Page 1

portfolio

architecture + photography maia dorin


MAIA DORIN

architect.

dorinmaia@gmail.com maiadorin.wixsite.com/photography dorinmaia.ph

about me I'm an Argetinian Architect graduated in December 2015 at the National University of Tucumรกn. I am very fond of Design and Photography. I believe that Architecture is the perfect mix of both things. My experience and education have given me great skills, especially multi-tasking and team work abilities. I consider myself to have great attention to detail, a strong work ethic, high motivation, persistence at all times and know how important it is to be a team player.

education 2008 - 2015 Master Degree in Architecture Collage of Architecture and Urbanism, National Univresity of Tucumรกn, Argentina. 2012 - 2013 Completed two years of Photography Thechnical Collage of Bellas Artes, National University of Tucumรกn.

skills Autocad Sketch up Corel Draw Archicad

Photoshop Ilustrator Lightroom Vray

languages

interests

Spanish English Hebrew

Sustainable Architecture Social Housing Architecture Drawing

Microsoft Office Hand Drawing Teamwork Adaptability

Photography History Travelling


work experience 2018 - 7 months Graduate Architect at Michael Folk Architects & Interior design, Sidney, Australia Houses Renovations/ DA and CC documentation/ Joinery and Interior design 2018 - 7 months Freelance Architectural Photographer at Michael Folk Architects & Interior design, Sidney, Australia 2017 - 2018 Marketing and adversiting in family owned food business. Photography and graphic design job, Argentina 2016 - 2017 Travel and working in New Zealand 2012 - 2015 Marketing and adversiting in family owned food business, Argentina 2014 Architecture internship at Ministry of Social Development-Design and construction of affordables houses, Argentina Community Kitchens and affordable housing projects 2011 and 2013 Architectural draftsperson, structural draftperson, Argentina Freelance jobs in advertising photography and events. Freelance on furniture design. Graphic design comissions, Argentina

courses conferences

2018 Course- Spoken English for Work & Study-Advanced, City East Collage. Sydney, Australia- 2 months 2015 Training leadership "Leaders - Seminar 2015" given by Rab Yejezkel Kanonitsch, Tucumán , Argentina 2014 Voluntary participation in Organization "TECHO para mi país", Salta, Arg. 2013 Participation in Congress ASADES-“XXXVI Meeting working Argentine Association of renewable energies and environment and XXII meeting of the international Association for solar energy education", UNT 2013 Urban Drawing Course by Norberto Dorantes. National University Of Tucumán. 2011 Contest ILAFA participation : Steel Architecture, Buenos Aires, Argentina 2010 Course of architecture digital work , National University Of Tucumán 2009 Art History Cycle given by Prof. Adela Noriega and Lic. Sara Kira –Centro Cultural Virla, Tucumán, Arg. 2008 Course " The plastic in the sketch", National University Of Tucumán.

2019 Online Course Sustainability in Architecture: An Interdisciplinary Introduction, edX UPValencia

2008 Course "Techniques representation and expression in architecture work", National University Of Tucumán.

2018 July Seminar Social Media for Architects, Sydney, Australia

2007 Graphic Design Course, Red Millenium IAC, Tucumán, Argentina - 1 year.


c. sydney

01

C.I.E.N

02

portico building

03

ecolodge

04

urban proposal

05

landscaping proposal

06

steel hive

07

Alexandria & Rose Bay apartments House Renovation/DA-CC/Interior Design Sydney, Australia.

Centro de Investigación Ecológica Nacional National Ecological Research Center Laguna Iberá, Corrientes, Arg.

Residential building Tucumán, Arg.

Ecological Hotel/Cottage Indiana, USA

mmm Tucumán, Arg.

“pedes in terra ad sidera visus” National University of Tucumán, Arg.

Intermodal Passenger Station Tucumán, Arg.


contents


01 Alexandria & Rose Bay apartments House Renovation/DA-CC/Interior Design Sydney, Australia

CD 14

1,685

DR W W/DRY

2,600

2 3

MOBIL

4

2211

NEW CARPET BY OWNERS

725

1

2

BEDHROOM 1

BATHROOM 1

NEW CARPET BY OWNERS

NEW TILES FLOOR

2

2380

F

2370

4

2623 COS

CD 17

LAUNDRY

NEW TILES FLOOR

3

1

2,370

2,285

3

2,350

6,412

ROBE

FOX

1

2,653

CD 6

ROBE

2,365

sydney

4,085

2,745

A CD18

1,170

2668

1

3,121

210

5,880

856

1,015

HEATER

2,600

3,800 1,142

CD 15 2335

4

NEW TILES FLOOR

LIVING ROOM

LOW DRAWERS

NEW TIMBER FLOOR a.s

NEW STORE ROOM

2335

NEW TILES FLOOR

2425

1,896

BEDHROOM 2

ROBE

2335

2383

2

2

2,980

3,710

4

1

2

2650

FOX

FOX

2375

450

3

1

BEDHROOM 3 NEW CARPET BY OWNERS

1,375

2

600

3,365

1,780

COS

ROSE BAY apartment 1

600

593

600

DR W

D

634

6,540

2620

600

C CD19

5,520

D CD19

3,072

1

2

2692

BATHROOM 2

NEW TILES FLOOR

1

3

B CD18

ROBE

4,910

NEW CARPET BY OWNERS

3

870

3

1

BATHROOM 3

1,275

2704

CD 16

2

G

450

1,050

1,157

328

40

DW

2,645

1,938

2

2692

2,130

DW

2636

2,680 ENTRY

NEW TIMBER FLOOR a.s

782

F

2,850

2 4,010

4

These three projects consisted in a total or partial renovation ofa house and apartments. The designs are fresh and modern and try to reflect the personality and tastes of each client. Detailed documentation, DA and CC. Bathrooms and kitchens renovation, site visits and electrical plans. Archicad 3d and shadows diagrams

