MASTER FACILITIES PLAN PRESENTATION loadin
g
loadin expan g sion
Sunday, October 14, 2018 walkin freeze r cover ed entry
walkin ref.
vestib
ule classr
oom office
entry
office office stairs
corrid
or
to gra
de
corrid or
t
orage classr
oom
storag
e
stage
classr
oom classr
oom
cou
stair
storag
e
comm
ercial
socia lh expan all sion
socia
l hall
corrid
or
kitche
n
men's acces s toilet ible room
toilet
classr
oom
wome n acces 's s toilet ible room
toilet office
entry
office storag
e
work
room
Dear Beloved Brothers and Sisters in Christ, classr
oom
stairs
Christ is in our midst!
nurse
ry
corrid or
We read in the Book of Psalms: “Unless the Lord builds the house, those who build it labor in vain” (Psalm 126:1). It is with this faithful spirit and trust in God’s providence that our forebears started the Annunciation Greek Orthodox Church in Lancaster almost 100 years ago in 1921.
urtyar
d
As we approach our centennial celebration intoailetfew years, we reflect back with gratitude on all confe r nce gourm e / those who have labored and sacrificed with love to build our Annunciation Church etfaithfully room upon the cornerstone of Faith in Christ (Ephesians 2:20) – growing and expanding our parish into lti-pur a true beacon of faith and service inmumLancaster County and beyond. The best way to honor our pos usic r e / m history is to look ahead to the next 100 years with the same spirit of faithfulness, conviction, and vision – to give to the next generations what past generations have given and entrusted into our own hands.
As we movemeahead into the next hundred years of ministry and service, there is no question that n's toilet r we are calledoo–mas Orthodox Christians and as a Church – to be less concerned with preserving and maintaining, and more concerned with growing and expanding the witness of our Faith to classr oom all people. Committee under the leadership of Kosta Kontanis womeThe Parish Council and Building n's t o il et ro loadin have established the enclosed Master Plan to ensure that the facilities of our parish reflect the g loadin om g expan of our vision and mission loftiness eleva as Orthodox Christians – entrusted to us by our Lord Jesus sion tor ac lobby corrid cess Christ.storage or Sund schoo ay l offic e
eleva
tor
e
lev The Master Plan is the culmination of years of planning and consultation with various ministry mech walk- stora in g e the church, including but rnot m leaders and fgroups of limited to: the clergy and staff, Sunday reeze r School, Property Committee, Bazaar/Gyrofest Committees, Youth Ministries, Philoptochos, and cover water ed servic e entrycommittees of the parish. Each of the five phases of the Master Plan will other organizations and walkin require Parish ref. Council and Congregation approval before moving forward.
We are all members of one Body (1 Corinthians 12:12), and may we all share together in the vision and mission of growing our Orthodox Faith and sharing the Light of Christ entrusted to us with all people. In the Service of our Lord, vestib
ule classr
oom
Fr. Hector Firoglanis Pastor e ntry
o
ice Dr. ffSpencer Phillips office Parish Council President
corrid
or
office stairs
to gra
de
1
corrid or
m
s Master Facilitie Plan for Parish and oras gio e n Expastn Renovation.
orage
t
Goals
classr
oom
stage
AS SET BY THE SEPTEMBER 2015 classr oom MEETING PARISH COUNCIL classr
oom
Restrooms
Loading Dock
in the breezeway, making them ADA compliant while providing more space and fixtures.
truck height with a capacity for up to three trucks.
Classrooms
Conference/ Multi-purpose Room
• To relocate the restrooms currently located
• To renovate and modernize all existing
classrooms, equipping them with new technology, updated furniture, white boards, and storage, and to improve the HVAC. • To add two stairadditional stor classrooms. age
Nursery
• To update the nursery room, including a flat
screen TV to allow parents to view live services.
Philoptohos Hall
• To enlarge the hall and its seating capacity
and to improve the HVAC. • To modernize the entire space, making it better suited for both social and athletic socia events. l hall
• To renovate the loading dock to standard
• To create a new conference room that
seats 75 people and includes multimedia capabilities and a sink/counter space. This space would be accessible without opening the entire building.
Chapel
• To create a chapel that seats up to 75
people, and is intended for smaller, more comm intimate, services such as small baptisms, ercial kitc weddings, and vespers and possibly the earlyhen Sunday service.
