Issuu on Google+


ST PETER’S CHURCH Landscape Design Services

Lectern Location 1

Lectern Location 2

Sunderland St Peters Church

Lectern Location 3


SEABURN Landscape Design Services


Seaburn coastal garden: Variety of plants from traditional to contemporary


Albany Primary School ALBANY SCHOOL Landscape Design Services

Proposal...

‘‘to create a rich and stimulating landscape for learning and play’’

proposal... ''to create an innovative and imaginative space that enhances the child's development..."

4

Saint Benets RC

Barnes Park

Bexhill School

Bexhill School

5

Barnes Park

Bexhill School

Bexhill School

Bexhill School

Barnes Park

1

Barnes Park

Fullwell School Bexhill School Fullwell School

Saint Benets RC

8

Barnes Park

Examples of spaces created...........

Barnes Park

Fullwell School

Fullwell School

Bexhill School

6

Fullwell School

9 12 11

Materials........ Oak timber sleepers Coloured tarmac/ asphalt Granite setts Concrete paving blocks -Herringbone - Synthetic turf

10

7


Albany Primary School Albany Primary School Sensory Garden Proposal...

Horseshoe Mound Proposal...

‘‘to create a rich and stimulating landscape for learning and play’’

6

‘‘to create a rich and stimulating landscape for learning and play’’

5

B

3

A

8

2

4

3

7

9c

9a

3

10 Legend:

2

1. Entrance tarmac path with steps to create welcoming atmosphere (new tarmac surface within sensory garden area) 2. Upright timber oak sleepers -retaining planting beds 3. Canopy alongside building to create sense of direction (provides consistancy with the pergolas located around the site)

1

4. Allotment style planting beds retained by timber oak sleepers (creating sense of ownership for children through learning and planting) 5. Wall art space - encouraging creativity, inspiring and motivating students

Legend: 1. New Entrance path (Ramp and stairs) 2. Canopy along side building - for sense of direction leading to main school doors 3. Raised horseshoe grass mound - recreating amphitheatre like experience (onsite excavation and utilisation) embedded with white horse print carved into mound (see horseshoe mound proposal sheet) 4. Main doors extended canopy- for rythmn and direction 5. Sensory Garden comprising of small pockets of spaces including pergola, seating, planting beds..(see sensory garden proposal sheet) 6. Cycle shelter- repositioned to adjacent side 7. Alignment of trees- mainly consisting of fruit trees 8. New Hedging to screen off parts of carpark 9. Retained tarmac with ball games markings/ ball game boards 10. Pergola and seating area (repositioned) 11. Retained trim trail 12. Secret garden - new concrete paving herringbone path leading to an enclosed seating space for quiet time/ teaching. Embedded with naturalistic planting

6. Synthetic Grass/turf - picnic area, learning outdoor space 7. Central pergola area with herringbone paving and curved seats enclosed with soft planting and completed with setts for edging 8. Boulders & planting area - different naturalistic and ornamental sensory planting, to increase aesthetics through colour and vibrance. 9. (a,b,c) Circular spaces- small diverse spaces with different textures, comprising- coloured tarmac, concrete paving blocks all finished with setts as edging 10. Sensory planting area with array of colours planted around the garden to provide consistancy and a transitional flow (providing rythmn through the vertical layers) Completed with aluminium edging 11. Small gravel path passing through planting and trees to provide additional flow.

11

1

1

9b Legend:

2

1. Horseshoe mound created from onsite excavation - amphitheatre like experience for teaching or events.. A. Stepped towards logs direction B. Adjacent side sloped 2. log seats 3. white horse print- carved into sloped mound, covered with concrete and painted white additional feature to represent area Examples-


HEELEY MILLENNIUM PARK Sheffield Heeley Development Trust


CHINESE CHURCH GARDEN PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

VI EW

RO A

Sheffield Heeley Development Trust

Key

Existing railing to be Total length: 58,67 m

Dog grids to be remo repaving see the dwg

PRODUCED BY AN AUTODESK

Dog grids to be remo dig out underground dog grid void to 300m ground level; PRO EDUCATIONAL Backfill with rubble to level and top up with

