Issuu on Google+

// UTS proposal ku-ring-gai park shelter

. : ku-ring-gai park shelter design


// process // process // process

. : ku-ring-gai park shelter design


// concept sketch . : ku-ring-gai park shelter design


emergent layer

canopy layer

understory layer

forest floor

// concept . : ku-ring-gai park shelter design


// canopy . : ku-ring-gai park shelter design


// canopy design development . : ku-ring-gai park shelter design


// texture mapping . : ku-ring-gai park shelter design


// roof structural development . : ku-ring-gai park shelter design


// structure . : ku-ring-gai park shelter design


. : visual column barrier

. : uninterrupted visual amenity

// column development . : ku-ring-gai park shelter design


// ground plane . : ku-ring-gai park shelter design


. : typical park furniture design

. : proposed folding ground plane to create shelter seating

// treatment of the ground plane . : ku-ring-gai park shelter design


// proposal // proposal // proposal

. : ku-ring-gai park shelter design


. : ku-ring-gai park shelter design


// atmospheric elevation + site plan . : ku-ring-gai park shelter design


. : table material + steel plate welded to columns

. : bench seating + concrete base cast in situ with FSC certified timber battens

. : pathway + crushed dark grey gravel pathway

. : concrete roof finish + class A smooth concrete finish, 20% of cement to be replaced with flyash (sustainable concrete finish)

. : column finish + powedercoated weather resistant CHS + integrated fluorescent light tube

. : floor slab finish + class B smooth finish with medium exposed aggregate, 20% of cement to be replaced with flyash (sustainable concrete finish)

// materials concept . : ku-ring-gai park shelter design


1.excavation of site

2.laying reinforcement

3.pour concrete

4.steel work

5.scaffolding and propping

6.formwork

7.lay concrete

8.concrete furniture

Clean-up Landscaping & finish Set up electrical Steel table instalment Furniture concrete & waiting

Furniture framework and reinforcement Remove framework and add light poles Concrete slab and waiting time

Reinforcement Scaffolding, propping and framework Installing columns Concrete slab and waiting time Reinforcement and electrical conduit Excavating site Fencing and set-up site

9.steel table

1

2

3

4

5

6

10.landscaping and furniture finishes

7

one

two

8

9 10 11 12 13 14 15 16 17 18 19 20 21

three

four

six

five

22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

43 44 45 46 47 48 49

seven

50

// construction process . : ku-ring-gai park shelter design


// model testing . : ku-ring-gai park shelter design


// architectural drawings // architectural drawings // architectural drawings

// architectural drawings . : ku-ring-gai park shelter design


Sheet Index

Contact. M: F: E: P:

Layout No:

Layout Name

0-00

Cover Sheet

01

30.09.11

1-00

Setout Plan

01

30.09.11

1-01

Column Setout Plan

01

30.09.11

1-02

RCP, Roof Plan

01

30.09.11

2-01

Elevations

01

30.09.11

2-50

Sections

01

30.09.11

3-00

Typical Details

01

30.09.11

3-01

Lamp Detail

01

30.09.11

3-02

Seat_A Detail

01

30.09.11

3-03

Seat_B Detail

01

30.09.11

3-04

Table Detail

01

30.09.11

7-00

Schedules

01

30.09.11

Date: Amendment: 30.09.11 ISSUE FOR INFORMATION

Rev Description

Rev: 01

Date

Client

Ku-ring-gai Council

Drawing Title:

Sheet Index, Camera

Project Name

FABTEC

The builder shall check and verify all dimensions and verify all errors and omissions to the Architect. Do not scale the drawings. Drawings shall not be used for construction purposes until issued by the Architect for construction.

Scale:

1:1, 1:100

Drawn By:

CM

Date:

30.09.11

Checked By:

DS

Drawing No.:

0-00

Rev:

01


4 2-01

1 2-01

33 Seat A

Uplights @600cts

1,211 Seat A

1 2-50

0x0x0 0x0x0

2,776 Tables Overall

Uplights @600cts

2 2-50

3,663

5,10 5

1,072

24.92째

128.45째

74 2,3

2,071

896 Seat B

59.99째

5,990

83.21째

2 2-01

3 2-01

4,261 Tables Overall

2,349

Seat B

4,221

NOTE: *ALL STEEL WORK TO BE COLOUR POWDERCOATED WITH RGB 60,60,60 *ROOF CAST IN-SITU FINISH: -CLASS A, SMOOTH, 20% CLASS C FLYASH *FURNITURE FINISHES: -CAST IN-SITUCLASS A, SMOOTH, 20% CLASS C FLYASH -CLASS 1 TIMBER BATTENS 50mm x 50mm (In accordance with AS3959-2009) *CONC. GROUND SLAB FINISH: -CLASS A, SMOOTH, 20% CLASS C FLYASH Contact. M: F: E: P:

Date: Amendment: 30.09.11 ISSUE FOR INFORMATION

Rev: 01

Client

Ku-ring-gai Council

Drawing Title:

Ground Plan

Project Name

FABTEC

The builder shall check and verify all dimensions and verify all errors and omissions to the Architect. Do not scale the drawings. Drawings shall not be used for construction purposes until issued by the Architect for construction.

