TOPCON (GTS – 230 N) QUICK MANUAL CENTERING AND LEVELING:

STEP-1

Set the instrument on the tripod and press the power button.

STEP-2

Press the star key for initial settings.

STEP-3a

Press the up & down arrow for contrast adjustment of the display.

STEP-3b

Press (F1) for turn on the backlight of the display screen.

STEP-3c

Press (F2) for setting the tilt correction

STEP-3d

Press (F3) for turn on the laser pointer. (optional)

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.


Technical Support Team E-mail: Fax :

STEP-3e

STEP-3f

topcontech@fajerest.ae 04-2868016

Press (F4) for adjusting the prism constant, temp& pressure value etc. Again, Press F1for (Prism Con.) Press F3for (Temp-Preas) Once you are complete the leveling and centering, press (Esc) button for exit.

********************************************************************

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.


Technical Support Team E-mail: Fax :

topcontech@fajerest.ae 04-2868016

MAKING A NEW JOB:

STEP-1

Press the menu button.

STEP-2

Press (F1) for data collect. Data collect is the detail survey menu.

STEP-3

STEP-4

NOTE:

Press [F1] for inputting a new job name or press [F2] for selecting an existing job from the list. If you want to type the alpha numeric characters, again press [F1] and input that.Then Press [F4] to accept the job.

If you want to do both the topography and setting out exercises, please select the same jobs in DATA COLLECT menu & LAYOUT menu. ********************************************************************

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.


Technical Support Team E-mail: Fax :

topcontech@fajerest.ae 04-2868016

CO-ORDINATES INPUTTING:

STEP-1

Press menu button to get the main menu. Press F3 to select the memory manager.

STEP-2

Press F4 for the next page.

STEP-3

Press F1 to input co ordinates.

STEP-4

Press F2 for getting the created job list (if you know the job name, you can type it directly).

STEP-5

To select the job with up & down arrow keys.

STEP-6

Then Press F4

STEP-7

Press [F1], for your coordinate entry

Continues on NEXT PAGE

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.


Technical Support Team E-mail: Fax :

STEP-8

Type the point ID If Press F1-Alpha numeric Press F2-space Press F3-clear screen

STEP-9

After typing you can press [F4] or [enter]

STEP-10

Input the co-ordinates

STEP-11

You should type your point name here.

STEP-12

After the inputting press [F4] or [Enter]

STEP-13

NOTE:

topcontech@fajerest.ae 04-2868016

This shows your input is recorded to the memory.

It is better to make a Control Point data sheet given below. This is very useful for the surveyors on job handover situations.

JOB NAME

Point.ID

Northing

Easting

Elevation

Code Name

AL FAJER

1

10.000

10.000

10.000

CP1

AL FAJER

4

2787545.098

5037555.088

10.400

DM1

AL FAJER

5

2787523.776

5037560.001

12.333

DM2

********************************************************** Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.


Technical Support Team E-mail: Fax :

topcontech@fajerest.ae 04-2868016

STATION SETTING ` STEP-1

Press your MENU button and Press (F1) for data collect. (Data collect is the detail survey menu.)

STEP-2

Press [F2] for selecting your job from the list. And press [F4] to set the job.

STEP-3

Press [F1] for OCC.PT# INPUT (occupied point is your instrument’s station point )

STEP-4

After inputing the station’s point ID, Instrument hight etc. Then Press [F4]

STEP-5

Check your station coordinates. If it is correct Press [F3] and go to STEP-9, else Press [F4]

STEP-6

Press [F4] to check the coordinates entry.

STEP-7

Check the point Id and Press [F4]

STEP-8

Check the recorded coordinates and Press [F3] Continues on NEXT PAGE

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.


Technical Support Team E-mail: Fax :

STEP-9

Press [F3]

STEP-10

Press [F3]

STEP-11

topcontech@fajerest.ae 04-2868016

This screen displays your station is completed.

**********************************************************

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.


Technical Support Team E-mail: Fax :

topcontech@fajerest.ae 04-2868016

BACK STATION ORIENTATION: NOTE: For Back orientation you can choose 3 ways. 1. Whole Circle Bearing ZERO SET. 2. Known W.C.Bearing SET. 3. Back Station Co-ordinate SET.  BACK STATION BY WHOLE CIRCLE BEARING ZERO SET:

STEP-1

After the station set up, orient the telescope to the Back station point. Then Press [F2] for start the Back sighting.

STEP-2

Press [F2] for ZERO set

STEP-3

Now you should get this message on the screen.

