Issuu on Google+

Media Production

Name

Risk Management Plan

Louis Lydon, Luis Sanchez, Chris Walsh

Position Organization

Toonworks, To the edge, Philistine Studios

Date

3 July 2012

Event

Venue/s

Description

Contact info.

Ref:#

Video at exhibit

The Risk

Likelihood

Consequences

Level of Risk

Pre-emptive

Response

Burn from hot lights

unlikely

moderate

M - moderate Risk

provide gloves for use with lights

First aider on hand

Tripping over wires

unlikely

Minor

M- moderate risk

Tape then down

First aider on hand

Dangerous props example bricks

Unlikely

Major

M- moderate risk

Be careful with the brick

First aider on hand may need a ambulance

Boom pole falling on a actor

Unlikely

Moderate medical treatment

M- moderate

Good boom pole operators

First aider on hand

Falling down stairs

Unlikely

Major

M-moderate

Be careful when walking

First aider on hand and may need an ambulance

Slip over fake blood

Moderate

Minor

Moderate

Be careful when working with the fake blood

First aider on hand

Page 1 of 2

Wednesday, 4 July 2012


Media Production

Risk Management Plan

Spilling a drink over equipment

Unlikely

Minor

M- moderate

Be careful with food and drinks

Have extra equipment and have no food or drink on location.

Crowed area

Moderate

Minor

M -moderate

Keep an eye on the amount of people and keep exits clear

First aider on hand

Electrical equipment everywhere

Unlikely

Catastrophic

H- High risk

Be aware of electrical outputs in one area

Emergency services may be needed

People tripping over projector

Moderate

Minor

M- Moderate

Put projectors on table

First aider on hand

Page 2 of 2

Wednesday, 4 July 2012


risk assessment