EstateManager
Property Appraisal - Detail Report Cond. 02 - Ceiling 03 - Floor
Cost to B Rem Life Priority C L
R
Year
C
£100
0
3
0 0
0
2009
B(C)
£350
4
3
0 0
0
2013
B(C)
£312
3
4
0 0
0
2012
C
£100
0
3
0 0
0
2009
B(C)
£420
4
3
0 0
0
2013
B(C)
£1,430
3
4
0 0
0
2012
£0
15
0
0 0
0
2024
Notes
Remedial Action
Suspended ceiling: Replace water damaged tiles. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.
Location: 001-07-0-071 01 - Decorations
02 - Ceiling 03 - Floor
Redecoration required as part of a regular maintenance schedule. Suspended ceiling: Replace water damaged tiles. Carpet: Requires replacement with contract quality carpet within the maintenance schedule.
Location: 001-07-0-072 01 - Decorations
02 - Ceiling
B
03 - Floor
B(C)
£1,925
4
3
0 0
0
2013
03 - Floor
B(C)
£1,925
4
3
0 0
0
2013
£0
6
0
0 0
0
2015
£5,000
2
2
0 0
0
2011
05 - Condition of Internal Walls 08 - Fixed Units
Sample College Physical Condition Survey
B B(C)
Redecoration required as part of a regular maintenance schedule. Timber panelling: In good condition. Anti-slip vinyl sheet flooring: Requires replacement within the maintenance schedule due to age and condition. Carpet: Requires replacement with contract quality carpet within the maintenance schedule. Ceramic wall tiling: In good condition. Fixed units: Kitchen unit requires replacement within the maintenance schedule due to age and level of deterioration. January 2010 0000 Issued by Oakleaf Surveying Ltd - 0845 293 7571