Scale:

1:50

Drawn By:

CM

Date:

30.09.11

Checked By:

DS

Drawing No.:

1-00

Rev:

01


3,412 C_08 3,332 C_09 3,175 C_10 3,113 C_11

3,884 Lamp_02 3,783 Lamp_03

4,948 C_05

5,729 C_02 5,523 C_03 5,353 C_04 5,265 Lamp_01

6,084 C_01

4,706 C_06 4,515 C_07 C_0 5

11 C_

Lamp_02

C_09

C_04

C_0 7

1,459 C_10 1,622 C_11 1,672 C_07 2,088 C_09 2,163 C_06 2,292 C_08 2,413 C_01 2,451 C_04 2,460 C_05 2,491 C_03 2,852 C_02

08 C_

C_03 C_ 01

C_06

0 C_1 03 Lamp_ 0x0x0 0x0x0

2,071 Lamp_02

2,702 Lamp_01

C_ 0

2

_01 Lamp

1,563 Lamp_03

NOTE: *ALL STEEL WORK TO BE COLOUR POWDERCOATED WITH RGB 60,60,60 *ROOF CAST IN-SITU FINISH: -CLASS A, SMOOTH, 20% CLASS C FLYASH *FURNITURE FINISHES: -CAST IN-SITUCLASS A, SMOOTH, 20% CLASS C FLYASH -CLASS 1 TIMBER BATTENS 50mm x 50mm (In accordance with AS3959-2009) *CONC. GROUND SLAB FINISH: -CLASS A, SMOOTH, 20% CLASS C FLYASH Contact. M: F: E: P:

Date: Amendment: 30.09.11 ISSUE FOR INFORMATION

Rev: 01

Client

Ku-ring-gai Council

Drawing Title:

Column Setout Plan

Project Name

FABTEC

The builder shall check and verify all dimensions and verify all errors and omissions to the Architect. Do not scale the drawings. Drawings shall not be used for construction purposes until issued by the Architect for construction.

Scale:

1:50

Drawn By:

CM

Date:

30.09.11

Checked By:

DS

Drawing No.:

1-01

Rev:

01


2,630 C_10

2,865 C_11

3,085 Lamp_03

3,485 C_09

4,427 C_05 4,360 Lamp_02 4,160 C_08 4,051 C_07

4,878 Lamp_01 4,706 C_06

5,353 C_04

5,671 C_03 5,595 C_01

6,133 C_02

7,152 2 3-00

2250

2250

2250

1,209 C_10

2250 2280

2150 Rakin g

2000 2150

2250

2150

Steel Top Plate (As Engineers Drawings) CHS (As Engineers Drawings)

1,417 Lamp_03

1,490 C_08 1,601 C_09 1,862 C_07 2,025 C_03 2,051 C_11 2,163 C_06

2,004 Lamp_02

2,460 C_04 2,712 C_01 2,745 C_05

2,606 Lamp_01

135.68째

3,275 C_02

g kin Ra

Rak ing

g kin Ra

2250

Drip Groove

2280

67.17째

2250

1

4,0 37

2250

Raking

2150

2250

2250

2250

2150

59.50째

97.65째

FALL 1:100 MIN

ing Rak

2250

2250

5,093

2250

5,990

Reflected Ceiling Plan

2

Roof Plan NOTE: *ALL STEEL WORK TO BE COLOUR POWDERCOATED WITH RGB 60,60,60 *ROOF CAST IN-SITU FINISH: -CLASS A, SMOOTH, 20% CLASS C FLYASH *FURNITURE FINISHES: -CAST IN-SITUCLASS A, SMOOTH, 20% CLASS C FLYASH -CLASS 1 TIMBER BATTENS 50mm x 50mm (In accordance with AS3959-2009) *CONC. GROUND SLAB FINISH: -CLASS A, SMOOTH, 20% CLASS C FLYASH

Contact. M: F: E: P:

Date: Amendment: 30.09.11 ISSUE FOR INFORMATION

Rev: 01

Client

Ku-ring-gai Council

Drawing Title:

Reflected Ceiling Plan, Roof Plan

Project Name

FABTEC

The builder shall check and verify all dimensions and verify all errors and omissions to the Architect. Do not scale the drawings. Drawings shall not be used for construction purposes until issued by the Architect for construction.

