B.

98

LEASE-LEASEBACK PROJECTS COMPLETED

60

MODERNIZATION PROJECTS

25

NEW CAMPUSES

TYPICAL NUMBER OF CHANGE ORDERS FOR A BALFOUR BEATTY LLB PROJECT?

|

LLB Qualifications & Experience

Over the past three decades, the construction industry has changed a great deal. With that change has come innovative new ways of executing project construction. Construction Manager @ Risk, Design-Build and Lease-Leaseback are just a few examples of delivery methods resulting from a change in industry needs. Balfour Beatty has been at the forefront with all of the current industry requirements and trends as various options to deliver projects have evolved.

Lease-Leaseback Having successfully completed 98 projects (25 in the last 7 years) utilizing the LeaseLeaseback delivery method, Balfour Beatty is one of the most experienced and knowledgeable construction firms of this delivery method. The flexibility afforded by the Lease-Leaseback delivery method allows Balfour Beatty to thoroughly review design documents with Ohlone College and the project architect, resulting in reduced change orders and skillfully completed projects that are on budget. We provide comprehensive preconstruction services, professional construction management, and solid field performance. One most recently completed project utilizing this delivery method is Del Norte High School. This 212,200 sf, comprehensive high school campus was constructed for the Poway Unified School District. It was designed under the Collaborative for High Performance Schools (CHPS) program. Balfour Beatty, as a direct result of effective collaboration between the design and construction teams, as well as the District, was able to complete this $104 million project two months ahead of schedule and $2 million under budget, for a final construction cost of $102 million. The Balfour Beatty team received a performance rating of ‘Outstanding’ on their past performance questionnaire. With our diversified resume, Balfour Beatty is capable of providing the services that best fit the needs of Ohlone College. The measure of Balfour Beatty’s success is evident in our extensive past experience utilizing a variety of delivery methods, and tailoring our services to deliver projects in the most efficient manner.

1

A CREDIT BACK TO THE OWNER! Utilizing the Lease-Leaseback delivery method, Del Norte High School was completed two months ahead of schedule and $2 Million under budget.

1

|

Qualifications


B.

|

LLB Qualifications & Experience

CMAR EXPERIENCE Southwestern Community College • One Stop Shop Student Services Center • Higher Education Center - Otay Mesa • High Education Facility- National City • Central Plant and Campus Wide Utility Loop • Turf Field Replacement Project • Devorre Stadium Field House (under construction)

Construction Manager at Risk (CMAR) Balfour Beatty has extensive experience providing CMAR services for numerous public agencies throughout California, including colleges, universities, schools, municipalities, and other public agencies. Having completed over 100 CMAR projects in the past 10 years in California, we bring tremendous experience providing preconstruction and construction services from a builder’s perspective. Our approach to CMAR projects is to push the limits of teamwork and integrate valuable lessons learned, proven techniques, and strong management systems and work collaboratively with Owners and designers to help manage the entire process and provide you all the information to make informed decisions with confidence.

Compton Community College • Stadium Renovations • Learning Resource Center CSU San Bernardino • College of Education • Science Building Renovations MiraCosta Community College • LRC-Library & Information Hub • Administration Building • Music Performance Hall • Creative Art & Music Replacement Building • Student Services Building/Counseling Transfer Center • Theater & Art Building Addition • Theater Renovation • Horticulture Building • San Elijo Student Center Mt. San Jacinto • Learning Resource Center • MVC Technology Building

At the Southwestern Community College Higher Education Center, Otay Mesa, the Balfour Beatty Construction team faced many challenges including an unforeseen soil condition delay that required rescheduling and resequencing of the buildings. Through the team’s management expertise, strong problem solving and communications with architect Martinez Cutri, they were able to mitigate the challenges and finish the project on time and with a change order rate of less than 1%. And this was before the days of change order reduction tools like BIM!

UC Riverside • Health Science Teaching Center • School of Medicine Research • Geology & Physics

2

|

Qualifications


B.

Design-Build Balfour Beatty is extremely knowledgeable and has extensive experience in the Design-Build delivery method. Our broad history of delivering projects for higher education and public sector clients has provided us with an impressive resume of experience, including more than 50 Design-Build projects to-date. We recently completed the San Francisco State University J. Paul Leonard & Sutro Library. Balfour Beatty was the design-builder on the $103.8 million dollar facility. The project won both the Design-Build Institute of America –Western Pacific Region 2012 Project of the Year and the Design-Build Institute of America 2012 Honor Award.

|

LLB Qualifications & Experience

SELECT DESIGN-BUILD EXPERIENCE • SFSU, J. Paul Leonard Library and Sutro Library • San Diego Community College District (SDCCD) Mesa College Fitness Center • San Diego Community College District (SDCCD) Mesa College Cafeteria/ Bookstore/Stockroom • Long Beach Community College District, Student Services Building • SDSU, Tony Gwynn Stadium • SDSU College of Arts & Letters • SDSU Gateway Center Building • CSU Los Angeles - Student Union • Alamo Community College District, San Antonio College Tobin Hill Mixed Use • Broward College Central Campus Parking Garage • Florida Atlantic University Innovation Village • Del Mar Union School District, Ashley Falls Elementary School • San Diego Unified School District, Herbert Ibarra Elementary School • School District of Osceola County, Osceola County School for the Arts

The Desgn-Build SFSU J. Paul Leonard & Sutro Library won both the Design-Build Institute of America –Western Pacific Region 2012 Project of the Year and the Design-Build Institute of America 2012 Honor Award.

