TABLE OF CONTENTS

PORTFOLIO WOOD JOINERY

p.4

MIDREVIEW

p.9

FACADE STUDIES

P.14

FINAL DESIGN

P.18

COMPREHENSIVE DOCUMENTATION

SUSTAINABLE SITE DESIGN p.27 ORDERING SYSTEMS

p.35

p.40 CIRCULATION AND LIFE SAFETY

ACCESSIBILITY

p.43

STRUCTURAL SYSTEMS

p.46

p.49 BUILDING ENCLOSURE SYSTEMS

ENVIRONMENTAL SYSTEMS p.54


PORTFOLIO


JAPANESE WOOD JOINERY SHIHOU KOGUCHI KUMI TSUGI


Wood Joinery - Axonometric Drawing

PAGE 5


Wood Joinery - Orthographic Drawings

PAGE 6


Wood Joinery - Cut Process Diagram

PAGE 7


Wood Joinery - Drawing Board

Wood Joinery - Physical Model

PAGE 8


MID-REVIEW: INITIAL STRUCTURAL STUDIES

PAGE 9


INITIAL STRUCTURAL STUDIES

PERSPECTIVE

The arts district was once an industrial zone of Los Angeles that represented great harvest in the late 19th Century. As presented with the opportunity to make use of heavy timber wood, the building takes the motif of harvest by employing a tree like structure or a dendriform; henceforth, the project aimed to play a larger part in celebrating the tradition of wood through the expression of the ceiling as another plane for architectural and structural expression.

SITE PLAN

PAGE 10


SITE SECTION

MODULE SECTION

WORM’S EYE

STRUCTURAL MODULE

PAGE 11


STRUCTURAL DESIGN OPTIONS

MODEL PICTURES

PAGE 12


MIDREVIEW DRAWING BOARDS

PAGE 13


FACADE STUDIES


First Iteration - GFRC Panel Option

FACADE

STUDIES/ ITERATIONS

Initial iterations of the building facade were concerned with expression of branching through the use of GFRC panels; however, due to some structural and load concerns the idea was scratched and transformed in latter iterations. A Grasshopper script was used to generate these branch projections on the facade, where in vector were projected on surfaces and rotated on various intervals to produce the intended results.

Grasshopper Script

PAGE 15


Second Iteration - GFRC Panel Option

Third Iteration - Corten Steel Panel Option

PAGE 16


Third Iteration - Wall Section Axon

Third Iteration - Renders

PAGE 17


FINAL DESIGN

PAGE 18


Final Design For structural and aesthetic purposes, the final design iteration makes use of a corten steel panel facade that playfully and gesturally carries over the expression of the tree with a perforated screen detailing to allow for indirect lighting to envelope the interior spaces of the building. The facade, henceforth, becomes a graphic for the design’s intent.

Site Isometric

Physical model - Corten Steel Panel Shell

PAGE 19


Section Perspective

Office

Art Gallery

Workshops

Site Plan

PAGE 20


Floorplans

Art Gallery

Workshop

Lobby

Typical Office

PAGE 21


Detail Section

PAGE 22


Axon Chunk

PAGE 23


Model Pictures

PAGE 24


Drawing Boards

PAGE 25


COMPREHENSIVE DOCUMENT


SUSTAINABLE SITE DESIGN


ARCH 500aL Student: Keith Nathan Vincent So Tiu

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

Page 28


ARCH 500aL Student: Keith Nathan Vincent So Tiu

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

The softscape conditions along the site perimeter seem to be scant of any type of greenery thus design of the project allows for the implementation of establishing greeneries along the building perimeter to activate possible social activity and gathering.

Page 29


ARCH 500aL Student: Keith Nathan Vincent So Tiu

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

Page 30


ARCH 500aL Student: Keith Nathan Vincent So Tiu

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

SUMMER SOLSTICE 10 A.M.

SUMMER SOLSTICE 2 P.M.

SUMMER SOLSTICE 6 P.M.