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

UCT Galanthus nivalis • •• • •••••• Vinca minor 4.69• ••• 1 No Rhododendron 'Cunningham's White' 1 No Rhododendron 'Golden Torch'

1 No Salix babylonica 2 No cornus alba 3No Leycesteria formosa

4 Betula pendula Mix Helleborus niger 3.56• ••• Helleborus x hybridus

80% of the area covered by: Mix fern partial shade - shade Athryum felix-femina Dryopteris filix mas Dryopteris affinis Asplenium scolopendrium

Glaucidium palmatum Geranium 'Jonsons blue' Geranium phaeum Anemone blanda

Polypodium vulgare Asplenium nidus Pellaea rotundifolia Luzula sylvatica 1.15m2

S

•• ••• •• • ••• •• • •• ••••••••••••••••••

Pleioblastus pumilus

Vinca minor (spreading ground cover)

Scabiosa atropurpurea mix 6No Miscanthus sinensis (white foliage) 80% of the area covered by: Mix fern sun: Athyrium filix-femina Dryopteris affinis Dryopteris filix-mas Luzula sylvatica Luzula nivea

4 No Cornus alba

Mix Helleborus nigra Helleborus x hybridus Glaucidium palmatum Geranium 'Jonsons blue' Geranium phaeum Anemone blanda • •• • ••••••

• • •• • • •••••••• Vinca minor

Climber: @ 600 mm c/s 3 No Clematis armandis 2 No Lonicera periclymenum Climber mixed with existing Parthenocisuss quinquifolia @ 600 mm c/s: 2 No Clematis armandis 1 No Lonicera periclymenum

3 No Cornus alba Magnolia grandiflora

3 No Viburnum bodnantese

7 Betula pendula 1No Cornus kousa Galanthus nivalis • • •• • •••••••

Climber mixed with existing Parthenocisuss quinquifolia: @ 600 mm c/s 1 No Clematis armandis 2 No Lonicera periclymenum

1No cercis siliquastrum

1No Sophora japonica 1No Amelanchier lamarkii

G

Phyllostachys nigra • •• • • •••••••

Mix Helleborus niger Helleborus x hybridus Glaucidium palmatum Geranium 'Jonsons blue' Geranium phaeum Anemone blanda

LE

AD

3 No Miscanthus sinensis (white foliage)

LE

1 No Salix babylonica

SS

3No Leycesteria formosa

Phyllostachy • •• • • •••••••

Mix Hakomechla macra "Aureola" 1.37• ••• Hosta "August moon"

Imperata cylindrica Panicum virgatum rotstrahlbusch Pennisetum setaceum

RO

5.04• •••

3 No Miscanthus sinensis (white foliage)

AD

3.58

Jasminum officinale

• •• Jasminum officinale

Astilbe chinensis

• •• • • •••••••

3 No Miscanthus sinensis (white foliage) Mix Helleborus niger 1.94• ••• Helleborus x hybridus Glaucidium palmatum Geranium 'Jonsons blue' Geranium phaeum Anemone blanda

Arundinaria variegata • •• • • •••••••

Phyllostachys nigra • •• • • ••••••• Mix Hakonechloa macra "Aureola" Hosta "August moon"

5.81• •••

Phyllostachys nigra

3.09• •••

Fargesia robusta • •• • ••••••


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

LE

AD

LE

R9 00 0 36

100

45 50

gate

R1

900

0 08 R1

60 R1 3

0

900

R1 36 0

900

70

100

600

600

530

70

100

0

north

08 R1

36 0

north

R1

800

Changing Spaces Heeley Millennium Park

70

Fence Panel details

Postcode: S8 9UB

Drawn by

Date

600

Scale

1:20 @ A3

Drg. no. R3

1200

20mm Macadam wearing course (6 mm ) 50mm of 0/20mm DBM 190 pen binder course L/Stone to BS 4987-1: Clause 6.5

1:40 fall from central camber to planting beds

1:40 fall from central camber to planting beds

Concrete foundation C20 Concrete foundation

PCC flat top pin kerb 150mm x 50mm

All adjacent surfaces to have a finished level flush with top of edging.

