Page 1

PORTFOLIO|

Semester Jan – May 2018

|Kow Jia Chiun | 1001747820 | AR415 Architecture Design Studio IV | B.Sc. (Hons) in Architecture | UCSI Unversity |


INDEX


Project 1 <

Design by Research << Project 2 <

Design Strategy

<<

Project 3 <

The Market <<


PROJECT 1|

Design by Research


Task 1 <

Market Engagement << Task 2 <

Site Context << Task 3 <

Site Context Model <<


PROJECT 1 | DESIGN BY RESEARCH

01

MARKET ENGAGEMENT

TASK

The students were in a group to work on the main project site - Pasar Sentul Market. The market has explored inside out and all the activities had been recorded. Students had understood how Pasar Sentul market functions from day to night. After the site research & visit, the understanding has been expressed on A1 size montage.

The intention of the montage is to express the old & new development of Pasar Sentul Market through the application of different materials. Some materials applied were collected on site to show the nostalgic & modern sense on site.

1


PROJECT 1 | DESIGN BY RESEARCH

02

SITE CONTEXT

TASK

All the existing site context & the socioeconomic of the area had been captured & compound into A4 size report.

The report had included

Site

covered Research,

9 topics which Site

Analysis,

Topography, Road Circulation, Building Types, Civic & Public Amenities, Main Source Income, Locally Source Material Workshop & Critical Review.

2


Site Research (Sentul History)


PROJECT 1 | DESIGN BY RESEARCH

Site Analysis (Sun)

9am

12pm

3pm

6pm

3


Site Analysis (Wind, Humidity & Rainfall)


PROJECT 1 | DESIGN BY RESEARCH

Site Analysis (Noise & Smell)

4


Topography


PROJECT 1 | DESIGN BY RESEARCH

Road & Circulation (Traffic Flow)

Traffic Condition

5


Road & Circulation (Pedestrian Routes) Pedestrian Density


PROJECT 1 | DESIGN BY RESEARCH

Road & Circulation (Vehicle Routes) Traffic Flow

6


Building Types


PROJECT 1 | DESIGN BY RESEARCH

Civic & Public Amenities

7


Main Source of Income (Residents)

63% - Paid employment by private income source or government

15.6% - Self-employed

12.9% - Income through property investment

8.5% - Earnings through fixed deposit account


PROJECT 1 | DESIGN BY RESEARCH

Locally Source Material Workshop

8


PROJECT 1 | DESIGN BY RESEARCH

Critical Review Sentul as a town located close to the city centre with a majority population of Indians is now improving itself with more upcoming developments. There are lots of new developments such as medium cost condominiums, high end skyscrapers, gated and guarded communities and etc. can be found within Sentul.

But then, the traditional cultures of Sentul had been engulfed slowly by the existing of new developments. Most of the market and farm have been slowly replaced by the new development projects. The "Original Face" of Sentul should be preserved at the same time when the town is developing to ensure the new generations are still able to know the meaning and the importance of the traditional culture and its historical stories.

9


PROJECT 1 | DESIGN BY RESEARCH

03

SITE CONTEXT MODEL

TASK

A final plaster site model with scale 1:500 has been produced. The main market building has been taken out as to replace with the new design proposals on later stage.

Through this task, students learnt how the reinforced the plaster model properly with chicken wire mesh & cast the plaster model properly by mixing the plaster & water with correct ratio.

10


PROJECT 2|

Design Strategy


Task 1 <

Site Context (Programme) << Task 2 <

Site Visit (Kuala Terengganu)

<<

Task 3 <

Form-Making << Task 4 <

Spatial Quality <<


PROJECT 2 | SITE CONTEXT

Programmatic Diagram

01 TASK

SITE CONTEXT - PROGRAMME -

With the chosen site context, student started to look into the site strategies and proposed program that eventually would complement to the existing Market. All the research done under Project 1 had been reflected.

The new proposed program is food arena & mini event square. This is due to market as a place for people to get fresh food ingredients & fresh food. The mini event square is the key to connect the market with its neighborhood & ensure its activities from day to night. The mini event square can be a place for citizens to exercise (dance, zumba, yoga & etc.) or as an event venue for celebrations, parties, wedding & religion activities.