Page 31

WINTER SOLSTICE 10 A.M.

WINTER SOLSTICE 2 P.M.

WINTER SOLSTICE 6 P.M.


ARCH 500aL Student: Keith Nathan Vincent So Tiu

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

Page 32


ARCH 500aL Student: Keith Nathan Vincent So Tiu

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

The strategy of site placement pushes the building towards the west side of the site boundaries to form a plaza/garden space on the east side and a courtyard on the north. By doing this, pedestrian flows is more direct between third street and the back alley.

Page 33


ARCH 500aL Student: Keith Nathan Vincent So Tiu

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

Garden/ Plaza space generation is justified on the east and north end of the building perimeter to activate social activity for pedestrians coming from third street or the back alley.

Page 34


ORDERING SYSTEM


ARCH 500aL Student: Keith Nathan Vincent So Tiu Jane Doe

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: ORDERING SYSTEMS Grade: HP P LP R

9” DENDRIFORM VARIANT

18” DENDRIFORM VARIANT

24” DENDRIFORM VARIANT

DENDRIFORM AGGREGATION

Page 36


ARCH 500aL Student: Keith Nathan Vincent So Tiu Jane Doe

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: ORDERING SYSTEMS Grade: HP P LP R

Page 37

16'-8"

0'-4"

13'-1"

0'-10"

9” Variant Tree Structure

9'-7"

Diagonal Connector Plate Two Way Steel Strut Connector Steel Strut-Beam Cap

18” Variant Tree Structure

18” Variant Tree Structure

18” Variant Tree Structure

24” Variant Tree Structure

Dendriform (n.) having the shapeor form of a tree

7'-11 21 "

0'-4"


ARCH 500aL Student: Keith Nathan Vincent So Tiu Jane Doe

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: ORDERING SYSTEMS Grade: HP P LP R

Page 38

ART GALLERY IS NESTED IN BETWEEN LOBBY AND OFFICE SPACE TO ALLOW FOR SEMI-PUBLIC ACCESS. FOR ACOUSTIC REASONS, WORK SHOP IS PUSHED UP TO THE TOP FLOOR SET ATOP THE THREE LAYERS OF OFFICES.


ARCH 500aL Student: Keith Nathan Vincent So Tiu Jane Doe

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: ORDERING SYSTEMS Grade: HP P LP R

Page 39


CIRCULATION AND LIFE SAFETY


ARCH 500aL Student: Keith Nathan Vincent So Tiu Jane Doe

Instructor:Rob Berry Date Due: 12/12/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: CIRCULATION AND LIFE SAFETY Grade: HP P LP R

Page 41


ARCH 500aL Student: Keith Nathan Vincent So Tiu Jane Doe

Instructor:Rob Berry Date Due: 12/12/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: CIRCULATION AND LIFE SAFETY Grade: HP P LP R

TYPICAL OFFICE PLAN

Page 42


ACCESSIBILITY


ARCH 500aL Student: Keith Nathan Vincent So Tiu

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlo/os-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: ACCESSIBILITY Grade: HP P LP R

Page 44

TWO ELEVATOR ACCESS TO EVERY FLOOR


ARCH 500aL Student: Keith Nathan Vincent So Tiu

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlo/os-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: ACCESSIBILITY Grade: HP P LP R

TYPICAL OFFICE PLAN

Page 45


JAPANESE WOOD JOINERY SHIHOU KOGUCHI KUMI TSUGI


ARCH 500aL Student: Keith Nathan Vincent So Tiu

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlo/os-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: ACCESSIBILITY Grade: HP P LP R

ADA COMPLIANT BATHROOM

Page 47


ARCH 500aL Student: Keith Nathan Vincent So Tiu

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlo/os-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: ACCESSIBILITY

7’-0”

Grade: HP P LP R

EGRESS SECTION

Page 48


STRUCTURAL SYSTEMS


ARCH 500aL Student: Keith Nathan Vincent So Tiu

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: STRUCTURAL SYSTEMS Grade: HP P LP R

