Offshore supplement

Page 10

E&P

Exploration and Production

EE p or P: tion

&

Pro uction

41%

Forty-one percent of E&P companies said that they would be investing in the development of drilling or exploration programmes, which is significantly lower than in 2014 when 70 percent reported this as a key strategic focus. (According to a survey by PwC see page 18 - 20 for more information)

DRC/Angola Chevron completes subsea engineering feat in Africa

C

hevron recently achieved a technological feat in the depths of one of the world’s largest underwater canyons. With vital right-of-way permits approved by the governments of the e ocr tic epu c o the Congo n Angola, Chevron has completed the r ng o e ntersection con u t ene th the Congo er su r ne c n on p rt o the Congo er C n on Crossing pipeline project. To cre te the ntersection t o e bores were drilled simultaneously ro sh o ter p or s oc te on each side of the canyon. One of

Stockists of Marine Industry’s best & leading known brands The Commercial Crewsaver Lifejacket provides critical safety at sea Crewsaver is dedicated to saving lives with innovation that comes from a passion for improving safety at sea Innovative Design and manufacture of critical marine safety equipment. Offering wide range of advanced, marine survival products for commercial markets. The quality, technological superiority and innovative design of the Comet products, combined with worldwide type approvals and manufacturing in Bremerhaven to ISO 9001 & 15736 standards, has placed Comet at the forefront of marine safety.

The Zodiac Commercial Liferaft is one the leading brands in the Marine Industry Offer an extensive range: 4 – 150 man capacity Advanced features include: Manufactured with a durable polyurethane coated fabric Assembled using Thermobonding™ Consistent (computer-controlled technique) Inert to aging factors in the marine environments Extremely strong and safe when loaded Easy to service, fit in small light reinforced plastic containers Can be dropped from up to 36 meters Approved EPIRB on request Equipment packs sealed in strong watertight bags Equipment packs secured inside the liferaft

Head Office

+27 (0)21 506 4300

Durban branch +27 (0)31 205 6201 nmservice@novamarine.co.za www.novamarine.co.za

ISO 9001 Marine & Aviation Equipment Suppliers and Service agents in Africa. Exclusive Agents in Africa for Zodiac, Arimar and Sea-Safe products

8

SPECIAL SUPPLEMENT: Supporting the offshore sector

the p or s s oc te n the e ocr tic epu c o the Congo h e the other p or s oc te n Ango The e ores tr ns tione ro ertic to horizontal, and then intersected almost midway beneath the canyon, approximately 2,000 feet (610 m) beneath the seabed, where the water depth is onehalf mile (0.8 km). The Congo er cross ng s Che ron s rgest e er e ntersection n t is the most technically challenging aspect of the pipeline project. The well ntersection pro e the ost secure method of crossing the canyon and connecting to the p pe ne t the p or s located on each side of the canyon. “This was the most unique well intersection pro ect o ts n e er un ert en Che ron n the er rst n the n ustr per or e offshore s Ben Leonard, project drilling manager for Chevron’s Southern Africa strateg c us ness un t ther ntersection projects have involved drilling under highways or riverbeds, but this one s ore th n ti es the ength o routine cross ng Se er nno ti e techno og es n processes were employed during the r ng o the e ntersection or e p e n cti e gnet r ng ng technology was used to direct the drilling assembly so that the wellbores merged precisely on a target roughly the size of s et Th s n o e gnetic sensor in the drill string on one side and a powerful magnet, located behind the drill bit, on the other side. An tion ch enge or the pro ect te s to nst the t o offshore p or s n n re c ose to the outh o the Congo er here there re strong currents. The pipeline will transport natural gas ro Ango s offshore oc s n to the Ango L ue e N tur s LN P nt the countr s rst LN pro ect. When completed, the pipeline will be approximately 87 miles (140 km) in ength n n ti tr nsport up to million cubic feet of natural gas per day.


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.