Storage Space
• To add ground-level storage space with
the minimum ability to store: racks of folding chairs; round tables; basketball nets; Kitchen warmers and racks for trays; wire shelving; • To renovate, expand, and/or relocate parts and other items used for annual events such socia l hall of the kitchen to include all its current as the Bazaar and Gyrofest. functions in addition to: a larger walk-in refrigerator and walk-in freezer; separate Music Room dishwashing and cooking areas; larger • To create a dedicated music room that doorways; and additional space for food accommodates 20 people seated, withcospace rridor preparation, stand-alone freezers, and dry for a piano and other instruments as well as storage. storage for robes, books, and sheet music. expan
sion
2
cou
men's acces s toilet ible room
toilet
classr
oom
wome n acces 's s toilet ible room
toilet office office storag
e
entry
Site Plan Overview
ms ms
work
room
classr
oom
stairs nurse
corrid or
ry
urtyar
d toilet
men's toilet room
loadin
g
multipurp music ose / rm
KITCHEN COVERED ENTRY
LOADING
confe r gourm ence/ et roo m
EXISTING SANCTUARY
REST ROOM
classr
oom
wome n's toilet ro loadin om expan g sion
lobby
storag
e
walk- stora in ge freeze r cover ed entry
walkin ref.
CHAPEL
eleva
tor ac corrid cess or
eleva
Sund schoo ay l offic e
tor
EXISTING SOCIAL HALL water
elev mech rm
servic
e
SOCIAL HALL ADDITION
vestib
PLAY YARD ule classr
oom office
entry
office office
3 corrid
or
corrid or
m
s Master Facilitie Plan for Parish and oras gio e n Expastn Renovation.
orage
Phases
t
classr
oom
stage
classr
oom
BUILDING class REAR room
cou
C D
A B E
BUILDING FRONT
4
men's acces s toilet ible room
toilet
classr
oom
wome n acces 's s toilet ible room
toilet office office storag
e
Phase A:
work
entry
room
classr
oom
Restroom Addition nur
stairs
urtyar
corrid or
sery • 750 sf men’s and woman’s addition located in the courtyard • 4 toilets and 4 wash sinks in the woman’s • 2 toilets, 2 urinals, and 4 wash sinks in the men’s • Two small janitorial/storage closets
d
oilet Phase B: conferencInterior & Exterior tRenovations e gourm / et roo • Classroom Renovations: m • New walls in front of CMU where necessary multipurpA/C ose units • Ductless mini split heat pumps mus& ic rm / • New paint, flooring, and ceilings • New LED lighting • Renovation of exterior and interior as needed
PhasetoC: men's ilet ro
Kitchen Renovation & Addition
• Expand intoomarea where current restrooms are located • Expand pantry into part of vestibule classr oo new larger walk-in refrigerator and a walk-in freezer • Remove womeexisting walk-in and add a m n's toilet dishwashing from cooking area • Separate room • Add additional dry storage ele vator acces lobby basement • Relocate freezers from kitchen s corrid to storag or e • Replace double range unit Snext with a double stack convection oven and levato unday to steamekettle r s
hool o elev ff6 single gas range oven cwith iceburners mech s torage from parking lot • New covered entry rm • Reconfigure loading dock to accommodate 3 trucks at the correct truck height water
servic
e
Phase D:
Social Hall Expansion
Phase E:
Chapel & Multi-purpose Room Addition
• Add 2,840 sf to existing social hall (55% increase) and 843 sf of storage space • Basement with option for a full or half expansion • 2 classrooms and a music room • Preschool option to relocate into the new section • All new HVAC located on the rooftop • New flooring and finishes in existing section • Multi-purpose conference room that can seat 75 • Chapel that can seat 75 • New staircase to lower level • Add restrooms and lounge on the narthex level, with possible space for classroom or storage • Option for exterior entrance
5
6
7
corrid or
m
orage
t
proposed loading dock above proposed kitchen walk-ins above entry corridor
women's accessible toilet room
play yard
storag