P

NEW TIMBER FLOOR a.s

450 600

1

ov mw

2405 NEW KITCHEN

3

1,200

3,475

50

appl

2673

2,438

ROBE

4,025

4,492

600

350

G

W/DRY

2w MOBIL

A/C

P

C B

2w

B 2w

PC

B

DW

2636

A

DW

2w

W

HEATER

A

A

2w

SD

A B

E

2w

E

4,910

C G

C

2335

D

2335

A

A

W

H

B

B

FOX

2650

A

W

P

F

2375

TV

B B

2620

TEL

150 418 1,780

130

2692

B

H

D

1,060

B

DRAWN:

C

A C

C

G

680

ROBE

E

TEL

1,510 2,745

1:100 @ A3 P

2425

C

TV

SCALE: B

2w

D

E

F

2692

2383

P

E

2w

2335

LOW DRAWERS

2704

E

G

Layout

A

I

300

B

763

DRAWING TITLE: 420

ADDITIONS & ALTERATIONS TO EXISTING HOUSE Client EHRLICH 1/11 IAN ST ROSE BAY

ov mw

2405

2,370

2,130

E appl B

FOX

G

D

2w

2673

F

C

ROBE

ROBE

C

2380

600

B

2370

H

C

D

725

2w

C

A 2668

P

B

A

C

2211 2623

F

In this project the client wanted to renoCheck all dimensions on site before vate all the bathrooms, kitchen and Commencement of work shown on bedrooms of the apartment. The client this drawing. Work to figured dimension only. Do not scale wanted a modern and open change, 64/61 MARLBOROUGH STREET drawings. Report any discrepancies SURRY HILLS, NSW joining the kitchen with thebefore living room. to the architect for a decision M: 0412 677 679 proceeding with work The modern and simple design ofm.folk@mfolkarchitects.com.au the kitchen was incorporated into the living room through a suspended structure and a fully functional but delicate island. Detailed documentation of the joinery and 3d.

A

GROUND FLOO

C

ROBE

ROBE

700

F

FOX

480

TV

0. -

MD

DAT


180

20

new tiles wall 600x300

feature wall new tiles 300x300 (same as floor tiles)

mirror cabinets

890

20

492 984

890

570 870

drawer

vertical led strip light drawer inside wardrobes, switch KB on automatically

eq

600

this drawing. Work to figured 64/61 MARLBOROUGH STREET SURRY HILLS, NSW M: 0412 677 679 m.folk@mfolkarchitects.com.au

ADDITIONS & ALTERATIONS TO EXISTING HOUSE Client EHRLICH 1/11 IAN ST ROSE BAY

DRAWING TITLE:

SCALE:

1:20 @ A3

DRAWN:

Commencement of work shown on this drawing. Work to figured dimension only. Do not scale drawings. Report any discrepancies to the architect for a decision before

64/61 MARLBOROUGH STREET SURRY HILLS, NSW M: 0412 677 679 m.folk@mfolkarchitects.com.au

DRAWING NO.:

KITCHEN ELEVATION 1

Check all dimensions on site before

proceeding with work

890 1,230

340 200

390

870

570

185

350

185

300

562

DW

garbage

trays

500

250

305

59

800 900

GPO and PC

drawer

drawer

SHOES

730 830

2,673

20

2,405 20

170

stone table with metal structure a.s

drawer

1,685 COS 600

571 685

1,692

GPO

food waste disposer

BEAM FOX

20

200

562

GPO

310

20

2,211

360

900

GPO

562

GPO

zip classic ba 280x313x333

shoes

110

2,692

20 20 300

2,263 1,800

360

GPO

new ceiling to match kitchen ceiling

ceiling hight in the kitchen

stone bench a.s

fixed panel for gpo's

782

1,200

adj

hanging structure with sliding doors cabinet

Bolero sink box 220 36-36 stainless steel

N

TD 15

24/07/2018

995

20

274

354

20

150

20 290

20

2,405

adj

380

20

290

1,000

290

1,940

324

290 600

adj

760

726

20

1,180 1,200

2,780

728

1,456

2,185

20

560

E L E V A T I O N 1 1: 5 0

90

2,098

1,470

MD

DATE:

24/07/2018

TD 7

1: 2 0

Structure components TBA Check all dimensions on site before Commencement of work shown on

Structure components TBA

proceeding with work

led strip light recessed into base of cabinet

private stone wall a.s

new beam after demolish existing wall

20

EL EV A T ION 2

Check all dimensions on site before

to the architect for a decision before

DATE:

676

6,410 COS

Commencement of work shown on dimension only. Do not scale

200

adj

E L E V A T I O N 2 1: 5 0

760

676

open shelf

20

E L E V A T I O N 1 1: 2 0

drawings. Report any discrepancies

ADJ

5,650 COS

N

492

20

170

80

adj

adj

20

GPO

1,052 M B E1,051D R O O 1 PLAN W A R D R O B E S 1: 5 0 eq

555

565 700

290

ROBE

1,330

adj

20

20

50 805 20 adj

G

drawer

DRAWING NO.: steel structure hanging from the roof structure

2,780

305

drawer

Structure components TBA All heated tail rail to be connected to a timer builder to allow for underfloor heating maintain existing position of floor waste