Scale:

1:50

Drawn By:

CM

Date:

30.09.11

Checked By:

DS

Drawing No.:

1-02

Rev:

01


NOTE: *ALL STEEL WORK TO BE COLOUR POWDERCOATED WITH RGB 60,60,60 *ROOF CAST IN-SITU FINISH: -CLASS A, SMOOTH, 20% CLASS C FLYASH *FURNITURE FINISHES: -CAST IN-SITUCLASS A, SMOOTH, 20% CLASS C FLYASH -CLASS 1 TIMBER BATTENS 50mm x 50mm (In accordance with AS3959-2009) *CONC. GROUND SLAB FINISH: -CLASS A, SMOOTH, 20% CLASS C FLYASH

2,000

400

+2,400 Roof

±0 Ground

1

North

2

South

3

East

2,000

400

+2,400 Roof

±0 Ground

2,000

400

+2,400 Roof

±0 Ground

4 Contact. M: F: E: P:

Date: Amendment: 30.09.11 ISSUE FOR INFORMATION

Rev: 01

Client

West

Ku-ring-gai Council

Drawing Title:

East, North, West, South

Project Name

FABTEC

The builder shall check and verify all dimensions and verify all errors and omissions to the Architect. Do not scale the drawings. Drawings shall not be used for construction purposes until issued by the Architect for construction.

Scale:

1:50

Drawn By:

CM

Date:

30.09.11

Checked By:

DS

Drawing No.:

2-01

Rev:

01


NOTE: *ALL STEEL WORK TO BE COLOUR POWDERCOATED WITH RGB 60,60,60 *ROOF CAST IN-SITU FINISH: -CLASS A, SMOOTH, 20% CLASS C FLYASH *FURNITURE FINISHES: -CAST IN-SITUCLASS A, SMOOTH, 20% CLASS C FLYASH -CLASS 1 TIMBER BATTENS 50mm x 50mm (In accordance with AS3959-2009) *CONC. GROUND SLAB FINISH: -CLASS A, SMOOTH, 20% CLASS C FLYASH

±0 Ground

1

2,000

650

450

100

400

+2,400 Roof

Short Section

2,000

650

100

400

+2,400 Roof

±0 Ground

2 Contact. M: F: E: P:

Long Section

Date: Amendment: 30.09.11 ISSUE FOR INFORMATION

Rev: 01

Client

Ku-ring-gai Council

Drawing Title:

Long Section, Short Section

Project Name

FABTEC

The builder shall check and verify all dimensions and verify all errors and omissions to the Architect. Do not scale the drawings. Drawings shall not be used for construction purposes until issued by the Architect for construction.

Scale:

1:50

Drawn By:

CM

Date:

30.09.11

Checked By:

DS

Drawing No.:

2-50

Rev:

01


16.70°

150

120

Drip Groove

+2,400 Roof

30

Roof Beam

100

Roof Slab Reinforced Concrete In-situ Beam/Slab (As Engineers Drawings) Recessed Steel Top Plate (As Engineers Draw CHS

1

2

Roof Edge

Column-Roof

See Schedule

±0 Ground

Topping Slab (50mm min cover of Base Plate) Steel Base Plate (As Engineers Drawings) Footing (As Engineers Drawings)

3

Contact. M: F: E: P:

Column-Footing NOTE: *ALL STEEL WORK TO BE COLOUR POWDERCOATED WITH RGB 60,60,60 *ROOF CAST IN-SITU FINISH: -CLASS A, SMOOTH, 20% CLASS C FLYASH *FURNITURE FINISHES: -CAST IN-SITUCLASS A, SMOOTH, 20% CLASS C FLYASH -CLASS 1 TIMBER BATTENS 50mm x 50mm (In accordance with AS3959-2009) *CONC. GROUND SLAB FINISH: -CLASS A, SMOOTH, 20% CLASS C FLYASH Date: Amendment: 30.09.11 ISSUE FOR INFORMATION

Rev: 01

Client

Drawing Title:

Ku-ring-gai Council

Roof Edge, Column-Roof, Column-

Project Name

Footing

FABTEC

The builder shall check and verify all dimensions and verify all errors and omissions to the Architect. Do not scale the drawings. Drawings shall not be used for construction purposes until issued by the Architect for construction.

