Issuu on Google+


Republic of the Philippines PROVINCE OF PALAWAN Municipality of Linapacan OFFICE OF THE MAYOR

MESSAGE The Local Government Code mandates local government to prepare a Comprehensive Development Plan that outlines the key aspirations, challenges and concerns facing LGUs and a set of programs, projects and policies towards the sustained socio-economic development. This Executive and Legislative Agenda serves as an implementing mechanism for the Comprehensive Development Plan, and its process ensures that the plan is relative and supportive of the sentiments of the various stakeholders in the Local Government Unit. This document contains the Governance program of the Municipality of Linapacan for the given period, usually three (3) years, corresponding to the term of office of elected officials. It is participatory process that promotes partnership between Local Chief Executive and Legislative Department and the involvement of multi-stakeholders in the identification, planning and programming of three (3) years of the Local Government Unit development priorities. Given the scope and complexity of the social structure that our people are striving to change, development workers must be sensitive to the historical roots of and the social-cultural circumstances obtaining in the people life situation. This will properly prioritize our efforts to ensure that our specific actions will be in harmony with their general thrust of the people’s struggle for social change. The ultimate goal of the Local Government Unit is to empower the people with the capability to conceptualize, organize and manage their own socio-economic programs/ projects and finally chart their own development. We must gear our work towards enabling people to help themselves. THANK YOU AND MABUHAY!

BIENVENIDO R. CABIGUEN Municipal Mayor


Republic of the Philippines PROVINCE OF PALAWAN Municipality of Linapacan OFFICE OF THE VICE MAYOR

MESSAGE For the continuity of growth and development of this municipality, the Executive and Legislative Department work hand and hand with its Comprehensive Development Plan and Government Land Use Plan. In Legislative Department, we have a legislative agenda containing a list of proposed legislative measures intended to be undertaken by a Legislative Body during a certain period of time. There is no specific standard in the formulation of a legislative agenda. As a plan, it should answer the three basic questions which are: WHO will do, WHAT and WHEN. As to WHAT question that could best answered during the plan implementation stage which should focus on the strategies and methods or approaches to be used. Basically, a legislative agenda contains a list of proposed measures of the Sanggunian, as a legislative body. It intends to accomplish a certain period of time in the performance of duties and functions as enumerated in the Local Government Code of 1991 (RA 7160). In the formulation of the Legislative Agenda, the proposed programs, projects and activities of the Sanggunian should only be those within its power to function. The Legislative Body will not encroach the Local Chief Executive in the exercise of its executive power. There are certain programs, projects and activities that the Sanggunian could do alone without involving the LCE but there are also programs, projects and activities that the Sanggunian should not preempt each other. With the vision and mission of this LGU, the Executive and Legislative Department collaborate with each other to establish development priorities and thrusts of the municipal government. THANK YOU AND MABUHAY!

ANGEL M. REY Municipal Vice Mayor


ELA PLAN CY 2011-2013 SECTOR : GENERAL PUBLIC SERVICE SECTOR SUB SECTOR : PUBLIC ADMINISTRATION PROGRAM/PROJECT TITLE

1. Executive Services & General supervision

DESCRIPTION

LOCATION

PHYSICAL TARGET

- provide general supervision & control overall PPAs

INVESTMENT REQUIREMENTS SOURCE COST (0000)

PERIOD OF IMPLEMENTATION 2011

2012

IMPLEMENTATION AGENCY/OFFICE

2013

G.F.

18,800.00

6,000,000.00

6,300,000.00

6,500,000.0

Office of the Mayor

- enforce all laws & ordinances relative to local governance & exercise appropriate corporate powers 2. Improvement of organization & management

Executive program

enhancement

G.F.

300,000.00

100,000.00

100,000.00

100,000.00

Office of the Mayor

3. General Administrative Services.

maintain an effective governance in decision service delivery & program/projects implementation

G.F.

240,000.00

80,000.00

80,000.00

80,000.00

Office of the Mayor

4. Human Resource Management & Development.

- maintain a sound personnel program to promote career development

G.F./20% D.F.

60,000.00

20,000.00

20,000.00

20,000.00

Office of the Mayor / HRMO

5. Community Affairs Program

- maintain sound Community Affair Services

G.F.

753,000.00

75,000.00

75,000.00

75,000.00

Office of the Mayor

6. Development Planning & Coordination Services

- Planning & Coordination on policy & plan formulation

Mun.Wide

G.F.