11


PROJECT 2 | SITE CONTEXT

02 TASK

SITE VISIT - KUALA TERENGGANU -

From the site walk around Kuala Terengganu, a scene has been captured & the technique of montage has been applied to the chosen scene to develop the understanding towards a market & its architecture value.

The chosen scene was the entrance of Pasar Payang at Kuala Terengganu. It was chosen because the uniqueness of each entrance connecting different sections of Pasar Payang from different directions. These made the interior spaces of the market to be different from each another with different sections. This helped to control the circulation of the visitors with their needs.

12


Form Diagram


PROJECT 2 | SITE CONTEXT

03

FORM-MAKING

TASK

This task required rigorous experimenting with sketches,

roughly

scaled

plan,

sections,

elevations & roughly scaled models (1:500). The proposals were placed to the site plaster model and

negotiate

with

the

immediate

site

surrounding.

13


PROJECT 2 | SITE CONTEXT

04

SPATIAL QUALITY

TASK

The existing market is separated into 4 parts & did not seem like one piece from exterior, the only feature connecting them is the small alley in the interior which can only be discovered in the internal spaces of the market. The new proposal is to strengthen the connection of the 4 parts of the market which are indoor, semiindoor & outdoor by using the elevated platform & linked bridge.

14


PROJECT 3|

The Market


Task 1 <

Measured Drawings & Existing Traders << Task 2 <

Functional Spaces << Task 3 <

Building Form << Task 4 <

Technical Consideration << Final Presentation <

Final Presentation Board << Final Model <<


PROJECT 3 | THE MARKET

01 TASK

MEASURED DRAWINGS & EXISTING TRADERS

A group task to conduct measured-drawings on the existing building and landscape within the

boundary.

All

existing

interior

space

configuration need to be mapped out.

Students revisited Pasar Sentul Market and spoke to the local existing traders to really understand

how a

market functions. The

synergy of Pasar Sentul Market were mapped out with food diagram, people movement, sectional, conversation, stall kiosk, carbon footprint, scale and etc. in a tangible way.

15


PROJECT 3 | THE MARKET

16


Layout Plan


PROJECT 3 | THE MARKET

02

FUNCTIONAL SPACES

TASK

The most suitable previous proposed program from Project 2 had been expanded to build up a proposal with existing total build-up area of 600m² & minimum 2-storey.

17


Sections


PROJECT 3 | THE MARKET

Sectional Perspectives

18


WET MARKET Vegetable session at the main entrance from Jalan Sentul.

WET MARKET View from vegetable session to the poultry session & dry market.


PROJECT 3 | THE MARKET

WET MARKET Poultry & meat session.

NON-HALAL MARKET Non-halal market selling pork at the side entrance.

19


DRY MARKET Dry groceries stall located at the first floor next to the admin office.

THE CORRIDOR The corridor connecting the catering area & dry market.


PROJECT 3 | THE MARKET

OUTDOOR CATERING AREA Outdoor catering area with the street view of Jalan Sentul.

STREET & CONNECTION Entrance from the street connecting to ground floor & first floor of Pasar Sentul Market.

20


PROJECT 3 | THE MARKET

03

BUILDING FORM

TASK

Series of sketch models with the scale 1:500 were done to test out the spatial configuration. The external facade design had been explored with the considerations of natural lighting, air ventilation & its aesthetic value.

21


Elevations


PROJECT 3 | THE MARKET

Elevations

22


Street View 01


PROJECT 3 | THE MARKET

Street View 02

23


PROJECT 3 | THE MARKET

04

TECHNICAL CONSIDERATION

TASK

Passive design has been applied to the proposal with the application of expanded metal panel in order to bring in more natural lighting into the internal spaces and enhance the air ventilation of Pasar Sentul Market.

The

existing

preserved architecture

ventilation to

blocks

showcase

style

of

the

had

the

been original

market.

The

combination of the existing concrete structure & expanded metal panel has brought out the meaning of inherited culture that survived in the new development.

24


Final Presentation Board


PROJECT 3 | THE MARKET

Final Model

25

Architecture Portfolio by Kow Jia Chiun  

Architecture Semester 4 Portfolio (Pasar Sentul Market)

Architecture Portfolio by Kow Jia Chiun  

Architecture Semester 4 Portfolio (Pasar Sentul Market)