Page 1

Maintenance and modernisation with Liftec

REGENT ON THE RIVER Situated on the banks of the River Thames in Fulham, Regent on the River is a prestigious residential development of 240 apartments. The medium rise six stories plus basement linked blocks originally had Schindler manufactured lifts installed when the building was constructed. In 2001 Liftec were awarded the maintenance contract for the site and have since then been providing the Liftec Comprehensive maintenance cover. Most recently and as a result of the service Liftec have been providing, the Company was awarded the contract to modernise the nine year old lifts, of which seven were hydraulic, serving the car park and basements. The phased modernisations were all undertaken whilst the building was fully occupied, so great care had to be taken to limit inconvenience to the residents and also to avoid as far a possible, nuisance noise during the modernisation. The modernisation project was completed to programme and specification as required by ILE.

Liftec Lifts Ltd, Unit7, Orbital One, Green Street, Green Road, Kent, DA1 1QG

ISO 9001 ISO 14001 OHSAS 18001 BUREAU VERITAS Nยบ 22785

Registered


Regent on the river - Liftec case study  

Phased modernisation and maintenance of passenger lifts at Regent on the river.

Advertisement
Read more
Read more
Similar to
Popular now
Just for you