2,730,000.00

880,000.00

900,000.00

950,000.00

Office of the MPDC

7. Development Administration Enhancement Program.

- priority development assistance

Mun. Wide

G.F./20% D.F.

1,500,000.00

500,000.00

500,000.00

500,000.00

Office of the Mayor / MPDO

- MDC Planning Workshop & Conference

1 conference

20% D.F.

150,000.00

50,000.00

50,000.00

50,000.00

Office of the Mayor / MPDO

- Zonal Planning Workshop & Conference

1 Zonal Planning Conference

20% D.F.

150,000.00

50,000.00

50,000.00

50,000.00

Office of the Mayor / MPDO


PROGRAM/PROJECT TITLE

DESCRIPTION

LOCATION

- preparation of AIP of

2011

PHYSICAL TARGET

INVESTMENT REQUIREMENTS SOURCE COST (0000)

PERIOD OF IMPLEMENTATION 2011

2012

IMPLEMENTATION AGENCY/OFFICE 2013

6 AIP

20% D.F.

150,000.00

50,000.00

50,000.00

50,000.00

MPDO

8. CBMS

- updating maintenance

&

10 bgy.

20% D.F.

250,000.00

150,000.00

50,000.00

50,000.00

MPDO

9. Project Management Information System

- Field monitoring & evaluation of PPAs

75 PPAs

20% D.F.

125,000.00

35,000.00

40,000.00

50,000.00

MPDO

30 maps

G.F./20% D.F.

65,000.00

-do-

30,000.00

35,000.00

MPDO

10 bgy

20% D.F.

150,000.00

50,000.00

50,000.00

50,000.00

MPDO

- program records collection & processing - documentation & packaging of accomplishment report & LGPMS 10.Geographic Information System

- developing mapping

11. LGU-Civil Society Organizations Private Sector Linkages Strengthening program

- Technical assistance to Brgy. Development Planning

- monitoring & field validating of geo-physical data.

   

12. Financial management improvement program

Mun.Wide

AIP Preparation CDP Preparation GAD Plan Disaster Risk Reduction – Climate Change adaptation plan preparation Disaster Risk Reduction – Climate Change adaptation plan Preparation

- Fiscal Management

Mun.Wide

1 system

105,000.00

35,000.00

35,000.00

35,000.00

MSWDO

20% D.F.

110,000.00

50,000.00

30,000.00

30,000.00

MSWDO/MPDO

G.F.

150,000.00

50,000.00

50,000.00

50,000.00

LFC


PROGRAM/PROJECT TITLE

DESCRIPTION

13. Local Revenue Generation Program.

- Revision of Municipal Code

14. Municipal Budget Administration Program

- Preparation Budget

LOCATION

PHYSICAL TARGET

1 code

of Executive

INVESTMENT REQUIREMENTS SOURCE COST (0000) G.F. 20% D.F.

PERIOD OF IMPLEMENTATION 2011

2012

IMPLEMENTATION AGENCY/OFFICE

2013

100,000.00

100,000-00

-o-

-o-

LFC/MTO

G.F.

2,635,000.00

865,000,00

870,000.00

900,000.00

MBO

G.F.

2,675,000.00

885,000.00

890,000.00

900,000.00

Accounting Office

G.F.

4,6000.00

1,520.00

1,530.00

1,550.00

- Conduct study evaluating of budgetary proposed of legislation. - review & recommend for approval of financial plans. - review the annual budget of the barangay. 15. Municipal Government Accounting Services

- internal audit system operations & management

1 system

- financial report preparation - recording & accounting all the financial transaction. - preparation of all statements in support of the financial reports. 16. Municipal Treasury Services Administration

- Maintenance of accurate & relevant information regarding availability of funds. - conduct IEC on tax & revenue collection. - collection of real property tax & other taxes

MTO


PROGRAM/PROJECT TITLE

17. Municipal RPTA & records management services.

DESCRIPTION

LOCATION

- continuous appraisal & assessment of real property for taxation purposes.

PHYSICAL TARGET

100%

INVESTMENT REQUIREMENTS SOURCE COST (0000)

PERIOD OF IMPLEMENTATION 2011

2012

IMPLEMENTATION AGENCY/OFFICE

2013

G.F.

2,753,000.00

908,000.00

915,000.00

930,000.00

Mun. Office

Assessor’s

G.F./20% D.F.

