MIXED USE BUILDING Construction Documents


A MIXED-USE BUILDING Local Market and Lofts Architect: Loren Amy

Lafayette, LA Client: Trevor Wallace Project #: 001 Construction Documents

t

tree ss S

pre

t Cy

Eas

t

e Stre Lee

Sheet Index: A1.1- Site Plan A2.1.1- First Floor Plan A2.2.1- Loft First Level Plan A2.1.2- First Floor Reflected Ceiling Plan A2.2.2- Loft Reflected Ceiling Plan A3.1- Door and Window Schedule Sheet A4.1- SouthWest Elevation A4.2- NorthWest Elevation A5.1- First Building Section A5.2- Second Building Section A6.1- First Wall Section A6.2- Second Wall Section A7.1- Enlarged Elevator Section A7.2- Enlarged Stair Section A7.3- Enlarged Stair Plan A7.4- Detail


A Mixed-Use Building in Lafayette, LA for

Downtown Lafayette

Construction Documents Loren Amy architect

Desormeaux engineers

SEAL REVISIONS: leveling site removal of plants keep trees on property line remove fence repave sidewalk

April 17, 2013

N

SITE PLAN

Site Plan

1/8”=1’-0”

A-1.1


A Mixed-Use Building in Lafayette, LA for

Downtown Lafayette

Construction Documents Loren Amy architect

Desormeaux engineers

SEAL

April 17, 2013

N

FIRST FLOOR PLAN

First Floor Plan

1/8”=1’-0”

A-2.1.1


A Mixed-Use Building in Lafayette, LA for

Downtown Lafayette

Construction Documents Loren Amy architect

Desormeaux engineers

SEAL

April 17, 2013

Loft Plan

N

LOFT PLAN 1/8”=1’-0”

A-2.2.1


A Mixed-Use Building in Lafayette, LA for

Downtown Lafayette

Construction Documents Loren Amy architect

Desormeaux engineers

SEAL

April 17, 2013

N

FIRST FLOOR REFLECTED CEILING PLAN 1/8”=1’-0”

First Floor Reflected Ceiling Plan

A-2.1.2


A Mixed-Use Building in Lafayette, LA for

Downtown Lafayette

Construction Documents Loren Amy architect

Desormeaux engineers

SEAL

April 17, 2013

N

LOFT REFLECTED CEILING PLAN 1/8”=1’-0”

Loft Reflected Ceiling Plan

A-2.2.2


A Mixed-Use Building in Lafayette, LA for

Downtown Lafayette

Construction Documents Loren Amy architect

Desormeaux engineers

SEAL

April 17, 2013

E

Door and Window Schedule

A-3.1


A Mixed-Use Building in Lafayette, LA for

Downtown Lafayette

Construction Documents Loren Amy architect

Desormeaux engineers

SEAL

April 17, 2013

SouthWest Elevation SOUTHWEST ELEVATION 1/8”=1’-0”

A4.1


A Mixed-Use Building in Lafayette, LA for

Downtown Lafayette

Construction Documents Loren Amy architect

Desormeaux engineers

SEAL

April 17, 2013

NorthWest Elevation NORTHWEST ELEVATION 1/8”=1’-0”

A-4.2


A Mixed-Use Building in Lafayette, LA for

Downtown Lafayette

Construction Documents Loren Amy architect

Desormeaux engineers

SEAL

April 17, 2013

SouthWest Section SOUTHWEST SECTION 1/8”=1’-0”

A5.1


A Mixed-Use Building in Lafayette, LA for

Downtown Lafayette

Construction Documents Loren Amy architect

Desormeaux engineers

SEAL

April 17, 2013

NorthWest Section NORTHWEST SECTION 1/8”=1’-0”

A-5.2


A Mixed-Use Building in Lafayette, LA for

Downtown Lafayette

Construction Documents Loren Amy architect

Desormeaux engineers

SEAL

April 17, 2013

SouthWest Wall Section SOUTHWEST WALL SECTION 3/8”=1’-0”

A6.1


A Mixed-Use Building in Lafayette, LA for

Downtown Lafayette

Construction Documents Loren Amy architect

Desormeaux engineers

SEAL

April 17, 2013

NorthWest Wall Section NORTHWEST WALL SECTION 3/8”=1’-0”

A-6.2


A Mixed-Use Building in Lafayette, LA for

Downtown Lafayette

Construction Documents Loren Amy architect

Desormeaux engineers

SEAL

May 6, 2013

N

ENLARGED ELEVATOR 04/ STAIR 04 - SECTIONS 1/4”=1’-0”

Enlarged Elevator/ Stair Sections

A-7.1


A Mixed-Use Building in Lafayette, LA for

First Floor Level

Second Floor Level

Downtown Lafayette

Construction Documents Loren Amy architect

Desormeaux engineers

1 2 3 4 5 6 7 8 9 10 11

23 24 25 26 27 28 29 30 31 32 33 34

SEAL 22 21 20 19 18 17 16 15 14 13 12

45 44 43 42 41 40 39 38 37 36 35

May 6, 2013

N

ENLARGED ELEVATOR 04/ STAIR 04 - PLAN 1/4”=1’-0”

Enlarged Elevator/ Stair Plan

A-7.2


A Mixed-Use Building in Lafayette, LA for

Downtown Lafayette

Construction Documents

2

Loren Amy architect

Desormeaux engineers

SEAL

May 6, 2013

Detail DETAIL

1-1/2”=1’-0”

A-7.3