Scale:

1:10

Drawn By:

CM

Date:

30.09.11

Checked By:

DS

Drawing No.:

3-00

Rev:

01


Roof (As Engineers Drawings) Fixing Plate Recessed (As Engineers Drawings) CHS Column

600

Perspex Cover

2

1,200

Perspex Cover

dia 26mm Fluorecent Lamp

ule ed ch eS Se Ground Slab (As Engineers Drawings) CHS Column

1

Column Lamp Elevation

Lamp Section

2

1:20

1:2

NOTE: *ALL STEEL WORK TO BE COLOUR POWDERCOATED WITH RGB 60,60,60 *ROOF CAST IN-SITU FINISH: -CLASS A, SMOOTH, 20% CLASS C FLYASH *FURNITURE FINISHES: -CAST IN-SITUCLASS A, SMOOTH, 20% CLASS C FLYASH -CLASS 1 TIMBER BATTENS 50mm x 50mm (In accordance with AS3959-2009) *CONC. GROUND SLAB FINISH: -CLASS A, SMOOTH, 20% CLASS C FLYASH *PERSPEX: -TRANSLUCENT Contact. M: F: E: P:

Date: Amendment: 30.09.11 ISSUE FOR INFORMATION

Rev: 01

Client

Ku-ring-gai Council

Drawing Title:

Lamp Section, Column Lamp Elevation

Project Name

FABTEC

The builder shall check and verify all dimensions and verify all errors and omissions to the Architect. Do not scale the drawings. Drawings shall not be used for construction purposes until issued by the Architect for construction.

Scale:

1:2, 1:20

Drawn By:

CM

Date:

30.09.11

Checked By:

DS

Drawing No.:

3-01

Rev:

01


0 10

0

85 2,8 10 0

2,3 0

3

0

2

16.3°

3,610

140.9°

180

450

75mm Conc. Recess

0

k Ra

ing

68 3,3

450

0

50x50 Timber Batten seating

g kin

4,1 77

Ra

148.9°

350

60 2,2

Ra ki ng

100

328

2.3°

294

5.3°

24 4,9

0 0 10

1

Seat_A 1:50

VARIES

100

350 50 50 50 50

50x50 Timber Batten Seating

EQ EQ EQ EQ

67.50° ±0 Ground

2 Contact. M: F: E: P:

100

275 75

Seating Conc. Base

Ground Slab (as Engineers

NOTE: *ALL STEEL WORK TO BE COLOUR POWDERCOATED WITH RGB 60,60,60 *ROOF CAST IN-SITU FINISH: -CLASS A, SMOOTH, 20% CLASS C FLYASH *FURNITURE FINISHES: -CAST IN-SITUCLASS A, SMOOTH, 20% CLASS C FLYASH -CLASS 1 TIMBER BATTENS 50mm x 50mm (In accordance with AS3959-2009) *CONC. GROUND SLAB FINISH: -CLASS A, SMOOTH, 20% CLASS C FLYASH

Section 1:20

Date: Amendment: 30.09.11 ISSUE FOR INFORMATION

Rev: 01

Client

Ku-ring-gai Council

Drawing Title:

Section, Seat_A

Project Name

FABTEC

The builder shall check and verify all dimensions and verify all errors and omissions to the Architect. Do not scale the drawings. Drawings shall not be used for construction purposes until issued by the Architect for construction.

Scale:

1:20, 1:50

Drawn By:

CM

Date:

30.09.11

Checked By:

DS

Drawing No.:

3-02

Rev:

01


0 2,00

410

2

20.6° 155

1

Seat_B

1:20 50 EQ 50 EQ 50 EQ 50 EQ 50 50x50 Timber Batten Seating

275

25

50

Seating Conc. Base

67.50° 100

±0 Ground

2 Contact. M: F: E: P:

112.50°

Date: Amendment: 30.09.11 ISSUE FOR INFORMATION

NOTE: *ALL STEEL WORK TO BE COLOUR POWDERCOATED WITH RGB 60,60,60 *ROOF CAST IN-SITU FINISH: -CLASS A, SMOOTH, 20% CLASS C FLYASH *FURNITURE FINISHES: -CAST IN-SITUCLASS A, SMOOTH, 20% CLASS C FLYASH -CLASS 1 TIMBER BATTENS 50mm x 50mm (In accordance with AS3959-2009) *CONC. GROUND SLAB FINISH: -CLASS A, SMOOTH, 20% CLASS C FLYASH

Section 1:10

Rev: 01

Client

Ku-ring-gai Council

Drawing Title:

Section, Seat_B

Project Name

FABTEC

The builder shall check and verify all dimensions and verify all errors and omissions to the Architect. Do not scale the drawings. Drawings shall not be used for construction purposes until issued by the Architect for construction.