STEP-4

Press [F3] for start measuring

STEP-5

Press [F3] for start co-ordinate measuring

Once the machine starts the measuring, quickly press ESC button. Because now your bearing is set as ZERO. Again STEP-6 press ESC button and start the survey works. NOTE: If you want to know the co-ords of the BS point, wait upto the complete measurement. For recording that data, Press [F3] ********************************************************** Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.


Technical Support Team E-mail: Fax :

topcontech@fajerest.ae 04-2868016

 BACK STATION BY KNOWN W.C.BEARING SET:

STEP-1

After the station set up, orient the telescope to the Back station point. Then Press [F2] for start the Back sighting.

STEP-2

Press [F4] for BS inputting.

STEP-3

Press [F3]

STEP-4

Press [F3]

STEP-5

Press [F1] for Azimuth inputting.

STEP-6

Type your W.C.B on this window. (12.0259 means 12° 2’ 59”)

STEP-7

Now you should get this message on the screen.

STEP-8

Press [F3] for start measuring Continues on NEXT PAGE

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.


Technical Support Team E-mail: Fax :

STEP-9

STEP-10

topcontech@fajerest.ae 04-2868016

Press [F3] for start co-ordinate measuring Once the machine starts the measuring, quickly press ESC button. Because now your bearing is set as ZERO. Again press ESC button and start the survey works.

NOTE: If you want to know the co-ords of the BS point, wait upto the complete measurement. For recording that data, Press [F3] . **********************************************************

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.


Technical Support Team E-mail: Fax :

topcontech@fajerest.ae 04-2868016

 BACK STATION BY CO-ORDINATE SET:

STEP-1

After the station set up, orient the telescope to the Back station point. Then Press [F2] for start the Back sighting.

STEP-2

Press [F1] and input the back station point id, PCODE, and Reflector Height. Then Press [F3] for confirmation.

STEP-3

Press [F3] for starting the co-ordinate measure.

STEP-4

Now you should get this message on the screen.

STEP-5

After checking the co-ords Press [F3] for recording the co-ordinate measurement.

STEP-6

Now you should get this message on the screen.

STEP-7

Now you should get this message on the screen. This shows your Back station is set properly. **********************************************************

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.


Technical Support Team E-mail: Fax :

topcontech@fajerest.ae 04-2868016

TOPOGRAPHIC SURVEYING

STEP-1

Press [F1] for preparing a detail survey.

STEP-2

After completing the station & B/S set up orient the telescope to the prism. Then Press [F3] to start detail surveying.

STEP-3

Input the starting point no, code, and reflector height. Then Press [F4]

STEP-4

Press [F3] to prepare the measurement.

STEP-5

Press [F3] to start the coordinate measurement.

STEP-6

Then you should see this message

STEP-7

Confirm your co- ordinate and Press [F3] to record this data.

STEP-8

After record, your point Id will be increasing automatically. **********************************************************

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.


Technical Support Team E-mail: Fax :

topcontech@fajerest.ae 04-2868016

NOTE: If you want to record the data with same code and same reflector height, you have to do shown on below.

STEP-1

Press [F4] to start measuring

STEP-2

Then you should see this message

STEP-3

Confirm your co- ordinate and Press [F3] to record this data.

STEP-4

This message shows that your data has recorded to the memory.

**********************************************************

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.


Technical Support Team E-mail: Fax :

topcontech@fajerest.ae 04-2868016

TOPOGRAPHIC SURVEYING WITH OFFSET MEASUREMENT

STEP-1

Input the starting point no, code, and reflector height. Then Press [F3]

STEP-2

Press [F4] for choosing next page.

STEP-3

Press [F1] for choosing OFFSET menu.

STEP-4

Most commonly using offset system is the 2nd one. So Press [F2] NOTE: This offset function is working as per this figure. Here, the telescopic line between building corner and the instrument is obstructed by a tree. Before inputting, please confirm the offset lengths from the chainman side. Now your required point (Building Corner) is 2m forward and 1m left of the actual observed point (prizm).

STEP-5

Input your Left (-) or Right (+) offset. Here your offset is 1m left. So input -1 and Press [F4] for enter. Continues on NEXT PAGE

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.


Technical Support Team E-mail: Fax :

STEP-6

Input your forward (+) or Backward (-) offset. Here your offset is 1m forward. So input 2m and Press [F4] to enter.

STEP-7

Press [F3] to start co-ordinate measuring

STEP-8

This screen shows, the machine is measuring.

STEP-9

This is the calculated coordinates and if you want record Press [F3].

STEP-10

This screen shows your data has recorded to the memory.

STEP-11

This screen shows your instrument is ready for next observation.

topcontech@fajerest.ae 04-2868016

**********************************************************

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.

27098791-Topcon230-Quick-Manual-by-Al-Fajr  