Issuu on Google+

A BETTER WAY

TO BUILD


JTS MODULAR: THERE’S NO COMPARISON Classroom

Elastomaric Stucco Siding Solar Option

3/4 moisture resistant roof diaphragm

Standing seam metal roof

Built in Gutter

Tackboard over gyp board

Down spout in Column

T-Bar Ceiling

7Ft. Walkway

Concrete or Wood Flooring

Split Face CMU veneer

Dry Well

Concrete Stem wall Footing

Store Front Window System (Optional)

Compare JTS to other manufactures

COMPETITION

Permanent Modular School Manufacturer

JTS is 75% heavier in the structural steel (JTS – 6,800lb, Competition – 3,900)

Solar standard on all JTS Modular Buildings

R-19 (JTS) insulation on walls compared to R-13 (Competition)

Ceiling heights 9’ (JTS) vs. 8’-6” (Competition)

Light gauge framing (JTS) vs. wood framing (Competition)

Floor Joist 16” o.c. (JTS) vs. 48” o.c. (Competition)

Foundation system is considerably more sound on

6,800 lb of structural steel

Completely customizable campus, classroom, [75% buildings heavier] restroom, concession, library, and administration Concrete floors, high efficiency heating unitson and walls R-19 insulation fixtures, natural lighting option and 9 ft plus ceilings

9' ceiling heights Light gauge framing Comprehensive full service lease-leaseback contractor 16" o.c. floor joist Full service electrical division FoundationFinancing system considerably more sound and funding procurement assistance PC 2'x6' wall framing HSS 5'x5' x 3/8' column 1 1/8" floor plywood sheathing Roof joist at 24" o.c. Industry leading design capabilities

ALSO

Permanent modular school manufacturer Completely customizable campus, classroom, restroom, concession, library, and administration buildings Concrete floors, high efficiency heating units and fixtures, natural lighting option and 9' plus ceilings

   

3,900 lb of structural steel

R-13 insulation on walls 8'6" ceiling JTS PC vs. simplified systemheights presented by Competition 2x6 JTS wall framing (JTS) vs. 2x4 framing (Competition) Wood framing HSS 5x5x3/8” column (JTS) vs. HSS 4x4x5/16” (Competition) 48" o.c. floor joist 1-1/8” floor plywood sheathing (JTS) vs. ¾” plywood sheathing. (Competition) Roof Foundation joist @ 24” o.c. (JTS) vs.system 48” oc. (Competition) not as sound Simplified system 2'x4' wall framing HSS 4'x4' x 5/16' column 3/4" floor plywood sheathing Roof joist at 48" o.c.

Comprehensive full-service leaseleaseback contractor Full service electrical division Financing and funding procurement assistance Solar standard on all JTS modulars Industry leading design capabilities


JTS MODULAR: YOUR COMPLETE CONTRACTOR In addition to designing and manufacturing completely custom modular buildings, JTS Modular is proud to offer many other services. DESIGN DEPARTMENT

Our design department offers complete building design and site design consulting.

ESTIMATING DEPARTMENT

Our general contracting estimating offers budgetary estimate stages at conceptual, 50% design, 75% design and final estimates.

CONSTRUCTION MANAGEMENT DEPARTMENT

We also offer sitework construction management from conception to occupancy. From grading and site utility installation to concrete, asphalt, and site-built structures, we will continue to help out with warranty issues.

JTS Modular offers complete lease-leaseback construction services with construction professionals specializing in school site construction.

To find out more about our lease-leaseback construction services, please contact one of our sales representatives: (661) 578-2285 [adame@jtsmodular.com] Adam Engler (559) 318-0833 [tomgiampietro@comcast.net] Tom Giampietro (661) 904-8944 [davea@jtsmodular.com] David Albee (661) 835-9270 Office


PHOTO VOLTAIC

& SOLAR SYsTEM OPTIONS

ATTRACTIVE|DURABLE|FUNCTIONAL

why does solar pay off now?

PERMANENT BUILDING QUALITY Adam Engler (661) 578-2285 Adame@JTSModular.com AT MODULAR BUILDING PRICES

Solar immediately lowers or eliminates your monthly electric bill! JTS will provide you with a comprehensive analysis showing the saving generated by a new photo voltaic solar system.