1,775,000.00

585,000.00

590,000.00

600,000.00

Mun. Civil Registry

G.F.

7,950,000.00

- updating & maintenance of statistical data ban - issuances of certified photo copy of tax declarations & other documents - assessment / tax information & dissemination campaign. - general revision 18. Civil Registry Services

- registered of live birth, death, marriage license, & certificate of marriage.

Mun.Wide

- mobile registration - correction of entry. 19. Legislative Leadership & General supervision

- provision of technical, administrative & legislative leadership, directions guidance & supervision.

20. Legislative output enhancement program.

- Legislative research.

21. local Legislation

- enhancement / passage of relevant resolution & ordinance. - conduct of committee hearings and legal research. Conduct public hearing.

Office of the Sangguniang Bayan


PROGRAM/PROJECT TITLE

DESCRIPTION

LOCATION

PHYSICAL TARGET

INVESTMENT REQUIREMENTS SOURCE COST (0000)

PERIOD OF IMPLEMENTATION 2011

2012

IMPLEMENTATION AGENCY/OFFICE

2013

22. Legislative Enhancement Program.

Provision

Local Funds

150,000.00

50,000.00

50,000.00

50,000.00

SB Office

23. Vice Mayor League.

Provision

-do-

150,000.00

50,000.00

50,000.00

50,000.00

-do-

24. National Councilor League.

Provision

-do-

180,000.00

60,000.00

60,000.00

60,000.00

-do-

25. National Movement of Young Legislator.

Provision

-do-

150,000.00

50,000.00

50,000.00

50,000.00

-do-

-do-

90,000.00

30,000.00

30,000.00

30,000.00

-do-

-do-

90,000.00

30,000.00

30,000.00

30,000.00

-do-

1,350,000.00

400,000.00

450,000.00

500,000.00

Office of the Sangguniang Bayan Secretary

26. Aid to Liga ng mga Bgy. 27. Aid to SK Federation 28. Support System to Municipal Legislator.

- provision of technical & administrative assistance to the Provincial Administrative Body. - take & prepare minutes of regular & special sessions & committee hearings of the Sangguniang Bayan.

- prepare agenda for all sessions & marriages. Conduct researches & prepare reports of concluded meetings & sessions.


ELA PLAN CY 2011-2013 SECTOR : SOCIAL SUB SECTOR : EDUCATION & MANPOWER DEVELOPMENT PROGRAM/PROJECT TITLE

DESCRIPTION

LOCATION

PHYSICAL TARGET

INVESTMENT REQUIREMENTS SOURCE COST (0000)

PERIOD OF IMPLEMENTATION 2011

2012

IMPLEMENTATION AGENCY/OFFICE

2013

1. School Building Program.

- construction/rehab,& repair of school building

Mun.Wide

6 school bldg.

G.F./20% D.F.

1,500,000.00

500,000.00

500,000.0

500,000.00

2. Sport development program

- management & supervision of different sports activities in the municipality

Mun. Wide

4

G.F./20% D.F.

3,000,000.00

1,000,000.00

1,000,000.00

1,000,000.00

3. Alternative learning system

- provision

Mun.Wide

20% D.F.

45,000.00

15,000.00

15,000.00

15,000.00

LGU/DepEd

4. PARA-Teacher

- provision

Mun.Wide

G.F.

750,000.00

250,000.00

250,000.00

250,000.00

LGU/DepEd

5. HEALTH AND SANITATION

- prevention & control of communicable, vector – borne & non-communicable diseases

Mun.Wide

G.F.

900,000.00

300,000.00

300,000.00

300,000.00

MHO

- support to epidemic control & management.

-do-

G.F.

750,000.00

250,000.00

250,000.00

250,000.00

MHO

- medicine augmentation.

drugs

-do-

G.F.

1,500,000.00

500,000.00

500,000.00

500,000.00

MHO

- assistance to Barangay Health worker.

-do-

G.F./20%D.F.

300,000.00

100,000.00

100,000.00

100,000.00

MHO

and

- incentives to Microscopists. 6. Nutrition Program

7. KLM

6 PARA Teacher

MEO Mayor’s Office/DepEd

Barangay

All bgy.

10 microscopists

G.F.

300,000.00

100,000.00

100,000.00

100,000.00

MHO

- IEC: Pabasa sa Nutrition, supplemental Feeding,MicroNutrient supplementation - support to BEANS

All bgy.