1,000 20 200 200 200 230 150

drawer

vertical led strip light inside cabinets, switch on automatically

DRAWING TITLE: ADDITIONS & ALTERATIONS FIXED BATHROOM 2 TO EXISTINGFIXED HOUSE Client hanging hanging long 24 1,363 hanging SCALE: EHRLICH 1:20, 1:50 @ A3 ADJ 1/11 IAN ST DRAWN: MD ROSE BAY

500

drawer

TO BE REMOVED

mdf's structure for led light switch on automatically

20 200 200 200 230

drawer

GPO

MANTAIN EXISTING

NEW ELECTRICAL remove existing nib wall to fit new bath

500

305 100

drawer

492

drawer

drawer

drawer

492

1,685

GPO

20

670 170 305 880

26/07/2018

TD 4.21

ack

drawer

984

1

adj

k ac hb las sp stone bench a.s cooktop a.s

drawer

remove existing GPO

adj

2

GPO

hb splas

drawer

drawer

492

adj 2211

KITCHEN GPO

pocket door pocket door

492

D3

GPO

led strip light

adj GPO

2668

1,780

20

20

GPO

adj

984

535

650

3

1,475 COS

NEW CARPET BY OWNERS

492

20

DRESSING ROOM RANGEHOOD A.S.

adj

GPO

535 1,685

m.folk@mfolkarchitects.com.au books

adj

BEDHROOM 1

drawer

20

M: 0412 677 679

1

305 170 800 900 1,330 610

50

adj

535

proceeding with work 755

3,020

GPO

DRAWING NO.:

600 64/61 MARLBOROUGH STREET entireHILLS, unit to beNSW polyurethane SURRY

to the architect for a decision before 20

755

805

ROBE

dimension only. Do not scale 935 drawings. Report any discrepancies

1: 2 0 ELECTRICAL

E L E V A T I O Nremovable 2 1: 5 0ceiling above

1: 5 0

305

268

vertical led strip light inside cabinets, switch on automatically

Base pressed steel bath

ROBE

this drawing. Work to figured

FOX

420

100

650

led strip light inside appliance cabinet

shelves finish 50mm until the edge of the cabinet to fit LED strip light

2,405

range hood to be ducted up into lowered ceiling space and then ducted externaly through back Check all dimensions on site before wall new shelf in front of existing Commencement of work shown on window

F

vertical led strip light inside wardrobes, switch on automatically

BA THROOM 2 ELECT R ICA L PLA N

NEW ELECTRICAL

TV

ELEV A T ION 1 existing window feature wall new tiles 300x300 (same as floor tiles)

710

TO BE REMOVED

3,229

20

MANTAIN EXISTING

T I E B E L T R A C K W 4 5 5 X H 1 1 1,534 8

658

ELECTRICAL

Base pressed steel bath/ top of bath to allow for two full wall tiles to meet feature

700

850

300

B

550 684

caroma forma cleanflush invisi II/ back to wall rimless toilet suite

Roca the gap semi recess basin 550x410

FOX

TV

B

new lowered ceiling to match with kitchen ceiling

2,375

F

2375

doble recessed handle

100

E L E V A T I O N 1 1: 5 0 B

H

850

mirror cabinets

1,480

C

GPO for heater

cistern/caroma under counter wall faced invisi II smartflush suite dual flush installation

1,185

180

drawer

waste pipe behind / cut drawer to accomodate

150

562

B1,685 1,230

Kado aspect swivel heated towel rail 1235x400 chrome/ hardwired

1: 5 0

1: 5 0

629

562

stone benchtop with mitre detail

drawer

20

vertical led strip light inside wardrobes, switch on automatically

B

3,229

314

562

795

420

354

A

715

Base pressed steel bath

100

1,430 3,020

BA THROOM 2 FLOOR PLAN

410 Roca the gap semi recess basin 550x410 and sprout a.s

ELEV A T ION 3

Base pressed steel bath

420

1,780

220

GPO

PA NT S HA NG ING R A C K

GPO

390

700

1,700

1,185

shoes

adj

20

pants hanging rack

Roca the gap semi recess basin 550x410

adj feature new splashback tiles

2,211

cistern/caroma under counter wall faced invisi II smartflush suite dual flush installation

hanging

adj

2,375

940 550 890 2,275

410

adj

340

3

hanging

700

715

795

2375

1,880

2

caroma forma cleanflush invisi II/ back to wall rimless toilet suite

940

4

remove existing nib wall to fit new bath hanging

Kado aspect swivel heated towel rail 1235x400 chrome/ hardwired

290

3,250

200 200 200 160 160

940 20

tie belt rack w455 x h118

new tiles wall 600x300

180

380

1,000

940

2,668

270

FOX

hanging

FIXED

hanging

BATHROOM 2 NEW TILES FLOOR

Kado aspect swivel heated towel rail 1235x400 chrome/ hardwired

1

1,880

FIXED

hanging 825

new tiles floor 300x300 a.s

TV 72cmx128cm

874 FIXED

605

hanging

long hanging

1,230

FIXED

hanging

hanging

680

hanging

1: 5 0

230 20

70

354

FIXED

80

1,708

2,100

850 850

new tiles wall 600x300

mirror cabinets

ELEV A T ION 4

150

1,760

caroma forma cleanflush invisi II/ back to wall rimless toilet suite

684 682

feature wall new tiles wall 300x300 (same as floor tiles)