C20 Concrete foundation

AD

post

AllAll adjacent surfaces toto Adjacent surfaces have a finished levelflush with have a finish level flush top of edging. topwith edging

RO

40 Elevation

60

15 40x 15mm m.s flat frame

12

See separate specification for details of removal; resiting; repainting and creation of new panels and posts.

60

Elevation 1:20 @ A3

PCC kerb 150mm PCC flatflat toptop pinpin kerb x 50mm 150mm x 50mm

gate

10

140 8 140

post

post

All fencing and railings must follow existing ground levels and panels lying over sloping ground must be built and fixed with a matching rake. Some existing panels will be removed to create the new fenceline. A number of the posts will have to have the panel supporting lugs repositioned in order to reuse the panels.

Note: all dimensions are in mm TW/MH 16-10-11 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

8 gate stop

60

G.L.

Tarmac detail 1:10 @ A3

Plan

Note

2135

2015

Scale 1:2 @ A3

Plan

Elevation

R1

08

Drg. no. R6

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

sliding latch 200 x 40 x 8 mm thick m.s.plate with 10mm dia m.s. handle; slotted thorugh post and gate frame 50 x 12mm slots; 45 x 50 x 8mm thick gate stop.

85

100

Note: refer to detail design drawings R7 and R8

Scale VARIES

Drg. no. R2

Detail 9: Special panel adjacent to doggrid

530

Drawn by Date TW/MH 16-10-11

G.L.

900

Changing Spaces Heeley Millennium Park New entrance and gate details 2

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Sasa vieitchii • • •••••••

10

B. Location of existing access. Gate to be installed in existing fenceline. See detail 6.

G.L.

Hinge: detail design 8

Elevation 1:20 @ A3

G.L.

20

100

A. Location of existing access. Gate to be installed in existing fenceline. See detail 6.

Note: all dimensions are in mm Postcode: S8 9UB

100

90

45

8• •••Phyllostachys nigra

45 40

1No Acer japonica

35

50

Climber: 1 No Lonicera periclymenum

ys nigra •

gate stop

100 100

Key

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Climber: @ 600 mm c/s 3 No Clematis armandis 2 No Lonicera periclymenum

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

8

post

10

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Church

5

Scale 1:500 @A3

EW

PRODUCED BY AN AUTODESK EDUCATIONAL PRO

200

north

00

A.

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

R9

35

SCALE BAR - metres

Scale 1:2 @ A3

1565

RO

755

B.

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

St Andrew's

detail design 7

SS

0

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Detail 8: Raking situation

Detail 7: Metal Fence Standard Panel

Elevation 1:20 @ A3

LE

1565

60

Latch:

EA

Scale VARIES

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT 



AD

DESK EDUCATIONAL PRODUCT

Drg. no. R5

Changing Spaces Heeley Millennium Park New entrance and gates details - 1

Drg. no. R4

2085

00 north

Scale 1 : 250 @ A3

Scale G VARIES L

D

900

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Drawn by Date TW/MH 16-10-11

85

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

o 300m below ground h 300mm topsoil.

Railing removal - Chinese Church site

20

Drawn by Date TW/MH 16-10-11

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

ODUCT

Changing Spaces Heeley Millennium Park

G.L.

100

Postcode: S8 9UB Note: all dimensions are in mm PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

1175

oved and carted away; d retaining wall around mm below finished

Drawn by Date TW/MH 16-10-11

10

C. Location of new access with new metal gate in new fenceline. Gateway to line up with the new tarmac path See detail 5.

Playground area: gate paving details

R5



Changing Spaces Heeley Millennium Park

2023

5 SCALE BAR - metres

Postcode: S8 9UB

Concrete foundation Demolish top of internal wall to create space for hardcore, MOT Type 1 underneath all the sand and paving layer

0

600

Hardcore to base of pit

AD

Scale 1:500 @A3

600

Existing brick 200x100 mm

RO

C.

