Issuu on Google+

road & bridge


SPCC’S ROAD & BRIDGE DEPARTMENT specializes in Design and Construction of Road and Bridge Works. Besides we also have carried out some Special Projects such as: Bridge Descending, Water Dam, Basement, and Bored Pile & Diaphragm Wall and so on. With more than 40 experienced expats & local engineers and more than 10 experienced years in Vietnam, we have constructed some typical projects such over 40 bridges on Nguyen Van Linh Parkway, Starlight Bridge, Dong Dien Bridge, Thay Tieu Bridge in Sai Gon South, Viet Nam and also built the New Monivong Bridge, Monivong Flyover, Pet Lok Song Flyover in Cambodia. Among these projects, there are seven special built bridges with largespan concrete-filled steel tube arch bridge, which was introduced into Vietnam first time. We always endeavor in researching and applying new construction technologies in order to achieve maximum quality and efficiency in whatever projects we understood.

Many new technologies, such as Less Supporting Installation Technology for Large-span Steel Tube Arch Bridge, Application and Construction Technology of Bridge Deck Suspension System, Technology of Large-tonnage Structure Hoisting and Installation, Self-balanced Method Technology for Pile Test and etc. which were introduced and applied into the above mentioned projects in Vietnam. As an evidence for our continuing commitment of quality and applying new technologies, we have been awarded Gold Medals of High Quality Build Certificates issued by Vietnam’s Ministry of Construction for completed seven bridges. Road & Bridge Department integrates cooperation and expert’s advice from all professional partners, and we also recognize that this is a powerful formula for success.


Construction Service Road & Bridge Construction Foundation & Basement Construction Construction of Other Special Works: - Pile test by Self-Balanced Method - Steel Lifting Caisson for Deep Water - Bridge Descending - Water Retaining Dam

Consulting Service Road and Bridge Design Project Management Investment Analysis


7 bridges was awarded High Quality Gold Medal by the Ministry of Construction of Vietnam

Top Ten Construction Company elected by Science & Technology Association of Vietnam

Nguyen Van Linh Parkway project was awarded Certificate of Merit for Social Economic Promotion by the Prime Minister of Vietnam

Certificate of Merit from the Prime Minister of Vietnam for its great achievement of cooperation, foreign investment attraction and development participation in HCMC.

The General Director was awarded medal for construction of New Monivong Bridge by the Prime Minister of Cambodia

Certificate of Merit from the Chairman of the HCMC’s People Committee, for its active investment participation and excellent achievement in business operations and continued contribution to the community


Highway Project


Nguyen Van Linh Parkway • Client: Phu My Hung Corp. • Construction Period: Phase I, I, III: 1996-1998; 2002-2003; 2004-2007. • Scope of Work: Roadway 17.8km and 27mx2 width, 40 bridges total 1.5kmx10.6mx2 and 1.5kmx15.85mx2


Concrete Filled Steel Tube Arch Bridge 1 Ong Lon Bridge • Client: Phu My Hung Corp. • Completion: 12/2003; 12/2007 • Scale: 395m (length) x 15.85m (width) • Span arrangement: 6x24.6m+99.1m+6x24.6m • Arch span: 99.1m (length) x 18.25m (width)

2 Can Giuoc Bridge • Client: Phu My Hung Corp. • Completion: 12/2003; 12/2007 • Scale: 430m (length) x 15.85m (width) • Span arrangement: 5x33m+99.1m+5x33m • Arch span: 99.1m (length) x 18.25m (width)

3 Xom Cui Bridge • Client: Phu My Hung Corp. • Completion: 12/2003; 12/2007 • Scale: 296m (length) x 15.85m (width) • Span arrangement: 4x24.6m+99.1m+4.24.6m • Arch span: 99.1m (length) x 18.25m (width)


2

4 Dong Dien Bridge • Client: IPC • Completion: 12/2009 • Scale: 408m (length) x 18m (width) • Span arrangement: 6x33m+75m+6x33m • Arch span: 75m (length) x 20.1m (width)

1 3

4


Continuous Box Girder Bridge


1

2

3

1 Pet Lok Song Flyover • Client: Mega Combo Construction Co. • Completion: 01/2012 • Scale: 220m (length) x 15.2m (width) Span arrangement: 3x30m+2x20m+3x30m Ramp: 100m (length, 5x20m) x 6.5m (width) 2 Monivong Flyover • Client: Mega Combo Construction Co. • Completion : 06/2010 • Scale: 180m (length) x 14.2m (width) Span arrangement: 3x30m+3x30m 3 New Monivong Bridge • Client: Overseas Cambodian Investment Corp. • Completion: 05/2009 • Scale: 269.5m (length) x 14m (width) Span arrangement: 25m+118m+75m


Steel Box Girder Bridge

Starlight Bridge • Client: Phu My Hung Corp. • Completion : 02/2010 • Scale: 130m (length) x 8.64m (width) • Span arrangement: 2x25m+30m+2x25m


Simple Supported Bridge 1 Thay Tieu Bridge • Client: Phu My Hung Corp. • Completion: 02/2010 • Scale: 100m (length) x 24m (width) Span arrangement: 5x20m 2 Ca Cam Bridge • Client: Phu My Hung Corp. • Completion: 12/2005 • Scale: 101m (length) x 40.5m (width) Span arrangement: 5x20m

1 2

3

3 Ba Lon Bridge • Client: Phu My Hung Corp. • Completion : 12/2003 • Scale: 123m (length) x 15.85m (width) Span arrangement: 5x24.6m


Construction of Foundation and Basement

1 3

4

2


5

1

Bored pile of Nguyen Van Linh Parkway

2

Bored pile of Crescent Mall

3

Diaphragm Wall of Crescent Mall

4

S21 Basement

5

Crescent Mall Basement


Special Works

1 2

4


3 1

Crescent Water Retaining Dam

2

Steel Lifting Caisson for Deep Water

3

Pile Test by Self-balanced Method

4

Descending of Ba Lon Bridge


Consultancy Projects

Suspension Bridge

Extra-dosed Cable Stayed Bridge

Decoration Suspension Bridge

Symmetrical Inclined Arch Bridge


High and Low Arch Bridge

Spherical Bridge


7th floor, Lawrence S.Ting Building 801 Nguyen Van Linh Parkway, Tan Phu Ward, District 7, Ho Chi Minh City 84 – 8 – 5 411 6888 * 84 – 8 – 5 411 6999 spcc@spcc.com.vn www.spcc.com.vn


roadbridge