Reduce 5%

G.F./20% D.F.

750,000.00

200,000.00

250,000.00

300,000.00

MNAO

20% D.F.

240,000.00

80,000.00

80,000.00

80,000.00

MNAO

300,000.00

100,000.00

100,000.00

100,000.00

- facilitate availability and distribution of anti-material drugs, nets and other essential materials.

-do-

Mayor’s Office/MHO/PHO/LM


ELA PLAN CY 2011-2013

PROGRAM/PROJECT TITLE

DESCRIPTION

8. Health Facilities Development Program

- maintenance of RHU & Lying-in building

9. Barangay Health Station 10. Municipal manpower employment services

LOCATION

Poblacion

PHYSICAL TARGET

INVESTMENT REQUIREMENTS SOURCE COST (0000)

PERIOD OF IMPLEMENTATION 2011

2012

IMPLEMENTATION AGENCY/OFFICE

2013

1 RHU 1 Lying-in

Municipal / Province / National

1,800,000.00

600,000.00

600,000.00

600,000.00

MEO

upgrading/repair & rehabilitation of ten BHS at all barangay.

10 BHS

-do-

2,400,000,.00

800,000.00

800,000.00

800,000.00

MEO

- implementation of R.A. 7323 (SPES)

15 SPES

20% D.F.

105,000.00

35,000.00

35,000.00

35,000.00

Mayor’s Office

- implementation of R.A. 7323 (SPES)

15 SPES

20% D.F.

105,000.00

35,000.00

35,000.00

35,000.00

Mayor’s Office

2,640,000.00

870,000.00

880,000.00

890,000.00

MSWDO

LABOR& EMPLOYMENT 11. Municipal manpower employment services

- skills and livelihood training SOCIAL SECURITY & SOCIAL WELFARE 12. Integrated Welfare Program for the basic sector

- crisis intervention and disaster operation program, assistance to individual in crisis situation. - technical assistance and resource augmentation to disaster management and relief services. community based rehabilitation program for persons with disabilities

G.F.


PROGRAM/PROJECT TITLE

DESCRIPTION

LOCATION

PHYSICAL TARGET

INVESTMENT REQUIREMENTS SOURCE COST (0000)

PERIOD OF IMPLEMENTATION 2011

2012

2013

IMPLEMENTATION AGENCY/OFFICE

- strengthening of partner – people’s organization (Day Care Worker’s Association, Youth Asso., Senior Citizen’s Asso. 13. Population Development Program.

parent effectiveness services, empowerment & reaffirmation of paternal abilities adolescent health, solo parents.

14. Aid to Senior Citizen to

Mun.Wide

G.F./20% D.F.

120,000.00

40,000.00

40,000.00

40,000.00

Population Office

Mun.Wide

20% D.F.

370,000.00

100,000.00

120,000.00

150,000.00

MSWDO

15. Women Protection & Development Program

- provision development

women

Mun.Wide

G.F./20% D.F.

90,000.00

30,000.00

30,000.00

30,000.00

MSWDO

16. Integrated Program for the protection of children.

- intensified services on children, early childhood care & development.

Mun.Wide

-do-

75,000.00

25,000.00

25,000.00

25,000.00

MSWDO

17. Assistance to DCW.

- incentives

Mun.Wide

-do-

90,000.00

30,000.00

30,000.00

30,000.00

MSWDO

18. Security & Protective Services

- anti-drug abuse program.

Mun.Wide

-do-

150,000.00

50,000.00

50,000.00

50,000.00

Office of the Mayor

19. Aid to PNP.

- Aid

G.F.

150,000.00

50,000.00

50,000.00

50,000.00

Office of the Mayor

20. Katarungang Pambarangay

- provision

20% D.F.

150,000.00

50,000.00

50,000.00

50,000.00

LGU/MLGOO

21. POC

- provision

20% D.F.

150,000.00

50,000.00

50,000.00

50,000.00

22. Day Care Services

- const./rehab./repair of day Care Centers.

20% D.F.

18,000.00

600,000.00

600,000.00

600,000.00

Mun.Wide

10 brgy.

6 Day Care Centers

MEO


SECTOR SUB SECTOR

: ECONOMIC : AGRICULTURE

PROGRAM/PROJECT TITLE

1. Agricultural Enhancement Program

DESCRIPTION

- maintenance of RAC - fish enhancement

2. Food Security Program

LOCATION

PHYSICAL TARGET

INVESTMENT REQUIREMENTS COST SOURCE (0000)

PERIOD OF IMPLEMENTATION 2011

2012

2013

Poblacion

1 RAC

20% DF

150,000.00

50,000.00

50,000.00

50,000.00

OMA

All brgy.