Page 50


ARCH 500aL Student: Keith Nathan Vincent So Tiu

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: STRUCTURAL SYSTEMS Grade: HP P LP R

Page 51


ARCH 500aL Student: Keith Nathan Vincent So Tiu

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: STRUCTURAL SYSTEMS Grade: HP P LP R

Page 52


ARCH 500aL Student: Keith Nathan Vincent So Tiu

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: STRUCTURAL SYSTEMS Grade: HP P LP R

Page 53


BUILDING ENCLOSURE SYSTEM


ARCH 500aL Student: Keith Nathan Vincent So Tiu

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: BUILDING ENCLOSURE SYSTEMS Grade: HP P LP R

Page 55

The expression of the tree was playfully carried over into the reading of the facade with a sensitivity to the resiliency and fabrication of the tree as a graphic corten steel metal panel facade system with a perforated copper sheet to allow for natural lighting Other than its natural weathering properties, the corten steel panels have low solar reflectivity and ability to withstand temperatures of 200-400 D Fahrenheit.


ARCH 500aL Student: Keith Nathan Vincent So Tiu

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: BUILDING ENCLOSURE SYSTEMS Grade: HP P LP R

Page 56

2” Corten Steel Facade Panel

1” Curtain Wall System with 1.5” Air Gap

Steel Metal Tie-in with HSS Detail

1.5” x 2” Acoustical Sleepers Woodblocking with Galvanized Steel C-Channel Support System

5 PLY (6-7/8”) thick clt floor slab Corten Steel Planter


ARCH 500aL Student: Keith Nathan Vincent So Tiu

Instructor: Rob Berry Date Due: 12/12/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/19

COMPREHENSIVE STUDIO DOCUMENTATION: BUILDING ENCLOSURE SYSTEMS Grade: HP P LP R

Page 57

Interior detail of wood and metal facade support systems in project interior.


ENVIRONMENTAL SYSTEMS


ARCH 500aL Student: Keith Tiu

Instructor: Rob Berry Date Due: 12/14/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/14/19

COMPREHENSIVE STUDIO DOCUMENTAITION: ENVIRONMENTAL SYSTEMS Grade: HP P LP R

HVAC Diagram

Page 59


ARCH 500aL Student: Keith Tiu

Instructor: Rob Berry Date Due: 12/14/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/14/19

COMPREHENSIVE STUDIO DOCUMENTAITION: ENVIRONMENTAL SYSTEMS Grade: HP P LP R

SPRINKLER DIAGRAM

Page 60


ARCH 500aL Student: Keith Tiu

Instructor: Rob Berry Date Due: 12/14/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/14/19

COMPREHENSIVE STUDIO DOCUMENTAITION: ENVIRONMENTAL SYSTEMS Grade: HP P LP R

Page 61

LIGHTING DIAGRAM

4’-0” LENGTH 1-6” LED LIGHTING SYSTEM


ARCH 500aL Student: Keith Tiu

Instructor: Rob Berry Date Due: 12/14/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/14/19

COMPREHENSIVE STUDIO DOCUMENTAITION: ENVIRONMENTAL SYSTEMS Grade: HP P LP R

RCP 10’-0” DIAMETER SPRINKLER SYSTEM DIAGRAM

Page 62


ARCH 500aL Student: Keith Tiu

Instructor: Rob Berry Date Due: 12/14/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/14/19

COMPREHENSIVE STUDIO DOCUMENTAITION: ENVIRONMENTAL SYSTEMS Grade: HP P LP R

RCP 1.5” LED LIGHTING DIAGRAM

Page 63


ARCH 500aL Student: Keith Tiu

Instructor: Rob Berry Date Due: 12/14/19

Coordinator: Wahlroos-Ritter Date Submitted: 12/14/19

COMPREHENSIVE STUDIO DOCUMENTAITION: ENVIRONMENTAL SYSTEMS Grade: HP P LP R

RCP HVAC Diagram