multi-purpose room
storage
e
proposed covered entry above
corridor
stoarge
stair
classr
oom
men's elec/ accessible mech toilet room room
stage
preschool
stairs to grade
club room
building addition - preschool
club office
D
boiler room
classr
oom
possible option
stairs storage
classr
oom
proposed toilet rooms above
cou courtyard above
chapel / lobby expansion above
6 4 h e r s h e y a v e n u e l a n c a s t e r , p a 1 7 6 0 3
flat roof
building addition - roof top mechanical equipment
D
flat roof
wc altar
office
flat roof
work room
solea storage
flat roof
sanctuary
courtyard below
ada toilet rm jan
storage lobby
cl
modify stairs to balcony eliminate stairs to ground floor
lounge
narthex
chapel, multi-purpose room & lobby addition
E
ada toilet rm
stairs/ exit
closet chapel
accessible ramp to lower level
stairs to lower level
86
4 h e r s h e y a v e n u e l a n c a s t e r , p a 1 7 6 0 3
foyer
elevator
tele
water tor
eleva
storag e stairs/ exit
classr oom
elev mech rm
servic e
stairs to grade
accessible ramp to grade
storage
lobby
sunday school office
elevator
water service
elevator access corridor
classroom
ry
storage
storage
corridor
multi-purpose / music rm
nurse
entrance from exterior
possible classroom
conference/ gourmet room
toilet
B
A
stairs
elev mech rm
stairs
storage room
lobby
courtyard
multipurp music ose / rm
multi-purpose room
classroom
nursery
work room
entry
new accessible toilet rooms
interior renovations of existing space
room
storage
classroom
toilet classroom
storage
office
toilet
work
E
stage
women's accessible toilet room
office
toilet
office
e office
chapel, multi-purpose room & lobby addition
eleva
tor ac corrid cess or classroom
men's accessible toilet room
classroom
corridor
cooffice rridor
oom
6 4 h e r s h e y a v e n u e l a n c a s t e r , p a 1 7 6 0 3
Sund schoo ay l offic e classroom
entry
office
classr
storage
e corridor
oom
kitchen renovation & addition
storag
storage
lobby social hall
wome n's toilet room classroom
C
office
stairs to grade
storag vestibule
covered entry
confe r gourm ence/ et roo m
D
walk-in ref.
walk-in freezer
d
social hall expansion
commercial kitchen
loading expansion
urtyar
social hall addition
storage
men's toilet room
stair
loading
classr
corridor
wome n acces 's s toilet ible room
corridor
men's acces s toilet ible room
toilet
toilet entry
9
corrid or
m
s Master Facilitie Plan for Parish and oras gio e n Expastn Renovation.
orage
t
Phase A
stage
classr
toilet room toilet room oom
RESTROOM ADDITION classr
oom
classr
oom
cou
janitor's closet
stair
supply closet
storag
e
fully accessible women's toilet room
fully accessible men's toilet room
comm
ercial
socia lh expan all sion
socia
l hall
corrid
or
10
kitche
n
men's acces s toilet ible room
toilet
classr
oom
wome n acces 's s toilet ible room
toilet office office
Costs
storag
e
work
room
classr
oom
urtyar
d
entry
stairs
nurse Restroom Addition ry
$ 200,000.
Phase B:
Interior & Exterior Renovations
$ 290,000.
Phase C:
Kitchen Renovation & Addition
$ 510,000.
Phase D:
corrid or
Phase A:
toilet
confe r gourm ence/ et roo m
Phase E:
Social Hall Expansion
$1,770,000.
multipurp Chapel & Multi-purpose Room Addition music ose /
$2,011,000.
rm
Additional Costs Site Workmen's toilet
$ 550,000.
room
Architectural/Engineering Fees (10%) loadin
$ 500,000.
classr
oom
wome n's toilet ro loadin om expan g sion
g TOTAL COST lobby
storag
e
walk- stora in ge freeze r cover ed entry
walkin ref.
$5,831,000.
eleva
tor ac corrid cess or
eleva
Sund schoo ay l offic e
water
tor
elev mech rm
servic
e
vestib
ule classr
oom office
entry
office office
11 corrid
or
corrid or
m
s Master Facilitie Plan for Parish and oras gio e n Expastn Renovation.
orage
t
FAQS
classr
oom
stage
FREQUENTLY ASKED QUESTIONS classr
oom classr
oom
Q:
cou
Can the proposed 5 Phases of the Master Facilities Plan be completed in any order?