10

G.F./20% D.F.

450,000.00

150,000.00

150,000.00

150,000.00

Office of the Mayor/OMA

D.F.

75,000.00

25,000.00

25,000.00

25,000.00

G.F.

150,000.00

50,000.00

50,000.00

50,000.00

- farm-family forum, fisher fols summit & participation to agriaqua fairs & promotional activities.

Mun.Wide

- provision of technical assistance to farmers/Farm families & fisher folks reagricultural advancement.

Mun.Wide

- distribution of seedlings

Mun.Wide

10 brgy.

-do-

-do-

10 brgy.

G.F.

150,000.00

50,000.00

50,000.00

50,000.00 -do-

- input assistance 3. Fish production Enhancement Program

IMPLEMENTATION AGENCY/OFFICE

- fishing gears & technology assistance.

Mun.Wide

G.F./20% D.F.

300,000.00

100,000.00

100,000.00

100,000.00

National/Provincial/ Municipal

360,000.00

120,000.00

120,000.00

120,000.00

G.F./20% D.F.

300,000.00

100,000.00

100,000.00

100,000.00

DA

- mariculture development 4. Seaweeds Farm Development Program

- seaweeds farm development & expansion

OMA

TOURISM 1. Tourism Services Administration

- updating Database.

of

Tourism

- implementation/strengthening of tourism standard. - tourist & visitors information standard.

Office of the Mayor/Tourism Office


PROGRAM/PROJECT TITLE

DESCRIPTION

LOCATION

2. Tourism promotion & Development

- participation to tourism fairs & other events related to the promotion of Linapacan as tourist destination.

3. Foundation Day Celebration

- provision

4. Tourist destination development program

PHYSICAL TARGET

INVESTMENT REQUIREMENTS COST SOURCE (0000)

PERIOD OF IMPLEMENTATION 2011

2012

2013

G.F./20% D.F.

240,000.00

80,000.00

80,000.00

80,000.00

Office of the Mayor/Tourism Office

G.F.

450,000.00

150,000.00

150,000.00

150,000.00

Mayor’s Office

- identification of Dive Sites & beaches for Island hopping - management of Caseledan Spanish Fort & Eli Tourist Spot as income generating project of the Municipality

Nat’l./Prov’l./Mun.

300,000.00

100,000.00

100,000.00

100,000.00

Tourism Office

20% D.F.

950,000.00

300,000.00

300,000.00

350,000.00

Mayor’s Office

- conduct pre-membership education seminar to newly organized group.

Provincial/Municipal

450,000.00

150,000.00

150,000.00

150,000.00

Nat’l. Provincial/Municipal

600,000.00

200,000.00

200,000.00

200,000.00

COOPERATIVE 5. Cooperative Enhancement and Promotion.

- refresher course/training to existing cooperatives. - provision of assistance for registration to CDA. - strengthening of Cooperative Council.

Mun.

Environmental & Natural Resources 6. Environmental protection and management.

IMPLEMENTATION AGENCY/OFFICE

- IEC on environmental laws, rules & regulations. conduct monitoring, investigation & verification of quarrying claims. - promotional events on environmental protection and development.


PROGRAM/PROJECT TITLE

DESCRIPTION

LOCATION

7. Enforcement of Environmental & Natural Resources laws, rules, & regulations.

- information & education (IEC)

8. Reforestation Program

- tree planting of industrial trees to identified denuded areas.

- monitoring, surveillance and apprehensions.

PHYSICAL TARGET

INVESTMENT REQUIREMENTS COST SOURCE (0000)

PERIOD OF IMPLEMENTATION 2011

2012

IMPLEMENTATION AGENCY/OFFICE

2013

Nat’l. Provincial/Municipal

450,000.00

150,000.00

150,000.00

150,000.00

20% D.F.

150,000.00

50,000.00

50,000.00

50,000.00

National/Provincial/ Municipal

600,000.00

200,000.00

200,000.00

200,000.00

Nat’l. / Provincial / Municipal

900,000.00

300,000.00

300,000.00

300,000.00

- tree planting on watershed areas. 9. Coastal & marine resources management program.