80

removable ceiling above

ADJ

ADJ

1,480

ADJ

870

20

334 20

340

vertical led strip light inside cabinets, switch on automatically

cistern/caroma under counter wall faced invisi II smartflush suite dual flush installation

20

mdf's structure for led light switch on automatically

2,375

70

OR for notes parts 1:100

TE:

ELEV A T ION 3 D E T A I L L E D L I G H T 1: 2 0

50

this drawing. Work to figured dimension only. Do not scale

N

drawings. Report any discrepancies to the architect for a decision before proceeding with work

DETAIL A

64/61 MARLBOROUGH STREET SURRY HILLS, NSW M: 0412 677 679

m.folk@mfolkarchitects.com.au

ADDITIONS & ALTERATIONS TO EXISTING HOUSE Client EHRLICH 1/11 IAN ST ROSE BAY

DRAWING TITLE:

DRAWING NO.:

KITCHEN ELEVATION 2 SCALE:

1:20 @ A3

DRAWN:

ADDITIONS & ALTERATIONS TO EXISTING HOUSE Client EHRLICH 1/11 IAN ST ROSE BAY

MD

DATE:

24/07/2018

N

TD 8

DRAWING TITLE:

MAIN BEDROOM & BE PLANS & WARDROBE SCALE:

1:50, 1:5 @ A3

DRAWN:

MD

DAT


8.3 3

ROOF 14.20

TOG 13.79

sunse t

TREE HT 10

TWO STOREY RENDERED STUDIO AND GARAGE

8.3

4

2,290

NEW STORAGE

NEW SLYLIGHTS

FALL

FALL 80

FALL 450

D1

SK7

SK3

SK2

FALL 420

D1

FALL 20

FALL 20

NEW METAL DECK ROOF

NEW METAL DECK ROOF

SK4

FALL 20

FALL 450

LAWRENCE

NEW METAL DECK ROOF

NEW SLYLIGHTS

BOUNDARY 5.035

NEW DORMER

NEW COURTYARD

BOX GUTTER

NEW METAL DECK ROOF

RIDGE 13.95

TOG 11.75

TOG 11.06

BOUNDARY 5.45

PATH

1,330

BITUMEN

STONE

KERB

HT 18

sum mer

TOG 14.15

BOUNDARY 30.505

SK1 FALL 20

TREE

2,855

LANE

D2

B

ROOF 14.57

D

TOG 14.85

ROOF 15.08

8.1 4

2,915

600

3,061

6,965

NEW SLYLIGHTS

A

SK6

NEW METAL DECK ROOF

8.1

4

SK5

A

9

8.3

BELMONT STREET

940 20

495

3,030 EXISTING ROOF

r

winte 24 SEC 7 D.P. 1881

t sunse

BOUNDARY 7.85

600

TWO STOREY

NO No.

700

PRELIMINARY

24 SEC 7 D.P. 1881

RESIDENCE

1,300

5,715

2,000

5,315

4,140

700

1,300

B

16,515

7,060 TWO STOREY RENDERED

2,938

4,905

RENDERED

600

GARAGE

2,938

B

D

1,750

STUDIO AND TREE

250

TOG 11.75

TOG 11.08

575

TOG 13.93

D

TWO STOREY BRICK SEMI-DETACHED RESIDENCE METAL ROOF No. 348

TOG 14.26

D2

C

This project consisted in a total renovation and the design of the back of a classic house. On the outside the house maintained his classic character and the elegance of the neighborhood but inside it becomes a modern house, articulated by a courtyard to unify spaces. DA, 3d, shadows diagrams. 3D

nrise

su mer

sum

C

1: 5 0

winte r su

nrise

710 2,692

80

N TWO STOREY RENDERED RESIDENCE NO No.

1,880

940

ALEXANDRIA house

8.2

4

250

1,750

2,800 5,170

LAWRENCE

3 8.2

302

20

663

DRAWERS

D1 WU.01

FL11590

WCL.02 STEPS FL11210

STORAGE

18

DECK & BBQ AREA

BATH

2,100 NEW FLOOR

Door Window Stamp 20 This label is not available for Fills.

B

563

PRELIMINARY 563 1,822

Check all dimensions on site before

sydney 01 02

Check all dimensions on site before

Commencement of work shown on

CLIENT:

Commencement of work shown on this drawing. Work to figured dimension only. Do not scale drawings. Report any discrepancies

64/61 MARLBOROUGH STREET SURRY HILLS, NSW

200

ROBE

C

EXISTING FLOOR

D

NEW CARPET

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

17

D2

BEDROOM 3

LINEN

1,050

ROBE

INTERNAL WINDOW ABOVE

NEW CARPET

1,110

A

PASSAGE

685

563

LLWAY UPPER FLOOR PLANH A1:100 563 1,822

DRAWING TITLE: DRAWING NO.: Work to figured ALTERATIONS & this drawing. Check all dimensions on site before only. Do not scale 64/61 MARLBOROUGH FLOOR of&work UPPER FLOOR STREET Commencement shown on ADDITIONS TO dimensionGROUND SURRY HILLS, NSW drawings. Report any discrepancies PLANS this drawing. Work to figured EXISTING HOUSEto the architect for a decision before M: 0412 677 679 SCALE: dimension only. Do not scale