3

|

Qualifications

• Oceanside Unified School District, Ivey Ranch Middle School


B.

|

Del Norte High School

LLB Qualifications & Experience

REQUEST FOR QUALIFICATIONS #6105-02 LEASE-LEASEBACK SERVICES FOR: ACADEMIC CORE BUILDINGS OHLONE COMMUNITY COLLEGE DISTRICT FREMONT, CALIFORNIA

ATTACHMENT RFQ-3 LLB QUALIFICATIONS & EXPERIENCE PROJECT DATA SHEET Instructions: Complete one project data sheet for each project submitted as part of RFQ Section 10B. Company Name: Balfour Beatty Construction 1. Project Name:

Del Norte High School

2. Project Location:

16601 Nighthawk Lane, San Diego, CA 92127

3. Owner’s Name:

Poway Unified School District

Address:

15250 Avenue of Science, San Diego, CA 92128

Phone/Fax:

phone: 858-521-2800 / fax: 858-486-4197

Contact/e-mail:

Mike Tarantino, Director of Facilities, Maintenance and Operations /email: mtarantino@powayusd.com

4. Architect/Engineer: NTD Architecture Contact/e-mail:

Phone: 858-565-4440

Jay Tittle, Principal / email: jtittle@ntd.com

5. Project Information: A. Start Date: May 2007 B. Original Completion date: June 2009 C. Approved extended completion date: N/A D. Actual Completion date: May 2009 E. Contract Amount: $ 102,500,000 F. Delivery Methods: Check delivery method used for construction of this project: X Lease-Leaseback ___ Design-Bid-Build ___

CM at Risk ___ Design-Build ___ Other _______________________________

G. If project is Lease-leaseback was financing provided to owner:______________ 6. Describe, briefly, the scope of the Project.

This ±212,000 sf, $104 million comprehensive high school campus was designed

and completed two months ahead of schedule as well as $2 million under budget. Features include 48 standard classrooms, 12 science labs, 5 art labs, 2 music classrooms, 5 special education classrooms, 1 drama classroom, 11 vocational education classrooms, 1 ASB classroom, 6 physical education classrooms, a sports stadium, swimming pool, library, research center, gymnasium, shower and locker facilities, performing arts complex, two-story administrative facility, food services and miscellaneous support facilities.

7. Provide any other pertinent Project information. Project was designed under the Collaborative for High Performance Schools (CHPS) program. The Balfour Beatty team received a performance rating of "Outstanding" on their past performance questionnaire.

4

|

Qualifications


Del Nor te High School

B.

|

LLB Qualifications & Experience

Del Norte High School Del Norte High School is the fifth comprehensive high school in the Poway Unified School District. Measuring over 212,200 square feet over 62 acres, the school serves grades 9 through 12 and was designed to accommodate approximately 2,250 students. Features of the school include 48 standard classrooms, 12 science labs, 5 art labs, 2 music classrooms, 5 special education classrooms, 1 drama classroom, 11 vocational education classrooms / labs, 1 ASB classroom, 6 physical education classrooms, a sports stadium, swimming pool, library, research center, gymnasium, shower and locker facilities, performing arts complex, two-story administrative facility, food services and miscellaneous support facilities.

5

|

Qualifications

Successful aspects of this project include a cost estimate that was within 1% of the actual value; the school was completed $2M under budget, allowing Balfour Beatty to return the money to the District for use in landscape upgrades; and the project was completed three months ahead of schedule. Balfour Beatty has provided project management, design assistance and quality control services on this project. Our firm also selfperformed approximately $10 million of concrete and framing work on this project. The school was designed under the Collaborative for High Performance Schools (CHPS) program, which provides students with an environment that is not only energy and resource efficient, but also containing the resources and amenities needed for a quality education.


B.

|

Redondo Union High School

LLB Qualifications & Experience

RFQ FORM

6

|

Qualifications


Redondo Union High School

B.

|

LLB Qualifications & Experience

Redondo Union High School This project has been completed in phases, beginning with Phase 1 completion in 2010. The project consists of the following phases: Phase 1: Student Services Center l Phase 2: Gym & Aquatics l Phase 3: Large Gym (Design-Assist) l Phase 4: Student Union (Design-Assist) Phase 5: Library (Design-Assist) l Phase 6: Science and Industrial Arts Building (Design-Assist). 7

|

Qualifications

The library consisted of partial demo and abatement of the existing library and associated science classroom. The existing library was remodeled with new finishes including everything from flooring to HVAC upgrades. The science classroom received new lab casework, resin tops, acid resistant flooring, acoustical ceilings, and overhead fire sprinkler system. The Science & Industrial Arts Buildings included the complete remodel of the existing science and industrial buildings.