- mariculture development - capacity building for fisher folks - establishment sanctuaries.

10. Mangrove Reforestation

of

fish

- plantation on mangrove - IEC on mangrove protection.

11. Disaster preparedness & Risk Management Program

- climate change program (IEC on global warming & effect of climate change).

Nat’l. / Provincial / Municipal

300,000.00

100,000.00

100,000.00

100,000.00

12. Shoreline protection Program.

- construction of flood control and seawall.

Nat’l. / Provincial / Municipal

3,300,000.00

800,000.00

100,000.00

1,500,000.00

13. Ecological Solid Waste Management.

- IEC

Nat’l. / Provincial / Municipal

3,000,000.00

1,500,000.00

1,500,000.00

- const. of category – I Sanitary Landfill.

Office of the Mayor


SECTOR SUB-SECTOR

: ECONOMIC : INFRASTRUCTURE

PROGRAM/PROJECT TITLE

DESCRIPTION

LOCATION

PHYSICAL TARGET

INVESTMENT REQUIREMENTS COST SOURCE (0000)

PERIOD OF IMPLEMENTATION 2011

2012

IMPLEMENTATION AGENCY/OFFICE

2013

1. Roads & Bridges Development Program 1.1. Maint. of Mun. roads

routine & periodic maintenance of municipal road

Poblacion

1.2. Concreting Municipal roads

- concreting of Mabini St. extension.

2. Farm to Market Road

3. Bridges

4. Water Supply Deve’t.

of

Municipal 20% D.F.

12,000.00

40,000.00

40,000.00

40,000.00

MEO

Poblacion

20% D.F.

450,000.00

150,000.00

150,000.00

150,000.00

MEO

- concreting of Malvar St.

Poblacion

20% D.F.

450,000.00

150,000.00

150,000.00

150,000.00

MEO

- concreting of Luna St.

Poblacion

20% D.F.

450,000.00

150,000.00

150,000.00

150,000.00

MEO

- for the construction of San Miguel to brgy. Maroyogroyog

20% D.F.

800,000.00

800,000.00

-o-

-o-

MEO

- San Miguel Junction I to San Nicolas

Prov’l./Municipal

10,000,000.00

-o-

500,000.00

500,000.00

MEO/PEO

Prov’l./Municipal

1,050,000.00

300,000.00

350,000.00

400,000.00

MEO/PEO

Municipal

150,000.00

50,000.00

50,000.00

50,000.00

MEO

- repair of Sitio Maybolo foot bridges.

Municipal

50,000.00

50,000.00

-o-

-o-

MEO

- repair of Sito Dinuangan foot bridges.

Municipal

50,000.00

-o-

50,000.00

-o-

MEO

- concrete bridges at brgy. Pical

Brgy. Pical

- maintenance of dagatan foot bridge.

Poblacion

Dagat-

- construction of Level III - improvements/rehabilitation & repair of level II water system.

4.36 Km.

48 L.M.

Poblacion

1 level III

Nat’l./Prov’l./Mun.

30,000,000.00

15,000,000.00

15,000,000.0

15,000,000.00

10 brgy.

10 level II

-o-

1,500,000.00

500,000.00

500,000.00

500,000.00

PEO/MEO -o-


PROGRAM/PROJECT TITLE

DESCRIPTION

LOCATION

PHYSICAL TARGET

INVESTMENT REQUIREMENTS COST SOURCE (0000)

PERIOD OF IMPLEMENTATION 2011

2012

2013

IMPLEMENTATION AGENCY/OFFICE

- water source development - construction of 2 units water tank.

-do-

6,000,000.00

2,000,000.00

2,000,000.00

2,000,000.00

-do-

- pipelines and fitting 5. Construction of New Municipal Building

- construction

Poblacion

-do-

4,000,000.00

3,000,000.00

1,000,000.00

1,000,000.00

MEO

6. Construction of Perimeter Fencing

- construction

Mun. Site

-do-

3,000,000.00

1,000,000.00

1,000,000.00

1,000,000.00

MEO

7. Erosion Control

- construction

Nat’l./Prov’l./Mun.

9,000,000.00

300,000.00

500,000.00

1,000,000.00

MEO

8. Drainage System

- construction

-do-

1,500,000.00

500,000.00

500,000.00

500,000.00

MEO

9. Legislative Building

- construction

-do-

1,500,000.00

15,000,000.00

MEO


ELA 2010-2013