EL EV A T IO

685

64/61 MARLBOROUGH STREET

HA LLW A

N

WU.04

NEW CARPET

D1

5,170

BEDROOM 2

ROBE

NEW CARPET

1,020

DRAWERS

BEDROOM 1

1,000

600

DRAWERS

2,100

WU.02

D2

705

650 1,127 1,205 445 2,820 695

COURTYARD

WCL.01

WU.06

BELMONT STREET

ENSUITE

477

E L E V A T I O N 1 4 1: 5

WU.05

WU.03

N

ROBE

780 100

E L E V A T I O N 1 4 1: 5 0

WCL.02 CLERESTORY WINDOW

STORAGE

200 200

100

sum

WCL.01 CLERESTORY WINDOW

445

695

mer

D

C

L B

3,050

B

4,905

4,140

sunse t

7,060

200

20

200

650

GROUND FLOOR PLAN 1:100 780

532

A

302

CROSSING

100

2,662 3,0

600

2,938VEHICULAR

200 200

20

B

200

2 D.P. 542510

800

900 LANE

N BOUNDARY 5.035 8.3

302 2,938

5,522

650

TWO STOREY BRICK SEMI-DETACHED RESIDENCE METAL ROOF No. 348

D

2,000

600

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

D2

EXISTING FLOOR

C

BOUNDARY 7.85

BRICK PARTY WALL

SOFT LANDSCAPING

P

532

50 75

9

APPL MW

17

4 8.3

663

0 8.4

8.3

F

302

0

8.4

EXISTING DOOR

ENTRY

800 100

0

ABL ME

PER

20

27/07/2018

DATE:

50 75

DRAWN: MD

ING ARK EP

KITCHEN

NEW TIMBER FLOOR

18

NEW TIMBER FLOOR

LAN 1: 5 0

8.4

8.4

1

1:100 @ A3

DA01 0

NEW TIMBER FLOOR

1

800

SHED 8.4

NEW TIMBER FLOOR

DG.02

1,000

STORAGE

DECK & BBQ AREA

LIVING

SCALE:

346 BELMONT STREET, 950 ALEXANDRIA

1,020

W

DINING

DRAWING NO.:

SITE & ANALYSIS PLAN

900

WG.01

DR

D1

LDY

NEW TIMBER FLOOR

8.1 4

SOFT LANDSCAPING

EXIST VERANDA

STUDY

NEW TIMBER FLOOR

WG.05

VOID

DRAWING TITLE:

DW

A

1.55

EXISTING WINDOW

m.folk@mfolkarchitects.com.au BEDROOM 4

DG.01

WG.04

M: 0412 677 679

8.4 2

PATH

5,460 4,410

FOR: L. PENPRASE D1 BITUMEN

KERB

TREE

HT 18

STONE

proceeding with work

64/61 MARLBOROUGH STREET SURRY HILLS, NSW

COURTYARD DECK

VOID

to the architect for a decision before

BOUNDARY 5.45

WM

D2

4

1,050 8.1

dimension only. Do not scale drawings. Report any discrepancies

ALTERATIONS & ADDITIONS TO EXISTING HOUSE

BATH

WG.07 WG.06

GRAVEL

WG.02 WG.03

this drawing. Work to figured

BELMONT STREET

BOUNDARY 30.505

CLIENT:

Commencement of work shown on

C

Check all dimensions on site before

900

HT 10 NEW FLOOR


CLIENT:

Check all dimensions on site before Commencement of work shown on this drawing. Work to figured dimension only. Do not scale

F

600 300 2,100

F

WG.01

1,050

4,100

5,460

3,635

2,450

850

2,450

2,400

1,750

600

250

20

780 900

2,178

F

F

100

300

250

2,700

2,100 700

2,443

50 75 272 272

300

2,450

600 20

150

250

850

4,100

1,750

415

SOUTH COURTYA ELEVATION 1:100

780 900

630

100

532

532

532

532

100

800

1,205

2,280

3,000

E L E V A T I O N 1 3 1: 5 0

50 75

m.folk@mfolkarchitects.com.au

524

493

4,004 493

2,662 568 3,000

568

170

665

80

K I T C H E N P L A N D 0 1 1: 5 0

150 630 338

100

532 524

175 175 175 175 20 20 20 20 20

ND5

695

N E W T IMBER

F

996

565

184

450

80

213 750

N

E L E V A T I O N 1 5 1: 5 0 2.934

278

N

278

E L E V A T I O N 1 2 1: 5 0 CONSTRUCTION DRAWING NO.: DOCUMENTS CONSTRUCTION DOCUMENTS

CD03

100

565

02

920

DRAWING NO.: 790

280

445

2,938

415

1,205

280

300

14

13 12 NE W K ITCHEN

BROOM

M: 0412 677 679 272

FOR: L. PENPRASE

272

670

DW

920

to the architect for a decision before

LINEN

ND6

64/61 MARLBOROUGH STREET SURRY HILLS, NSW

drawings. Report 15 any discrepancies

1,300 600

2,938

600

dimension only. Do not scale

800

250

1,750

900

760 CLIENT:

800

80

700

278 278

300 445

110 1,720 1,850

170

20

70

WG.03

DG.01

280 445

280

2,938

920

1,205 695

695

532

proceeding with work

50 75

850

380 ELE T I O N450 1150 2 1: 50 80V A 690

0

1,127 597 1,205 270

2,820 2,122 ALTERATIONS E L E V A T I O N 1 4 1: 5 2,072 0 TO EXISTING APARTMENT NEW KITCHEN DRAWING TITLE: Client: ALTERATIONS SCALE: NEW KITCHEN R. &TO E. STORER EXISTING APARTMENT 1:50 @ A3 1/585 NEW SOUTH HEADClient: ROAD DRAWN: CWSCALE: DATE: 12/06/2018 MF

F

75

270

650

N

700

600

850

670 628

670

2,713

750

213

300 445

750

100

780 900 695

338

N E W T IMBER

50

900

DRAWING TITLE:

628

380 565

790 477

2,645

708 before708 184 Check all dimensions on site 450

2.934

663

376 2,072

597 270 445

F

WG.04

BEAM

SECTION B-B 1:100

this drawing. Work to figured

100

524

1,720 1,850 600

170 200

100

450

2,122

F

W1.05

100

780

315

200 200

20

20

20

200

650 210

315

800

210

210

2,150

315 315

100

628 270

F

DW

ENTRY

415

213 302

110 700

20

663 600 650

RANGEHOOD A.S.