Scale:

1:10, 1:20

Drawn By:

CM

Date:

30.09.11

Checked By:

DS

Drawing No.:

3-03

Rev:

01


400 270 3,560

540

290

84.04°

415

101.78°

107.61°

252.73°

890

Upper Table 550

110.53°

Welded joins around columns on table top to be finished Flush

Lower Table

377

107.27°

10

VARIES

10

STEEL ANGLES TO ENGINEERS DRAWING INTERCECTINGAND WELDED TO COLUMNS

2

118.89°

Lower=650, Upper=750

1,900

246.58°

STEEL PLATE TABLE TOP

61.11° 0 4,55

870

±0 Ground

69.47°

2 1

Ground

TABLE DETAIL

NOTE: *ALL STEEL WORK TO BE COLOUR POWDERCOATED WITH RGB 60,60,60 *ROOF CAST IN-SITU FINISH: -CLASS A, SMOOTH, 20% CLASS C FLYASH *FURNITURE FINISHES: -CAST IN-SITUCLASS A, SMOOTH, 20% CLASS C FLYASH -CLASS 1 TIMBER BATTENS 50mm x 50mm (In accordance with AS3959-2009) *CONC. GROUND SLAB FINISH: -CLASS A, SMOOTH, 20% CLASS C FLYASH Contact. M: F: E: P:

Date: Amendment: 30.09.11 ISSUE FOR INFORMATION

Rev: 01

Client

Ku-ring-gai Council

Drawing Title:

Ground, TABLE DETAIL

Project Name

FABTEC

The builder shall check and verify all dimensions and verify all errors and omissions to the Architect. Do not scale the drawings. Drawings shall not be used for construction purposes until issued by the Architect for construction.

Scale:

1:20

Drawn By:

CM

Date:

30.09.11

Checked By:

DS

Drawing No.:

3-04

Rev:

01


Column C_01 C_02 C_03 C_04 C_05 C_06 C_07 C_08 C_09 C_10 C_11 Lamp_01 Lamp_02 Lamp_03

Slant Angle 74.21° 74.44° 76.58° 90.00° 74.00° 90.00° 76.38° 62.56° 76.31° 74.42° 77.03° 78.94° 76.81° 71.38°

Item Ground Slab Roof Slab Seat A Seat B_1 Seat B_2

Core Size 140 140 114 114 140 114 140 140 114 140 140 114 114 114

Volume m3 5.09 3.97 1.61 0.33 0.33

Columns Height 2,027 2,087 2,048 2,000 2,079 2,035 2,066 2,113 2,093 2,133 2,151 2,038 2,051 2,118

Material Powdercoated Steel (RGB 60,60,60) Powdercoated Steel (RGB 60,60,60) Powdercoated Steel (RGB 60,60,60) Powdercoated Steel (RGB 60,60,60) Powdercoated Steel (RGB 60,60,60) Powdercoated Steel (RGB 60,60,60) Powdercoated Steel (RGB 60,60,60) Powdercoated Steel (RGB 60,60,60) Powdercoated Steel (RGB 60,60,60) Powdercoated Steel (RGB 60,60,60) Powdercoated Steel (RGB 60,60,60) Powdercoated Steel (RGB 60,60,60) Powdercoated Steel (RGB 60,60,60) Powdercoated Steel (RGB 60,60,60)

Concrete Note 20% CLASS C FLYASH 20% CLASS C FLYASH 20% CLASS C FLYASH 20% CLASS C FLYASH 20% CLASS C FLYASH

Surface 25.46 26.50 2.43 1.31 1.31

FINISH CLASS A CLASS A CLASS A CLASS A CLASS A

NOTE: SIZES ARE NOT TO BE USED FOR CONSTRUCTION, ESTIMATION ONLY REFER TO ENGINEERS DRAWINGS FOR ACTUAL SIZES Contact. M: F: E: P:

Date: Amendment: 30.09.11 ISSUE FOR INFORMATION

Rev: 01

Client

Ku-ring-gai Council

Drawing Title:

Columns, Concrete Volumes

Project Name

FABTEC

The builder shall check and verify all dimensions and verify all errors and omissions to the Architect. Do not scale the drawings. Drawings shall not be used for construction purposes until issued by the Architect for construction.

Scale:

1:1

Drawn By:

CM

Date:

30.09.11

Checked By:

DS

Drawing No.:

7-00

Rev:

01


. : ku-ring-gai park shelter design


// UTS proposal ku-ring-gai park shelter

. : ku-ring-gai park shelter design


Uts presentation final compressed