Page 1

KE

LS

IE

BR

OO

KE

R

PORTFOLIO ARCHITECTURAL TECHNOLOGIST


TABLE OF CONTENTS SketchUp

Revit

ATB Bank Design


Get in Touch PHONE 

Working Drawings

Adobe

EMAIL 

ADDRESS 


MU

M CO

K/

N-

N BA

T NI

Y

ER

C

T EN

TOR

RA UST

ILL SIG BE O DE an D P/A AL Pl IN oor OSHO G I l T OR in F /PHO a D A M OC

AUT

ORIGINAL DESIGN-BANK BRANCH

SKETCHUP/IRENDER/PHOTOSHOP


r mmunity e t en ell as a coe location,e C ty bank as wies into th importancuri n u ion as a use it t e of the r is a fo le m s b t m func ign beca d becau ity cente th renta to o o t C needed is des nue, an ommun oor, wi signed & that ic for th per Ave bank/c e first fl ace de district. k n g n i a iginal des ord organ ley on Jasents. The ted on th munity sp Quarters B B n or cept w river val nvironm er situa he com wntown a T s i A B bank the con winding urban e ity cent red as t busy do un e e AT se ffe ur The r. I cho ext to th into o d comm ry is o joy in th k n n to e n cent ed right ture bac bank a onserva se to e t o a c h situa nging n with the plant for t e c i A r of b building above. ceful pla story spaces d a pea n e offic nature a bring

ORIGINAL DESIGN-BANK BRANCH

SKETCHUP/IRENDER/PHOTOSHOP

ORIGINAL DESIGN- COMMUNITY CENTER

SKETCHUP/IRENDER/PHOTOSHOP


COURSE WORK-GENERIC OFFICE BUILDING

REVIT

COURSE WORK-GENERIC OFFICE BUILDING

REVIT


ough n e xible sists of e fl s n t’ G , tha ilding co tor. The g n i build . The bu an eleva evit®. e r u s truct busines om, and s using R s l e y ste types of anical ro ring skill r o t s h e y oa tw ate man n, a mec nd rend s i ilding commod , a kitche rafting a u b d e offic ble to ac shrooms ractice c i r gene hat it’s a ublic wa was to p e h t T p sign es, two ignment e d in offic the ass n e v se tive of c obje

G

ic r e en

ce fi f O

n

i d l i Bu

COURSE WORK-GENERIC OFFICE BUILDING

REVIT


COURSE WORK-MEDICAL CENTER FLoor Plan

REVIT

COURSE WORK-MEDICAL CENTER

REVIT/PHOTOSHOP


COURSE WORK-MEDICAL CENTER

REVIT

Whole Life Medical Center

The Whole Life Medical Center is a one story cast in place structure that consist of six offices, five examination rooms, a consultation room, staff room, copier room, public washrooms, and a reception/waiting area. The objective of the assignment was to create a Revit® model using an existing AutoCAD® floor plan, with a phasing and demolition plan.

COURSE WORK-MEDICAL CENTER

REVIT


COURSE WORK- JAMES RESIDENCE

REVIT

COURSE WORK- JAMES RESIDENCE Main Floor Plan

REVIT


COURSE WORK- APARTMENT COMPLEX

REVIT/PHOTOSHOP


COURSE WORK-SMITH RESIDENCE

SKETCHUP/IRENDER

ORIGINAL DESIGN- URBAN DESIGN City Streetscape

SKETCHUP/IRENDER/PHOTOSHOP


COURSE WORK-PHARMACY

SKETCHUP/IRENDER/PHOTOSHOP

COURSE WORK-SMITH RESIDENCE

SKETCHUP/IRENDER


COURSE WORK-RENDERING ENHANCEMENT

PHOTOSHOP

COURSE WORK-ALL DAY CAFE Floor Plan

PHOTOSHOP


COURSE WORK-ALL DAY CAFE Elevation

PHOTOSHOP

RB -U N G ESI L D ape HOP A N OTOS IGI reetsc H P R / O R St ENDE City P/IR

CHU

SKET

N

SIG

DE AN


Belvedere Community Hall

Belvedere was an already existing community hall where the objective of the assignment was to take the existing floor plan, transfer it into AutoCAD®, and add an extensive addition to the community hall. The two-story steel construction addition consists of: two stairwells, elevator, machine room, mechanical room, two offices, an activity area, change rooms, banquet hall, outdoor storage, and public washrooms on each floor. 1

STAIRS

ELEVATOR MACHINE

OFFICE

2

STAIR DETAIL

ACTIVITY AREA

CHANGE

CHANGE

STAIRS WOMEN

1

STAIR DETAIL

MECH.

3

STAIR DETAIL

MEN

OUTDOOR STORAGE

CORRIDOR


E

D

C

B

A

2

1

2

3

4

EAST ELEVATION

5

6

VESTIBULE CORRIDOR

1

5

6

NORTH ELEVATION

3

4

2

3

E

G

D

C

1

SOUTH ELEVATION

B

A

4

WEST ELEVATION

F


NAIT Dormitory

The NAIT Dormitory is a three-story mixed-use building that consists of a coffee shop as well as, a student lounge and gym on the first floor where as, student residences occupy the second and third floor. The objective of the assignment was to create a full set of working drawing using AutoCAD® for a singular building from start to finish. A

1

C

B

D

2

E

STAIRS

2 KITCHEN

MECHANICAL RM.

JANITOR ROOM

EAST ELEVATION

D

C

MACHINE RM.

COFFEE SHOP EATING AREA

VESTIBULE

E

STUDENT LOUNGE

WOMENS

MENS

1

ELEVATOR

VESTIBULE

STUDENT GYM STAIRS

2

1

1

MAIN FLOOR PLAN PL

A

1

NORTH ELEVATION

A

B

C

D

B

C

D

E

S STAIRS SUITE

BARRIER-FREE SUITE

BARRIER-FREE SUITE

1

SOUTH ELEVATION

1

2

SUITE SUITE

STUDENT LOUNGE ELEVATOR ELEV

LAUNDRY

STAIRS

2

1

2ND FLOOR PLAN

2

WEST ELEVATION


6

4

PL

AN

SE

CT

2

DE

SE

TA

CT

IL

N

1

DE

IO

TA

N

DE

TA

2

IO

IL

3

A

IL

A

PL

AN

DE

TA

W

AL

IL

7 SE

LC

ON

ST

RU

CT

IO

N

LE

IO

N

4

GE

ND

7

PL

AN

5 SE

PL

AN

CT

DE

TA

B

CT

IL

IO

N

IO

N

DE

1

DE

TA

TA

CT

DE

IL

IL

2

TA

IL

A

8 SE

CT

IO

N

DE

TA

IL

6 SE

CT

1

IO

N

DE

TA

8

IL

PL

AN

DE

B

TA

IL

E

9 PL

AN

DE

TA

IL

P

D


Kelsie Brooker (780) 908-3726 kelsie21@gmail.com

Profile for kelsie brooker

Kelsie Brooker Portfolio- Architectural Technologist  

Kelsie Brooker Portfolio- Architectural Technologist  

Advertisement