628

F

2,662

665

RANGEHOOD A.S.

2,938

600

650

2,150

210 800

210 210

100

376

F

KITCHEN

Commencement of work shown on

370

170

568

WU.04

3,635

565

278

568

493

ND5

E L E V A T I O N 1 5 1: 5 0 K I T C H E N P L A N D 0 1 1: 5 0

278

50 75

75 50 663

600

493

996

2,713

524

DA05 WG.02

1,000

665

302

50 663

524

900

100

670 80

K I T C H E N P L A N D 0 1 1: 5 0

170

568

2,662 3,000

415

LINEN

800 100 568

493

14

ND5

75

493

DW

N E W T IMBER

F

F

600

DW

4,004

524

760

14 13 12 NE W KITCH 13E N N E W T IMBER 12 NE W K ITCHEN 532

27/07/2018WU.03

2,280

920

1,300

600 250

L I N E N2,938

ND6 900

1,750

ND6

700 600 250 100

524

532

E L E V A T I O N 1 3 1: 5 0

BROOM 524

532

E V A708 T I O N 1 37081: 5 0

15

F

BROOM

20

A Y E L E V A T I O N 1 6 1: 5 0

150

532

2,662

15

780 900

O N 1 6 1: 5 0

70

600

532

2.934 700

700 600 250 20 780 900

670 850 690 920

DW

760

532

80

4,004

80

SCALE:

350

EL 184

ENTRY

100

650 1,127 1,205 2,820

250

20

708

338 2,280

450

N E W T IMBER

477

532

3,000

150

DRAWING NO.:

SECTIONS & ELEVATIONS

175 175 175 175 20 20 20 20 20

565

N E W T IMBER

80

532

2,662

708

996

ENTRY

70

532

3,000

E L E V A T I O N 1 5 1: 5 0

670

DW

532

80

2.934

850 690 920

780 900

150

630

532

184

E L E V A T I O N 1 5 1: 5 0

1,750

150

630

338

250

80

450

100

565 2,662 3,000

700

50 75 272 272

300 445

280

800

175 175 175 175 20 20 20 20 20

996

000

ALTERATIONS & ADDITIONS TO EXISTING HOUSE

DRAWING TITLE:

BEAM

1:100 @ A3 STREET, In this apartment we renovate346 theBELMONT kitchen and the living room. The DRAWN: DATE: ALEXANDRIA m.folk@mfolkarchitects.com.au architectural style of the apartment was Art Deco MD and the goal was to try to make a modern kitchen but still have the same architectural language. M: 0412 677 679

415

2,938

175 175 175 175 20 20 20 20 20

800

FOR: L. PENPRASE 100

80

64/61 MARLBOROUGH STREET SURRY HILLS, NSW

ROSE BAY apartment 2

to the architect for a decision before

NORTH ELEVATION 1:100

BEAM

370

415

drawings. Report any discrepancies

280

dimension only. Do not scale

280

2,938

445

this drawing. Work to figured

proceeding with work

250

50 75 272 280

300

Commencement of work shown on

272

CLIENT:

Check all dimensions on site before

PRELIMINARY

SECTION C-C 1:100

SOUTH COURTYARD ELEVATION 1:100

250

SECTION B-B 1:100

SECTION D2-D2 1:100

1,318

1,000

2,645

1,574

WG.07

00

2,100

KITCHEN

WG.03

DG.01

F

280

F

WG.04

2,443

2,700

300

WG.02

1,000

F

1,800

F

W1.05

600

F

W1.01 m.folk@mfolkarchitects.com.au

300

F

2,400

F

WCL.02

WU.02

2,100

F

FOR: L. PENPRASE

2,400

2,400

2,400 1,000

2,178

F

350

F

WCL.01

M: 0412 677 679

WU.05

proceeding with work

WU.04

2,470

to the architect for a decision before WU.03

2,400

64/61 MARLBOROUGH STREET SURRY HILLS, NSW

drawings. Report any discrepancies

2

50

1:100

SOUTH ELEVATION 1:100

NORTH ELEVATION 1:100

15

532 708


02

C.I.E.N

Centro de Investigación Ecológica Nacional National Ecological Research Center Laguna Iberá, Corrientes, Arg. Esteros del Iberá is an extensive wetland that covers between 15,000 and 25,000 km² in the province of Corrientes, where a subtropical and tropical ecosystem of great diversity is developed. C.I.E.N. is a National Ecological Research Center located on the shores of Laguna Iberá, the second largest lagoon in the estuaries. The project arose in order to give the sector a space with the necessary conditions for scientific research of the place. It has a research sector, an educational sector and lodging for the scientists, both permanent and visitors. The sectors address the study of resources such as climate, water, soil and biological diversity (flora and fauna) of the Mburucuyá Nature Reserve. The building generates spaces and technological tools to assist the scientific sector on a national scale, in addition to the incentive to educate on ecological conservation. The objective of this development is to generate new knowledge and innovative tools in the field of ecology; and for it to act like an outdoor laboratory immerse in the Esteros del Iberá.