Key

70

120 mm MOT TYPE 1

2 No. Dog grids to be removed:- Unbolt existing dog grid and remove; remove detritus; void backfilled with reclaimed MOT type 1 equivalent / recycled hardcore / crusher run - 45 to dust compacted in layers not exceeding 250mm to height necessary to allow for base and paving as shown in Detail 10; Consolidate with wacka plate and replaced with paving as shown opposite in Detail 10.

60

530

45 mm Grit sand/Cement 6:1

SS

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

AD

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Blue Engineering brick 215 x 102.5 x 65 mm on C20 concrete foundation; mortared pointing

Postcode: S8 9UB

oved, to be g no. R4

10

1:500 @A3

Detail 6: Main gate with curved panel Elevation 1:10 @ A3

e removed m

5 SCALE BAR - metres

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Church

0

Paving bradstone concrete blue/black d: 450x450x 35mm

LE

1320

Blue Engineering brick d: 215x102.5 mm h: 65 mm on C20 concrete foundation

Key

AD



RO

AD

Existing brick 200x100 mm

LE

Elevation 1:10 @ A3

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

St Andrew's

SS

Paving bradstone concrete blue/black d: 450x450x 35mm

Community

G

Detail 5: Metal Gate

G

scale 1:20 @A3

600

2023

Detail 10: Paving detail

Compacted subgrade

100mm base of compacted recycled DOT Type 1

N P a B 1

C f a B B

M s a


DEEPCAR Private Commission


Betula pendula

4No. Broom with underplanting as per mix 1

Existing Trees 2No. Betula pendula

As per Mix 1

Wooden post rail and fence

Wooden stairs single unit

Underplanting as per Mix 1

Proposed Trees

Proposed reinforced grass - carpark area

Amenity grass

Proposed treated softwood for decking

New wooden fence posts 100mm x 100mm

New wooden benches allocated within woodland and meadow mix

Site Boundary


TOTLEY EXTENSION Private Commission

Before

After


Totley Brook Glen Sheffield


VISUALS


LAHORE The Conservation and Enhancement of Iqbal Park Lahore


OTHER EXAMPLES

Bill of quantities Bills of quantities - Local Authority Open Green Space

ITEM

DESCRIPTION

No.

UNIT

RATE

£

No.

UNIT

RATE

£

BILL NO.1 – PRELIMINARIES A

Allow for compliance with condition of contract in respect of all insurances

B

Allow for compliance with health and safety

C

Allow for temporary fencing to secure site work areas

D

Allow for accommodation, workmen facilities, secure lock up for tools etc.

E

Allow for a through site investigation; fly tipping area.

F

Allow for security staff to supervise any vulnerable elements safe.

G

Allow for removal of rubbish and unwanted materials away

SUB- TOTAL BILL1 CARRIED TO SUMMARY

ITEM

DESCRIPTION BILL NO.2- SITE CLEARANCE & PREPERATION All rates to be inclusive of excavation of concrete footings, edgings, reinstatement of adjacent surfaces and unsuitable materials to the contractor tip. Note: specification checklist combined within description column Refer to DWG 1 & 2

A

Reinstate and trim surrounding hedge: height, width, finishing – quality

B

Excavate and remove existing path: Time, method (or as agreed by contractors), general- handling.

m2

C

Remove all rubbish (fly-tipping) and other unnecessary objects: general, handling, storage. Timing.

item

D

Reinstate gate: to its original colour and finishing, paint type, durability, time.

item

E

Remove all weeds and use systemic glyphosate (containing weed killer) and allow the soil to settle and germinate: method, time.

m2

F

Remove existing turf and store on site for reuse in creation of new levels: general, storage.

m2

G

Cultivate bare root planting areas to a depth of 450mm including general grading and stone/ debris pick: method, time, general, handling.

m2

H

Supply and spread 50mm depth well rotted compost to planting areas and rotivate in: Ameliorants (see NBS Q28) method, general, handling,Quality.

m2

I.

Areas B & C see dwg 2 8360m2 Supply and spread 110mm depth of topsoil to all the area to be sown. Firm & rake level and roll to prepare sowing: method, classification, standard- quality/classification. crumb structure (NBS spec)

m2

Page 1

m2



Portfolio mh