In-plant Poured Concrete Floor Wasco High School Classroom Wing

Instead of renting your 2 Story Multi Classroom Bathroom Building electricity from your utility company, you can now have your own clean energy solar system. Producing your own clean energy In-plant Fully Assembled Exterior View Vandal Resistant Bathroom Building is environmentally friendly, Photovoltaic Solar System Options financially rewarding, and reduces your dependence on local and ANALYSIS INCLUDES Permanent Building Quality at Modular Building Prices Attractive * Durable * Functional state utility companies. INTERNAL RATE OF RETURN COST OF SOLAR VS. NO SOLAR

In-plant Fully Assembled Interior View

CURRENT AND FUTURE CASH FLOW ANALYSIS

NET ANNUAL SAVINGS

7001 McDivitt Dr., Suite B, Bakersfield, CA 93313

LIFE-CYCLE PAYBACK~ Fax: Phone: 661-835-9270 661-847-1007 ANNUAL SAVINGS BEFORE, AFTER INCREASED RESALE VALUE STATE AND FEDERAL INCENTIVE ANALYSIS

PAYBACK

ADDED VALUE AND EQUITY OVER TIME


HOLD FAST TO MODULAR ALTERNATIVES MODULAR DESIGN AFFORDS 2 STRUCTURAL SYSTEMS SHEAR WALL

(Simple lateral resistive system)

Typical plywood diaphram with studs Defined openings No special testing Majority of school facilities use this system High energy performance (wood is a good insulator)

Very cost effective to build Limited to length and width ratios Limited size

MOMENT FRAME

(Complex lateral resistive system)

All steel construction Requires special testing Requires special inspections (Mil certifications) Superior flexibility Unlimited size Think about end-use before you define your structural system. A media center may not need a lot of exterior glass & may be well-suited for shear wall.

Layout designs no longer confined to 12' wide x 40' long. Revised transportation limits allow for 15' wide x 72' long x 18' high, giving you the opportunity to experiment with more creative design options. Curved walls or more intricate shapes are no longer outside the realm of possibility.


ULTIMATE DESIGN CAPABILITIES JTS has changed the standards in modular manufacturing. COMMON EXPECTATION: Modular buildings are poorly constructed, non-energy efficient grey boxes built as a temporary solution.

TRUTH: Permanent modular building having limitless design capabilities and precision engineering with indistinguishable characteristics as site-built buildings.

a d d it i o n a l f e at u r e s PHOTO VOLTAIC SOLAR SYSTEMS The ultimate in affordable renewable energy systems is now available at JTS! JTS has a factory authorized direct designer and installer of PV solar panels, inverters and components. Our solar option is offered on all of our new modular buildings. Ask our sales representatives for more information. Our system is a Direct-to-grid System that supplements your utility needs during occupancy or banks your extra energy by returning it to the grid. Your electric meter actually spins backwards! While your buildings are not in use during the summer months, your PV system is working for you by selling kilowatt hours back to your utility company. Most energy providers now offer significant rebates for an alternative energy system and, of course we can’t ignore the environmental benefits provided by clean, free sunshine. (661) 578-2285 [adame@jtsmodular.com] Adam Engler (559) 318-0833 [tomgiampietro@comcast.net] Tom Giampietro (661) 904-8944 [davea@jtsmodular.com] David Albee (661) 835-9270 Office


wasco high school [WASCO, CALIFORNIA]

classroom and restroom 27 modular classrooms 3 modular bathrooms


oro grande elementary campus

[ORO GRANDE, CALIFORNIA] ORO GRANDE ELEMENTARY CAMPUS

[oro grande, california] PHASE ONE [1] 36 x 40 building [5] 24 x 40 classrooms [3] 48 x 40 M/U buildings [1] 30 x 32 restroom [11,520 total ft2]

PHASE TWO [15] classrooms [1] 40 x 48 band room [2] 30 x 32 restrooms [18,240 total ft2] 36' x 40'

36' x 40' 32' X 30' 36' x 40'

24' x 40'

48' x 40'

24' x 40'

48' x 40'

24' x 40'

48' x 40'


riverside preparatory school [ORO GRANDE, CALIFORNIA]

4O,OOO square feet


KERMAN UNIFIED sCHOOL DISTRICT [KERMAN, CALIFORNIA]

new elementary school ORIGINAL SITE BUILT PROJECT BUDGET INCLUDED 3 classroom wings 1 administration building 1 multi-purpose building 1 kindergarten building