B.

|

Sage Creek High School

LLB Qualifications & Experience

REQUEST FOR QUALIFICATIONS #6105-02 LEASE-LEASEBACK SERVICES FOR: ACADEMIC CORE BUILDINGS OHLONE COMMUNITY COLLEGE DISTRICT FREMONT, CALIFORNIA

ATTACHMENT RFQ-3 LLB QUALIFICATIONS & EXPERIENCE PROJECT DATA SHEET Instructions: Complete one project data sheet for each project submitted as part of RFQ Section 10B. Company Name: Balfour Beatty Construction 1. Project Name:

New Carlsbad High School at College and Cannon

2. Project Location:

Carlsbad, CA

3. Owner’s Name:

Carlsbad Unified School District

Address:

6225 El Camino Real, Carlsbad, CA 92009

Phone/Fax:

phone: 760-331-5000 / fax: 760-431-6707

Contact/e-mail:

Curt Huckins, Director Facilities, Ops, & Transportation / email: chuckins@carlsbadusd.net

4. Architect/Engineer: Roesling Nakamura Terada Architects Contact/e-mail:

Phone: 619 233-1023

Chikako Terada, Principal / email: terada@rntarchitects.com

5. Project Information: A. Start Date: October 15, 2010 B. Original Completion date: February 22, 2013 C. Approved extended completion date: April 5, 2013 - Substantial Completion & Owner Occupancy D. Actual Completion date: April 5, 2013 E. Contract Amount: $ 78,597,000 F. Delivery Methods: Check delivery method used for construction of this project:

X Lease-Leaseback ___ Design-Bid-Build ___

CM at Risk ___ Design-Build ___ Other _______________________________

G. If project is Lease-leaseback was financing provided to owner:______________ Local Bond Measure & State Matching Funds 6. Describe, briefly, the scope of the Project.

The school houses 1,500 students, and was built in two phases. The

first phase included mass grading of the 52 acre site, underground storm utilities, SWPPP for a Level 3 Storm Water Permit site, and the extension of the City roadway, College Road into the site. The second phase included the construction of administrative bldg., library & media center, classroom buildings, science labs, food services building and cafeteria, campus lawns, football/ soccer/la crosse fields, baseball & softball fields, and tennis courts, as well as gymnasium and locker rooms.

7. Provide any other pertinent Project information.

The site fell under a Level 3 State of California storm water permit,

due to the natural flow lines of the site, with storm water run off draining to the adjacent Calavera Creek. Two endangered species - the Least Bell Vireo bird and the gnat catcher added activity constraints to the already challenging project.

8

|

Qualifications


Sage Creek High School

B.

|

LLB Qualifications & Experience

Sage Creek High School The Sage Creek High School campus houses 1,500 students and was built in two phases. The first phase included mass grading of the 52-acre site, underground storm utilities, SWPPP for a Level 3 Storm Water Permit site, and the extension of the City roadway, College Road, into the site. The second phase included the construction of an administrative building, a library and media center, classroom buildings, science labs, a food services building and cafeteria, campus lawns, football/soccer/la crosse fields, baseball & softball fields, and tennis courts, as well as gymnasium and locker rooms. The campus was designed by the architect to create a dynamic balance of the crafted environment with nature. The architectural and site design fosters an intellectual understanding/experience of 9 | Qualifications natural systems. The learning spaces are diverse with many types

of indoor and outdoor venues. These spaces are intended to engage students and provide an inspirational atmosphere for learning. The site is approximately 56 acres with northern and eastern portions of the site left in a natural, undisturbed state. These undeveloped portions are intended to make a “seamless� edge with the Department of Fish and Game natural preserve beyond the state border. Demonstrations of balanced site designs are there for teaching purposes and to set an example for environmental studies. An example of this is the natural drainage path across the site, sloping from east to west. The drainage path is kept mostly intact with the native landscape/boulders to control the flow of water. The drainage is directed to a bio-swale to return the water to the aquifer.


B.

|

Foothill High School Science Center

LLB Qualifications & Experience

RFQ FORM

10

|

Qualifications


Foothill High Schoo l Science Center

B.

|

LLB Qualifications & Experience

Foothill High School Science Center The new 51,000 square foot, two-story Science Center includes classroom, biology labs, chemistry labs, a physics lab, staff prep rooms, restrooms, staff lounge, conference rooms and administrative offices. The radial shaped structure features special design elements that include radiused prep rooms, a radiused glass block stairway enclosure, and radiused tall shade structure. Energy-minded features include fabricated steel solar reflectors beneath windows to reflect incoming light from the north and fabricated steel shading devices above the south-facing windows. A landscaped courtyard contains circular planters that double as seating areas beneath mature palm trees. A special accent concrete paving (“lithocrete�) atom design is featured in the west end of the courtyard at the base of a custom-fabricated atomic sculpture. Because funding for this project was especially tight, we supported the District in fundraisers to augment the allocated Measure G Bond funds. When the trade bids came in below the estimate, we worked with the District to further refine reductions in cost in order to maximize the value in the available funds. 11

|

Qualifications