ubication ARGENTINA

PROVINCIADE CORRIENTES

ESTEROS DEL IBERA R40 COLONIA C. PELLEGRINI

R40

MERCEDES

LAGUNA DEL IBERÁ

COLONIA C. PELLEGRINI

formal generation

Lagun texture detachment repetition translation

C.I.E.N

Geometrization hexagons

02

Detachment triangles

modules triangles squares

Mesh squares

FULL AND VOID


1

4

2

lodge 1 study centre 2 reception 3 greenhouse 4 investigation centre 5

3

5

SITE PLAN


SOUTH FACADE

SECTION A-A

C.I.E.N

02 01


A

11

10

6

B

B

7

5 4 1

3 2

9

reception area 1 lounge 2 bar 3 kitchen 4 library 5 reading lounge 6 bar 7 laboratories 8 green house 9 parking 10 residence 11

8

A

GROUND LEVEL


WEST FACADE

SECTION B-B

C.I.E.N

02 01


RECEPTION ADMINISTRATION Place destined to receive the visitor and guide him through the center. Work offices for administration staff. INVESTIGATION Place where the main activity is scientific research, and other activities where science and technology are also carried out, training of human capital is given, dissemination, monitoring and evaluation of the processes of science. This center should promote and investigate the natural heritage of Esteros del Iberรก. EDUCATION Place of educational activity, with all the necessary facilities to provide courses and workshops related to ecology in general and the Iberรก Natural Reserve in particular. DISPERSION Places of being with expansion otwards. Common spaces, leisure and relaxation for recreational activities. UNDERGROUND

BREAK Place destined of rest and recreation of both permanent and invited scientists.


AUDITORIUM

LIBRARY CONFERENCE ADMINISTRATION ROOM READING AREA OFFICES COMPUTER ROOM

OFFICES

SECOND FLOOR

C.I.E.N

02 01

FIRST FLOOR


LIBRARY READING ROOM BAR

GREEN HOUSE BAR

HALL

LABORATORIES

REST ROOM

CLASSROOM

GREEN BOOK HOUSE STORAGE

LABORATORIES

LIBRARY

GROUND FLOOR

UNDERGROUND


library

C.I.E.N

02 01


laboratories

C.I.E.N

02 01


03

portico building Residential building Tucumรกn, Arg.

Porticos building is a apartment high-riser. The terrain is located between two houses with adjoining walls. The main design objective was for the building to maintain harmony with its surroundings and to give the area a lacking green space. The building is integrated by a sequence of porticos of different sizes that generte a visual and spatial continuity. The building has four characteristics that were taken into account when designing, 1. Immediate surroundings with variable heights; human scale and lack of green. 2. Mimicry with the environment through the use of straight vertical and horizontal lines, and with porticos that increase their height as they move away from the municipal line. 3. Free plan and green 4. Continuity: invites the user to the building and eliminates municipal line as a limit.


The struc made of c are flexib translucen windows solar pan slide. The balc whole fa these win pletely ob parency f exterior; w any aesth the space inclemenc

portico building

03


cture of the building is concrete. The facades ble, changeable and nt thanks to the which incorporate nels that can fold or

conies make up the açade protected by ndows that open combtaining a total transfrom the interior to the which does not cause hetic impact and keeps es protected from the cy of the weather.

zonification access 170m² 3 bedroom 70m² 1 bedroom NCV


B

A

A

B

FLOOR TIPO

portico building

03


S alon de fies tas

S PA

S PA

SECTION A-A

SECTION B-B


+1.50m

+0.00m

+1.50m

Terraza

+0.00m

GROUND LEVEL

+0.00m

Cisterna a P.P.T Bomba

Pozo bombeo

Interceptor de naftas

Termotanque C.V

UNDERGROUND

portico building

03


MACHINE ROOM

TERRACE

NORTH FACADE

SOUTH FACADE


portico building

03


04

ecolodge

Ecological Hotel/Cottage Indiana, USA

Ecolodge is a building located in Indiana, USA on a large terrain with steep slopes. The hotel is composed of two longitudinal bodies connected by walkways, one containing the guest rooms and the other the reception and a spa. These elongated forms were designed so that the entire building would be able to receive light and sun during the day since the climate is very cold. On the other hand, the eco-cabins are separated more privately from the hotel. The main idea of the building was to create a complex where everything forms part of the landscape, is sustainable, has historical continuity and can integrate the old with the new.


02

Historic Main Logde

ECOLodge part of the landscape Conservation of the natural environment Inclusion of the landscape in architecture / rajas Design and afforestation / deciduous trees and flowers of different species local vegetation + afforestation

part of the landscape historical continuity old-new integration

+

idea

Building proposal

sustentability Old building

Eco cabaĂąas

old-new integration

historical continuity

functional diagram

volumetry Simple forms / abtraction modules porticos

Historic site preservation Rehabilitation of the old complex

1

Formal evolution / variation of the module according to function

3

2

4

Hotel administration

ecolodge

04

Energy efficiency Water efficiency Waste reduction green cover

plant wall

Social area Bedrooms

Use of noble mate North-south orient

solar panels

Spa

Access - Reception

sustentabi

1 2 3 4

Historic Main Logde Old building Eco cabaĂąas Hotel + Spa


ility

erials ntation / visual-solar radiation


02

C

NORTH FACADE

SECTION A-A

ecolodge

04


B

A

C

B

A

GROUND FLOOR


05

urban proposal

Tucumán, Arg.