NEW PERMANENT MODULAR PROJECT BUDGET INCLUDED 4 classroom wings 1 administration building 1 multi-purpose building 1 kindergarten building

2 baseball fields with 400-seat bleachers 1 concession/restroom 88 KW photo voltaic solar

After going with JTS Modular’s permanent After going with JTS Modular’s permanent After going with JTS Modular’s permanent modular buildings, why would Iwould ever go back toback modular buildings, why i ever go modular buildings, why would I ever go back to site built? The quality is just as good, if good, not to site built? The quality is as just as site built? The quality is just good, if notif not better, and it is less expensive better, and significantly less expensive better, and ititsignificantly isissignificantly less expensive than conventional construction. than conventional construction. than conventional construction.

-JA MM ES LE JA E SF O FO LY EY

assistant superintendant assistant superintendant

KSUD was able to maximes theirtheir space, add additional structures, increase theirtheir greengreen areas, decrease theirtheir carbon KSUD was able to maximes space, add additional structures, increase areas, decrease carbon footprint and save over over $5,000,000 by switching to a permanent modular campus instead of site Now...so can you! footprint and save $5,000,000 by switching to a permanent modular campus instead of built. site built. Now...so can you!


INYO COUNTY OFFICE OF EDUCATION Inyo County Office of Education

CALIFORNIA]

6X6

4040

51"

6X6

4040

CRIPPLE: 84-3/4" 48"

4'-0"

4X6

51"

6X6

4040

CRIPPLE: 84-3/4" 4X6

CRIPPLE: 33 14 "

51"

48"

48"

4X6

CRIPPLE: 33 14 "

99"

6X8

8040 CRIPPLE: 84-3/4"

CRIPPLE: 84-3/4"

CRIPPLE: 33 14 "

14'-10

1 4"

Administration building [INDEPENDENCE,

9'-10 41 "

Project Name:

96"

4X6

CRIPPLE: 33 14 "

3'-10 21 "

7'-10 21 "

12'-0"

24'-0" 1 2"

15'-10

27'-10

1 2"

24'-0" 60'-0"

LEFT SIDEWALL FRAMING TEMPLATE

administration building N M

L

K

J

I

H

A B

C D

E

F

G

L

R

6,200 square feet design/build 6,200 s/f Design / Build Administration Building

JOB # 03-710 INYO COUNTY ADMINISTRATION BLDG. SIDEWALLS


roject Name:

TRANSBAY TRANSIT TERMINAL [SAN FRANCISCO, CALIFORNIA] Transbay Transit Terminal 8,500 s/f transit terminal downtown San Francisco

TRANSIT TERMINAL 8,500 square feet


M:\05-10 Master Project File\2010 Projects\Grimmway Academy\Grimmway Academy - Cad Design\01 (Job Name) Preliminary Design\Restroom\12x40 Restroom Building.rvt

grimmway academy

[ARVIN, CALIFORNIA]

40' - 0"

D

A

B

1

1

C

1

1

F

F

2

TYP

R

2'

4

AA-6.30

48" MIN

TYP

TYP

L 1

2

TYP

3

L 1

48"

" -6

8

4

2'

" -6

12' - 0"

R

1

6

2

MENS 180 SF

3

AA-3.30

5

" -6

S 1

42"

WC 1

TYP

12"

12"

TYP

2 TYP

TYP

U 1

48" MIN

WC 1

36" MIN

CUSTODIAL 55 SF AA-3.30 7

11

2'

AA-3.30 10

9

WOMENS 180 SF

12

R

42" MIN

MAX

2

3

2

TYP

TYP

TYP

FIRE SPRINKLER RISER

2

1

PLUMBING FIXTURES - SEE PLUMBING PLAN

RESTROOM ACCESSORIES - SEE INTERIOR ELEVATIONS

BUILDING MODLINE TYP.

KEYNOTES 2

FLOOR ACCESS - SEE FOUNDATION PLAN

FLOOR VENTILATION - SEE FOUNDATION PLAN

3 4 5

Ɣ A BETTER WAY TO BUILD Ɣ

MODULAR INC.

JTS

Ɣ

Ɣ

RENEWAL

3-31-11

No. 16825

O F CA L I F O

RN

SHEET NAME.

