey

B B(C)

Redecoration required as part of a regular maintenance schedule. Timber panelling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Ceramic wall tiling: In good condition. Fixed units: Kitchen unit requires replacement within the maintenance schedule due to age and level of deterioration. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.