Urban proposal was thought for some of the abandoned areas in San Miguel de Tucumán. A lineal proposal in which priority is given to maintaining green but incorporating cultural and sport buildings. The main idea was to create a “green lung” designed for the enjoyment of users and to revitalize the area. The proposed organic design gives a flexible space to be traveled as a public walk joining the different buildings. The proposal also tries to include and create a relationship with the adjacent blocks by incorporating green in them, in such a way that it invades the houses little by little and has a direct communication with the “green lung”.

buildings blocks-houses


urban proposal

05


SITE PLAN


urban proposal

05


GROUND LEVEL


06

landscaping proposal

“pedes in terra ad sidera visusâ€? National University of TucumĂĄn, Arg. Analyzing the site to intervene in all its scales it is posible to identify the character of it. The site is a memorial site but it is not well developed. I decided to resolve the proposal with a strong commemorative character to the military dictatorship and that students may feel as part of the place. The proposal generates different spaces through the use of roads and the different levels of the land. The objective is to maintain and enhance the character of this space to allow full use of it, through a landscaping treatment and the provision of necessary equipment. The vocation of the site is to serve students by maintaining their identity as an area where memory is present. The sector contains an architecture and civil engineering building, semi-covered walkways, vertical circulation services as well as a variety of vegetation. The sector also is characterized by a lack of social equipment where users can not appropriate the place. The users are mostly students who practice activities such as recreation, socialization, eating, reading and resting. The presence of the footbridges allows a design that can be appreciated from above and a reminiscence to the Italian gardens.


ubication

formal generation / idea The “golden rectangle� has a proportionality between its sides equal to the golden ratio. When a square section is removed, the remainder is another golden rectangle; that is, with the same aspect ratio as the first. Square removal can be repeated infinitely as to get the golden spiral, which is a logarithmic spiral. It is more pleasing to the eye because of its particular proportions between its sides. From it we can obtain infinities of new golden rectangles and other designs

recreation area exposition and memory area graduation area relax area

landscaping proposal

06


SITE PLAN


vegetation

design elements

It was decided to maintin the existing vegetation of the area because of its beauty: trees of old age. The proposed vegetation is designed to give a lot of shade to make good use of the outside, taking into account the climate. I chose trees with and without flower, with short periods of being without leaves. I propose citrus trees for the consumption of the users. Yellow and lilac colors predominate to contrast with the gray concrete of the blocks. Flowering trees provide a good aroma to the environment. All these qualities give a particular character to the area that increases the quality of the space.

PANELS - exhibition support. Materialized with perforated pla GOLAS- perforated stainless steel with vines. WATER- inco generate relaxation spaces due to its environmental and FLOORS- use of local materials such as gravel and slab. Gra flooring. EQUIPMENT- aimed at the comfort of the users, pre benches, hanging chairs and beds. LIGHTING - use of differe

landscaping proposal

06


ates to allow different visuals. PERorporation of water into the area to d sensory qualities. WALKS AND aduation of grass to blocks drilled to edominance of students. I propose ent artifacts depending on the area


07

steel hive

Intermodal Passenger Station Tucumรกn, Arg.

The project was a contest for a steel company. Analyzing the province of Tucumรกn I decided to concentrate on the current problems of traffic and the agglomeration of people on a provincial, national and international scale. Tucumรกn is in a strategic location for being not only an important cultural and educational center of the northeastern region of the country, but also a point of confluence of many national routes; permitting a local, pronvincial and national connection. With this analysis I decided to carry out an intermodal transport station for buses and trains. The hexagon: "the force of nature applied to architecture" The link of the hexagons, as links of a chain, allows the possibility of a flexible almost organic growth, breaking with the geometric rigidity of the isolated


ubication SOUTH AMERICA

ARGENTINA

TUCUMAN

idea honeycomb

SOUTH OF TUCUMAN STATION

organization

breeding station - qu secondary station module - hexagonal Complex - comb / h

organization in geom to define the creati ules.

formal generation

estructure

The repetition of thi growth and future perimetral control an

37 42 36

36

35 35 35

basic module

honeycomb cell

steel hive

assembly

honeycomb

07

integrated cells composition

basic module

principal mash

module wall

secondary mash


ueen bee worker bees l cells hive

metric patterns that allows ion of the repetitive mod-

is module allows to define expansion of the project, nd program organization.

ASSEMBLY DRAWING


titanium plates injected polyurethane filler titanium plates stainless steel mesh for plate fixation galvanized steel mesh with square section bars 0,40mx0,40m secondary structure of galvanized steel roof with welded reinforcements every 5m square section bars 0,80mx0,80m principal structure of galvanized steel roof with welded reinforcements every 5m square section bars 1,60mx1,60m galvanized steel nest with square section bars 0,80mx0,80m.triangular subdivision and steel mesh for fixing solar panels with separate batteries. airtight frosted glass galvanized steel mesh for glass fastening secondary structure of galvanized steel roof with welded reinforcements every 5m square section bars 0,80mx0,80m principal structure of galvanized steel with welded reinforcements every 5m square section bars 1,60mx1,60m 0,10m thick light partition for functional division supporting partitions for vertical circulation core. lightweight mezzanine of steel profiles double T. structural package of steel plates, steel mesh and cement planning wall module for structural stiffening. diagonal bars of square section 1,60mx1,60m

steel hive

07


GROUNDFLOOR

CROSS SECTION

SECOND FLOOR


steel hive

07


Profile for maiadorin

Portfolio Maia Dorin  

Portfolio Maia Dorin  

Profile for maiadorin
Advertisement