Restroom Building Floor Plan

AA-1.30

SHEET NO.

Ɣ

COMMERCIAL INSTITUTIONAL AND RESIDENTIAL MODULAR BUILDINGS DESIGN & PLANNING Ɣ

7001 Mc Divitt Dr. Bakersfield, CA 93313 Office: (661) 835-9270 Plant: (661) 833-2940 Fax: (661) 847-1007 www.jtsmodular.com

E

AR

D A RCH I NSE T CE D WA T E R E

AT

CT A N M

E

5

IA

DATE: 3/24/2011 9:06:41 AM

LI

ST

Restroom - Floor Plan 3/8" = 1'-0"

JOB NUMBER:

DATE:

GRIMMWAY ACADEMY CHARTER SCHOOL CHECKED BY:

E DW

DRAWN BY:

33" 33" 35" 87 1/2"

6" MAX

12x40 RESTROOM BUILDINGS (3) As indicated SCALE:

A

B

1

36" MIN

REVISIONS DECRIPTION:

CLIENT NAME: RLG Land Foundation

86 1/2" 35"

36"

6"

14,200 square feet classrooms 4,160 square feet kitchens 3,600 square feet multi-purpose 960 square feet storage space Slab on grade campus 24" MIN 18"

3,600 square feet library/computer lab 1,440 square feet restroom buildings 30" MIN 12" MIN

2,160 square feet admin. office 30" MIN 30"

29,500 square feet 30" 18" MIN 18" MIN 30"

17' - 5" 5' - 5 1/2" 17' - 1 1/2"

6' - 0 1/2" 0' - 5" 6' - 0 1/2"


san jacinto community college [SAN JACINTO, CALIFORNIA]

SAN GORGONIO PASS CAMPUS A-2.00

1

Project Floor Plan 1/4" = 1'-0"

1


einstein bros bagel company [HAYWARD, CALIFORNIA]

JTS

MODULAR INC.

Ɣ A BETTER WAY TO BUILD Ɣ

COMMERCIAL INSTITUTIONAL AND RESIDENTIAL MODULAR BUILDINGS DESIGN & PLANNING

A-2.00 3

1

Ɣ

2 30' - 0" 15' - 0"

3' - 0"

10' - 0"

5' - 11"

9' - 1"

2

Room 9' - 0"

Ɣ

Restroom

166 SF

71 SF

3

30' - 0"

3

4

A-2.00

Enter address here

A

Ɣ

CSUB - East Bay Bagel Building

15' - 0" 2' - 0"

Ɣ

7001 Mc Divitt Dr. Bakersfield, CA 93313 Office: (661) 835-9270 Plant: (661) 833-2940 Fax: (661) 847-1007 www.jtsmodular.com

3

D A RCH I NSE T CE D WA T E E AR

LI

16' - 0"

AN

E DW

RM

No. 16825 3-31-11

0' - 7 1/2"

RENEWAL

E

IA

ST

AT

O F CA L I F O

RN

3' - 4"

10' - 7 1/2"

0' - 7 1/2"

SHEET NAME.

Floor Plan SHEET NO.

A-1.00

1/4" = 1'-0" SCALE:

DATE: 8/18/2010 5:07:20 PM

Author

2 A-2.00

JOB NUMBER:

Project Number

REVISIONS DECRIPTION:

0' - 10"

CHECKED BY:

13' - 11 1/2"

DRAWN BY:

0' - 7 1/2"

DATE:

1

CLIENT NAME:

B

CT

21' - 0"

Room 573 SF


typical state school building funding process FROM THE OFFICE OF PUBLIC SCHOOL CONSTRUCTION START DISTRICT SUBMITS APPLICATION FOR ELIGIBILITY DETERMINATION TO THE OPSC

OPSC PROCESSES ELIGIBILITY APPLICATIONS FOR SAB APPROVAL

SAB APPROVAL

DISTRICT SUBMITS FUNDING APPLICATION INCLUDING DSA AND CDE APPROVED PLANS OT THE OPSC

OPSC PROCESSES APPLICATIONS FOR SAB APPROVAL AND FUNDING FOR GRANT ALLOWNACE AND SITE

FINISH opsc performs audit

district submits expenditure reports to the opsc

project construction

opsc releases grant amount upon evidence of district match and construction contract

sab approval unfunded approval certification filing sab apportionment



brochure bidner