Yes, with the exception of Phase C: Kitchen Renovation & Addition. Phase A: Restroom Addition must be completed prior to the kitchen renovation. The rest can be done at any time deemed appropriate by the congregation.
Q:
What is the process by which each of the phases of the Master Facilities Plan are approved for execution?
Each phase recommendation of the Building Committee will be first approved by Parish Council. It will then be presented for approval by the parish at the annual Congregational stair torage Assembly or, if sneeded, at a special parish meeting. Phase A: Restroom Addition has already been approved by Parish Council. The intention is to obtain final approval by the parish at the Special Congregational Meeting on October 14, 2018.
Q:
How will this project be funded?
Q:
What is the time line for completing all 5 phases?
Funds for Phase A: Restroom Addition are already available and allocated by Parish comm ercial Council for this purpose. Funds for the remaining phases will be raised. A fund raising kitche n committee will be formed for this purpose upon approval of the Master Facilities Plan. Parish Council will also budget a certain amount each year to the “building fund.” There is no time line. Phase A: Bathroom Addition is to begin immediately, upon approval by the parish. The remaining phase development will depend on how quickly the funds can be raised and the desires of the parish.
socia lh expan all sion
Q:
Why don’t we just build a new church? socia
l ha
Building a new church is extremely expensive,ll requiring land acquisition and bank financing. Simple comparisons of costs and funding options show that renovating and adding to our current structure is a more favorable plan. corrid
or
12
men's acces s toilet ible room
toilet
classr
oom
wome n acces 's s toilet ible room
toilet office
entry
office storag
e
work
room
classr
oom
urtyar
d
nurse
ry
corrid or
Q:
stairs
What about current maintenance issues?
While building maintenance is continually monitored and recommendations for improvements made when determined necessary, the Master Facilities Plan also includes a phase cthat takes a comprehensive looktoat ilet areas of the church’s interior and exterior onfere nce/ g o urmet maintenance or renovation. that require roo m
Q:
m
ulti-pu rp or building codes that will complicate our Are there any zoning ordinances music ose / rm plans?
Jeff Wyant, the architect, has reviewed the ordinances and codes. At this point, there is nothing of which we are aware.
Q: loadin
g
Q:
Will amsprinkler system need to be installed? en's toil
et roo m the architect, has reviewed the requirements for Additions to Existing Jeff Wyant, Structures. Based on the total square footage of the addition plans, we are near that classr oom mark. ways to meet this requirement, such as separating wome But there are less expensive n's toilet r o o spaces with fire rated doors. Also, a certain amount of leniency is allowed in cases such m loadin g eas xpanchurches. eleva at this point that we will not be required to install a Jeff lois confident sion tor ac bby corrid cess sprinkler system. storag or e eleva
Sund schoo ay l offic e
tor
ele
v Will we wlose any parking spaces as a result mechof this plan? alk-instorag e freeze r
rm Phase C: Kitchen Renovation & Addition will result in the loss of approximately 14 spaces. We will still meet Lancaster Zoning Ordinance Parking requirements. cove water re s wa
entry
d
ervice
Q:
lk-in Are there ref. any options available for more parking spaces?
Q:
What if we decide that we no longer like a phase or aspect of the Master Facilities Plan?
Perhaps. We have informally approached the owner of House of Pasta to ascertain the availability of an area of their lot that is adjacent to our own. The owner had a positive response and we will continue to explore the opportunity.
That could Our Master Facilities Plan is intended to provide an overview of our veshappen. tibule facilities, both current andclaprojected, alongside their purpose and plans for the future. ssroo m Our Master Facilities Plan is designed to evolve with the needs of the parish. office
entry
office office
13 corrid
or
Annunciation Greek Orthodox Church 64 Hershey Avenue Lancaster, PA 17603
Non-ProďŹ t ORG U.S. POSTAGE
PAID
LANCASTER, PA Permit No. 502
stair
storag
e
comm
ercial
Save the Date AND PLEASE PLAN TO ATTEND. socia lh expan all OPINION AND FEEDBACK MATTER! YOUR sion socia
Special Congregational Meeting l hall
Sunday, October 14 IMMEDIATELY FOLLOWING DIVINE LITURGY
corrid
or
kitche
n